ARFQ DEP2500000018-Attachment 3E - Revised Final O&M Manual-5 (2).pdf

PDF 18 MB Posted

Attached to
OER - VIENNA PCE SUPERFUND SITE
Solicitation number
ARFQ-0313-DEP2500000018-1
Issued by
Upshur County, West Virginia

About this file

This document is an Attachment 3E to an Appalachian Regional Field Quota (ARFQ) issued by the West Virginia Department of Environmental Protection (DEP). The attachment provides a revised final Operations and Maintenance (O&M) Manual for a project. The O&M Manual details the requirements and procedures for operating and maintaining the project facilities, which include wastewater treatment and disposal systems. The manual covers topics such as equipment specifications, maintenance schedules, safety protocols, and reporting requirements. It is intended to ensure the proper and efficient operation of the project infrastructure over the term of the contract.

The document does not contain information about pricing, set asides, incumbents, funding sources, or other salient contract details. It solely focuses on the technical O&M requirements for the project facilities.

View the file

Other files

File Type Posted
ARFQ DEP2500000018-Vienna_PCE_OM_Specs.pdf PDF
ARFQ DEP2500000018-Attachment 8 Groundwater Well Sampling Procedures (110) (3).pdf PDF
ARFQ DEP2500000018-Attachment 5 ERT-PROC-2044-20-R1 SOP Manual (3).pdf PDF
ARFQ DEP2500000018-Attachment 2 WVDEP CERCLA QAPrP Final October 2022-signed_09072022_BM (2).pdf PDF
ARFQ DEP2500000018-Attachment 6 Vienna PCE Superfund_SAP_ R1 (2).pdf PDF
ARFQ DEP2500000018-Attachment 1 ViennaPCE_USEPA (2).pdf PDF
ARFQ DEP2500000018-Attachment 7 Vienna Well Details 2020 MASTER rev 1.xlsx - Monitoring Wells (3).pdf PDF
ARFQ DEP2500000018-Attachment 3A - Revised Final O&M Manual (3).pdf PDF
ARFQ DEP2500000018-Attachment 3C - Revised Final O&M Manual-3 (2).pdf PDF
ARFQ DEP2500000018-Attachment 3D - Revised Final O&M Manual-4 (2).pdf PDF
Final_ARFQ_0313_DEP2500000018_1_WV_ARFQ_FORM.PDF PDF
ARFQ DEP2500000018-Attachment 9 Soil Gas Sampling (130) (2).pdf PDF
ARFQ DEP2500000018-Attachment 3B - Revised Final O&M Manual-2 (2).pdf PDF
ARFQ DEP2500000018-Attachment 4 ERT-PROC-2048-20-R1 SOP Manual (2).pdf PDF
ARFQ DEP2500000018-Pricing Page - Exhibit A (9).pdf PDF
ARFQ DEP2500000018-DEP Instructions to Vendors & Terms and Conditions - Construction Reclamation.pdf PDF
DEP Construction Forms-ARFQ DEP2500000018-Vienna PCE Superfund Site.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R‐1

Appendix R Miscellaneous Electrical Equipment

S‐1

Appendix S Example Forms and Logs for O&M Recordkeeping

EQUIPMENT INITIAL SET-UP / START-UP

TU1

Equipment Initial Set-Up / Start-Up Form

Equipment Operating Condition Measurement Date Performed By Comments

Control Panel

L1 to ground (V)

L2 to ground (V)

L3 to ground (V)

L1 to L2 (V)

L1 to L3 (V)

L2 to L3 (V)

SVE Transfer Pump

PUMP motor amp draw

PUMP pressure will running

Deadhead pressure (pressure w/pump effluent valve closed)

SVE System

SVE inlet vacuum

SVE motor amp draw

Pressure drop across the knock out filter

SVE exhaust temperature

SVE exhaust pressure

SVE flow rate

Air Compressor #1

Compressor outlet pressure

Compressor motor amp draw

Dryer motor amp draw

Compressor flow rate indicator

Equipment Operating Condition Measurement Date Performed By Comments

Air Compressor #2

Compressor Outlet pressure

Compressor motor amp draw

Dryer motor amp draw

Compressor flow rate indicator

Air Sparge

Mainfold

Flow meters with valves

Pressure gauge

Air Sparge

Wellhead

Well pressure gauge

SVE Manifold

Vacuum gauge

Flow rate

SVE wellheads Vacuum gauge

VPGAC

Inlet pressure to GAC 1

Inlet pressure to GAC 2

Outlet pressure to stack

Room Heaters Fan motor amp draw

On/off function

Air Conditioner On/off function

Exhaust Fan On/off function

Emergency Stop

Button

Off function

TU2

Equipment Initial Set-Up / Start-Up Form

Equipment Operating Condition Measurement Date Performed By Comments

Control Panel

L1 to ground (V)

L2 to ground (V)

L3 to ground (V)

L1 to L2 (V)

L1 to L3 (V)

L2 to L3 (V)

Air Compressor #1

Compressor outlet pressure

Compressor motor amp draw

Dryer motor amp draw

Compressor flow rate indicator

Air Sparge

Mainfold

Flow meters with valves

Pressure gauge

Air Sparge

Wellhead

Well pressure gauge

Room Heaters Fan motor amp draw

TU3

Equipment Initial Set-Up / Start-Up Form

Equipment Operating Condition Measurement Date Performed By Comments

Control Panel

L1 to ground (V)

L2 to ground (V)

L3 to ground (V)

L1 to L2 (V)

L1 to L3 (V)

L2 to L3 (V)

SVE Transfer Pump

PUMP motor amp draw

PUMP pressure will running

Deadhead pressure (pressure w/pump effluent valve closed)

SVE System

SVE inlet vacuum

SVE motor amp draw

Pressure drop across the knock out filter

SVE exhaust temperature

SVE exhaust pressure

SVE flow rate

Air Compressor #1

Compressor outlet pressure

Compressor motor amp draw

Dryer motor amp draw

Compressor flow rate indicator

Air Compressor #2

Compressor Outlet pressure

Compressor motor amp draw

Dryer motor amp draw

Compressor flow rate indicator

Air Sparge

Mainfold

Flow meters with valves

Pressure gauge

Air Sparge

Wellhead

Well pressure gauge

SVE Manifold

Vacuum gauge

Flow rate

SVE wellheads Vacuum gauge

VPGAC

Inlet pressure to GAC 1

Inlet pressure to GAC 2

Outlet pressure to stack

Groundwater

Treatment System

Influent flow rate

Bag filter #1 inlet pressure

Bag filter #1 outlet pressure

Bag filter #2 inlet pressure

Bag filter #2 outlet pressure

LP GAC #1 inlet pressure

LP GAC #1 outlet pressure

LP GAC #2 inlet pressure

LP GAC #2 outlet pressure

Transducer Water level prior to start up

Room Heaters Fan motor amp draw

AIR SPARGE WELL AND MANIFOLD READINGS

Air Sparge Well and Manifold Reading (TU1)

Well Number Wellhead

Pressure (psi) Manifold

Pressure (psi) Rotameter (ft3/min) Date

Performed By Comments

S-A1

S-A2

S-A3

S-A4

S-A5

S-A6

S-A7

S-A8

S-A9

S-A10

S-A11

S-A12

S-A13

S-A14

S-A15

S-A16

S-A17

S-A18

S-A19

S-A20

S-A21

S-A22

S-A23

Air Sparge Well and Manifold Reading (TU2)

Well Number Wellhead

Pressure (psi) Manifold

Pressure (psi) Rotameter (ft3/min) Date

Performed By Comments

S-B1

S-B2

S-B3

S-B4

S-B5

S-B6

S-B7

S-B8

S-B9

S-B10

S-B11

S-B12

S-B13

S-B14

S-B15

Air Sparge Well and Manifold Reading (TU3)

Well Number Wellhead

Pressure (psi) Manifold

Pressure (psi) Rotameter (ft3/min) Date

Performed By Comments

S-C1

S-C2

S-C3

S-C4

S-C5

S-C6

S-C7

S-C8

S-C9

S-C10

S-C11

S-C12

S-C13

S-C14

S-C15

S-C16

S-C17

S-C18

S-C19

S-C20

S-C21

S-C22

Well Number Wellhead

Pressure (psi) Manifold

Pressure (psi) Rotameter (ft3/min) Date

Performed By Comments

S-C23

S-C24

S-C25

S-C26

S-C27

S-C28

S-C29

S-C30

S-C31

S-C32

S-C33

S-C34

S-C35

S-C36

S-C37

SVE WELL AND MANIFOLD READINGS

SVE Well and Manifold Reading (TU1)

Well Number Wellhead Vacuum

(in WC) Manifold Vacuum

(in WC) Differential

Pressure(in WC) Date

Performed By Comments

V-A1

V-A2

V-A3

V-A4

V-A5

V-A6

V-A7

VE-1

VE-2

SVE Well and Manifold Reading (TU3)

Well Number Wellhead

Vacuum (in WC) Manifold Vacuum

(in WC) Differential

Pressure(in WC) Date

Performed By Comments

V-C1

V-C2

V-C3

V-C4

V-C5

V-C6

V-C7

V-C8

V-C9

V-C10

V-C11

V-C12

V-C13

V-C14

V-C15

V-C16

V-C17

SYSTEM RUN TIME AND SHUTDOWN

Systems Shutdown Record

Facility ________________

Date of Shutdown: Recorded By:

Time of Shutdown:

Planned Shutdown Unplanned Shutdown

System Restart: Date: Time:

Description of Shutdown (e.g., all systems shutdown, partial shutdown, etc.)

Cause of unplanned shutdown – OR – purposed of planned shutdown

Recommended Corrective Action (s): (Discuss)

Corrective Action(s) Completed

By: Date:

Observation/Notes

System Runtime and Shutdown Log

Facility _________

System _____________

Start Stop

Total Time

(minutes)

Planned

Maint.

Failure /

Alarm Description

Run Time System Shutdown Date

GROUNDWATER SYSTEM MONITORING

Groundwater Extraction Well Monitoring Log

Date Well ID Valve Position Wellhead Pressure (psi)

Flowrate (gpm)*

Notes:

* Flowrate is based on totalizer reading (gallons) divided by the time interval (minutes)

Groundwater Extraction System Monitoring Data

Date Time Totalizer

(gal.)

Flowrate

(gpm)

Wellhead

Pressure

(psi)

Bag Filter

#1 Inlet

Pressure

(psi)

Bag Filter

#1 Outlet

Pressure

(psi)

Bag Filter

#2 Inlet

Pressure

(psi)

Bag Filter

#2 Outlet

Pressure

(psi)

LP GAC #1

Inlet

Pressure

(psi)

LP GAC #1

Outlet

Pressure

(psi)

LP GAC #2

Inlet

Pressure

(psi)

LP GAC #2

Outlet

Pressure

(psi)

AIR SPARGE / SVE SYSTEMS MONITORING

Air Sparge/SVE Systems Monitoring Data - TU1

(psi) (in. H2O) (psi) (Deg. F) (psi) (scfm) (psi) (scfm)

Compressor

Outlet

Pressure

Compressor

Air

Discharge

Flow Rate

SVE Transfer

Pump

Discharge Press.

SVE Inlet

Vacuum

Knock-out

Tank Filter

Diff. Pressure

SVE Exhaust

Temperature

SVE Exhaust

Pressure

SVE Flow

Rate

Air Sparge/SVE Systems Monitoring Data - TU2

(psi) (scfm)

Compressor

Outlet Pressure

Compressor Air

Discharge Flow

Rate

Air Sparge/SVE Systems Monitoring Data - TU3

(psi) (in. H2O) (psi) (Deg. F) (psi) (scfm) (psi) (scfm)

SVE Exhaust

Pressure

SVE Flow

Rate

Compressor

Outlet

Pressure

Compressor

Air

Discharge

Flow Rate

SVE Transfer

Pump

Discharge Press.

SVE Inlet

Vacuum

Knock-out

Tank Filter

Diff. Pressure

SVE Exhaust

Temperature

OFFGAS TREATMENT SYSTEMS MONITORING

Offgas Treatment System Monitoring Data

Facility _______________

(Deg. F) (psi) (psi) (psi)

Date

GAC #1

Infl. Temp.

GAC #1

Effl. Press.

GAC #2

Effl. Press.

GAC #1

Influent.

Press.

OPERATIONS AND MAINTENANCE ACTIVITIES

General Maintenance Log

Date Time Equipment ID Total Time Unit Has

Run To Date

Time Elapsed Since Prior Maintenance

Event

Maintenance Activity*

Performed By Comments

Notes:

* i.e., lubrication, cleaning, filter replacement, drain condensate

Operations and Maintenance Activities

Facility _____________

Date

Operation and Maintenance Events

O & M Performed

T‐1

Appendix T Treatment Media Modeling Data

File details come from the government source that posted it. Updated .