Atch 1 - SOW - HVAC Unit - 4 Sep.pdf
PDF 519 KB Posted
- Attached to
- 4-Ton HVAC Units
- Solicitation number
- FA301626Q0270
About this file
This Statement of Work (SOW) defines requirements for the decommissioning, removal, replacement, and disposal of seven existing 4-ton Bard wall-mounted HVAC units at Building 1472, JBSA Fort Sam Houston, Texas. The contractor must supply and install seven brand-new, high-efficiency 4-ton Bard units or equivalent models featuring modern, environmentally compliant refrigerant (R-454B or R-32) in strict compliance with EPA Section 608 regulations, local building codes, and industry best practices. The units directly support mission-critical operational spaces including Electrical Panel & Switchgear Rooms and Chiller Plant & Control Locations, where strict climate control is essential to prevent thermal equipment failures and moisture issues.
The project comprises six phases executed over the contract period: Pre-Installation & Site Preparation (comprehensive site survey, facility coordination, and local approvals); Decommissioning & Removal (EPA-compliant refrigerant recovery with certified manifests, electrical disconnection via LOTO protocols, mechanical removal, and licensed disposal); Equipment Procurement & Specifications (seven new units meeting precise physical dimensions of 42" W × 25.5" D × 84.8" H, with nominal 48,000 BTU/h cooling capacity, minimum 11.0 EER efficiency, and specified electrical configurations at 460V/60/3-phase); Installation of New Units (wall mounting with heavy-duty brackets, commercial-grade gasketing, ASTM C920 sealant application, drip flashing installation, and AAMA 501.2 water-tightness testing); Testing, Commissioning & Startup (factory-authorized commissioning, system evacuation to 500 microns, 15-minute vacuum rise testing, and certified air-balancing reports); and Site Cleanup & Handover (debris removal, minimum 2-hour hands-on staff training covering thermostat programming and maintenance procedures, and comprehensive joint walkthrough with CE Project Manager). All work must be performed by master/journeyman HVAC technicians holding active Texas licenses and EPA Section 608 Universal Certifications. Normal work hours are 0700–1700 Monday through Friday, excluding 11 federal holidays in 2026. The contractor must provide all labor, materials, equipment, tools, transportation, and heavy lifting equipment; the government furnishes utilities, emergency services, building access, and security. Critical deliverables include pre-construction field verification, site safety/LOTO plans, EPA recovery manifests, disposal certificates, weatherproofing logs, certified startup reports, and O&M binders, with water-tightness test approval required before proceeding to subsequent unit installations. The contractor provides a standard manufacturer's warranty (typically 5 years parts/compressor) and a minimum 1-year workmanship warranty with 48-hour response time for covered issues.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Project: Replacement of Seven (7) 4-Ton Bard HVAC Units
1. Executive Summary This Statement of Work (SOW) defines the requirements, deliverables, and scope of work for decommissioning, removing, replacing and disposing seven (7) existing 4-ton Bard wall-mounted HVAC units. The existing units will be replaced with new, energy-efficient Bard units or equal to the existing unit utilizing modern, environmentally compliant refrigerant in strict accordance with EPA regulations, local building codes, and industry best practices.
2. Project Objectives
• Decommission and Remove: Safely recover refrigerant and decommission seven outdated 4-ton Bard units.
• Install New Units: Supply and install seven brand-new, high-efficiency 4-ton
Bard wall-mounted units or equal to the existing unit featuring up-to-date, non-ozone-depleting refrigerant.
• These seven units directly support high-sensitivity, mission-critical operational spaces—specifically Electrical Panel & Switchgear Rooms and Chiller Plant & Control Locations—the primary engineering objective is to maintain strict, non-stop climate thresholds to prevent thermal equipment failures, safety tripping, or localized moisture issues.
• Compliance & Safety: Ensure all work meets local mechanical, electrical, and environmental safety regulations (specifically EPA Section 608).
• System Integration: Connect new units to existing electrical systems, ductwork, and environmental controls, ensuring fully operational climate control in the designated facility spaces.
3. Detailed Scope of Work The Contractor shall provide all labor, materials, equipment, tools, transportation, and fully licensed, certified, manufacturer-authorized HVAC technicians with supervision necessary to complete the following tasks:
Phase 1: Pre-Installation & Site Preparation
• Conduct a comprehensive site survey to verify electrical compatibility, structural wall integrity, mounting brackets, and ductwork dimensions.
• Coordinate with facility management to establish a safety perimeter, staging area, and work schedule to minimize operational downtime.
• Secure all necessary approvals required by local base jurisdictions before commencing physical work.
Phase 2: Decommissioning & Removal of Existing Units
• EPA Section 608 Compliance: Safely and legally recover all existing refrigerant from the legacy units using certified recovery equipment in strict accordance with EPA Section 608 regulations. No venting of refrigerant is permitted under any circumstances. Recovery Cylinders: CE will provide the necessary recovery cylinders to the contactor to recover any refrigerant remaining in the existing Bard Units. The Contractor must submit a highly detailed, certified Refrigerant Recovery Log & Manifest directly to CE (Civil Engineering / Client Entity) prior to physical equipment disassembly. A separate recovery log must be completed for each of the seven (7) individual units (indexed by unit physical location and manufacturer serial number
• Electrical Disconnection: Safely disconnect electrical power and control wiring, following standard Lock-Out/Tag-Out (LOTO) safety protocols.
• Mechanical Removal: Detach the seven (7) 4-ton Bard units from their wall mounts and duct connections.
• Disposal & Recycling: Transport and legally dispose of the old units, including the recovered refrigerant, at a licensed disposal/recycling facility. Provide disposal manifests and certificates to the client within 10 days.
Phase 3: Equipment Procurement & Specifications
The Contractor shall procure seven (7) brand-new Bard wall-mounted units or equal to the existing units meeting or exceeding the following minimum technical requirements:
• Capacity: 4 Tons (nominal 48,000 BTU/h cooling capacity per unit). Contractor is still responsible and confirms the current tonnage of the current units.
• Legacy Equipment Inventory (Existing Units to Be Replaced)
• The Contractor is responsible for removing, cataloging, and replacing the following specific legacy models currently installed at the facility:
Unit Number
Equipment Location / Serviced Space Mfg Legacy Model
Number
Unit 1 Electrical Panel Room / Switchgear Bard WA602-C15V
Unit 2 Electrical Panel Room / Switchgear Bard WA602-C15V
Unit 3 Chiller Plant Room Bard W48A2-C09XPXXXJ
Unit 4 Chiller Plant Room Bard W48A2-C09XPXXXJ
Unit 5 Chiller Control Room Bard PA13482-C
Unit 6 Critical Support Area Bard WA372-C15B
Unit 7 Auxiliary Infrastructure Room Bard WA701-C15B
• Type: Wall-mounted Air Conditioner and Heat Pump (matching current configuration).
• Refrigerant: Eco-friendly, up-to-date refrigerant compliant with current EPA regulations (R-454B / R-32 depending on current model availability and safety standards).
• Electrical: Must match existing facility power supply (typically 208/230V or 460V/60/3 phase; to be verified during site survey).
• Controls: Compatible with existing thermostats/building automation systems or include new digital programmable thermostats.
• Filtration: MERV 8 minimum, or as specified by facility standards.
Phase 4: Installation of New Units
• Sleeve & Framing Inspection: Inspect, clean, and structurally reinforce the existing wall framing, sleeve, and duct interfaces. Prepare wall openings, inspect flashing, and install new heavy-duty mounting brackets or wall sleeves as required.
• A Heavy Lifting Equipment: The Contractor shall provide all heavy lifting equipment (e.g., cranes, rigging, forklifts, or boom lifts) required to safely lift, transport, and mount the units. The Government will not provide material handling equipment, operator support, or storage for contractor-leased lifting machinery.
• Mandatory Minimum Clearances: The Contractor must ensure the physical placement of each installed unit conforms to the manufacturer's engineering specifications to prevent hot air recirculation and facilitate maintenance. Mount the seven (7) new 4-ton Bard units or equal to existing securely to the exterior walls.
• Weatherproofing & Air Barrier Standards:
• Gasketing: Apply commercial-grade, heavy-duty, closed-cell, UV-resistant neoprene weather-sealing gaskets around the entire perimeter of the wall sleeve interface. Gaskets must be compressed uniformly to form a continuous air and water barrier.
• Sealant Quality (ASTM C920): Seal all exterior seams, mounting flange edges, and fastener penetrations with a high-performance, non-sag polyurethane or hybrid polymer sealant conforming to ASTM C920 (Class 25 or higher). Pure silicone sealants are not acceptable on porous masonry surfaces.
• Drip Flashing: Install an aluminum or galvanized steel drip cap flashing at the top header of each unit casing, integrated into the building's exterior siding/cladding layer, to divert overhead rainwater runoff away from the wall penetration.
• Water-Tightness Verification (AAMA 501.2): Conduct a localized, low-pressure water spray test on the first installed unit (following modified AAMA
501.2 guidelines) to verify zero water ingress into the building envelope prior to completing the remaining six installations.
• Provide new thermostat replacements for each new unit.
• Ensuring airtight seals with high-grade, weather-resistant gaskets and sealants.
• Connect electrical power lines and control wiring. Install new electrical disconnects if existing units are worn or out of compliance.
• Install condensate drain lines according to manufacturer specifications and local plumbing codes.
• All technical, electrical, rigging and mechanical tasks are strictly limited to master/journeyman HVAC technicians holding active State of Texas licenses and active EPA Section 608 Universal Certifications.
Phase 5: Testing, Commissioning, & Startup
• Factory-Authorized Startup for Warranty Validation: Regardless of the brand installed, the Contractor must perform an official manufacturer-certified commissioning startup. This setup must be executed by a technician holding active factory-training credentials for the selected brand (or co-signed by an authorized manufacturer representative) to validate, register, and preserve the factory's parts and compressor warranties.
• Evacuation & Evacuation Testing: Evacuate system lines to a minimum of 500 microns(if field-charged) and conduct a 15-minute vacuum rise test to guarantee system seals are 100% leak-free.
• Verify proper airflow, temperature differentials, and thermostat/control system response.
• Provide a certified air-balancing and commissioning report for each of the seven units.
Phase 6: Site Cleanup & Handover
• Clean up all construction debris, packaging, and materials from the interior and exterior of the facility. 100% removal and off-site disposal of all project-related waste.
• Staff Training Seminar: Conduct an on-site, hands-on training session (minimum of 2 hours) for the client's facility maintenance team. Training must cover:
• Master thermostat and smart controller programming.
• Interpretation of lead-lag controller diagnostics and active system alarms.
• Routine preventive maintenance procedures (e.g., filter replacement schedules, coil cleaning practices, and winterization)
• Joint Walkthrough & Final Walk-through List: Execute a comprehensive post-project walkthrough alongside the CE Project Manager. Any cosmetic, structural, or functional discrepancies identified must be documented.. The Contractor must resolve all items to 100% satisfaction before final project sign-off.
4. Project Deliverables & Key Milestones
To secure final payment, verify equipment engineering alignment, and receive final closeout sign-off, the Contractor must supply the following deliverables strictly in accordance with the timeline boundaries below:
Phase Deliverable Description Required Timing &
Milestone Dependencies
Pre-Construction Physical Field Verification & Submittals
Signed field dimensional notes, electrical circuit reviews, and manufacturer specification sheets for proposed models.
Copies of Licenses must be provided prior to mobilization.
MUST be submitted and approved by CE prior to ordering any equipment or materials.
Phase 1:
Mobilization
Site Safety, Rigging, & LOTO Plan
Written safety barricade design, crane setup pathways, and physical Lock-Out/Tag-Out (LOTO) logs co-signed by the Facility Manager.
Due 5 business days prior to any physical on-site labor or equipment staging.
Phase 2: PART 1 Decommissioning
EPA Recovery & Certified Weight Manifests (to CE)
Cylinder serial inventory, electronic scale calibration certs, individual Tare/Gross/Net calculations, and technician universal cards.
Submitted daily during disassembly phase; consolidated final log due within 3 days of phase completion.
Phase 2: PART 2 Decommissioning
Demolition & Disposal Certificates
Certified environmental disposal receipts from approved recycling and hazardous waste handling facilities for 7 units.
Due within 5 business days following the physical removal of the old cabinets from the site.
Phase 3:
Installation
New Unit Integration & Weatherproofing Logs
Physical mounting, leveling check, ASTM C920 sealant lot logs, structural clearance checklist, and water-tightness results
(AAMA 501.2).
Water-tightness test results must be approved prior to starting subsequent unit installations. All remaining logs are due within 48 hours of mechanical mounting.
Phase 4:
Commissioning
Certified Startup & Performance Report
Certified factory-authorized startup sheets, static pressure metrics, balanced blower CFM readings, temperature split dry-bulb checks, and BAS alert tests.
To be submitted within 3 business days of individual system startup; must be approved before beginning the Phase 6 Handover.
Phase 5: Closeout Closeout, Training, & Handover Package
O&M binders, local inspection permits, custom low-voltage wiring schematics, registered warranty certs, signed training attendance logs, and completed Punch List Sign-off.
Must be completed, submitted, and signed off by CE before authorization of final project payment release.
5. Health, Safety, & Environment (HSE)
• The Contractor must strictly adhere to OSHA safety standards throughout the project.
• Lock-out/Tag-out (LOTO) procedures must be enforced prior to working on any electrical components.
• Proper Personal Protective Equipment (PPE) must be worn by all field personnel.
• All refrigerant handling must be performed by EPA Section 608 Universal
Certified technicians.
6. Warranty & Support Manufacturer's Warranty: Standard manufacturer warranty on parts and compressor typically 5 years parts, 5 years compressor, or as specified by manufacturer. Contractor will be responsible to ensure all new equipment is registered with manufacturer within 90 days of installation and provide supporting documentation.
• Workmanship Warranty: The Contractor shall provide a minimum of 1-Year warranty on all installation labor and workmanship from the date of final acceptance. Contractor shall respond within a 48 hour period to address any issues that are covered under the 1 year warranty.
7. HOURS OF WORK
• Normal duty hours are from 0700-500 PM, Monday through Friday, except on federal holidays (if any during the work week). The contractor shall coordinate the work with the 502d CES Project Manager. Any work outside of normal duty hours must be approved in advance by the Government.
• The following table details the chronological dates for all 11 federal holidays occurring within the 2026 calendar year (January 1, 2026, through December 31, 2026).
Holiday Name Official Designation / Rule 2026 Date of Observance
New Year's Day January 1st Thursday, January 1, 2026
Martin Luther King Jr. Day Third Monday in January Monday, January 19, 2026
Washington's Birthday (Presidents' Day)
Third Monday in February Monday, February 16, 2026
Memorial Day Last Monday in May Monday, May 25, 2026
Juneteenth National Independence Day
June 19th Friday, June 19, 2026
Independence Day July 4th Saturday, July 4, 2026 (Observed Friday, July 3, 2026)
Labor Day First Monday in September Monday, September 7, 2026
Columbus Day (Indigenous Peoples' Day)
Second Monday in October Monday, October 12, 2026
Veterans Day November 11th Wednesday, November 11, Thanksgiving Day Fourth Thursday in November
Thursday, November 26, Christmas Day December 25th Friday, December 25, 2026
8. Special Requirements PROJECT LOCATION: Building 1472, 3290 CPL JOHNSON RD. JBSA Fort Sam Houston, TX
OUTAGES: The Contractor shall make every effort to complete all elements of the project without electrical outages. Any electrical outages shall be coordinated and scheduled with Civil Engineering.
SITE MAINTENANCE: The Contractor shall protect adjacent property, buildings and their contents from dust, dirt or other materials. Work areas shall be maintained in a neat, clean, and safe condition and shall, at a minimum, be cleaned at the end of each shift. All streets and roadways in/ adjacent to the site shall always remain free of project generated trash and debris.
GOVERNMENT FURNISHED SERVICES: The government will provide utilities (water and electricity) and emergency, fire, and security police response. The Government will also provide access to the building and designated work areas
POLICE PROTECTION: The 802nd Security Forces Squadron shall provide security and law enforcement response and services to the contractor.
FIRE PROTECTION: The JBSA Fort Sam Houston Fire Departments shall provide initial response, EMS, and fire protection services to the Contractor.
TRAFFIC REGULATIONS: Contractor employees shall comply with all base traffic regulations and are subject to random vehicle speed control checks. Contractor’s personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action. The use of cell phones, except hands-free phones, is prohibited while driving on military installations in San Antonio, TX
DAILY CLEANING: The Contractor shall keep the site free from debris when setting up and tearing down. The Contractor shall collect all trash, debris, refuse, garbage, etc., that is generated and place it in appropriate containers with lids or approved covers on a periodic basis. The materials shall be hauled from the site by appropriate means daily, unless otherwise approved by the designated Planning Technician. Disposal shall be outside the limits of Government property. Disposal shall be by sanitary landfill or other approved methods and shall conform to all local, state, and federal guidelines, criteria, and regulations. Upon completion of the work, the Contractor shall leave the work site and storage area(s) in a clean, neat, and workmanlike condition satisfactory.
CONTRACTOR FURNISHED ITEMS: All required tools, parts, materials, and supplies shall be supplied by the contractor and should be on hand before beginning work. This includes providing all necessary personal protective equipment (PPE) for workers.
SECURITY REQUIREMENTS: Contractor shall be subject to a background check through the 502d Security Forces Squadron to gain access to the Government installation and shall comply with DAFFARS Clause 5352.242-9000, “Contractor access to Air Force Installations” and all on-base traffic laws.
Elimination of Use of Class I Ozone Depleting Substances (ODS)
(a) Contractors shall not:
(1) Provide any service or product with any specification, standard, drawing, or other document that requires the use of a Class I ODS in the test, operation, or maintenance of any system, subsystem, item, component, or process; or
(2) Provide any specification, standard, drawing, or other document that establishes a test, operation, or maintenance requirement that can only be met by use of a Class I ODS as part of this contract/order.
(b) For the purposes of Department of the Air Force policy, the following products that are pure (i.e., they meet the relevant product specification identified in AFI 32- 7086) are Class I ODSs:
(1) Halons: 1011, 1202, 1211, 1301, and 2402;
(2) Chlorofluorocarbons (CFCs): CFC-11, CFC-12, CFC-13, CFC-111, CFC-112, CFC-
113, CFC-114, CFC-115, CFC-211, CFC-212, CFC-213, CFC-214,
CFC-215, CFC-216, and CFC-217, and the blends R-500, R-501, R-502, and R-503;
and
(3) Carbon Tetrachloride, Methyl Chloroform, and Methyl Bromide.
[NOTE: Material that uses one or more of these Class I ODSs as minor constituents do not meet the Department of the Air Force definition of a Class I ODS.]
Health and Safety on Government Installations
(a) In performing work under this contract on a Government installation, the contractor shall:
(1) Take all reasonable steps and precautions to prevent accidents and preserve the health and safety of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and
(2) Take such additional immediate precautions as the contracting officer may reasonably require for health and safety purposes.
(b) The contracting officer may, by written order, direct Air Force Occupational Safety and Health (AFOSH) Standards and/or health/safety standards as may be required in the performance of this contract and any adjustments resulting from such direction will be in accordance with the Changes clause of this contract.
(c) Any violation of these health and safety rules and requirements, unless promptly corrected as directed by the contracting officer, shall be grounds for termination of this contract in accordance with the Default clause of this contract.
Contractor Access to Air Force Installations
(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Department of the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or Security Forces for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver's license, current vehicle registration, valid vehicle insurance certificate, and any other required documentation to obtain a vehicle pass.
(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Integrated Defense, and AFI 31-501, Personnel Security Program Management.
(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
(f) The contractor shall provide an after-hours contact number or after-hours email in the Emergency Mass Notification System (EMNS) for each of their personnel, whose normal place of duty is on a DoD installation or within a DoD facility. The contractor shall comply with any additional requirements in DAFMAN 10-206 for emergency operational reporting. Foreign Nationals may participate and may remove themselves from the Emergency Mass Notification System at any time. To update information, personnel can access the globe icon on their system desktop screens and choose the "Access Self-Service" option.
(g) Failure to comply with these requirements may result in withholding of final payment.
9. Salient Characteristics Summary
• This technical specification document compiles critical nameplate data for seven
Bard HVAC units currently installed. The objective is to provide field technicians, engineers, and facility managers with a reliable, centralized reference for electrical requirements (voltage, phase, frequency, minimum circuit ampacity, and maximum overcurrent protection) and mechanical specifications (refrigerant type and charge volume).
Unit Serial Number Model VAC HZ PH Max.
Fuse
Refrigerant Charge (oz)
1 155B0926016 02-02
WHA602-
C15
460 60 3 30 R22 148
2 155B0926016 03-02
WHA602-
C15
460 60 3 30 R22 148
3 402D1936430 88-02
W48A2- C15
460 60 3 30 R410A 81
4 402H1936668 48-02
W48A2- C15
460 60 3 30 R410A 81
5 307B0926087 09-1
PG13482-
C
460 60 3 20 R410A 22.5
6 217C0926128 15-02
IWAH372-
C15
460 60 3 30 R22 66
7 198C0926128 79-02
IWA701-
C15
460 60 3 30 R22 107
Mandatory Technical & Performance Characteristics
A. Physical & Dimensional Compatibility (Structural Envelope)
To prevent modifications to concrete masonry, exterior cladding, or interior wall structures, any bidding unit must conform to the following physical footprint:
• Cabinet Envelope Dimensions: Maximum allowable exterior footprint of 42 in. (W) × 25.5 in. (D) × 84.8 in. (H) (±0.5 inches variance).
• Duct Location & Spacing: Air supply and return openings must align perfectly with standard wall sleeves without the use of adapters, offsets, or transition ductwork:
Supply Duct Opening: Nominally 10 in. (H) × 30 in. (W).
(±0.5 inches variance) Return Duct Opening: Nominally 16 in. (H) × 30 in. (W).
(±0.5 inches variance)
• Mounting Configuration: Vertical exterior wall-mount package chassis utilizing built-in structural side-mounting brackets designed to bolt directly to exterior walls.
• Cabinet Clearances: The unit must be certified to operate safely and maintain full performance capacity under the following tight spatial restrictions:
Front Clearance: Minimum 60 inches (5 feet) of unobstructed outdoor air throw.
Side Clearance: Minimum 20 inches on the access/control panel side and 15 inches on the non-service side.
Top Clearance: Minimum 12 inches beneath building soffits, overhangs, or architectural projections.
B. Refrigeration & Environmental Specifications
• Cooling Capacity: Nominal 4.0 Tons (48,000 BTU/h) under AHRI standard conditions.
• Refrigerant Type: Must utilize R-454B (or modern, low Global Warming Potential A2L-classified safety refrigerant). Legacy R-22 or high-GWP R-410A refrigerants are strictly prohibited.
• System Efficiency: Minimum 11.0 EER (Energy Efficiency Ratio) complying with the Department of Energy's Single Package Vertical Unit (SPVU) commercial energy standard.
• Compressor Type: High-efficiency hermetic scroll compressor with integrated internal thermal overload protection, high-pressure cut-out switch, and low-pressure safety switch.
• Moisture Dehydration Tolerance: Internal refrigeration loop must be clean, tight, and dehydrated to sustain a standing vacuum below 1,000 microns for a minimum of 15 minutes with the vacuum pump completely isolated (decay test).
C. Air Handling & Ventilation
• Blower Assembly: High-static, direct-drive blower powered by a brushless, programmable ECM (Electronically Commutated Motor) constant-torque fan motor.
• Volumetric Airflow Output: Capable of delivering a continuous range of 1,400 to 1,800 CFM (nominal 350 to 450 CFM per ton of capacity) against an External Static Pressure (ESP) of up to 0.5 inches water gauge (in. w.g.).
• Ventilation Damper: Integrated motorized commercial room ventilator (CRV) with built-in exhaust relief damper to introduce outdoor air and balance space pressure.
• Coil Environmental Protection: Evaporator and condenser coils must utilize copper tubes with hydrophilic aluminum fins, or be treated with an industrial-grade, factory-applied anti-corrosive coating to resist dirt, grime, and industrial atmospheric moisture.
D. Electrical & Heating
• Power Supply Voltage & Phase: Must terminate directly to existing branch circuits. The contractor must verify and deliver units configured to match the exact field voltage and phase:
• Integrated Heat Kit: Factory-installed electric resistance heat strip assembly. Sizing must match field capacity requirements as verified during the pre-inspection..
3. Mandatory Quality Standards & Certifications Every unit supplied must possess the following national listings, certifications, and support structures:
• AHRI Certified: Performance and capacity metrics must be certified in accordance with the Air-Conditioning, Heating, and Refrigeration Institute (AHRI).
• Safety Listing: UL (Underwriters Laboratories) or ETL (Intertek) safety listed for outdoor vertical commercial wall-mounted application.
• Water-Tightness Verification: Construction and seals must be certified to withstand localized, high-velocity wind-driven rain testing in accordance with AAMA 501.2 standards without showing interior moisture ingress.
• Factory Startup Validation: The equipment's internal engineering must be fully compatible with, and eligible for, standard manufacturer warranties when commissioned, documented, and co-signed on-site by a factory-certified technician or direct manufacturer's representative.
| Statement of Work (SOW) |
| Project: Replacement of Seven (7) 4-Ton Bard HVAC Units |
| 1. Executive Summary |
| 2. Project Objectives |
| 3. Detailed Scope of Work |
| Phase 1: Pre-Installation & Site Preparation |
| Phase 2: Decommissioning & Removal of Existing Units |
| Phase 3: Equipment Procurement & Specifications |
| Phase 4: Installation of New Units |
| Phase 5: Testing, Commissioning, & Startup |
| Phase 6: Site Cleanup & Handover |
| 4. Project Deliverables & Key Milestones |
| 5. Health, Safety, & Environment (HSE) |
| 6. Warranty & Support |
| 7. HOURS OF WORK |
| 8. Special Requirements |
| 9. Salient Characteristics Summary |
| Mandatory Technical & Performance Characteristics |
| A. Physical & Dimensional Compatibility (Structural Envelope) |
| B. Refrigeration & Environmental Specifications |
| C. Air Handling & Ventilation |
| D. Electrical & Heating |
| Power Supply Voltage & Phase: Must terminate directly to existing branch circuits. The contractor must verify and deliver units configured to match the exact field voltage and phase: |
| 3. Mandatory Quality Standards & Certifications |
File details come from the government source that posted it. Updated .