About this file

This document package includes a floor plan drawing and related federal contract opportunity solicitation. The floor plan drawing depicts mechanical, electrical, and plumbing details for the penthouse and roof of Building 106 at the Bay Pines VA Healthcare System. The drawing includes notes specifying materials, dimensions, and work to be performed.

The related federal contract opportunity is a combined synopsis/solicitation seeking offers to repair the roof of Building B106 under project number 516-22-118. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 8. Offerors are invited to submit pricing for roof repair services by the response date listed on the solicitation. The award is to be made to a contractor who can best meet the requirements at a fair and reasonable price. The opportunity is not set aside for small businesses or other socioeconomic categories.

View the file

Other files

File Type Posted
S06_36C24822R0116 0003.pdf PDF
P09_ IGE B106 Roof- Rev 2.doc DOC document
Q and A Question_response 6_09_2022 (1).xlsx XLSX spreadsheet
as-702.pdf PDF
077100 roof specialties.pdf PDF
as-701.pdf PDF
264100 lightning protection.pdf PDF
077200 roof accessories.pdf PDF
ep-113.pdf PDF
072213 roof and deck insulation.pdf PDF
075423 tpo.pdf PDF
36C24822R0116 0002.pdf PDF
076000 flashing and sheet metal.pdf PDF
as-723.pdf PDF
Attachment 10 Contract Progress Schedule.pdf PDF
Amend_ 36C24822R0116 0001.pdf PDF
AS-502.pdf PDF
36C24822R0116.docx DOCX document
Attachment 3 - LOS Certification Solicitation Version.doc DOC document
AS-851.pdf PDF
AS-100.pdf PDF
attachment 9 - q_a rfis.xlsx XLSX spreadsheet
AS-502 02.pdf PDF
AS-501.pdf PDF
AS-703.pdf PDF
Wage Determination 2022.pdf PDF
Attachment 4 - Price Matrix.xlsx XLSX spreadsheet
Attachment 8 (Exhibit B) Past and Present Performance Questionnaire.docx DOCX document
AS-203-FLO.pdf PDF
Attachment 6 -(Exhibit C) EMR.docx DOCX document
Site Location.pptx PPTX presentation
Attachment 7- (Exhibit A) Performance Relevancy Survey v2.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD

FD

A B C D E

12.8

MECH.

3G-100AS-501

E

AS-502A

AS-501

D

AS-502 C

B

AS-701

A

AS-701

STAIR 12

3G-122S

3/

4"

56' - 4"

E

AS-422

C

AS-701

B

AS-702

23' - 6"

AS-501

G

AS-502D

AS-501

F

AS-502 E

AS-501

A

AS-501

H

AS-501B

AS-502 B

B.5 D.6

11.3

12.3

8"

1 1

/2"

6' - 0"

E 2

H8.21

SS

C.3

6'

- 0

8' - 5"

A

AS-703

A

AS-723

E 2

H8.26

SS

RD

OD

RD

OD

RD

OD

RD

OD

7' - 6" 10' - 0 1/2"

3' - 0 1/2"

3'

- 0

E

AS-851

SIM

D

AS-851

Sim

D

AS-851

Sim

D

AS-851

Sim

D

AS-851

Sim

C

AS-851

TYP

SCREEN WALL

CHILLER, CURB

6' - 9" 25' - 0" 11' - 0" 14' - 0" 8' - 5" 16' - 7" 14' - 10" 10' - 2" 2' - 1 1/2"

100' - 0"

2'

- 0

2'

- 1

1/ 2"

1 1 /2"

1/

2"

8"

8" 8'

- 8

0"

0"

2'

- 1

1/ 2"

ROOF PAD, TYP

L2

5' - 3"

D

AS-851

Sim

D

AS-851

Sim

4'

- 9

MECHANICAL

HOUSEKEEPING PAD

8' - 4 1/2"

8'

- 4

1/ 2"

EXHAUST FAN, TYP

ACCESS LADDER

EXHAUST FAN, TYP

2' - 2"

RD

OD

5' - 11 1/2" E.J.

D

AS-851

Sim

H

AS-851

Sim

J

AS-851

C D

A

AS-701

AS-502D

AS-501

F

AS-502 E

B.5 D.6

11.3

12.3

C.3 A

AS-703

RDOD

TYP

F

AS-851

1' - 9" 14' - 0" 8' - 5" 16' - 7" 14' - 10"

1' - 9" 1'

- 7 1/

2"

8"

1/

2" 1'

- 9

D

AS-851

Sim

53' - 10"

6 1 /2"

A B

D

AS-851

Sim

SCUPPER BOX AND

DOWNSPOUT

PROVIDE SPLASH

BLOCK ON ROOF

BELOW

GENERAL PLAN NOTES:

1. ALL GYP BD PARTITIONS SHALL BE TAPED, SPACKLED, AND SANDED WITH NO VISIBLE JOINTS. PATCH AND REPAIR SURFACES TO MATCH ADJACENT OR ADJOINING SURFACES WHERE REQUIRED. ALL SURFACES

SHALL BE ALIGNED.

2. WHERE FURRED PARTITIONS EXCEED MAXIMUM HEIGHT. BRACE TO ADJACENT STRUCTURE, PER DETAIL.

3. FIRE SAFE PENETRATIONS AT RATED PARTITIONS PER APPLICABLE UL ASSEMBLY. REFER TO PARTITION

DETAILS IN THE DOCUMENT SET.

4. ALL INTERIOR PARTITIONS, PENETRATIONS, OTHER OPENINGS IN THE BUILDING SHELL SHALL BE SEALED, GASKETED, OR WEATHER STRIPPED.

5. PROVIDE METAL BLOCKING AS REQUIRED AT LOCATIONS INCLUDING BUT NOT LIMITED TO: GRAB BARS, SHELVING, OVERHEAD CABINETS, SIGNAGE, TOILET ROOM ACCESSORIES, ETC.

6. PROVIDE FIRE MTL. BLOCKING AS REQUIRED AT ALL CORRIDOR HANDRAIL LOCATIONS. SEE FINISH PLAN

FOR HANDRAIL LOCATIONS.

7. ALL WOOD TO BE FIRE RETARDANT TREATED IN ACCORDANCE WITH LOCAL CODES.

8. PROVIDE CORNER GUARDS AT ALL OUTSIDE CORNERS. SEE INTERIOR FINISH PLAN FOR LOCATIONS.

9. ALL GYP BD PARTITIONS RECEIVING RUBBER BASE TO BE FINISHED SMOOTH TO THE SLAB.

10. PATCH AND REPAIR EXISTING SLAB WHERE REQUIRED.

11. ALL PARTITIONS ARE DIMENSIONED FROM FACE OF FINISH TO FACE OF FINISH UNLESS OTHERWISE NOTED.

ALL DIMENSIONS MARKED "CLEAR" OR "HOLD" SHALL BE MAINTAINED AND SHALL ALLOW FOR THICKNESS OF ALL

WALL FINISHES.

12. DIMENSIONS NOTED "CLEAR" OR "HOLD" MUST BE ACCURATELY MAINTAINED AND SHALL NOT VARY MORE

THAN +/- 1/8" WITHOUT WRITTEN CONSENT FROM THE ARCHITECT

13. PROVIDE BLOCKING/SUPPORT AS NECESSARY FOR MILLWORK.

14. CONTRACTOR TO COORDINATE AND PROVIDE BLOCKING FOR ALL OWNER SUPPLIED EQUIPMENT AND FURNITURE. CONTRACTOR SHALL INSTALL ALL REQUIRED BLOCK PRIOR TO INSTALLATION OF GWB IN ALL

LOCATIONS.

15. PROVIDE POWER FOR AUTOMATIC DOOR OPENERS AND ASSOCIATED HARDWARE. COORDINATED WITH

ELECTRICAL CONTRACTOR AND HARDWARE SUPPLIER.

16. NEW PNEUMATIC TUBE RECEIVERS FOR NEW BUILDING ADDITION WILL TIE INTO EXISTING BUILDING 100 PNEUMATIC TUBE SYSTEM ZONE 2. NEW SYSTEM FOR BUILDING ADDITION WILL BE COORDINATED WITH

THE MEDICAL CENTER TO MINIMIZE DOWN TIME OF THE EXISTING PNEUMATIC TUBE SYSTEM.

EXISTING 2-PORT TRANSFER STATION (#27) WILL BE REMOVED AND REPLACED WITH A NEW 4-PORT TRANSFER STATION. THE EXISTING TRANSFER STATION (#27) IS LOCATED IN BUILDING 100 INTERSTITIAL SPACE, AREA 1B, APPROXIMATELY 25FT WEST OF COLUMN D.4/26. THE NEW 4-PORT SYSTEM SHALL SERVE EXISTING PNEUMATIC TUBE STATIONS AND NEW PNEUMATIC TUBE STATION LOCATED IN THE EYE TREATMENT CENTER (RECEPTION ROOM 161). CONTRACTOR SHALL PROVIDE A FULLY FUNCTIONING SYSTEM IN COMPLIANCE WITH THE

CONTRACT REQUIREMENTS.

PNEUMATIC TUBE STATIONS SHALL BE MODEL CTS TL 2007 (OR THE LATEST VERSION OF THIS PTS) WITH I.Q.

CONTROLS OR EQUAL, PROVIDE A 3-PORT TRANSFER STATION IN THE ETC INTERSTITIAL TO SERVE THE PTS IN ROOM 161 AND THE TWO (2) PTS IN ASC (ONE IN THE CONTROL ROOM AND ONE IN THE MEDICAL

EQUIPMENT ROOM ADJACENT TO THE NURSE STATION IN THE PACU AREA).

THE TWO (2) 6-INCH CONDUITS WILL HAVE TO BE ROUTED FROM THE FIRST FLOOR INTERSTITIAL TO THE

SECOND FLOOR INTERSTITIAL, AND THEN DOWN TO THE PTS IN ASC.

17. ALL PRECAST PANELS ARE TO BE SPRAYED WITH A CONTINUOUS VAPOR BARRIER (INTERIOR BUILDING SIDE), ALL SEAMS, BOTH INTERNAL AND EXTERNAL SHALL BE CAULKED.

HELLMUTH, OBATA & KASSABAUM, INC.

ARCHITECTURE, ENGINEERING, PLANNING,

INTERIORS, GRAPHICS, CONSULTING

Drawing Number:

Drawing Title: Project Number

DrawnChecked:

CONSULTANTS Project Title

Building Number

All reproduction & intellectual property rights reserved © 2008

Revisions

Client Location

Contract No:

One Tampa City Center, Suite 1800, Tampa, FL, 33602 Voice:

Fax:

Internet:

| 813 | 229 - 0300 | 813 | 223 - 7116 http://www.hok.com

Date

ARCHITECT/ ENGINEERS:

FL. Reg. AAC001139

Approved: Division Chief

Date

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

D e p ar tm en t of V e t er an s

A ff ai rs

CONSTRUCTION DOCUMENTS CD 3

FULLY SPRINKLERED

BAY PINES HEALT

HCARE SYSTE

M

Approved: Service Director

05.29010.09 / 05.29010.13

Bay Pines FL 33744

FLOOR PLAN - PENTHOUSE/ROOF

AS-203

KC -09/08/2009

516-326 / 516-334VA Bay Pines Healthcare System - Eye Treatment Center &

Ambulatory Surgery Center

1/8" = 1'-0"A PENTHOUSE PLAN / ROOF PLAN

EXISITNG BUILDING 100

1/8" = 1'-0"B PENTHOUSE ROOF PLAN

1/8" = 1'-0"C PENTHOUSE STAIR ROOF PLAN

EXTERIOR

ROOF

LADDER

ROOF

MOUNTED

FAN

ROOF

MOUNTED

FAN

1 ADDENDUM #3 2009.08.28

2 ADDENDUM #4 2009.09.08

File details come from the government source that posted it. Updated .