Atch 4 Calculation of Contractor Self Performed Work.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Z1DA--626A4-23-203 - Upgrade Fire Alarm System
- Solicitation number
- 36C24925R0005
About this file
This is a calculation template spreadsheet that contractors must complete to demonstrate compliance with self-performance requirements for Service Disabled Veteran Owned Small Business (SDVOSB) contractors under solicitation 36C24925R0005. The template requires SDVOSB contractors to show that at least 15% of personnel costs will be performed by either the SDVOSB prime contractor or verified SDVOSB subcontractors.
The spreadsheet format includes columns for specification divisions, small business vendor status, personnel costs, and material/equipment costs for both prime and subcontractors. It requires calculation of subtotals, profit, home office overhead, and bond costs to arrive at a grand total. The template includes a specific calculation section to determine the percentage of self-performed personnel costs by comparing total personnel costs against non-SDVOSB subcontractor personnel costs. Personnel costs are defined to include laborers, mechanics, tradesmen, and direct-charged office personnel such as project managers, superintendents, administrators, and estimators.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch 11 Sign in Sheet 03122025.pdf | ||
| 36C24925R0005 0001.docx | DOCX document | |
| Atch 2 Drawings 03112025.pdf | ||
| Atch 3 Specifications 03262025.pdf | ||
| Atch 1 WD Rutherford County Building TN20240187 dated 03142025.pdf | ||
| Atch 12 Geotech Report 05162023.pdf | ||
| Atch 1 WD Rutherford County Building TN20240187 dated 01032025.pdf | ||
| Atch 5 Contractor EMR Certification Form.docx | DOCX document | |
| Atch 10 RFI Form.docx | DOCX document | |
| Atch 3 Specifications 103124 Final.pdf | ||
| 36C24925R0005_3.docx | DOCX document | |
| Atch 7 Past Performance Questionnaire.docx | DOCX document | |
| Atch 6 General Conditions Breakout.xlsx | XLSX spreadsheet | |
| Atch 2 Drawings 09272024.pdf | ||
| Atch 9 TAX ID UEI Document.docx | DOCX document | |
| Atch 8 Price Breakout Schedule.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK 36C24925R0005 | |||
| Offerors for Contractors (NAICS code 236220) must provide at least 15 percent (general construction) of the cost of the contract performance incurred for personnel must be performed by the Service Disabled Veteran Owned Small Business (SDVOSB) awardee or those of a verified SDVOSB subcontractor. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format. | |||
| Specification Division | SB Vendor (Y or N) | Personnel Cost | Material/Equipment Costs |
| Prime | $0.00 | $0.00 | |
| Sub | $0.00 | $0.00 | |
| Sub | $0.00 | $0.00 | |
| Sub | $0.00 | $0.00 | |
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||
| $0.00 | $0.00 | ||
| (Add additional lines as necessary for each Division applicable to this project) | $0.00 | $0.00 | |
| Sub Total (Personnel Costs, Material /Equipment Costs) | $0.00 | ||
| Percentage | 0 | Profit | $0.00 |
| Percentage | 0 | Home Office Overhead | $0.00 |
| Percentage | 0 | Bond | $0.00 |
| Grand Total | $0.00 | ||
| Calculation of self-performed personnel costs: | |||
| 1. Total personnel costs * both prime and all subcontractors: | $0.00 | ||
| 2. Subtract all subcontractor personnel costs* that are not SDVOSB | |||
| companies that will perform work on this contract: | $0.00 | ||
| 3. Remainder is ‘Total amount of work to be self-performed under the | |||
| Contract: | $0.00 | ||
| 4. Self-performed work = Line 3/Line 1 x 100 = | ERROR:#DIV/0! |
| *personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to |
| the project (includes project manager, job superintendent, administrative, estimators, etc.) |
File details come from the government source that posted it. Updated .