This document package includes construction drawings and specifications for repair work on the roof of Building B106 at the Bay Pines VA Healthcare System in Florida. The drawings depict existing building elevations and details for the roof repair project, which is identified as Project 516-22-118 BB - Repair Roof B106. The related federal contract opportunity is a solicitation issued by the Department of Veterans Affairs for this roof repair work, with responses due on August 28, 2022. The solicitation is designated as number 36C24822R0116 and will result in an award to perform the roof repairs depicted in the construction documents.

View the file

Other files

File Type Posted
S06_36C24822R0116 0003.pdf PDF
P09_ IGE B106 Roof- Rev 2.doc DOC document
as-203.pdf PDF
Q and A Question_response 6_09_2022 (1).xlsx XLSX spreadsheet
as-702.pdf PDF
077100 roof specialties.pdf PDF
as-701.pdf PDF
264100 lightning protection.pdf PDF
077200 roof accessories.pdf PDF
ep-113.pdf PDF
072213 roof and deck insulation.pdf PDF
075423 tpo.pdf PDF
36C24822R0116 0002.pdf PDF
076000 flashing and sheet metal.pdf PDF
as-723.pdf PDF
Attachment 10 Contract Progress Schedule.pdf PDF
Amend_ 36C24822R0116 0001.pdf PDF
AS-502.pdf PDF
36C24822R0116.docx DOCX document
Attachment 3 - LOS Certification Solicitation Version.doc DOC document
AS-851.pdf PDF
AS-100.pdf PDF
attachment 9 - q_a rfis.xlsx XLSX spreadsheet
AS-502 02.pdf PDF
AS-703.pdf PDF
Wage Determination 2022.pdf PDF
Attachment 4 - Price Matrix.xlsx XLSX spreadsheet
Attachment 8 (Exhibit B) Past and Present Performance Questionnaire.docx DOCX document
AS-203-FLO.pdf PDF
Attachment 6 -(Exhibit C) EMR.docx DOCX document
Site Location.pptx PPTX presentation
Attachment 7- (Exhibit A) Performance Relevancy Survey v2.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST FLOOR

0' - 0"

FIRST

INTERSTITIAL

10' - 9"

SECOND FLOOR

23' - 0"

ABCDE

SECOND

INTERSTITIAL

33' - 3"

ROOF

42' - 6"

PENTHOUSE ROOF

60' - 5 1/2"

PREFINISHED METAL COPING (TYP)

ARCH PRECAST CONCRETE

PANEL, HEAVY BLAST FINISH

HOLLOW METAL DOOR AND

FRAME

EMERGENCY EXIT LIGHTING COORDINATE W/

ELEC DWGS AND PRECAST CONCRETE

PANELS

PJPJPJ

9' - 6 1/2" 7' - 7 1/2" 7' - 7 1/2"

PJ

PJ

ALUMINUM COMPOSITE PANEL,

DEDUCT ALTERNATE

ALUMINUM COMPOSITE PANEL,

DEDUCT ALTERNATE

ALUMINUM COMPOSITE PANEL,

DEDUCT ALTERNATE

ARCH PRECAST PANEL BELOW GRADE

ALUMINUM STOREFRONT WINDOW SYSTEM

ARCH PRECAST

CONCRETE PANEL,

LIGHT BLAST FINISH

4'

- 0

5'

- 0

4'

- 9

4'

- 0

4'

- 8

6"

4"

0 1

/2"

0"

9' - 7 1/2" 7' - 7 1/2" 7' - 7 1/2" 6' - 3 1/2"

6' - 9"25' - 0"11' - 0"14' - 0"8' - 5"16' - 7"14' - 10"10' - 2"2' - 1"

B.5D.6 C.3

A

AS-703

13W 12W 11W

8W9W10W

PJ

4'

- 3

FIRST FLOOR

0' - 0"

FIRST

INTERSTITIAL

10' - 9"

SECOND FLOOR

23' - 0"

A B

SECOND

INTERSTITIAL

33' - 3"

ROOF

42' - 6"

ARCH. PRECAST CONCRETE

PANEL, LIGHT BLAST

ARCH. PRECAST CONCRETE

COLUMN ENCLOSURE, LIGHT

BLAST

APPROX.

FINISHED

GRADE

9'

- 0

9'

- 5

ALUMINUM COMPOSITE PANEL,

DEDUCT ALTERNATE

2'

- 9

PJ, TYP

PREFINISHED METAL

COPING (TYP)

6 1/2" 4' - 8 1/2" 22' - 10"

TOP OF PARAPET

55' - 6"

B

AS-723

A

AS-723

AL

IG

N

L1

26W26W26W

ENTRY CANOPY

BEYOND

5'

- 0

4'

- 9

4'

- 0

4'

- 3

7'

- 8

9'

- 0

" PJ

PJ

FIRST FLOOR

0' - 0"

FIRST

INTERSTITIAL

10' - 9"

SECOND FLOOR

23' - 0"

B D E

SECOND

INTERSTITIAL

33' - 3"

ROOF

42' - 6"

PENTHOUSE ROOF

60' - 5 1/2"

PREFINISHED METAL

COPING (TYP)

SEE DETAIL G/AS-501 FOR

INFORMATION BEYOND

4'

- 9

4'

- 0

4'

- 3

4'

- 8

5'

- 0

4'

- 0

3' - 1 1/2"24' - 0"19' - 0 1/2"

PJ

PJ PJ

ALUMINUM COMPOSITE

PANEL, DEDUCT

ALTERNATE

ALUMINUM COMPOSITE

PANEL, DEDUCT

ALTERNATE A-4

B.5 D.6C.3 A

AS-703

25W 24W

23W 22W

D

ROOF

42' - 6"

METAL PANEL

SYSTEM ON STEEL

FRAMING

D.6 C.3

A

AS-703

1'

- 6

0"

14' - 10" 16' - 7" 7 1/2"

CD

ROOF

42' - 6"

PENTHOUSE ROOF

60' - 5 1/2"

PREFINISHED METAL

COPING, TYP

ARCH CONCRETE

PRECAST PANELS,

LIGHT BLAST FINISH

B.5D.6 C.3

A

AS-703

PRECAST

REVEAL

PJ

4" 6'

- 9

1' - 9" 2' - 9 1/2"12' - 11 1/2"8' - 5"16' - 7"13' - 9 1/2"2' - 9 1/2"

CONCRETE ROOF

CURB, REFER TO

STRUCTURAL DWGS.

1'

- 6

PJ

1' - 9"

FIRST FLOOR

0' - 0"

FIRST

INTERSTITIAL

10' - 9"

SECOND FLOOR

23' - 0"

A B

SECOND

INTERSTITIAL

33' - 3"

ROOF

42' - 6"

0' - 8"

6' - 1" 25' - 0"

4"

ARCH CONC PRECAST

PANEL, HEAVY BLAST

FINISH

5' - 7 1/2" 7' - 7 1/2" 7' - 7 1/2" 9' - 7 1/2"

TOP OF PARAPET

55' - 6"

1'

- 6

"7'

- 2

1' - 8"

6' - 4"

PREFINISHED

MTL. COPING,

TYP.

PJ

2'

- 9

5'

- 0

0"

PJ

PJ

PJ

THRU WALL

SCUPPER BOX

AND DOWNSPOUT,

PROVIDE SPLASH

BLOCK AT

DISCHARGE

RAISED DOOR SILL

C D

ROOF

42' - 6"

PENTHOUSE ROOF

60' - 5 1/2"

PREFINISHED

METAL COPING, TYP

ARCH CONCRETE

PRECAST PANELS,

LIGHT BLAST FINISH

B.5 D.6C.3

A

AS-703

7' - 6"

4'

- 3

C

AS-561

L2

CURB

PRECAST

REVEAL

PRECAST

JOINT

PJ

6'

- 9

4"

3' - 0" 13' - 7"16' - 7"8' - 5"12' - 9 1/2"

3' - 0"

1' - 9" 1' - 9"

FIRST FLOOR

0' - 0"

FIRST

INTERSTITIAL

10' - 9"

SECOND FLOOR

23' - 0"

SECOND

INTERSTITIAL

33' - 3"

ROOF

42' - 6"

ARCH CONC PRECAST

PANEL, HEAVY BLAST

FINISH

PREFINISHED

MTL. COPING,

TYP.

PJ

8' - 3" 4' - 3"

0"

3"

0"

PRECAST CONCRETE LIGHT BLAST FINISH

PRECAST CONCRETE HEAVY BLAST FINISH

HELLMUTH, OBATA & KASSABAUM, INC.

ARCHITECTURE, ENGINEERING, PLANNING,

INTERIORS, GRAPHICS, CONSULTING

Drawing Number:

Drawing Title: Project Number

DrawnChecked:

CONSULTANTS Project Title

Building Number

All reproduction & intellectual property rights reserved © 2008

Revisions

Client Location

Contract No:

One Tampa City Center, Suite 1800, Tampa, FL, 33602 Voice:

Fax:

Internet:

| 813 | 229 - 0300 | 813 | 223 - 7116 http://www.hok.com

Date

ARCHITECT/ ENGINEERS:

FL. Reg. AAC001139

Approved: Division Chief

Date

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

D e p ar tm en t of V e t er an s

A ff ai rs

CONSTRUCTION DOCUMENTS CD 3

FULLY SPRINKLERED

BAY PINES HEALT

HCARE SYSTE

M

Approved: Service Director

05.29010.09 / 05.29010.13

Bay Pines FL 33744

BUILDING ELEVATIONS

AS-501

KC -07/07/2009

516-326 / 516-334VA Bay Pines Healthcare System - Eye Treatment Center &

Ambulatory Surgery Center

1/8" = 1'-0"C NORTH ELEVATION

EXISITNG BUILDING 100

C

E

1/8" = 1'-0"E PARTIAL SOUTH ELEVATION

1/8" = 1'-0"D PARTIAL SOUTH ELEVATION

1/8" = 1'-0"A NORTH CHILLER YARD ELEVATION

1/8" = 1'-0"F NORTH PENTHOUSE ELEVATION

1/8" = 1'-0"H SOUTH STAIR 12 ELEVATION

1/8" = 1'-0"G SOUTH PENTHOUSE ELEVATION

1/8" = 1'-0"B EAST STAIR 12 ELEVATION

D

ROOF LADDER AND

PROTECTIVE CAGE

1 ADDENDUM #3 2009.08.28

File details come from the government source that posted it. Updated .