ARFQ DEP2500000018-Attachment 3A - Revised Final O&M Manual (3).pdf

PDF 16 MB Posted

Attached to
OER - VIENNA PCE SUPERFUND SITE
Solicitation number
ARFQ-0313-DEP2500000018-1
Issued by
Upshur County, West Virginia

About this file

This document is the Revised Final Operations & Maintenance (O&M) Manual for Request for Quotation (ARFQ) DEP2500000018 issued by the West Virginia Department of Environmental Protection (WVDEP). The O&M Manual provides detailed requirements and specifications for the operation and maintenance of the Canaan Valley Acid Mine Drainage Treatment Plant located in Tucker County, West Virginia. The manual covers all aspects of the treatment plant's operations, including influent and effluent water quality monitoring, sludge management, mechanical and electrical equipment maintenance, and emergency response protocols.

The contract term is one year with four optional one-year renewal periods. No specific quantities are provided, as this is an on-going operations and maintenance contract. The document does not contain any information about pricing, set-asides, incumbents, funding, or other salient commercial terms.

View the file

Other files

File Type Posted
ARFQ DEP2500000018-Vienna_PCE_OM_Specs.pdf PDF
ARFQ DEP2500000018-Attachment 3E - Revised Final O&M Manual-5 (2).pdf PDF
ARFQ DEP2500000018-Attachment 8 Groundwater Well Sampling Procedures (110) (3).pdf PDF
ARFQ DEP2500000018-Attachment 5 ERT-PROC-2044-20-R1 SOP Manual (3).pdf PDF
ARFQ DEP2500000018-Attachment 2 WVDEP CERCLA QAPrP Final October 2022-signed_09072022_BM (2).pdf PDF
ARFQ DEP2500000018-Attachment 6 Vienna PCE Superfund_SAP_ R1 (2).pdf PDF
ARFQ DEP2500000018-Attachment 1 ViennaPCE_USEPA (2).pdf PDF
ARFQ DEP2500000018-Attachment 7 Vienna Well Details 2020 MASTER rev 1.xlsx - Monitoring Wells (3).pdf PDF
ARFQ DEP2500000018-Attachment 3C - Revised Final O&M Manual-3 (2).pdf PDF
ARFQ DEP2500000018-Attachment 3D - Revised Final O&M Manual-4 (2).pdf PDF
Final_ARFQ_0313_DEP2500000018_1_WV_ARFQ_FORM.PDF PDF
ARFQ DEP2500000018-Attachment 9 Soil Gas Sampling (130) (2).pdf PDF
ARFQ DEP2500000018-Attachment 3B - Revised Final O&M Manual-2 (2).pdf PDF
ARFQ DEP2500000018-Attachment 4 ERT-PROC-2048-20-R1 SOP Manual (2).pdf PDF
ARFQ DEP2500000018-Pricing Page - Exhibit A (9).pdf PDF
ARFQ DEP2500000018-DEP Instructions to Vendors & Terms and Conditions - Construction Reclamation.pdf PDF
DEP Construction Forms-ARFQ DEP2500000018-Vienna PCE Superfund Site.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

EVISED FIN

AL O

PERATIO

N

S AN

D M

AIN

TEN

AN

CE

(O M ) M

AN

UAL G

RO

U N

DW

ATER TREATM

EN

T SYSTEM

S

(TU

1, TU

AN

D TU

3)

Vienna PCE Superfund Site Vienna, W est Virginia O ctober 2015

Response Action Contract for Remedial Planning and Oversight Activities in

EPA Region III

Revised Final Operations and Maintenance (O&M) Manual Groundwater Treatment Systems

(TU1, TU2 and TU3)

Vienna PCE Superfund Site Vienna, West Virginia

October 2015

ResponseActionContract
forRemedialPlanningandOversightActivities

in EPA Region III

U.S. EPA Contract No. EP‐S3‐07‐06

RevisedFinalOperationsandMaintenance
(O&M)ManualGroundwaterTreatmentSystems
(TU1,TU2andTU3)
ViennaPCESuperfundSite
Vienna,WestVirginia
WorkAssignmentNo.:016‐LRLR‐03AT
DocumentControlNo.:3330‐016‐OM‐REPT‐02940

October 2015

Prepared for:

U.S.EnvironmentalProtectionAgency
RegionIII
1650ArchStreet
Philadelphia,Pennsylvania19103

Prepared by:

3201JermantownRoad,Suite400
Fairfax,Virginia22030

i

Table of Contents

Section 1 Introduction ....................................................................................................... 1‐1

1.1DocumentOrganization.........................................................................................................................................1‐1
1.2O&MStaffingPlan.....................................................................................................................................................1‐2
1.3ProjectDirectory.......................................................................................................................................................1‐3

Section 2 Background Information and Overview .............................................................. 2‐1

2.1SiteDescription.........................................................................................................................................................2‐1
2.2RemedialActionObjectives..................................................................................................................................2‐2
2.3TreatmentUnitDesignSummary......................................................................................................................2‐2
2.4O&MRequirements..................................................................................................................................................2‐6
2.4.1Operations......................................................................................................................................................2‐6
2.4.2SamplingandMonitoring........................................................................................................................2‐8

2.4.2.1 Performance Monitoring of Operational Conditions ..................................................... 2‐9

Section 3 Control Systems Description ............................................................................... 3‐1

3.1ControlPanels............................................................................................................................................................3‐1
3.2ControlLogicOverview..........................................................................................................................................3‐1
3.3ControlSystemFunctionalityOverview.........................................................................................................3‐2
3.4Human‐MachineInterface(HMI).......................................................................................................................3‐3
3.4.1MAINScreen..................................................................................................................................................3‐4
3.4.2MOTORSScreen...........................................................................................................................................3‐6
3.4.3VALVESScreen.............................................................................................................................................3‐9
3.4.4ALARMSScreen..........................................................................................................................................3‐10
3.4.5TRENDScreens..........................................................................................................................................3‐11
3.4.6DataLogs......................................................................................................................................................3‐13
3.4.7AlarmLogs...................................................................................................................................................3‐14
3.5RemoteAlarmNotification.................................................................................................................................3‐14
3.6RemoteAccess.........................................................................................................................................................3‐15

Section 4 Initial Set‐Up Procedures .................................................................................... 4‐1

4.1ControlPanels............................................................................................................................................................4‐1
4.2BagFilters(TU3only).............................................................................................................................................4‐1
4.3TransferPumps.........................................................................................................................................................4‐2
4.4Compressors...............................................................................................................................................................4‐3
4.5ExtractionWellPump(TU3only).....................................................................................................................4‐3
4.6SVESystems................................................................................................................................................................4‐4
4.7Off‐GasTreatmentSystems..................................................................................................................................4‐5
4.8MiscellaneousEquipment.....................................................................................................................................4‐5

Section 5 Systems Operating Procedures ........................................................................... 5‐1

5.1PreliminaryChecksPriortoSystemStart‐Up..............................................................................................5‐1
5.2FullAutomaticStart‐UpandOperation..........................................................................................................5‐1
5.3AutomaticStartupandOperationofSelectEquipment...........................................................................5‐3
5.4ManualSpeedControlforSubmersibleWellPump(TU3only)...........................................................5‐3
5.5RoutineOperations..................................................................................................................................................5‐4

Table of Continents (Continued) ii

5.6OperatorShutdown..................................................................................................................................................5‐4
5.7AutomaticShutdownonAlarmCondition.....................................................................................................5‐5
5.8EmergencyShutdown.............................................................................................................................................5‐5

Section 6 Maintenance Procedures ................................................................................... 6‐1

6.1PreventativeMaintenanceandLubricationSchedules.............................................................................6‐1
6.2ReplacementofConsumableItems...................................................................................................................6‐1
6.2.1BagFilters.......................................................................................................................................................6‐1
6.2.2Off‐GasTreatmentMedia.........................................................................................................................6‐2
6.2.3LiquidPhaseTreatmentMedia.............................................................................................................6‐2
6.3ExtractionWellMaintenance...............................................................................................................................6‐3
6.4ShutdownforMaintenance,Repair,orReplacement...............................................................................6‐4
6.4.1BagFilters.......................................................................................................................................................6‐4
6.4.2Compressors..................................................................................................................................................6‐4
6.4.3SubmersibleWellPump...........................................................................................................................6‐4
6.4.4SVESystem.....................................................................................................................................................6‐4
6.4.5Off‐GasTreatmentSystem.......................................................................................................................6‐4
6.4.6LiquidPhaseTreatmentSystem...........................................................................................................6‐4

6.5 Spare Parts List .......................................................................................................................................................... 6‐5

Section 7 Inspection and Monitoring Procedures ............................................................... 7‐1

7.1ExtractionWellsandPumps................................................................................................................................7‐1
7.2ConveyancePiping...................................................................................................................................................7‐1
7.3TreatmentPlants.......................................................................................................................................................7‐2

Section 8 Troubleshooting Guidelines ................................................................................ 7‐1

Section 9 Health and Safety Guidelines ............................................................................. 7‐1

Section 10 Recordkeeping and Reporting .......................................................................... 7‐1

10.1OperationsRecords...............................................................................................................................................7‐1
10.2MaintenanceRecords...........................................................................................................................................7‐1
10.3QuarterlyOperationsSummaryReport.......................................................................................................7‐2

Section 11 References ....................................................................................................... 7‐1

Table of Contents (Continued) iii

List of Figures

Figure3‐1MAINScreen,TU1
Figure3‐2MAINScreen,TU2
Figure3‐3MAINScreen,TU3
Figure3‐4MOTORSScreen,TU1
Figure3‐5MOTORSScreen,TU3
Figure3‐6VALVESScreen,TU1
Figure3‐7ALARMSScreen,TU3
Figure3‐8Real‐TimeTRENDScreen,TU3
Figure3‐9HistoricalTRENDScreen,TU3

List of Tables

Table1‐1ProjectO&MDirectory
Table2‐1StormSewer/AirDischargeCriteria
Table2‐2TU1EquipmentList
Table2‐3TU2EquipmentList
Table2‐4TU3EquipmentList
Table3‐1TU1ControlSystemInterlocks
Table3‐2TU2ControlSystemInterlocks
Table3‐3TU3ControlSystemInterlocks
Table3‐4TU1ControlTagDatabase
Table3‐5TU2ControlTagDatabase
Table3‐6TU3ControlTagDatabase
Table5‐1RoutineOperatingParameters
Table6‐1RoutineandPreventativeMaintenanceSchedule
Table6‐2SparePartsList
Table7‐1RoutineInspection,Monitoring,andMaintenanceSchedule
Table8‐1GeneralTroubleshootingGuidelines

List of Drawings

Drawing2‐1TreatmentUnit#1SitePlan
Drawing2‐2TreatmentUnit#1MechanicalLayout
Drawing2‐3AirSpargeandSVEManifoldDetails
Drawing2‐4TreatmentUnit#2SitePlan
Drawing2‐5TreatmentUnit#2MechanicalLayout
Drawing2‐6TreatmentUnit#3SitePlan
Drawing2‐7TreatmentUnit#3MechanicalLayout
Drawing2‐10TreatmentUnit#1ProcessandInstrumentationDiagram
Drawing2‐11TreatmentUnit#2ProcessandInstrumentationDiagram
Drawing2‐12TreatmentUnit#3ProcessandInstrumentationDiagram

Drawing 2‐14 Treatment Unit #3 Groundwater Extraction Wellhead Detail

Table of Continents (Continued) iv

Appendices

AppendixAVaporPhaseCarbonUnitswithGAC
AppendixBVapor/LiquidSeparator
AppendixCLiquidBagFilterVessels
AppendixDLiquidPhaseCarbonUnitswithGAC
AppendixEInductionMotors
AppendixFSubmersiblePump
AppendixGCustomLiquidLevelSwitch
AppendixHTransferPumps
AppendixIRotaryLobeBlowers
AppendixJElectromagneticFlowMeter
AppendixKPressureTransmitters
AppendixLIn‐LinePneumaticFlowMeter
AppendixMTemperatureTransmitters
AppendixNPoleGuidedandVenturiFlowMeters
AppendixOGroundwaterExtractionPump,Motor,Transducer,andController
AppendixPSupervisoryControlsandDataAcquisition
AppendixQAirCompressors
AppendixRMiscellaneousElectricalEquipment
AppendixSExampleFormsandLogsforO&MRecordkeeping
AppendixTTreatmentMediaModelingData

Table of Contents (Continued) v

Abbreviations and Acronyms

amslabovemeansealevel
CVcontrolledvariable
EPAU.S.EnvironmentalProtectionAgency
EWextractionwell
GACgranularactivatedcarbon
gpmgallonsperminute
HDPEHighDensityPolyethylene
HMIHuman‐MachineInterface
HPhorsepower
I/Oinputs&outputs(PLCI/O)
KVAkilovolt‐ampere
lbspounds
LGACliquidgranularactivatedcarbon
LTRALongTermRemedialAction
MCLmaximumconcentrationlimits
O&Moperationsandmaintenance
OITOperatorInterfaceTerminal
P&IDProcessandinstrumentationdiagram
PCEtetrachloroethene
PIDproportional‐integral‐derivative
PLCprogrammablelogiccontroller
ppmvpartspermillionbyvolume
psigpoundspersquareinchgage
PVCPolyvinylChloride
RARemedialAction
RACResponseActionContract
RCRAResourceConservationandRecoveryAct
SMPSiteManagementPlan
scfmcubicfeetperminuteatstandardconditions
SDRstandarddimensionratio
SVEsoilvaporextraction
TCLPtoxicitycharacteristicleachingprocedure
TDHtotaldischargehead
TUTreatmentUnit
µg/Lmicrogramsperliter
VACvoltsAC
VDCvoltsDC
VFDvariablefrequencydrive
VGACvaporgranularactivatedcarbon
wcwatercolumn

1‐1

Section 1 Introduction

CDMFederalProgramsCorporation(CDMSmith)haspreparedthisRevisedFinalOperationsand
Maintenance(O&M)Manual,GroundwaterTreatmentUnit(TU)1,TU2,andTU3attheVienna
Tetrachloroethene(PCE)SuperfundSite(theSite)inVienna,WestVirginia.Thismanualisan
updatetotheFinalO&MManual,GroundwaterTreatmentUnit(TU)#1,TU#2,TU#3,andTU#4,
Revision2datedJune2006andpreparedforCDMSmithbyArrowheadContracting,Inc.under
SubcontractNo.3232‐042‐004‐SI.CDMSmithhaspreparedthisUpdatedO&MManualunderthe
U.S.EnvironmentalProtectionAgency(EPA)Region3ResponseActionContract(RAC)No.EP‐S3‐
07‐06,WorkAssignment(WA)No.016‐LRAR‐03ATinresponsetorecentupdatestotheSite
treatmentsystemsandtherelocationoftheTU4airsparge/soilvaporextraction(AS/SVE)
systemtotheRavenswoodPCESuperfundSiteinMay2009.Thescopeofgroundwaterandair
samplingassociatedwithsystemperformancemonitoringispresentedinaseparatelybound
documentandisnotdiscussedinthisdocument.

1.1 Document Organization

The O&M manual includes the following sections and appendices:

Section1.0–Introduction–InadditiontopresentingtheoutlineforthisO&MManual,this
sectionpresentsalistofrelevantsupportingdocuments,adescriptionofO&M
responsibilities,andaprojectdirectory(includingEmergencyContactList).
Section2.0–BackgroundInformationandOverview–Thissectionpresentsgeneral
backgroundinformationabouttheSiteandproject,includingtheRemedialAction(RA)
objectives,asummaryofthedesignofeachTU,andtherequirementsforO&M.
Section3.0–ControlSystemsDescription–Thissectionprovidesadiscussionofthe
controllogicandfunctionalityforeachsystem,includingthecapabilitiesofeachsystem’s
motorcontrolcenter.Thissectionhasbeenupdatedtoreflecttherecentupgradestothe
controlsystemsandtheremovalofTU4.
Section4.0–InitialSet‐UpProcedures–Thissectionprovidesproceduresfortheinitialset‐
up/start‐upofeachpieceofequipmentfollowinginstallation.
Section5.0–SystemsOperatingProcedures–Thissectionpresentstheproceduresfor
operatingtheequipmentwithineachTU.Theprimaryscenariosforstartup,operation,and
shutdown(includingemergencyshutdownprocedures)arecovered.Thissectionhasbeen
updatedtoreflecttherecentupgradestothecontrolsystemsandtheremovalofTU4.
Section6.0–MaintenanceProcedures–Thissectionpresentsthegeneralproceduresfor
preventativemaintenanceandinspectionstooptimizetheoperationofeachsystem.For
moredetailedmaintenanceinformation,readersarereferredtothemanufacturer‐specific

Section 1 Introduction

1‐2

O&Mliteraturecontainedintheappendices.Thissectionhasbeenupdatedtoreflectthe
recentupgradestothecontrolsystemsandtheremovalofTU4.
Section7.0–InspectionandMonitoringProcedures–Thissectionpresentsgeneral
proceduresforinspectionandmonitoringofeachsystem,aspartoftheroutineO&M

program.

Section8.0–TroubleshootingGuidelines–Thissectionpresentsgeneraltroubleshooting
guidelinesintheeventofsystemfailureorshutdown.Formoredetailedtroubleshooting
information,readersarereferredtothemanufacturer‐specificO&Mliteraturecontainedin
theappendices.
Section9.0–HealthandSafetyGuidelines–Thissectionreferencesastand‐aloneHealth
andSafetyPlanforO&Mrelatedactivities.
Section10.0–RecordkeepingandReporting–Thissectionpresentstherecordkeepingand
reportingrequirementsapplicabletolong‐termO&M.
Section11.0–References–Thissectionisanewadditionandlistsrelevantdocuments
referencedinthismanual.
AppendicesA–R‐ManufacturerO&Mliteratureandinformationforequipmentassociated
witheachTU,includingpreventativemaintenanceschedules,troubleshootingguidelines,
andsparepartslists.

Appendix S ‐ Example forms and logs for O&M recordkeeping.

Appendix T ‐ Treatment media modeling data.

1.2 O&M Staffing Plan

TherecommendedstaffingforO&Mincludesaprojectmanager,operator,andprojectengineer.
Thefollowingparagraphssummarizetheresponsibilitiesassociatedwitheachposition.

Project Manager

Asupervisorypositiondirectingtheoveralloperation,maintenance,monitoring,and
managementofairsparging,soilvaporextraction(SVE),andgroundwatertreatment

system.

Inchargeofdevelopingplansandmakingsurethattheplansarecarriedout.Supervise
anddirecton‐siteoperationoftreatmentsystems.Ensurecompetencyandsafetyof
operations.Ensurecompliancewithallpermitrequirements.Inchargeofapprovingall
changesintreatmentsystemoperation.Performotherrelatedadministrativeand
managementwork,asrequired.

Operator

Inchargeoftheday‐to‐dayoperation,maintenance,monitoring,andmanagementof
treatmentsystems,extractionwellsystemsandassociatedfacilities,attainmentofeffluent

Section 1 Introduction

1‐3

andairdischargerequirements,recordmaintenance,reporting,wastedisposal,and
associatedon‐siteoperations.
Intimatelyfamiliarwithallpermitregulationsandenforcementrequirements.Maintains
accurateandorderlymanagedO&Mrecords.

Performs other related work including, administration, and routine office duties, as required.

Project Engineer

ResponsibleforprovidingtechnicalassistancetotheOperatorandProjectManagerinday‐
to‐dayoperations,maintenance,andmonitoringoftreatmentsystems,asneeded.

Provide changes in operations schedules and control functions.

Monitor site data to ensure the systems are operating at specified performance levels.

1.3 Project Directory

Table1‐1isprovidedasadirectoryoftheprimaryvendors,suppliers,andmanufacturersofthe
processequipmentandinstrumentation.

2‐1

Section 2 Background Information and Overview

ThissectionpresentsgeneralbackgroundinformationabouttheSiteandproject,includingthe
RAobjectives,asummaryofthedesignofeachTU,andtherequirementsforO&M.

2.1 Site Description

TheViennaPCESiteislocatedintheCityofViennaintheOhioRiverValleyofWestVirginia.The
contaminatedareaisanurbanizedresidentialandcommercialareasurroundingtheCityof
ViennaMunicipalBuilding(CityHall)andtheViennaandBusyBeeCleaners.TheCityofViennais
locatedinWoodCounty,WestVirginia.ThecountyislocatedintheAlleghenyPlateausectionof
theAppalachianPlateausGeomorphicProvince.Thetopographyoftheareaisthatofamaturely
dissectedplateau,characterizedbynarrow,windingridges,steepsidedstreamvalleys,anda
dendriticdrainagepattern.TheSiteissituatedonabroad,relativelyflatfloodplainoftheOhio

River.

PCE,adrycleaningsolvent,hasbeendetectedintheCitymunicipaldrinkingwaterwells.Twelve
municipalwatersupplywells,locatedthroughouttheCity,areintheaffectedarea.Withinthe
areabeingevaluated,twofacilitieshavebeenidentifiedasbeingprobablesourcesof
groundwatercontaminationandareconsideredtobepotentialresponsibleparties(PRPs).These
facilitiesareViennaCleanersandBusyBeeCleaners.
PCEcontaminationwasfirstdetectedinFebruary1992atMunicipalWells1through4,locatedat
CityHall.ThehighestconcentrationsofPCEweredetectedinsamplescollectedfromthesewells
in1992;170,390,8,and7microgramsperliter(µg/L)weredetectedinWells1through4,
respectively.TheCitydiscontinueduseofthesewellsinJune1992.Groundwatersamples
collectedfromMunicipalWells5and6byWestVirginiaDepartmentofEnvironmentalProtection
(WVDEP)onSeptember22and24,1992hadPCEconcentrationsof70ug/Land0.5ug/L,
respectively.MunicipalWells7and8arehydraulicallydowngradient,andthereisconcernabout
futurecontaminationasaresultofbeingdowngradientofMunicipalWells5and6.Municipal
Wells5and6wereremovedfromservicein1991,duetoPCEcontaminationandbenzene
contaminationwhichoriginatedfromaUST.Withproductionatsixofthetwelvewells
discontinued,theCityfacedapotentialwatershortageemergency.Consequently,twoadditional
municipalwells(13and14)wereinstalledin1995,hydraulicallyupgradientfromthe
contaminatedareas,toserveasabackupwatersupplyintheeventofsuchanemergency.The
twowellswerebroughtonlineonMarch10,1997tomeetexistingdemands.
InMay1993and1994,REACpersonnelalsofoundPCEattheSite.APCEplumewasdetectedin
soilgasandgroundwaterextendingfromjustnorthoftheViennaCleanerstothesouthasfaras
theintersectionofGrandCentralAvenueand27thStreet.ThehighestPCEconcentrationswere
found,inbothsoilandgroundwater,inthevicinityoftheViennaCleanersandtheBusyBee
Cleaners.ThehighestgroundwaterconcentrationswerepresentinERT‐3andERT‐4(4,763µg/L
and787µg/L,respectively);thesewellsareclosetotheViennaandBusyBeeCleaners.Asa

Section 2 Background Information and Overview

2‐2

result,thecontaminationisassumedtohaveoriginatedfromthesefacilities.ARemedial
Investigation(RI)conductedin2001hasfurtherdelineatedtheplumes.Constructionofthe
groundwatertreatmentunits(TU1,TU2,TU3andTU4)wascompletedinAugust2005by
ArrowheadContractingundersubcontracttoCDMSmith.TheTU4AS/SVEsystemwasrelocated
totheRavenswoodPCESuperfundSiteinMay2009.

2.2 Remedial Action Objectives

Theremedialobjectiveofthisproject,asdescribedinthe2002RecordofDecision(ROD),isto
reducethegroundwaterPCEconcentrationtoariskbaseddrinkingwaterlevel(1x10‐5
cumulativeexcesscancerriskandaHazardIndexof1.0).Successfullyachievingthecumulative
excesscancerriskgoalwillrequireareductionintheconcentrationsofPCEtoatleastthe
MaximumContaminantLevel(MCL)of5µg/L.Tomeettheremedialobjective,airspargingwith
soilvaporextraction(SVE)systemswereinstalledatthefollowingthreeareas:

Vienna Cleaners Source Area (TU1)

Central Plume Area (TU3)

Busy Bee Source Area (TU4)

Additionally,anairspargingsystemwithoutSVEwasinstalledintheViennaWellProtectionArea
(TU2),downgradientoftheleadingedgeoftheplume,toprotecttheactivemunicipalsupply
wells(Wells7and8)frombecomingcontaminated.Onegroundwaterextractionwellwas
installedatTU3intheCentralPlumeAreatohydraulicallycontroltheplumeandimpede
migrationofPCEtowardsnearbyactivemunicipalsupplywells.Extractedgroundwateris
treatedonsiteanddischargedtotheCity’sstormsewersystem.Table2‐1liststhestormsewer
andairdischargecriteria.

2.3 Treatment Unit Design Summary

Thefollowingisasummaryofthetreatmentsystemdesignforeachoftheremainingthreeunits
currentlyinstalledattheSite.

TU1

OperationsatTU1includesairspargingcombinedwithSVE,consistentwiththeRAobjectives
discussedinSection2.2.ThesitelayoutforTU1,includingtheairspargeandSVEwellhead
locations,theundergroundairspargeandSVEpiperoutes,andthelocationofthetreatment
buildingisdepictedinDrawing2‐1.Thedesignbasisfortheflowrateoftheairspargesystem
was231standardcubicfeetperminute(scfm)ataminimumpressureatthewellheadsof41
poundspersquareinchgage(psig).ThedesignbasisfortheflowrateoftheSVEsystemwas217
scfmat2.8inchesofmercury(Hg)attheinlettothemoistureseparator.Thereareatotalof23
airspargewellsand9SVEwells.ThesewellswereconstructedbyProsonic,howeverArrowhead
wasresponsibleforthewellheadhookups.
ThedesignedmaximumandaveragePCEinfluenttothegranularactivatedcarbon(GAC)atTU1
are2,096partspermillionbyvolume(ppmv)and1,048ppmv,respectively.

2‐3

The overall system design for TU1 incorporates the following pieces of equipment:

Two30horsepower(HP)rotaryscrewaircompressorswith1.5HPrefrigeratedairdryer,
moistureseparator(notethatthecondensatefromthemoistureseparatorisroutedtothe
sanitarysewersystem),
SVEskidincluding55gallonmoistureseparator,3/4HPtransferpump,inletsilencer,5HP
blower,anddischargesilencer,
Off‐gastreatmentsystem,consistingoftwovaporphaseGACvesselswith5,000pounds
(lbs)GACpervessel(refertoAppendixTforoff‐gastreatmentmodelingdataandmedia
usageestimates),

Appurtenances, including flow control valves, solenoid valves, and sample ports,

Instrumentation,includingtemperaturegauges,temperatureswitches,pressuregauges,
pressureswitches,flowmeters,flowtransmitters,andlevelswitches,and

Control panel.

Drawing2‐2depictstheequipmentarrangementforTU1.Thisbuildingissubdividedintoa
processroomandoffice.Theofficehousesthecontrolpanels,electricalservicepanels,and
transformers.Theoff‐gastreatmentvesselsaremountedonaconcretepadlocatedoutsideand
adjacenttothetreatmentbuilding.
Pressurizedairfromacompressorisfedtotheairspargewellsviaindividualcontinuous1/2–
inchdiameterstandarddimensionratio(SDR)9HighDensityPolyethylene(HDPE)lines.The
routingofthispipingisdepictedonDrawing2‐1.Eachairspargewellheadiscomprisedofa
flowcontrolvalveand100psigpressuregaugehousedina12‐inchdiameterwellvault.Theair
spargepipingiseitherdirectlyburiedorrunthroughPolyvinylChloride(PVC)conduit.Pull
boxesarealsosituatedalongthepipingroutes(refertoDrawing2‐1).Theminimumburial
depthoftheHDPEpipeis18inches.
SoilvaporextractedfromtheSVEwellsisconveyedtotheSVEskidvia2‐inchschedule40PVC
pipe.TheroutingofthispipingisdepictedonDrawing2‐1.EachSVEwellheadiscomprisedofa
flowcontrolvalve,avacuumgauge,andasampleporthousedinan18‐inchdiameterman‐way.
TheminimumburialdepthofthePVCpipeisalso18inches;however,thepipesareslopedto
draintowardswellheadsorsumpspositionedalongthepipingroutes.Constructiondetailsfor
thewellheadsandthesumpsareshownonDrawing2‐3.Waterthataccumulatesinthesumpsis
periodicallyextractedwiththeuseofahand‐operatedpump.
ContaminatedvaporsfromtheSVEwellsareroutedthroughtheoff‐gastreatmentsystem,
consistingofvaporphaseGAC.Thetreatedairstreamisdischargedtotheatmospherethrougha
20‐foothighstackmountedonthesideofthetreatmentbuilding.
Itisanticipatedthatthesystemwillbeoperatedonacycledbasis.Thecycleofoperationforeach
well(airspargeandSVE)iscontrolledwithsolenoidvalves.Adescriptionofthesystemcontrols
ispresentedinSection3.0.AcomprehensiveequipmentlistforTU1isprovidedinTable2‐2.

2‐4

TU2

OperationsatTU2includeairspargingonly,consistentwiththeRAobjectivesdiscussedin
Section2.2.ThesitelayoutforTU2,includingthewellheadlocations,theundergroundpipe
routes,andthelocationofthetreatmentbuildingisdepictedinDrawing2‐4.Thedesignbasis
fortheflowrateoftheairspargesystemwas115scfmataminimumpressureatthewellheadsof
38psig.Thereareatotalof15airspargewells.

The overall system design for TU2 incorporates the following pieces of equipment:

One25HProtaryscrewaircompressorwith1.5HPrefrigeratedairdryer,moisture
separator,and30gallonholdingtanktostorewaterfromthemoistureseparator,

Appurtenances, including flow control valves, solenoid valves, and sample ports,

Instrumentation,includingtemperaturegauges,temperatureswitches,pressuregauges,
pressureswitches,flowmeters,flowtransmitters,andlevelswitches,and

Control panel.

Drawing2‐5depictstheequipmentarrangementforTU2.Thisbuildingissubdividedintoa
processroomandanoffice.Theofficehousesthecontrolpanel,electricalservicepanels,and

transformer.

Pressurizedairfromacompressorisfedtotheairspargewellsviaindividualcontinuous1/2–
inchdiameterSDR9HDPElines.TheroutingofthispipingisdepictedonDrawing2‐4.Eachair
spargewellheadiscomprisedofaflowcontrolvalveand100psigpressuregaugehousedina12‐
inchdiameterwellvault.TheairspargepipingiseitherdirectburiedorrunthroughPVC
conduit.Onepullboxisalsosituatedalongthepipingroute(refertoDrawing2‐4).The
minimumburialdepthoftheHDPEpipeis18inches.
Itisanticipatedthatthesystemwillbeoperatedonacycledbasis.Thecycleofoperationforeach
welliscontrolledwithsolenoidvalves.Adescriptionofthesystemcontrolsispresentedin
Section3.0.AcomprehensiveequipmentlistforTU2isprovidedinTable2‐3.

TU3

OperationsatTU3includeairspargingcombinedwithSVEandgroundwaterextraction,
consistentwiththeRAobjectivesdiscussedinSection2.2.ThesitelayoutforTU3,includingthe
airsparge,SVEandgroundwaterextractionwellheadlocations,theundergroundpipingroutes,
andthelocationofthetreatmentbuildingisdepictedinDrawing2‐6.Thedesignbasisforthe
flowrateoftheairspargesystemwas372scfmwithaminimumpressureatthewellheadsof43
psig.ThedesignbasisfortheflowrateoftheSVEsystemwas408scfmat3.2inchesHgatthe
inlettothemoistureseparator.Thedesignbasisforthegroundwaterextractionratewas20
gallonsperminute(gpm)atatotalheadof80feet.Thereareatotalof37airspargewells,17
SVEwells,andonegroundwaterextractionwell.

2‐5

ThedesignedmaximumandaveragePCEvaporinfluenttothevapor‐phaseGACsystematTU3
are414ppmvand207ppmv,respectively.ThedesignedPCEgroundwaterinfluent
concentrationtotheliquid‐phaseGACsystemis1,103ug/L.

The overall system design for TU3 incorporates the following pieces of equipment:

Two40HProtaryscrewaircompressorswith1.5HPrefrigeratedairdryer,moisture
separator(notethatthecondensatefromthemoistureseparatorisroutedtothesanitary
sewersystem),
SVEskidincluding55gallonmoistureseparator,3/4HPtransferpump,inletsilencer,15
HPblower,anddischargesilencer,
Off‐gastreatmentsystem,consistingoftwovaporphaseGACvesselswith3,000lbsGAC
pervessel(refertoAppendixTforoff‐gastreatmentmodelingdataandmediausage

estimates),

Grundfos®Redi‐Flo425E15‐8P.EelectricsubmersiblewellpumpandFranklin1.5HP
submersiblemotor,

Two liquid bag filters,

Liquidphasetreatment,consistingoftwoGACvesselswith1,000GACpervessel(referto
AppendixTfortreatmentmodelingdataandmediausageestimates),
½HPsumppumpforthesecondarycontainment(onstand‐byintheeventwater
accumulatesinsidethesecondarycontainment),whichrouteswaterbackthoughthebag
filtersandliquidphaseGACvessels,

Appurtenances, including flow control valves, solenoid valves, and sample ports,

Instrumentation,includingtemperaturegauges,temperatureswitches,pressuregauges,
pressureswitches,flowmeters,flowtransmitters,andlevelswitches,and

Control panel.

Drawing2‐7depictstheequipmentarrangementforTU3.Thisbuildingissubdividedintoa
processequipmentroom,office,utilitysink,andtoilet.Theofficehousesthecontrolpanels,
electricalservicepanels,andtransformers.Theoff‐gastreatmentvesselsandliquidphase
treatmentvesselsarelocatedwithinthebuilding.ThebagfiltersandliquidphaseGACvessels
arelocatedwithinasecondarycontainmentstructuretocapturepotentialwaterleaks/spills.
Pressurizedairfromacompressorisfedtotheairspargewellsviaindividualcontinuous1/2–
inchdiameterSDR9HDPElines.TheroutingofthispipingisdepictedonDrawing2‐6.Eachair
spargewellheadiscomprisedofaflowcontrolvalveand100psigpressuregaugehousedina12‐
inchdiameterwellvault.TheairspargepipingiseitherdirectburiedorrunthroughPVC
conduit.Pullboxesarealsosituatedalongthepipingroutes(refertoDrawing2‐6).The
minimumburialdepthoftheHDPEpipeis18inches.

2‐6

SoilvaporsextractedfromtheSVEwellsareconveyedtotheSVEskidvia2‐inchschedule40PVC
pipe.TheroutingofthispipingisdepictedonDrawing2‐6.EachSVEwellheadiscomprisedofa
flowcontrolvalve,avacuumgauge,andasampleporthousedina18‐inchdiameterwellvault.
TheminimumburialdepthofthePVCpipeisalso18inches,however,thepipesareslopedto
draintowardswellheadsorsumpspositionedalongthepipingroutes.Constructiondetailsfor
thesumpsareshownonDrawing2‐3.Waterthataccumulatesinthesumpsisperiodically
extractedwiththeuseofasmallvacuumpump.
Contaminatedgroundwaterextractedfromtheextractionwell(EW‐1)isconveyedtothebag
filtersvia2‐inchschedule40PVCpipe.ThegroundwateristhenroutedtotheliquidphaseGAC,
withtreatedwaterdischargedtothestormsewer.Thelocationoftheeffluentoutfallisshownon
Drawing2‐6.TheroutingofthispipingisdepictedonDrawing2‐6.Constructiondetailsofthe
wellvaultareshownonDrawing2‐3.Theminimumburialdepthoftheinfluentandeffluentpipe
is36inches.
ContaminatedvaporsfromtheSVEwellsareroutedthroughtheoff‐gastreatmentsystem,
consistingofvaporphaseGAC.Thetreatedairstreamisdischargedtotheatmospherethrougha
stackmountedonthesideofthetreatmentbuilding.
TheairspargeandSVEsystemisoperatedonacycledbasis.Thecycleofoperationforeachwell
iscontrolledwithsolenoidvalves.Thegroundwaterextractionwellwillberunonacontinuous
basis.AdescriptionofthesystemcontrolsispresentedinSection3.0.Acomprehensive
equipmentlistforTU3isprovidedinTable2‐4.

Control Systems

Thecontrolsystemsarebasedona480‐voltAC(VAC)controlpanelcontaininganOperator
InterfaceTerminal(OIT),programmablelogiccontroller(PLC),Allen‐BradleyPowerFlex®40
variablefrequencydrive(VFD)(TU3only),andassociated24‐voltDC(VDC)powersuppliesfor
DCinput/output(I/O)circuits.Thefacilityreceivesincomingpowerat480VAC,3Øfrom
MonPowerCompanypole‐mountedtransformers.Theelectricaldropconnectstoapowermeter
mountedonthepoles.Powerisbroughtintoeachbuildingwhereitissplitbetweentwoservice
panelsandthecontrolpanel.Detailsareprovidedintheelectricalschematics(E‐series
drawings)fromthesetofas‐builtdrawings.Section3.0providesfurtherinformationregarding
thecontrolpanelhardwareandsoftware.Theoverallcontrollogicschemeisdepicted
graphicallyinprocessandinstrumentationdiagrams(P&IDs),Drawings2‐10through2‐12.

2.4 O&M Requirements

Thissubsectionsummarizesthespecifiedrequirementsforoperations,maintenance,sampling
andmonitoringtobeimplementedbytheO&Mcontractor.

2.4.1 Operations

The following are the operational requirements applicable to each TU:

Operateallequipment,systems,processes,andappurtenancesinaccordancewiththe
equipmentmanufacturer’sspecificationsandO&Minstructions,andtheapprovedO&M

Manual, 2‐7

Extractgroundwateronacontinuousbasistoachievehydrauliccontrolofthegroundwater
atTU3,

Operate air sparge and SVE systems on cycled basis to achieve groundwater cleanup level, Discharge treated vapor to the atmosphere in accordance with air discharge requirements, Discharge treated groundwater at TU3 to the storm sewer in accordance with discharge limits,

Containerize,characterize,transport,anddisposeofallprocessandsamplingwaste
residualsatanapprovedwastedisposalfacility,
Procureallequipment,spareparts,supplies,andservicesrequiredforoperation,
maintenance,monitoring,andmanagementofthetreatmentsystems,
Manageandmaintainaninventoryofequipment,spareparts,supplies,andtoolsrequired
forcontinuousoperationwithminimaldowntime,
Monitortreatmentsystemperformance,compliance,andremedialprogressbycollecting
specifiedsamplesandfieldmeasurements(refertoSection10.0),
Prepareoperationalrecordsandmaintainprojectfiles(refertoSection10.0).Prepareand
submitprogressreports,

Abide by all operational requirements and report any non‐compliant conditions to EPA, Optimize the use of process equipment to minimize operational costs,

NotifyCDMSmithProjectManagerimmediatelyofanysystemdowntimegreaterthan24
hoursoranynon‐compliancewithdischargerequirements,
Provideroutine,preventative,andcorrectivemaintenance,includingallprocesses,
equipment,controls,facilities,andappurtenances,
Performroutine,preventative,andcorrectivemaintenanceinaccordancewiththe
equipmentmanufacturer’sspecificationsandthisO&MManual,
Storealltools,spareparts,equipment,andsuppliesinanappropriatestoragearea.
Managetheinventoryandmaintenanceofsuchitemstominimizedowntimefor

maintenance,

Maintaingoodhousekeepingpractices.Facilitiesshallbekeptneat,organized,andlitter‐
free.Cleanandremoveaccidentalspills,
Routinelyinspectandmaintainthephysicalconditionofexteriorfacilities,equipment,and
groundsasfollows:

Fencing and locks shall be maintained, and repaired or replaced when necessary, 2‐8

Vegetationshallbemaintainedinamannerthatisconsistentwiththesurrounding
propertiesandcutwhennecessary,
Touch‐uppaintingshallbeperformedasnecessarytopreventcorrosionorother
damageassociatedwithenvironmentalexposure,
Wellvaultsshallbeinspectedforsurfaceleaks;accesshatchsealsandgradingshallbe
replaced/correctedwhenneeded,
SVEsumpsshallbeemptiedasneededtopreventwaterfromhinderingvaporflow
fromthewells,
Structuralsupportsystems,suchasconcreteflooring,structuralanchoring,andguy
wires,shallbeperiodicallycheckedforstructuralintegrityandadjusted/repairedif

necessary,

Buildingopeningsandaccessways,includingdoors,louvers,fans,andairconditioners
shallbeperiodicallycheckedforleakageandstructuralintegrity;adjust/tighten
hardware,applycaulk,andreplaceweatherstrippingwhenneeded.

2.4.2 Sampling and Monitoring

AspartoftheoverallO&Mofeachsystem,samplingandmonitoringactivitieswillbeconducted
toevaluatethefollowing:

Treatment system compliance to confirm that permitted discharge requirements are being met,

Treatmentsystemperformancetoconfirmthathydrauliccontrolisbeingmaintainedand
thattreatmentsystemsareoperatingproperly.Monitorinfluentflowandwaterquality
fromtheextractionwell,drawdownandhydrauliccontrolofgroundwater,andunit
processperformance.Informationshallbeusedtosupportdecisionsregarding
adjustmentstothepumpingrateandunitprocessoperation,
Remedialprogressbymonitoringchangesinsource‐areaandsite‐widegroundwater
quality,levels,andflowovertime.Thisshallincludetheareassubjectedtoairsparging,
andgroundwaterextraction.Informationshallbecomparedagainstdesignassumptions
andpredictionsregardingremedyperformance,andshallbeusedtorefinesuch
assumptionsandpredictionsandtheenvironmentalmonitoringprogramasmore
informationisgathered.

The long‐term O&M phase of the RA includes two primary sampling programs:

Performance and compliance sampling (groundwater and vapor)

Site‐wide groundwater sampling

The specific requirements for the sampling programs is discussed in a separately bound document.

2‐9

2.4.2.1 Performance Monitoring of Operational Conditions

Performancemonitoringofoperationalconditionswillbeconductedonaprescribedbasisfor
purposesofdocumentationandtoassesswhetheradjustmentsormaintenanceisrequired.The
followingoperationalparametersshallberecordedonaprescribedbasisfromprocess
instruments,meters,andgauges:

Extraction well water level

Extraction well pump flow rate and totalized flow

Bag filter differential pressure

Liquid granular activated carbon (LGAC) #1 differential pressure

LGAC #2 differential pressure

Air sparge flow rates

Air sparge wellhead pressure

Air sparge manifold pressure

Compressor outlet pressure

SVE wellhead vacuum

SVE manifold vacuum for each well

SVE flow rate from each well

SVE blower flow (extraction) rate

SVE blower inlet vacuum

SVE blower inlet temperature

SVE blower discharge temperature

SVE blower discharge pressure

Vapor granular activated carbon (VGAC) #1 outlet pressure

VGAC #1 differential pressure

VGAC #2 outlet pressure

VGAC #2 differential pressure

Groundwater level measurements in monitoring wells

Other routine operating parameters

3‐1

Section 3 Control Systems Description

TheTreatmentUnitsareequippedwithprogrammablecontrolsystemswhichcontrolall
automaticprocessesandfacilitateremoteaccessandremotealarmnotifications.EachTreatment
Unitfunctionsasastand‐alonesystemwithitsowncontrolpanelcontainingaprogrammable
logiccontroller(PLC),OperatorInterfaceTerminal(OIT),andassociatedcontrolequipment.
Eachcontrolpanelispoweredbyanuninterruptiblepowersupplywhichmaintainspowertothe
PLC,OIT,andallinput&outputcircuitsfor15minutesfollowingapoweroutage.Controlsystem
components,remoteaccessfeaturesandoperationalinstructionsaredescribedintheSections
thatfollow.Thedescriptionofthecontrolsystemsisbasedonthecomponentsandfeatures
commontothethreesystemscurrentlyinstalledonSitewithexceptionsasnotedthroughout.

3.1 Control Panels

EachcontrolpanelisequippedwithanAllen‐BradleyVersaView1500P15‐inchtouch‐screenOIT
fromwhichtheon‐siteoperatorandremoteuserscontrolandmonitorallautomatedprocesses
inthesystem(refertoAppendixP).TheVersaViewOITisanindustrialcomputerwitha
Windows7Pro32‐bitoperatingsystem,aCD‐RWdrive,3‐1/2inchfloppydrive,keyboard,
mouse,andseveralserialandUSBportsforperipheraldevices.TheOITisconnectedtoanAllen‐
BradleySLC5/05programmablecontrollerlocatedonthepanelbehindtheOIT.Two24VDC
powersuppliesareprovidedinthecontrolpanelatTU3–oneforanalogI/Oandtheotherforthe
discrete24VDCcircuitsshownintheelectricalschematics.TU1containsone24VDCpower
supplyforanalogI/O.TU2doesnotcontaina24VDCpowersupplyastherearenotanyanalogor
other24VDCcircuits.TheTU3controlpanelalsoincludesanAllen‐BradleyPowerFlex®40VFD
usedtocontrolthespeed(pumpingrate)ofthewellpumpinextractionwellEW‐1.

3.2 Control Logic Overview

ThecontrolsystemsforeachTreatmentUnitareprogrammedwithladderlogictoimplement
interlocks,controlsystemprocesses,cycleprocessequipment,initiatelocalandremotealarms,
andsafelystartupandshutdowneachsystem.ThecontrolinterlocksarelistedinTables3‐1
through3‐3forTU1,TU2andTU3,respectively.AUTOmodemustbeselectedforeachmotor
orsolenoidvalveinorderfortheinterlockstofunctionasdesigned.Anypieceofequipment
placedinMAN(ual)modewillhaveitscontrolinterlocksbypassed.
Thecontrolinterlocksbegintofunctionautomaticallyuponstartup.ClickingtheSystemSTART
buttonontheMAINscreenfirstremovesanypreviouslyexistingstopcommands,placesall
processequipmentinAUTOmode,andthensequentiallystartsthefollowinginorder:

TU1

SVE blower, B‐1

SVE solenoid valves (order determined by well cycle schedule and time of day at startup)

Section 3 Control Systems Description

3‐2

Transfer pump, P‐1

Air compressor, AC‐1 (depending on compressor cycle schedule and time of day at startup)

Air compressor, AC‐2 (depending on compressor cycle schedule and time of day at startup)

Sparge solenoid valves (order determined by well cycle schedule and time of day at startup)

TU2

Air compressor, AC‐1

Sparge solenoid valves (order determined by well cycle schedule and time of day at startup)

TU3

SVE blower, B‐1

SVE solenoid valves (order determined by well cycle schedule and time of day at startup)

Transfer pump, P‐1

Air compressor, AC‐1 (depending on compressor cycle schedule and time of day at startup)

Air compressor, AC‐2 (depending on compressor cycle schedule and time of day at startup)

Sparge solenoid valves (order determined by well cycle schedule and time of day at startup)

Extraction well pump

The systems can also be started by the START pushbutton on the front of the control panel.

TheSTARTsequencetestsforallapplicablecontrolinterlocksandpossiblealarmconditionsand
preventsanycomponentortheentiresystemfromstartingdependingontheseconditions,as
outlinedinTables3‐1through3‐3.AtTU3thisincludeswellwaterlevelcontrolswhichprevent
thepumpfromrunningdrywithalowlevelshutdowninterlockmeasuredwithasubmersible
waterleveltransmitterinstalledinthewell,orifahighwaterlevelconditionisdetectedinthe
catchbasinoutfall.TheaircompressorstypicallyareallowedtorunaslongastheSVEbloweris
maintainingsufficientvacuumandtherearenointernalalarmconditionswithintheseunits,i.e.,
aninternalfaultcondition.TheSVEblowerstypicallyareallowedtorunaslongaswaterlevelsin
themoistureseparatorsarekeptbelowthehigh‐highlevelalarmcondition.

3.3 Control System Functionality Overview

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .