P09_ IGE B106 Roof- Rev 2.doc
DOC document 33 KB Posted
- Solicitation number
- 36C24822R0116
About this file
This document outlines requirements for a roof replacement project at a Department of Veterans Affairs facility. The scope of work includes removing the existing roof system and deck on all levels of Building 106 and installing a new roofing system and deck. The roof must meet Florida energy code and hurricane resistance standards. The project completion deadline is 120 days. The base bid covers the main roof, while optional bids include stairwell and mechanical room roofs and a roof connecting Building 106 to another building.
The related federal contract opportunity is a solicitation from the VA for project 516-22-118 to repair the roof of Building 106. Contractors should follow applicable environmental and energy conservation regulations for any hazardous materials, Energy Star products, biobased products, or recovered materials used.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Provide all services necessary for the replacement of the Building 106 roof system. The roof system replacement shall include the removal of the existing roofing system and deck on all levels and providing a new roofing system and deck on all levels. The lightning protection system, shall be reused, repaired where required and recertified. The roof will be a direct replacement of the existing TPO roofing system. The penthouse roof, north stairwell roof and the small south west section that is attached to building 100 can be bid deducts. All materials and finishes must meet performance requirements contained in VA master construction specifications. The roof shall meet current applicable Federal, State, and Local code and the Florida Energy Code. The roof shall have an R-38 value and meet Miami Dade Hurricane Code, CAT-5 Hurricane resistant. The anticipated completion of this project is 120 days.
The contractor shall restore any damage to Building, landscaping, and surrounding pavement caused by the contract work in the construction area to its original condition.
Construction Period Submittals
The contractor shall provide review of shop drawings, product data, and samples during construction as required by the VA RFP documents.
A. Building No. 106 will be occupied during performance of the work. Contractor shall furnish schedule of phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof, in order to coordinate phasing.
B.
All employees of the contractor shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
C.
The work shall comply with all applicable Federal, State and local legal requirements regarding workers health and safety. The requirements include but are not limited to those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities, and shall ensure safe and healthful working conditions for its employees.
F. Security – Identification badges will be required for all contractor and subcontractor personnel access as needed and defined/coordinated with the COR for this project. All contractor and subcontractor personnel will provide the Contracting Officer with a VA Form 20-0344 (Annual Certification of Veteran Status and Veteran-Relatives). VA Privacy and Health Insurance Portability and Accountability Act (HIPAA) training will be required for all contractors/subcontractors on this project. No classified information will be required for this acquisition.
G. Period of Performance – The contract performance period for this project is estimated to be 120 calendar days for design after issuance of the “Notice to Proceed”.
H. Environmental and Energy Conservation – Applicable FAR Part 23 environmental and energy conservation regulations will be followed by the contractor, as indicated in the specifications by product, to include hazardous materials, Energy Star products, biobased products, pollution prevention and recovered material. A
PRICING:
BASE BID: The base bid will encompass the main roof of building 106 (excluding the stairwell roof, mechanical room roof, and the roof connecting building 106 to building 100).
BID OPTION 1: This bid will encompass the stairwell roof and the mechanical room roof.
BID OPTION 2: This bid will encompass the roof connecting building 106 to building 100.
1 | Page