ARFQ DEP2500000018-Pricing Page - Exhibit A (9).pdf
PDF 551 KB Posted
- Attached to
- OER - VIENNA PCE SUPERFUND SITE
- Solicitation number
- ARFQ-0313-DEP2500000018-1
- Issued by
- Upshur County, West Virginia
About this file
This document is an Exhibit A Pricing Page for a West Virginia Department of Environmental Protection contract for the Operation, Maintenance and Monitoring of the Vienna PCE site. The contract includes tasks such as environmental scientist and technician labor hours, monitoring well installation and maintenance, groundwater sampling and gauging, and various operations and maintenance activities for the air sparge and soil vapor extraction systems. The contract has estimated quantities for each line item task, including 800 hours for an Environmental Scientist, 1000 hours for a Project Manager, and 1000 hours for an Environmental Technician.
The contract also includes pricing for components and parts that may need to be replaced or repaired as part of the operations and maintenance work. This includes items such as air filters, oil filters, belts, solenoid valves, and pressure/vacuum gauges. The contract allows for a vendor markup percentage on parts. There is also a provision for the use of subcontractors with no markup.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT "A"
PRICING PAGE
WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION
Operation, Maintenance and Monitoring of the Vienna PCE
Item Frequency Specification Description Unit of Measure Est. Qty (For Bidding only)
1 As needed/directed 4.1 Environmental Scientist - (for tasks not listed)
Hour 800
2 As needed/directed 4.2 Project Manager - (for tasks not listed)
Hour 1000
As needed/directed 4.3 Environmental Technician (System Operator) - (for tasks not listed)
Hour 1,000
As needed/directed 4.4 Electrician Hour 250
As needed/directed 4.5 CAD/GIS Technician Hour 200
As needed/directed (Monitoring Well Installation)
5.2.1 Mobilization and demobilization
Per Well 1
Monitoring Well Installation 5.2.2 Rotosonic Drilling Per linear foot 240
Monitoring Well Installation 5.2.3 2-inch monitoring well Per linear foot 240
Monitoring Well Installation 5.2.4 Well abandonment (if needed)
Per linear foot 160
Monitoring Well Installation 5.2.5 Borehole abandonment Per linear foot 160
Monitoring Well Installation 5.2.6 Reclamation of disturbed areas
Per square foot 90
Monitoring Well Installation 5.2.7 DOT 17-C Drums Each 15
Monitoring Well Installation 5.2.8 IDW disposal Per drum 15
Monitoring Well Installation 5.2.9 PID Organic vapor analyzer Per day 3
Report/Deliverable 5.2.10 Monitoring Well Construction Report
Each 3
Report/Deliverable 5.3.1 Sampling Plan Update Each 4
17 Sampling - Biannual 5.3.1.1.1 Sampling of groundwater monitoring wells - low flow
Per Well 50
18 Sampling - Biannual 5.3.1.1.2 Sampling of groundwater monitoring wells - PDB
Per Well 35
19 Groundwater Gauging - Semi-annual 5.3.2 Gauging depth to water in all site monitoring wells
Per Well 152
Sampling - Semi-annual 5.3.3 Sampling of AS/SVE monitoring wells
Per Well 26
As needed/directed 5.3.4 Report Writing (for tasks not listed)
Hour 500
Report/Deliverable 5.3.4 Semi-annual Sampling Report Each 2
Weekly 5.4.1 Perform weekly O&M activities
Each 52
Monthly 5.4.2 Perform monthly O&M activities
Each 12
Quarterly 5.4.3 Perform quarterly O&M activities
Each 4
Biannually 5.4.4 Perform biannual O&M activities
Each 4
Annually 5.4.5 Perform annual O&M activities
Each 1
As needed/directed 5.4.6 Restart computers Each 24
29 As needed/directed 5.4.6 Change bag filters when DP reaches 12 psig
Each 1
30 As needed/directed 5.4.6 Change out or backwash liquid phase when GAC media becomes spent
Each 1
As needed/directed 5.4.6 Check EW-1 well vault for leaks
Each 1
As needed/directed 5.4.6 Check pull boxes for leaks Each 1
33 As needed/directed 5.4.6 Clean or replace blower inlet air filters
Each 1
34 As needed/directed 5.4.6 Empty condensate collection drums at TU2
Each 1
35 As needed/directed 5.4.6 Pull and check extraction well pump for bio-fouling
Each 1
WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION
Operation, Maintenance and Monitoring of the Vienna PCE
Frequency Specification Description Unit of Measure Est. Qty (For Bidding only)
As needed/directed 5.4.6 Shock chlorinate extraction well as needed
Each 1
As needed/directed 5.4.6 Clean transformers Each 1
As needed/directed 5.4.6 Clean exhaust fan blades and motor
Each 1
As needed/directed 5.4.6 Clean or replace SVE blower inlet air filter element
Each 1
Component 5.5.1 Oil filter for air sparge systems
Each 1
Component 5.5.1 Air filter for air sparge systems
Each 1
Component 5.5.1 Belts for air sparge systems Each 1
Item
43 Component 5.5.1 Solenoid Valve for Air Sparge Systems
Each 1
44 Component 5.5.1 Oil filter for air sparge (TU3) C300, C400 compressor
Each 1
45 Component 5.5.1 Oil filter separator for air sparge (TU1) C300, C400 compressor
Each 1
46 Component 5.5.1 Oil filter separator for air sparge (TU3) C300, C400 compressor
Each 1
47 Component 5.5.1 Air filter for air sparge(TU3) C300, C400 compressor
Each 1
48 Component 5.5.1 PDX filter for Air Sparge (TU3) C300, C400 compressor
Each 1
49 Component 5.5.1 PDX filter for Air Sparge (TU1) C300, C400 compressor
Each 1
Component 5.5.1 Solenoid Time Delay Fuses
ATQR 1/2
Each 1
Component 5.5.1 Solenoid Rebuild Kit Each 1
52 Component 5.5.1 Vacuum Gauge (0-30” WC vacuum) for SVE Manifold/Wellhead
Each 1
53 Component 5.5.1 Differential pressure gauge for VGAC Tanks DPI-200, 201
(0-10" WC)
Each 1
54 Component 5.5.1 Differential pressure gauge for Drop out tank DPI-100 (0-
15" WC)
Each 1
55 Component 5.5.1 Air Sparge Manifold & Wellhead gauge (0-100 PSI)
Each 1
Component 5.5.1 Pressure gauge (0-15" WC) PI 200, 201 on VGAC-201, 202 Tanks
Each 1
Component 5.5.1 Moisture separator air filter Each 1
Component 5.5.1 Belt set for SVE Systems Each 2
Component 5.5.1 Filter element for SVE Systems
Each 2
Component 5.5.1 Oil for SVE Systems Per Gallon 20
Component 5.5.1 Screen 18x18 mesh for VC Vessels
Each 2
62 Component 5.5.1 Mechanical shaft seal Transfer pumps
Each 2
63 Component 5.5.1 Oil-food grade for air sparge systems
Per Gallon 20
64 Component 5.5.1 25 micron bag filter for TU 3 Bag Filters
Each 2
Component 5.5.1 O-ring for bag filter housing lid for TU 3 Bag Filters
Each 2
Report/Deliverable 5.6.1 Weekly O&M report Each 52
Report/Deliverable 5.6.2 Monthly O&M report Each 12
68 Report/Deliverable 5.6.3 Semi-annual Sampling Report Each 2
WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION
Operation, Maintenance and Monitoring of the Vienna PCE
Frequency Specification Description Unit of Measure Est. Qty (For Bidding only) Report/Deliverable 5.6.4 O&M Manual Update Each 1
Item
70 Parts Markup 5.5.2 Vendor's percentage of parts markup (presented as a decimal)
71 As needed/As directed 5.1 Subcontractors Use (No Markup)
No bid item