This is a project list appendix documenting planned infrastructure improvements for Philadelphia International Airport and Philadelphia Northeast Airport under the oversight of the City of Philadelphia Department of Aviation. The document outlines a comprehensive five-year pavement management plan (2025-2030) based on evaluations performed in accordance with FAA Advisory Circular standards. Philadelphia International Airport projects include terminal apron rehabilitation, taxiway improvements (Taxiways J, S, F, and N), runway end-around taxiway construction, departures queue taxiway construction for Runway 27R Phase 1, and miscellaneous electrical, safety, and pavement rehabilitation repairs. Philadelphia Northeast Airport projects include taxiway rehabilitation (Taxiway A), run-up apron construction, connecting taxiway work, taxiway G relocation, airfield guidance signage installation, and miscellaneous pavement, electrical, and safety rehabilitation repairs. The pavement condition survey evaluated existing airfield pavements using the Pavement Condition Index methodology to identify both short-term maintenance requirements and long-range rehabilitation needs. The City of Philadelphia Department of Aviation is seeking qualified applicants to provide comprehensive professional project management and construction management consulting services for these specific projects.

The document indicates that project phasing determinations are pending due to existing and upcoming airfield construction activities that may affect implementation schedules. The service request encompasses full project and construction management consulting support across multiple infrastructure categories including pavement rehabilitation, taxiway construction, apron development, and miscellaneous repairs and safety improvements. No specific pricing information, contract terms, funding sources, or award dates are detailed in this appendix, which serves primarily as a planning document outlining the scope and nature of anticipated airport infrastructure work across the two facilities during the 2025-2030 period.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX E

PHILADELPHIA INTERNATIONAL AIRPORT PROJECTS PLANNED 2023-2027

Project: Airfield Improvements

Pursuant to a Pavement Management Study (PMS), the functional condition of existing airfield pavements were evaluated and both short-term and long-range maintenance requirements were identified. The pavement condition survey was performed to record pavement distress types, quantities, and severity for computation of the current Pavement Condition Index in accordance with the FAA Advisory Circular 150/5380-7B, “Airport Pavement Management Program” and Advisory Circular 150/5380-6C “Guidelines and Procedures for Maintenance of Airport Pavement.”

Cargo development design as well as pavements requiring major rehabilitation were identified and grouped into a list of projects in an integrated five (5) year pavement management plan, see below. [Note that due to existing and upcoming airfield construction, a determination will need to be made regarding the phasing of the below projects in relation to existing work being performed on the airfield.]

Philadelphia International Airport Projects Planned 2025-2030

• VALE Infrastructure

• Terminal Aprons

• Rehabilitate Taxiway J

• Rehabilitate Taxiway S

• Rehabilitate Taxiway F

• Northeast Airside Development

• Runway 27L End Around Taxiway

• Construct Departures Queue Taxiway for Runway 27R (Ph 1)

• Rehabilitate Taxiway N

• Miscellaneous Pavement Rehabilitation/ Repairs

• Miscellaneous Electrical Rehabilitation/ Repairs

• Miscellaneous Safety Rehabilitation/ Repairs

PHILADELPHIA NORTHEAST AIRPORT PROJECTS PLANNED 2025-2030

Multiple taxiways and runways were identified as in need of repair and rehabilitation. This list comprises the current projects.

Philadelphia Northeast Airport Projects Planned 2025-2030

• Rehabilitate Taxiway A

• Construct Run-up Apron

• Connecting Taxiways

• Relocation of Taxiway G

• Miscellaneous Pavement Rehabilitation/ Repairs

• Miscellaneous Electrical Rehabilitation/ Repairs

• Miscellaneous Safety Rehabilitation/ Repair