ARFQ DEP2500000018-Pricing Page - Exhibit A (9).pdf

PDF 551 KB Posted

Attached to
OER - VIENNA PCE SUPERFUND SITE
Solicitation number
ARFQ-0313-DEP2500000018-1
Issued by
Upshur County, West Virginia

About this file

This document is an Exhibit A Pricing Page for a West Virginia Department of Environmental Protection contract for the Operation, Maintenance and Monitoring of the Vienna PCE site. The contract includes tasks such as environmental scientist and technician labor hours, monitoring well installation and maintenance, groundwater sampling and gauging, and various operations and maintenance activities for the air sparge and soil vapor extraction systems. The contract has estimated quantities for each line item task, including 800 hours for an Environmental Scientist, 1000 hours for a Project Manager, and 1000 hours for an Environmental Technician.

The contract also includes pricing for components and parts that may need to be replaced or repaired as part of the operations and maintenance work. This includes items such as air filters, oil filters, belts, solenoid valves, and pressure/vacuum gauges. The contract allows for a vendor markup percentage on parts. There is also a provision for the use of subcontractors with no markup.

View the file

Other files

File Type Posted
ARFQ DEP2500000018-Vienna_PCE_OM_Specs.pdf PDF
ARFQ DEP2500000018-Attachment 3E - Revised Final O&M Manual-5 (2).pdf PDF
ARFQ DEP2500000018-Attachment 8 Groundwater Well Sampling Procedures (110) (3).pdf PDF
ARFQ DEP2500000018-Attachment 5 ERT-PROC-2044-20-R1 SOP Manual (3).pdf PDF
ARFQ DEP2500000018-Attachment 2 WVDEP CERCLA QAPrP Final October 2022-signed_09072022_BM (2).pdf PDF
ARFQ DEP2500000018-Attachment 6 Vienna PCE Superfund_SAP_ R1 (2).pdf PDF
ARFQ DEP2500000018-Attachment 1 ViennaPCE_USEPA (2).pdf PDF
ARFQ DEP2500000018-Attachment 7 Vienna Well Details 2020 MASTER rev 1.xlsx - Monitoring Wells (3).pdf PDF
ARFQ DEP2500000018-Attachment 3A - Revised Final O&M Manual (3).pdf PDF
ARFQ DEP2500000018-Attachment 3C - Revised Final O&M Manual-3 (2).pdf PDF
ARFQ DEP2500000018-Attachment 3D - Revised Final O&M Manual-4 (2).pdf PDF
Final_ARFQ_0313_DEP2500000018_1_WV_ARFQ_FORM.PDF PDF
ARFQ DEP2500000018-Attachment 9 Soil Gas Sampling (130) (2).pdf PDF
ARFQ DEP2500000018-Attachment 3B - Revised Final O&M Manual-2 (2).pdf PDF
ARFQ DEP2500000018-Attachment 4 ERT-PROC-2048-20-R1 SOP Manual (2).pdf PDF
ARFQ DEP2500000018-DEP Instructions to Vendors & Terms and Conditions - Construction Reclamation.pdf PDF
DEP Construction Forms-ARFQ DEP2500000018-Vienna PCE Superfund Site.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT "A"

PRICING PAGE

WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

Operation, Maintenance and Monitoring of the Vienna PCE

Item Frequency Specification Description Unit of Measure Est. Qty (For Bidding only)

1 As needed/directed 4.1 Environmental Scientist - (for tasks not listed)

Hour 800

2 As needed/directed 4.2 Project Manager - (for tasks not listed)

Hour 1000

As needed/directed 4.3 Environmental Technician (System Operator) - (for tasks not listed)

Hour 1,000

As needed/directed 4.4 Electrician Hour 250

As needed/directed 4.5 CAD/GIS Technician Hour 200

As needed/directed (Monitoring Well Installation)

5.2.1 Mobilization and demobilization

Per Well 1

Monitoring Well Installation 5.2.2 Rotosonic Drilling Per linear foot 240

Monitoring Well Installation 5.2.3 2-inch monitoring well Per linear foot 240

Monitoring Well Installation 5.2.4 Well abandonment (if needed)

Per linear foot 160

Monitoring Well Installation 5.2.5 Borehole abandonment Per linear foot 160

Monitoring Well Installation 5.2.6 Reclamation of disturbed areas

Per square foot 90

Monitoring Well Installation 5.2.7 DOT 17-C Drums Each 15

Monitoring Well Installation 5.2.8 IDW disposal Per drum 15

Monitoring Well Installation 5.2.9 PID Organic vapor analyzer Per day 3

Report/Deliverable 5.2.10 Monitoring Well Construction Report

Each 3

Report/Deliverable 5.3.1 Sampling Plan Update Each 4

17 Sampling - Biannual 5.3.1.1.1 Sampling of groundwater monitoring wells - low flow

Per Well 50

18 Sampling - Biannual 5.3.1.1.2 Sampling of groundwater monitoring wells - PDB

Per Well 35

19 Groundwater Gauging - Semi-annual 5.3.2 Gauging depth to water in all site monitoring wells

Per Well 152

Sampling - Semi-annual 5.3.3 Sampling of AS/SVE monitoring wells

Per Well 26

As needed/directed 5.3.4 Report Writing (for tasks not listed)

Hour 500

Report/Deliverable 5.3.4 Semi-annual Sampling Report Each 2

Weekly 5.4.1 Perform weekly O&M activities

Each 52

Monthly 5.4.2 Perform monthly O&M activities

Each 12

Quarterly 5.4.3 Perform quarterly O&M activities

Each 4

Biannually 5.4.4 Perform biannual O&M activities

Each 4

Annually 5.4.5 Perform annual O&M activities

Each 1

As needed/directed 5.4.6 Restart computers Each 24

29 As needed/directed 5.4.6 Change bag filters when DP reaches 12 psig

Each 1

30 As needed/directed 5.4.6 Change out or backwash liquid phase when GAC media becomes spent

Each 1

As needed/directed 5.4.6 Check EW-1 well vault for leaks

Each 1

As needed/directed 5.4.6 Check pull boxes for leaks Each 1

33 As needed/directed 5.4.6 Clean or replace blower inlet air filters

Each 1

34 As needed/directed 5.4.6 Empty condensate collection drums at TU2

Each 1

35 As needed/directed 5.4.6 Pull and check extraction well pump for bio-fouling

Each 1

WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

Operation, Maintenance and Monitoring of the Vienna PCE

Frequency Specification Description Unit of Measure Est. Qty (For Bidding only)

As needed/directed 5.4.6 Shock chlorinate extraction well as needed

Each 1

As needed/directed 5.4.6 Clean transformers Each 1

As needed/directed 5.4.6 Clean exhaust fan blades and motor

Each 1

As needed/directed 5.4.6 Clean or replace SVE blower inlet air filter element

Each 1

Component 5.5.1 Oil filter for air sparge systems

Each 1

Component 5.5.1 Air filter for air sparge systems

Each 1

Component 5.5.1 Belts for air sparge systems Each 1

Item

43 Component 5.5.1 Solenoid Valve for Air Sparge Systems

Each 1

44 Component 5.5.1 Oil filter for air sparge (TU3) C300, C400 compressor

Each 1

45 Component 5.5.1 Oil filter separator for air sparge (TU1) C300, C400 compressor

Each 1

46 Component 5.5.1 Oil filter separator for air sparge (TU3) C300, C400 compressor

Each 1

47 Component 5.5.1 Air filter for air sparge(TU3) C300, C400 compressor

Each 1

48 Component 5.5.1 PDX filter for Air Sparge (TU3) C300, C400 compressor

Each 1

49 Component 5.5.1 PDX filter for Air Sparge (TU1) C300, C400 compressor

Each 1

Component 5.5.1 Solenoid Time Delay Fuses

ATQR 1/2

Each 1

Component 5.5.1 Solenoid Rebuild Kit Each 1

52 Component 5.5.1 Vacuum Gauge (0-30” WC vacuum) for SVE Manifold/Wellhead

Each 1

53 Component 5.5.1 Differential pressure gauge for VGAC Tanks DPI-200, 201

(0-10" WC)

Each 1

54 Component 5.5.1 Differential pressure gauge for Drop out tank DPI-100 (0-

15" WC)

Each 1

55 Component 5.5.1 Air Sparge Manifold & Wellhead gauge (0-100 PSI)

Each 1

Component 5.5.1 Pressure gauge (0-15" WC) PI 200, 201 on VGAC-201, 202 Tanks

Each 1

Component 5.5.1 Moisture separator air filter Each 1

Component 5.5.1 Belt set for SVE Systems Each 2

Component 5.5.1 Filter element for SVE Systems

Each 2

Component 5.5.1 Oil for SVE Systems Per Gallon 20

Component 5.5.1 Screen 18x18 mesh for VC Vessels

Each 2

62 Component 5.5.1 Mechanical shaft seal Transfer pumps

Each 2

63 Component 5.5.1 Oil-food grade for air sparge systems

Per Gallon 20

64 Component 5.5.1 25 micron bag filter for TU 3 Bag Filters

Each 2

Component 5.5.1 O-ring for bag filter housing lid for TU 3 Bag Filters

Each 2

Report/Deliverable 5.6.1 Weekly O&M report Each 52

Report/Deliverable 5.6.2 Monthly O&M report Each 12

68 Report/Deliverable 5.6.3 Semi-annual Sampling Report Each 2

WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

Operation, Maintenance and Monitoring of the Vienna PCE

Frequency Specification Description Unit of Measure Est. Qty (For Bidding only) Report/Deliverable 5.6.4 O&M Manual Update Each 1

Item

70 Parts Markup 5.5.2 Vendor's percentage of parts markup (presented as a decimal)

71 As needed/As directed 5.1 Subcontractors Use (No Markup)

No bid item

File details come from the government source that posted it. Updated .