This document is a technical specification for asphalt paving for the Department of Veterans Affairs, specifically for resurfacing roadways and a patient parking lot at the Albany VAMC. The specification details comprehensive requirements for asphalt pavement construction, including aggregate base course, asphalt surface course, and crack sealing, with strict adherence to New York State Department of Transportation (NYSDOT) standards. Key technical requirements include precise temperature controls for asphalt mixing (143-160°C), specific aggregate compositions, roller compaction procedures, and surface smoothness tolerances of 3mm in 1.8m.
The specification covers multiple technical aspects such as subgrade preparation, base course construction, asphaltic concrete placement, and crack sealing, with detailed instructions for material selection, mixing, spreading, rolling, and finishing. Materials must meet NYSDOT specifications, with asphalt cement of penetration grade 50/60, prime coat of MC-250, and tack coat of SS-1H. The work involves establishing precise alignments, grades, and cross-sections, with strict quality control measures including temperature monitoring, compaction requirements, and surface finish standards. The project is associated with Solicitation Number 36C24225B0025 for the Veterans Health Administration's Veterans Integrated Service Network 2.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24225B0025 0002.docx | DOCX document | |
| 36C24225B0025 0001.docx | DOCX document | |
| WD.pdf | ||
| Site Visit Sign In Sheet Resurface Parking Lot.pdf | ||
| Pavement Markings.docx | DOCX document | |
| Sustainable Construction Requirements.docx | DOCX document | |
| Buy American Certificate.pdf | ||
| General Requirements.docx | DOCX document | |
| Striping.pdf | ||
| Quality Control.docx | DOCX document | |
| Solicitation Resurface Roadways and Patient Parking Lot.pdf | ||
| Safety Requirements.docx | DOCX document | |
| Joint Sealants.docx | DOCX document | |
| Project Schedule.docx | DOCX document | |
| Resurface Visitor Lot 2.pdf | ||
| Testing Laboratory Services.docx | DOCX document | |
| Earthwork.docx | DOCX document | |
| Auto Desk Build Documentation.pdf | ||
| Resurface Visitor Lot 1.pdf | ||
| Construction Waste Management.docx | DOCX document | |
| Demolition.docx | DOCX document | |
| Wage Determination.pdf | ||
| VA Notice of Limitations on Subcontracting.docx | DOCX document | |
| Drawings.docx | DOCX document | |
| Shop Drawings and Product Data.docx | DOCX document |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
09-01-15
SECTION 32 12 16
ASPHALT PAVING
PART 1 GENERAL
1.1 DESCRIPTION
This work shall cover the composition, mixing, construction upon the prepared subgrade, and the protection of hot asphalt concrete pavement. The hot asphalt concrete pavement shall consist of an aggregate or asphalt base course and asphalt surface course constructed in conformity with the lines, grades, thickness, and cross sections as shown. Each course shall be constructed to the depth, section, or elevation required by the drawings and shall be rolled, finished, and approved before the placement of the next course.
1.2 RELATED WORK
| A. | Laboratory and field testing requirements: Section 01 45 29, TESTING LABORATORY SERVICES. |
| B. | Subgrade Preparation: Paragraph 3.3 and Section 31 20 00, EARTHWORK. |
| C. | Pavement Markings: Section 32 17 23, PAVEMENT MARKINGS. |
1.3 INSPECTION OF PLANT AND EQUIPMENT – NOT USED
1.4 ALIGNMENT AND GRADE CONTROL
The Contractor shall establish and control the pavement (aggregate or asphalt base course and asphalt surface course) alignments, grades, elevations, and cross sections as shown on the Drawings.
1.5 SUBMITTALS
| A. | In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES, furnish the following: |
| B. | Data and Test Reports: |
| 1. | Aggregate Base Course: Sources, gradation, liquid limit, plasticity index, percentage of wear, and other tests required by New York State Department of Transportation (NYSDOT). |
| 2. | Asphalt Binder/Surface Course: Aggregate source, gradation, soundness loss, percentage of wear, and other tests required by the contract drawing or if absent, the NYSDOT. |
| 3. | Jobmix formula. |
4. Hot rubberized asphalt crack sealant with application method conforming to the Federal Highway Administration (FHA) Manual of Practice Sealing Asphalt Cracks.
| C. | Certifications: |
| 1. | Asphalt prime and tack coat material certificate of conformance to the NYSDOT requirements. |
| 2. | Asphalt cement certificate of conformance to NYSDOT requirements. |
| 3. | Jobmix certification Submit plant mix certification that mix equals or exceeds the State Highway Specification. |
| D. | Provide MSDS (Material Safety Data Sheets) for all chemicals used on ground. |
PART 2 PRODUCTS
2.1 GENERAL
A. Aggregate base and asphalt concrete materials shall conform to the requirements of the following and other appropriate sections of the latest version of the NYSDOT Standard Specifications, including amendments, addenda and errata. Where the term "Engineer" or "Commission" is referenced in the NYSDOT Standard Specifications, it shall mean the VA COR or VA Contracting Officer.
2.2 AGGREGATES
| A. | Provide aggregates consisting of crushed stone, gravel, sand, or other sound, durable mineral materials processed and blended, and naturally combined. |
| B. | Subbase aggregate – NYSDOT subbase Type 4 unless otherwise noted. |
| C. | Asphaltic binder course – In conformance with NYSDOT Type 3 binder unless otherwise noted. |
| D. | Aggregates for asphaltic concrete paving: Provide a mixture of sand, mineral aggregate, and liquid asphalt mixed in such proportions that the percentage by weight will be within limits as specified by the NYSDOT Standard Specifications. |
2.3 ASPHALTS
| A. | Comply with provisions of Asphalt Institute Specification SS2: |
| 1. | Asphalt cement: Penetration grade 50/60 |
| 2. | Prime coat: Cut-back type, grade MC-250 or approved equivalent. |
| 3. | Tack coat: Uniformly emulsified, grade SS-1H or approved equivalent. |
2.4 CRACK SEALER
A. Use hot rubberized asphalt in accordance with ASTM D3405 or approved equivalent.
PART 3 EXECUTION
3.1 GENERAL
The Asphalt Concrete Paving equipment, weather limitations, jobmix formula, mixing, construction methods, compaction, finishing, tolerance, and protection shall conform to the requirements of the appropriate sections of the NYSDOT Standard Specifications for the type of material specified.
3.2 MIXING ASPHALTIC CONCRETE MATERIALS
| A. | Provide hot plant-mixed asphaltic concrete paving materials. |
| 1. | Temperature leaving the plant: 143 degrees C(290 degrees F) minimum, 160 degrees C(320 degrees F) maximum. |
| 2. | Temperature at time of placing: 138 degrees C(280 degrees F) minimum. |
3.3 SUBGRADE
| A. | Shape to line and grade and compact with self-propelled rollers. |
| B. | All depressions that develop under rolling shall be filled with acceptable material and the area re-rolled. |
| C. | Soft areas shall be removed and filled with acceptable materials and the area re-rolled. |
| D. | Should the subgrade become rutted or displaced prior to the placing of the subbase, it shall be reworked to bring to line and grade. |
| E. | Proof-roll the subgrade with maximum 45 tonne (50 ton) gross weight dump truck as directed by VA COR or VA Contracting Officer. If pumping, pushing, or other movement is observed, rework the area to provide a stable and compacted subgrade. |
3.4 BASE COURSES
| A. | Subbase (when required) |
| 1. | Spread and compact to the thickness shown on the drawings. |
| 2. | Rolling shall begin at the sides and continue toward the center and shall continue until there is no movement ahead of the roller. |
| 3. | After completion of the subbase rolling there shall be no hauling over the subbase other than the delivery of material for the top course. |
| B. | Base |
| 1. | Spread and compact to the thickness shown on the drawings. |
| 2. | Rolling shall begin at the sides and continue toward the center and shall continue until there is no movement ahead of the roller. |
| 3. | After completion of the base rolling there shall be no hauling over the base other than the delivery of material for the top course. |
| C. | Thickness tolerance: Provide the compacted thicknesses shown on the Drawings within a tolerance of minus 0.0mm (0.0") to plus 12.7mm (0.5"). |
| D. | Smoothness tolerance: Provide the lines and grades shown on the Drawings within a tolerance of 5mm in 3m (3/16 inch in ten feet). |
| E. | Moisture content: Use only the amount of moisture needed to achieve the specified compaction. |
3.5 PLACEMENT OF ASPHALTIC CONCRETE PAVING
| A. | Remove all loose materials from the compacted base. |
| B. | Apply the specified prime coat, and tack coat where required, and allow to dry in accordance with the manufacturer’s recommendations as approved by the COR. |
| C. | Receipt of asphaltic concrete materials: |
| 1. | Do not accept material unless it is covered with a tarpaulin until unloaded, and unless the material has a temperature of not less than 130 degrees C(280 degrees F). |
| 2. | Do not commence placement of asphaltic concrete materials when the atmospheric temperature is below 10 degrees C (50 degrees F), not during fog, rain, or other unsuitable conditions. |
| D. | Spreading: |
| 1. | Spread material in a manner that requires the least handling. |
| 2. | Where thickness of finished paving will be 76mm (3") or less, spread in one layer. |
| E. | Rolling: |
| 1. | After the material has been spread to the proper depth, roll until the surface is hard, smooth, unyielding, and true to the thickness and elevations shown own the drawings. |
| 2. | Roll in at least two directions until no roller marks are visible. |
| 3. | Finished paving smoothness tolerance: |
| a. | No depressions which will retain standing water. |
| b. | No deviation greater than 3mm in 1.8m (1/8" in six feet). |
3.6 APPLICATION OF CRACK FILLER/SEALANT
| A. | Prepare the surfaces, heat and mix the sealant material, and apply in accordance with the manufacturer’s recommendations as approved by the COR. Use a heated lance to remove debris and moisture from cracks prior to applying filler/sealant. |
| B. | Achieve a finished surface seal which, when dry and thoroughly set, is smooth, tough, resilient, of uniform black color, and free from coarse textured areas, lap marks, ridges, and other surface irregularities. |
| C. | When the top of the sealant sags below the road surface, apply additional layers until even with road surface. |
3.7 PROTECTION
Protect the asphaltic concrete paved areas from traffic until the sealant is cool and set and does not pick up under foot or wheeled traffic.
3.8 FINAL CLEAN-UP
Remove all debris, rubbish, and excess material from the work area.
E N D 32 12 16 - 1