Appendix_E_-_Water_Treatment_Requirements.pdf
PDF 125 KB Posted
- Solicitation number
- IFB- 26 - 262
- Issued by
- Pinellas County, Florida
About this file
Appendix E - Water Treatment Requirements Summary
This appendix document outlines water treatment requirements applicable to the City of St. Petersburg's HVAC, Preventative Maintenance contract for municipal buildings in Florida. The document establishes specifications and standards for water treatment systems that support HVAC operations within the city's municipal facilities. These requirements address the chemical treatment, monitoring, and maintenance protocols necessary to ensure optimal performance and longevity of cooling towers, boilers, and other water-dependent HVAC components across the city's building portfolio. The specifications establish baseline treatment standards that vendors must implement and maintain throughout the contract performance period.
The water treatment requirements detailed in this appendix serve as essential operational guidelines that successful bidders must comply with when performing HVAC preventative maintenance services. These standards address water quality parameters, treatment chemical specifications, system monitoring protocols, and documentation requirements to prevent scaling, corrosion, and biological contamination in HVAC water systems. Compliance with these treatment requirements is a mandatory component of the overall HVAC maintenance scope of work, ensuring that all water-dependent equipment operates efficiently and maintains the city's asset preservation objectives.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HVAC,_Preventative_Maintenance,_Municipal_Buildings_(Addendum_#1_Revision).pdf | ||
| HVAC,_Preventative_Maintenance,_Municipal_Buildings.pdf | ||
| Agreement.pdf | ||
| Performance_&_Payment_Bond.pdf | ||
| Bid_Bond_.docx | DOCX document | |
| Maintenance_Checklist.pdf | ||
| Full_Equipment_List.xlsx | XLSX spreadsheet | |
| Subcontractor_Summary_Spreadsheet.xlsx | XLSX spreadsheet | |
| Appendix_D_-_City_Hall_MSC_Chillers_Chiller_Services_Provider_(CSP).pdf | ||
| FILLABLE_LETTER_OF_INTENT_BEP-FORM_A.pdf | ||
| Shelterd_BID_-_Subcontractor_Summary_Spreadsheet_.xlsx | XLSX spreadsheet | |
| FILLABLE_BEP_NON-USE_BEP_FORM_B.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix E Water Treatment Requirements
1. Municipal Services Center – One 4th Street N., St. Petersburg, FL 33701
Systems to be Treated:
a. Cooling Tower Condenser Water System – One (1)
b. Chilled Water Closed Loop System – One (1)
c. Hot Water Heat Closed Loop System - One (1)
Bi-Monthly Maintenance:
a. Chemically test the make-up water quality (presently using city water).
b. Chemically test the cooling tower system for conductivity, pH, alkalinity, hardness, chlorides and inhibitor level.
c. Chemically test both closed loop systems for conductivity, pH, and inhibitor level.
d. Take a bacteria test of cooling tower monthly.
e. Take a bacteria test of chilled water system quarterly.
f. Replace closed loop filter bags with new, if necessary.
g. Provide and install all chemicals to the systems. Fill chemical tanks.
h. Remove empty containers from the site.
i. Troubleshoot and adjust automatic feeding equipment.
j. Report any water losses immediately.
k. Visually inspect cooling towers. Shock dose with additional biocide, if necessary.
l. Leave a detailed field service report on-site, signed, and dated.
Chemicals To Be Used:
a. Cooling Tower C876L – Phosphonate based corrosion inhibitor
b. A102 – Biocide – 1.5% Isothiazolin
c. S100L – Biocide – 12.5% Sodium Hypochlorite
d. Closed Loops B939L – Nitrite based corrosion inhibitor
Chemical Testing Limits:
a. Cooling Tower Conductivity 1200 – 1400 mmhos (changes as makeup changes)
b. pH 7.6 – 8.6
c. Total Alkalinity 300 – 400 ppm
d. Total Hardness < 600 ppm
e. Phosphonate Inhib. 6 – 12 ppm
f. Bacteria Count < 10,000 org/ml
Appendix E, Water Treatment Requirements
g. Closed Loops Conductivity 1000 – 3000 mmhos
h. pH 9.0 – 10.3
i. Nitrite Inhibitor 500 – 1000 ppm
j. Bacteria Count < 1,000 org/ml
2. City Hall - 175 Fifth Street N., St. Petersburg, FL 33701
Systems to be Treated:
a. Chilled Water Closed System
b. Hot Water Heat Closed System
Quarterly Maintenance:
a. Chemically test the make-up water quality.
b. Chemically test the chilled/hot water system for conductivity, pH and inhibitor level.
c. Provide and install all chemicals to the system.
d. Replace closed loop filter bags with new, if necessary.
e. Take a bacteria test of chilled/hot water system quarterly.
f. Report any water losses immediately.
g. Leave a legible, detailed field service report on-site, signed and dated.
Chemicals to be Used:
a. Chilled/Hot Water System B939L – Nitrite based corrosion inhibitor.
Chemical Testing Limits:
a. Chilled/hot Water Conductivity 1000 – 3000 mmhos
b. pH 9.0 – 10.3
c. Nitrite Inhibitor 800 – 1000 ppm
d. Bacteria Count < 1,000 org/ml
Appendix E, Water Treatment Requirements
Common Tasks to be Incorporated:
a. Field service reports shall be in legible writing, and an electronic copy shall be sent to the city’s Project Manager, and the BSP, within 24 hours after completing services.
b. Any deviations from this list of minimum services shall be pre-approved by the city’s Project Manager.
c. The Water Treatment Company performing the listed services shall have been in business in the State of Florida, performing such services, for a minimum of three
(3) years.
d. Upon request, the credentials of the Water Treatment Company and/or service technicians shall be presented to the city.
e. Any apparent issues that might be related to Water Treatment shall immediately be brought to the attention of the city’s Project Manager.