Atch 1 WD Rutherford County Building TN20240187 dated 01032025.pdf
PDF 2 MB Posted
- Attached to
- Z1DA--626A4-23-203 - Upgrade Fire Alarm System
- Solicitation number
- 36C24925R0005
About this file
This is a Davis-Bacon Act wage determination for building construction projects in Rutherford County, Tennessee, effective January 3, 2025 (General Decision Number TN20250187). The determination covers building construction projects excluding single family homes and apartments up to 4 stories.
The wage determination establishes minimum wage rates and fringe benefits for various construction trades, with notable rates including Asbestos Worker/Heat & Frost Insulator ($36.52/hour plus $18.47 fringe), Elevator Mechanic ($50.56/hour plus $37.885+a+b fringe), and Pipefitter ($29.54/hour plus $12.41 fringe). The document specifies that contracts entered after January 30, 2022 must pay workers at least $17.75 per hour under Executive Order 14026, while contracts awarded between January 1, 2015 and January 29, 2022 must pay at least $13.30 per hour under Executive Order 13658. The determination also includes provisions for paid sick leave under Executive Order 13706, requiring contractors to provide 1 hour of paid sick leave for every 30 hours worked, up to 56 hours annually.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch 11 Sign in Sheet 03122025.pdf | ||
| 36C24925R0005 0001.docx | DOCX document | |
| Atch 2 Drawings 03112025.pdf | ||
| Atch 3 Specifications 03262025.pdf | ||
| Atch 1 WD Rutherford County Building TN20240187 dated 03142025.pdf | ||
| Atch 12 Geotech Report 05162023.pdf | ||
| Atch 5 Contractor EMR Certification Form.docx | DOCX document | |
| Atch 10 RFI Form.docx | DOCX document | |
| Atch 3 Specifications 103124 Final.pdf | ||
| 36C24925R0005_3.docx | DOCX document | |
| Atch 7 Past Performance Questionnaire.docx | DOCX document | |
| Atch 6 General Conditions Breakout.xlsx | XLSX spreadsheet | |
| Atch 2 Drawings 09272024.pdf | ||
| Atch 9 TAX ID UEI Document.docx | DOCX document | |
| Atch 4 Calculation of Contractor Self Performed Work.xlsx | XLSX spreadsheet | |
| Atch 8 Price Breakout Schedule.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .