Atch 2 - B208 Repair HVAC Bid Schedule.xls
XLS spreadsheet 1 MB Posted
- Attached to
- Dover AFB Multiple Award Construction Contract (MACC) Federal contract opportunity
- Solicitation number
- FA449720R0004
About this file
This solicitation is for a Multiple Award Construction Contract to be awarded by the Department of the Air Force Air Mobility Command. Up to six small businesses will be selected to receive indefinite delivery/indefinite quantity contracts for construction projects at Dover Air Force Base over a seven-year period. A pre-proposal conference will be held on April 7th and questions must be submitted by April 9th. Proposals are due on May 4th and should include pricing for the seed project in Attachment 2. The total maximum expenditure under all contracts is $70 million. The guaranteed minimum is $500 payable after a post-award conference. Project values will typically range from $500,000 to $1 million. This acquisition is set aside for total small businesses with a NAICS code of 236220 and size standard of $39.5 million.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.
Exceptions:
(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.
(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page.
| The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above. |
| Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works. |
| * CSI = Construction Specifications Institute |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Summary
| CONSTRUCTION COST ESTIMATE | Date: | |||||
| Fill Here | ||||||
| COMPANY | ||||||
| Fill Here | ||||||
| PROJECT | ||||||
| Repair of Building 208 HVAC | ||||||
| LOCATION | PROJECT NO. | 1053657 | ||||
| DOVER AIR FORCE BASE, DOVER DE | ||||||
| DIVISION | DESCRIPTION | % by | ||||
| Division | Division Total | |||||
| DIVISION 01 | GENERAL REQUIREMENTS | 28.7% | 50.00 | |||
| DIVISION 02 | EXISTING CONDITIONS | 34.2% | 59.48 | |||
| DIVISION 03 | CONCRETE WORK | 37.1% | 64.45 | FILL IN AS REQUIRED (this will link to the entire document) | ||
| DIVISION 04 | MASONRY | 0.0% | - 0 | |||
| DIVISION 05 | METALS | 0.0% | - 0 | |||
| DIVISION 06 | WOOD, PLASTICS AND COMPOSITES | 0.0% | - 0 | GC Overhead | 10.00% | |
| DIVISION 07 | THERMAL AND MOISTURE PROTECTION | 0.0% | - 0 | GC Profit | 15.00% | |
| DIVISION 08 | OPENINGS | 0.0% | - 0 | Sub Overhead | 5.00% | |
| DIVISION 09 | FINISHES | 0.0% | - 0 | Sub Profit | 11.00% | |
| DIVISION 10 | SPECIALTIES | 0.0% | - 0 | Sales Tax | 6.00% | |
| DIVISION 11 | EQUIPMENT | 0.0% | - 0 | Risk/Bonding | 2.00% | |
| DIVISION 12 | FURNISHINGS | 0.0% | - 0 | |||
| DIVISION 13 | SPECIAL CONSTRUCTION | 0.0% | - 0 | This spreadsheet contains many formulas... please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas | ||
| DIVISION 14 | CONVEYING EQUIPMENT | 0.0% | - 0 | |||
| DIVISION 15 | RESERVED | 0.0% | - 0 | |||
| DIVISION 16 | RESERVED | 0.0% | - 0 | |||
| DIVISION 20 | RESERVED | 0.0% | - 0 | |||
| DIVISION 21 | FIRE SUPRESSION | 0.0% | - 0 | |||
| DIVISION 22 | PLUMBING | 0.0% | - 0 | |||
| DIVISION 23 | HEATING, VENTILATING AND A/C | 0.0% | - 0 | |||
| DIVISION 24 | RESERVED | 0.0% | - 0 | |||
| DIVISION 25 | INTEGRATED AUTOMATION | 0.0% | - 0 | |||
| DIVISION 26 | ELECTRICAL | 0.0% | - 0 | |||
| DIVISION 27 | COMMUNICATIONS | 0.0% | - 0 | |||
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | 0.0% | - 0 | |||
| DIVISION 29 | RESERVED | 0.0% | - 0 | |||
| DIVISION 30 | RESERVED | 0.0% | - 0 | |||
| DIVISION 31 | EARTHWORK | 0.0% | - 0 | |||
| DIVISION 32 | EXTERIOR IMPROVEMENTS | 0.0% | - 0 | |||
| DIVISION 33 | UTILITIES | 0.0% | - 0 | |||
| DIVISION 34 | TRANSPORTATION | 0.0% | - 0 | |||
| DIVISION 35 | WATERWAYS AND MARINE CONSTRUCTION | 0.0% | - 0 | |||
| DIVISION 36 | RESERVED | 0.0% | - 0 | |||
| DIVISION 37 | RESERVED | 0.0% | - 0 | |||
| DIVISION 38 | RESERVED | 0.0% | - 0 | |||
| DIVISION 39 | RESERVED | 0.0% | - 0 | |||
| DIVISION 40 | PROCESS INTEGRATION | 0.0% | - 0 | |||
| DIVISION 41 | MATERIAL PROCESING AND HANDLING EQUIPMENT | 0.0% | - 0 | |||
| DIVISION 42 | PROCESS HEATING, COOLING AND DRYING EQUIPMENT | 0.0% | - 0 | |||
| DIVISION 43 | PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT | 0.0% | - 0 | |||
| DIVISION 44 | POLLUTION CONTROL EQUIPMENT | 0.0% | - 0 | |||
| DIVISION 45 | INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT | 0.0% | - 0 | |||
| DIVISION 46 | RESERVED | 0.0% | - 0 | |||
| DIVISION 47 | RESERVED | 0.0% | - 0 | |||
| DIVISION 48 | ELECTRICAL POWER GENERATION | 0.0% | - 0 | |||
| DIVISION 49 | RESERVED | 0.0% | - 0 | |||
| HARD COST TOTAL | 100% | 173.93 | ||||
| PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%) | 10% | 17.39 | ||||
| SUBTOTAL | 191.32 | |||||
| PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%) | 15% | 28.70 | ||||
| SUBTOTAL | 220.02 | |||||
| BUILDER'S RISK / PERFORMANCE BONDS (Fill in%) | 2% | 4.40 | ||||
| PROPOSAL TOTAL INCLUDES ALL DESIGN AND CONSTRUCTION WORK REQUIRED TO COMPLETE THE REPAIR TO BUILDING 208 HVAC | $ 224.42 |
&L&"Verdana,Bold"Construction Cost Estimate&RSoliciation: FA4497-20-R-0004 Attachment 2 &R&P of &N davisjam:
Percentages listed are place fillers. Please complete as required
Div1
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| GENERAL REQUIREMENTS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| Sample Input | 2 | - 0 | 10.00 | 20.00 | 20.00 | ||
| Sample Input | 3 | 1.00 | 10.00 | 30.00 | - 0 | 30.00 | |
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | 30.00 | 20.00 | |||||
| SUBTOTAL | 50.00 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ 50.00 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div2
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EXISTING CONDITIONS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| Sample Input | 2 | - 0 | 10.00 | 20.00 | 20.00 | ||
| Sample Input | 3 | 10.00 | 30.00 | - 0 | 30.00 | ||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | 30.00 | 20.00 | |||||
| SUBTOTAL | 50.00 | ||||||
| Sub-Contractor's Overhead | 5.00% | 2.50 | |||||
| Sub-Contractor's Profit | 11.00% | 5.78 | |||||
| FL State Sales Tax | 6.00% | 1.20 | |||||
| TOTAL | $ 59.48 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div3
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| CONCRETE WORK | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| Sample Input | 2 | - 0 | 10.00 | 20.00 | 20.00 | ||
| Sample Input | 3 | 10.00 | 30.00 | - 0 | 30.00 | ||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | 30.00 | 20.00 | |||||
| SUBTOTAL | 50.00 | ||||||
| Sub-Contractor's Overhead | 10.00% | 5.00 | |||||
| Sub-Contractor's Profit | 15.00% | 8.25 | |||||
| FL State Sales Tax | 6.00% | 1.20 | |||||
| TOTAL | $ 64.45 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div4
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| MASONRY | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div5
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EXISTING CONDITIONS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div6
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| WOOD, PLASTICS AND COMPOSITES | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div7
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| THERMAL AND MOISTURE PROTECTION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div8
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| OPENINGS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div9
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| FINISHES | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div10
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| SPECIALTIES | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div11
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div12
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| FURNISHINGS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div13
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| SPECIAL CONSTRUCTION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div14
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| CONVEYING EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div15
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div16
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div20
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div21
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| FIRE SUPRESSION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div22
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| PLUMBING | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div23
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| HEATING, VENTILATING AND A/C | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div24
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div25
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| INTEGRATED AUTOMATION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div26
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| ELECTRICAL | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div27
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| COMMUNICATIONS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div28
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| ELECTRONIC SAFETY AND SECURITY | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div29
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div30
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div31
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EARTHWORK | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div32
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EXTERIOR IMPROVEMENTS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div33
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| UTILITIES | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div34
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| TRANSPORTATION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div35
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| WATERWAYS AND MARINE CONSTRUCTION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| RESERVED | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div36
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div37
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div38
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div39
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div40
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| PROCESS INTEGRATION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div41
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| MATERIAL PROCESING AND HANDLING EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div42
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| PROCESS HEATING, COOLING AND DRYING EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 5.00% | - 0 | |||||
| Sub-Contractor's Profit | 11.00% | - 0 | |||||
| FL State Sales Tax | 6.00% | - 0 | |||||
| TOTAL | $ - 0 |
&L&"Verdana,Bold"Construction Cost Estimate &R&P of &N
Div43
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Repair of Building 208 HVAC | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| DOVER AIR FORCE BASE, DOVER DE | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | 1053657 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .