This Mission-Essential Contractor Services Plan is for maintaining radio towers services at FE Warren Air Force Base in Wyoming, prepared for Solicitation/Contract No. FA461325Q0027. The document outlines procedures for continuing essential radio tower maintenance services during crisis periods, specifically for the 90th Missile Wing. The plan requires the contractor to detail provisions for acquiring essential personnel and resources, addressing challenges like pandemics, managing personnel availability, establishing communication protocols, and maintaining operations during adverse conditions.
The mission-essential service involves maintenance of radio towers at 5 Mission Aerospace Facilities (MAFs) and Building 3650, with pricing to be set at the current contract rates at the time the plan is activated. The contractor must develop internal quality control procedures and continue services until the Contracting Officer directs cessation of the plan. The document is structured to ensure continuity of critical radio tower maintenance services for up to 30 days or until normal operations can be resumed during potential crisis scenarios.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment #5 Solicitation/Contract No: FA461325Q0027
Mission-Essential Contractor Services Plan for
Maintain Radio Towers
Services
FE Warren AFB, WY 04 September 2025
Solicitation/Contract No: FA461325Q0027
1. INTRODUCTION. This Mission-Essential Contractor Services Plan has been developed in accordance with DFARS Clause 252.237-7023 – Continuation of Essential Contractor Services.
It addresses how [Insert Name of Contractor] will continue providing the mission-essential radio towers maintenance services identified in the solicitation during periods of crisis, upon notification by the Contracting Officer (CO) to activate the plan.
2. OBJECTIVE. In support of the 90th Missile Wing, the objective is to provide mission-essential radio towers maintenance services for FE Warren AFB, WY during a crisis. The essential contractor services are identified below and will be performed at the prices in the contract at the time the plan is activated.
3. CONTRACTOR PROCEDURES. Contractor MUST answer the following in this plan:
a. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed;
1)
b. How you will address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves (i.e. list efforts taken to maintain sufficient level of staff and ensure adequate supplies);
1)
c. How you will address time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site (i.e. discuss actions/time needed to get personnel and resources in place, actions to expedite the process, ability to work extended hours if base access is restricted);
1)
d. How you will address components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home (i.e. list actions that can be performed remotely, contract manager duty location, etc);
1)
e. How you will establish an alert and notification procedure for mobilizing identified “essential contractor service” personnel (i.e. explain if alert/notification will be made after Government direction and means of notification, etc); and
1)
Solicitation/Contract No: FA461325Q0027
f. The approach you will use for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis (i.e. explain means of communication, use of Quality Control Plan, checklists, or other additional duties).
1)
g. Identify how you will conduct plant operations to overcome adverse conditions and situations, such as significant weather situations, employee illnesses, or unexpected vacancies (i.e. explain means of maintaining operations if weather limits travel or loss of employees).
1)
4. PRICING. The mission-essential [contract title] services are identified in paragraph 5 and will be paid at the prices in the contract at the time the Plan is activated. The prices will also be used as the basis for any equitable adjustments resulting from the activation of the Plan.
5. Mission-Essential Contractor Services.
CLIN
Description of Service Qty Unit Unit Price Total Price
0001 Maintenance of Radio Towers at 5 MAFs and Bldg 3650 1 JO Current
Price Current Price
6. QUALITY CONTROL PLAN (QCP). The contractor shall utilize its own internal QCP during the performance of this plan.
7. DEACTIVATION OF PLAN. [Insert Name of Contractor] shall perform the mission-essential contractor services during a crisis until notified by the CO to cease performance of the Plan.
SIGNATURE PAGE
Contractor Point of Contact:_______________________________________
Phone Number(s):_______________________________________
Email Address:_______________________________________
Date:_____________________________
File details come from the government source that posted it. Updated .