Atch 3 - Mission Essential Ktr Svc Plan.pdf

PDF 368 KB Posted

Attached to
Integrated Solid Waste Management (ISWM) (Service) FE Warren AFB, WY Amendment 03 Federal contract opportunity
Solicitation number
FA461325R0001
Issued by
Department of the Air Force Global Strike Command

About this file

This document is a Mission-Essential Contractor Services Plan for Integrated Solid Waste Management (ISWM) services at FE Warren Air Force Base in Wyoming. The plan outlines procedures for continuing essential waste management services during crisis situations, with specific focus on maintaining contractor operations for up to 30 days or until normal operations resume. The mission-essential services include municipal solid waste/food waste collection, landfill tipping fees, unscheduled item pickups (including various trash receptacles and dumpsters), construction and demolition debris pickup, and medical refuse dumpster services.

The solicitation, issued by the Department of the Air Force Global Strike Command, seeks a contractor to provide comprehensive waste management services at FE Warren AFB. Key dates include a site visit request deadline of 11:00 am MT on March 20, 2025, with proposal documentation due by 11:00 am MT on April 10, 2025. The contract will be awarded under NAICS code 562111 for Solid Waste Collection, with the understanding that funds are not currently available and the government reserves the right to cancel the solicitation. Pricing will be based on contract rates at the time of plan activation, with specific line items for various waste management services and quantities.

View the file

Other files for this federal contract opportunity

Other files attached to Integrated Solid Waste Management (ISWM) (Service) FE Warren AFB, WY Amendment 03, newest first.
File Type Posted
Amendment 03.pdf PDF
Atch 5 - Post SV Questions and Answers 3 Apr 2025.pdf PDF
Conformed Solicitation.pdf PDF
Atch 4 - Price Proposal REV2.xlsx XLSX spreadsheet
Atch 1 - PWS REV1 2 Apr 2025.pdf PDF
Amendment 01.pdf PDF
Conformed Solicitation.pdf PDF
Amendment 02.pdf PDF
Atch 4 - Price Proposal REV1.xlsx XLSX spreadsheet
Conformed Solicitation.pdf PDF
Amendment 01.pdf PDF
Atch 4 - Price Proposal.xlsx XLSX spreadsheet
Atch 1 - PWS 26 Feb 25 .pdf PDF
Solicitation - FA461325R0001.pdf PDF
Atch 2 - Wage Determination 23Dec24.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3 Solicitation No: FA461325XXXXX

Mission-Essential Contractor Services Plan for

Integrated Solid Waste Management (ISWM)

Services

FE WARREN AFB, WY

3 February 2025

Solicitation No: FA461325XXXXX

1. INTRODUCTION. This Mission-Essential Contractor Services Plan has been developed in accordance with DFARS Clause 252.237-7023 – Continuation of Essential Contractor Services.

It addresses how [Insert Name of Contractor] will continue providing the mission-essential Integrated Solid Waste Management (ISWM) services identified in the solicitation during periods of crisis, upon notification by the Contracting Officer (CO) to activate the plan.

2. OBJECTIVE. In support of the 90th Missile Wing, the objective is to provide mission-essential ISWM services for FE Warren AFB, WY during a crisis. The essential contractor services are identified below and will be performed at the prices in the contract at the time the plan is activated.

3. CONTRACTOR PROCEDURES. Contractor MUST answer the following in this plan:

a. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed;

1)

b. How you will address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves (i.e. list efforts taken to maintain sufficient level of staff and ensure adequate supplies);

1)

c. How you will address time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site (i.e. discuss actions/time needed to get personnel and resources in place, actions to expedite the process, ability to work extended hours if base access is restricted);

1)

d. How you will address components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home (i.e. list actions that can be performed remotely, contract manager duty location, etc);

1)

e. How you will establish an alert and notification procedure for mobilizing identified “essential contractor service” personnel (i.e. explain if alert/notification will be made after Government direction and means of notification, etc); and

1)

Solicitation No: FA461325XXXXX

f. The approach you will use for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis (i.e. explain means of communication, use of Quality Control Plan, checklists, or other additional duties).

1)

g. Identify how you will conduct plant operations to overcome adverse conditions and situations, such as significant weather situations, employee illnesses, or unexpected vacancies (i.e. explain means of maintaining operations if weather limits travel or loss of employees).

1)

4. PRICING. The mission-essential ISWM services are identified in paragraph 5 and will be paid at the prices in the contract at the time the Plan is activated. The prices will also be used as the basis for any equitable adjustments resulting from the activation of the Plan.

5. Mission-Essential Contractor Services.

CLIN

Description of Service Qty Unit Unit Price

Total Price

X001 Municipal Solid Waste/Food Waste Collection – Base (PWS 1.1.1)

1500 TON

Per the

Contract Per the

Contract

X002 Landfill Tipping Fees (PWS 1.5) 1500 TON Per the

Contract Per the

Contract

X003 Unscheduled Items Pick-up and Special Events 60-gallon trash receptacle (PWS

1.1.3.1 & PWS 1.1.3.6)

200 EA

Per the

Contract Per the

Contract

X004 Unscheduled Items Pick-up and Special Events 8 Cu. Yd. Dumpster (PWS

1.1.3.1 & PWS 1.1.3.6)

10 EA

Per the

Contract Per the

Contract

X005 Unscheduled Items Pick-up and Special Events 15 Cu. Yd. Roll-off (PWS

1.1.3.1 & PWS 1.1.3.6)

20 EA

Per the

Contract Per the

Contract

X006 Unscheduled Items Pick-up and Special Events 30 Cu. Yd. Roll-off (PWS

1.1.3.1 & PWS 1.1.3.6)

5 EA

Per the

Contract Per the

Contract

X007 Construction and Demolition Debris Pick-up 15 Cu. Yd. Roll-off (PWS 1.1.3.2)

75 EA

Per the

Contract Per the

Contract

X008 Construction and Demolition Debris Pick-up 30 Cu. Yd. Roll-off (PWS 1.1.3.2)

10 EA

Per the

Contract Per the

Contract

X009 Medical Refuse Dumpsters (PWS 1.1.1.1)

12 EA

Per the

Contract Per the

Contract

Solicitation No: FA461325XXXXX

6. QUALITY CONTROL PLAN (QCP). The contractor shall utilize its own internal QCP during the performance of this plan.

7. DEACTIVATION OF PLAN. [Insert Name of Contractor] shall perform the mission-essential contractor services during a crisis until notified by the CO to cease performance of the Plan.

Contractor Point of Contact:_______________________________________

Phone Number(s):_______________________________________

Email Address:_______________________________________

Date:_____________________________

File details come from the government source that posted it. Updated .