Appendix_D_-_FDOT_Utility_Permit.pdf
PDF 10 MB Posted
- Attached to
- C-17 Lift Station Replacement.
- Solicitation number
- B-7-25-40
- Issued by
- Brevard County, Florida
About this file
This document is a Florida Department of Transportation (FDOT) Utility Permit for the Lift Station C-17 Replacement project by Brevard County Utility Services. The permit (No. 2024-H-590-00196) covers the relocation of an existing lift station from the southeast corner of a car wash parcel to the northeast corner of the same property, with work to be performed along N. Courtenay Parkway and Catalina Isle Drive. The project involves installing approximately 190 linear feet of 12" gravity sewer with two manholes, re-routing sanitary flow, abandoning existing infrastructure by grouting in place, and installing a proposed 12" force main that will tie into an existing 20" force main. The anticipated start date is October 1, 2024, with 300 calendar days allocated for completion.
The permit requires the contractor to comply with multiple FDOT and Brevard County specifications, including providing a detailed Maintenance of Traffic (MOT) plan, a dewatering plan, and signed sheeting and shoring plans prior to the preconstruction meeting. Additional requirements include coordinating with FDOT, protecting existing utilities, and restoring the site to its original condition. The project involves multiple utility notifications, including AT&T, Brevard County Public Works, Charter Communications, City of Cocoa, and Florida City Gas. The work will be conducted within the FDOT right-of-way on State Road 3, with careful attention to traffic control, utility protection, and roadway restoration standards.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix D FDOT Utility Permit
Rule 14-46.001 F.A.C.
FLORIDA DEPARTMENT OF TRANSPORTATION December 14, 2016
UTILITY PERMIT
PERMIT NO:__________________________________
STATE ROAD INFORMATION
County: Section: State Road No: Beginning Mile Post: Ending Mile Post:
APPLICANT INFORMATION
The Utility Agency Owner (UAO) shall be identified in this Applicant Information Box. When the UAO is a City or County and desires to have the Utility Builder make a joint permit applicant, as prescribed in Section 2.1(4) of the 2017 Utility Accommodation Manual (UAM), the Utility Builder shall also be identified in this Applicant Information Box. A Utility Builder alone cannot apply for a utility permit without the City or County adding them as a joint applicant.
Utility Agency/Owner (UAO) Utility Builder (only applicable when the UAO is a City or County) Name: _____________________________________ Name: ______________________________________
Contact Person: _____________________________________ Contact Person: ______________________________________ Address: _____________________________________ Address: ______________________________________
City: _____________________________________ City: ______________________________________ State: _____ State: _____ Zip: _________ Zip: _________
Telephone: _____________________________________ Telephone: ______________________________________ Email: ____________________________________ Email: ______________________________________
WORK DESCRIPTION
The Applicant(s) requests permission from the Florida Department of Transportation (FDOT) to construct, operate, and maintain the utilities as described below and as depicted in the incorporated documentation.
Utility Work No: ___________________________
Additional sheets are attached and are incorporated into this permit Yes No For FDEP certification, the FDOT agency report is attached in accordance with UAM Section 2.4.1 (13) Yes No
TRAFFIC CONTROL (TCP)
The TCP will comply with the following 600 series index(es) ________________________________________________________________________ A TCP has been attached and incorporated into this permit application in compliance with UAM Section 2.4.2.
MOT Technician’s contact information (may be supplied at the two (2) business day notification to FDOT):
Name: ________________________________ Telephone ________________________ Email: _______________________________
COMMENCEMENT OF WORK
The UAO and/or Utility Builder shall commence actual construction in good faith within sixty (60) calendar days after approval of the permit application. If the beginning date is more than sixty (60) calendar days from the date of approval, the UAO and/or Utility Builder must review the permit with the FDOT Approving Engineer listed to make sure no changes have occurred to the transportation facility that would affect the permit’s continued approval. The UAO and/or Utility Builder shall make good faith efforts to expedite the work and complete the work within the calendar days indicated.
Anticipated Start Date: ___________________ Calendar days needed to completed: ________
Brevard
3216332091
Florida
SR 3
Brevard County Utility Services
10/1/2024
0.849
2725 Judge Fran Jamieson Way
600, 613, 603, 602
32940
The existing lift station will be relocated from the southeast corner of the car wash parcel at the intersection of Courtenay Parkway and Catalina Isle Drive to the northeast corner of the car wash property. Sanitary flow will be re-routed from the existing station to the new lift station, and the existing infrastructure grouted in place and abandoned. Approximately 190 LF of 12" gravity sewer will be installed within N. Courtenay Parkway, with 2 manholes and additional sa ... (see work description cont. page)
2024-H-590-00196
70140000
Brevard County Utility Services
Viera utility.development@brevardfl.gov
1.093
Approved 2024-H-590-00196
William Rickard 8/26/2024
Florida Department of Transportation
UTILITY PERMIT
December 14, 2016
PERMIT NO:_________________________________
APPLICANT SIGNATURE
By the below signature(s) the UAO and/or Utility Builder agree(s) to construct, operate, and maintain the work as noted in the above Work Description, shown in plans and incorporated documents, in compliance with the UAM, all instructions noted in the FDOT Special Instructions Box, and special instructions incorporated into this permit. The UAO and/or Utility Builder declares, the location of all existing utilities that it owns or has an interest in, both aerial and underground, are accurately shown on the plans of the work areas. In accordance with UAM Section 2.8, the UAO and/or Utility Builder further declares that a letter of notification was delivered to the owners of other facilities within the work areas and that those listed below are the only facility owners known to be involved or potentially impacted by the proposed work.
Date Notified: Name of other facility owners (attach additional sheets if necessary).
Utility Agency/Owner Utility Builder (when applicable)
Signature: ____________________________ Date: ________________ Signature:___________________________ Date: _______________ Name (printed): _____________________________________________ Name (printed): __________________________________________ Title: ______________________________________________________ Title: ___________________________________________________
FDOT PROJECT INFORMATION
Pursuant to UAM Section 2.1(10), the utility work is within FDOT projects listed below and must have a Utility Work Schedule for each project approved prior to commencement of work within the FDOT project limits:
FDOT SPECIAL INSTRUCTIONS
In accordance with UAM Section 2.7, FDOT incorporates the below and attached special instructions into this permit.
Additional FDOT Special Instructions are attached and incorporated into this permit. Yes No
PERMIT APPROVAL
By signature below, FDOT gives permission to the UAO and /or Utility Builder to construct, operate, and maintain the utilities indicated in this Utility Permit in compliance with the UAM, all incorporated documents, and special instructions. Any changes to the approved work must be approved by the FDOT’s Approving Engineer and attached and incorporated into this permit in accordance with UAM Section 2.11.
Approving Engineer: _____________________________________________ Date: _______________ Name: _____________________________________________
Title:______________________________________________
Notification of Utility Work to be provided to: Telephone _____________________ or Email: _____________________________
An FDOT Representative is required to be present on the worksite prior to commencement of work. Yes No Rep. Name: _____________________________ Telephone _____________________ Email: _____________________________
8/26/2024
Permittee requested conditional approval for this permit and the approval is recommended subject to following requirements:
1. Provide detail Maintenance of traffic (MOT) plan prior to preconstruction meeting to the department for review and approval.
2. Provide dewatering plan prior to preconstruction meeting to the department for review and approval.
3. Provide signed and sealed sheeting and shoring plan to the department for review prior to preconstruction meeting for this Project.
7/22/2024
(321) 634-6063 ext. ______ rajib.shrestha@dot.state.fl.us
William Rickard
William Rickard (digital signature) william.rickard@dot.state.fl.us
JULIAN GUERRERO (digital signature)
AT&T6/24/2024
Brevard County Public Works Engineering Division6/24/2024 Charter Communications6/24/2024 City of Cocoa6/25/2024 Florida City Gas6/24/2024
JULIAN GUERRERO
3216346086William Rickard
MAINTENANCE MANAGER/PERMITS
2024-H-590-00196
There are NO FDOT constructions (proposed or underway).
This work is NOT related to an approved Utility Work Schedule.
Approved 2024-H-590-00196
Florida Department of Transportation
UTILITY PERMIT
December 14, 2016
PERMIT NO:_________________________________
CERTIFICATION
I, the undersigned UAO and/or Utility Builder, hereby CERTIFY that the utilities were constructed and inspected in compliance with the UAM all incorporated documents, and special instructions. Pursuant to UAM Section 2.11, all changes have been approved by the FDOT’s Approving Engineer and incorporated into this permit along with all other material certifications, test results, bore logs, approved plans changes, as-built plans or other required documentation.
I also CERTIFY that work began on ________________ and was completed on ________________ and that the area was left in as good or better condition than when the work began.
Utility Agency/Owner Utility Builder (when applicable)
Signature: ____________________________ Date _________________ Signature:___________________________ Date ________________ Name (printed): _____________________________________________ Name (printed): ____________________________________________ Title: ______________________________________________________ Title: ____________________________________________________
FINAL INSPECTION OF WORK
The work was inspected and found to be in non-compliance as noted below:
All issues of non-compliance listed above have been brought into compliance and/or FDOT has no outstanding issues that need to be addressed by the UAO and/or Utility Builder. However, this final inspection does not release the UAO and/or Utility Builder of their continuing responsibilities pursuant to Rule 14-46.001, the UAM, all incorporated documents, and special instructions.
FDOT Inspector: _____________________________________________ Date: _______________ Name: _____________________________________________
Title: ______________________________________________
2024-H-590-00196
Approved 2024-H-590-00196
PERMIT NO.:
The complete Work Description could not fit in the space allotted on Page 1 of the Utility Permit so it is displayed below.
Work Description work description continuation page
2024-H-590-00196
The existing lift station will be relocated from the southeast corner of the car wash parcel at the intersection of Courtenay Parkway and Catalina Isle Drive to the northeast corner of the car wash property. Sanitary flow will be re-routed from the existing station to the new lift station, and the existing infrastructure grouted in place and abandoned. Approximately 190 LF of 12" gravity sewer will be installed within N. Courtenay Parkway, with 2 manholes and additional sanitary infrastructure installed to re-route the flow within Catalina Isle Drive. Due to the depth of installation, sheeting and shoring will be required.
Additionally, the proposed 12" force main will be installed within Catalina Isle Drive right-of-way with a proposed tie-in to the existing 20" DIP force main that runs along the east side of North Courtenay Parkway at the intersection of Courtenay Parkway and Catalina Isle Drive.
Approved 2024-H-590-00196 continuation page
PERMIT NO.:
STATE ROAD INFORMATION:
NAME OF OTHER FACILITY OWNERS / DATE NOTIFIED:
FDOT PROJECT INFORMATION:
THE WORK WAS INSPECTED AND FOUND TO BE IN NON-COMPLIANCE AS NOTED BELOW:
Facility Name: FPL - Brevard, Date Notified: 6/24/2024, Facility Name: MCI, Date Notified: 6/24/2024, Facility Name: Zayo Group, Date Notified: 6/24/2024
There are NO FDOT constructions (proposed or underway).
This work is NOT related to an approved Utility Work Schedule.
2024-H-590-00196
Approved 2024-H-590-00196
Shrestha, Rajib
From: Sweetman, Katie <Katie.Sweetman@brevardfl.gov> Sent: Thursday, August 15, 2024 8:39 AM To: Keels, Curtis; Rickard, William Scott; Shrestha, Rajib Cc: Hunter, Tucker Subject: Meeting Follow-up: FDOT Permit Application Number 2024-H-590-00196
EXTERNAL SENDER: Use caution with links and attachments.
Good morning, I just wanted to send a recap of our mee ng from yesterday regarding applica on number 2024-H-590-00196. As discussed:
1. The note on the plans sta ng the contractor is to submit the MOT plan prior to the preconstruc on mee ng with FDOT will remain on the plans.
2. The note on the plans sta ng the contractor is responsible for submi ng the shee ng and shoring plans along with the dewatering plan is to remain on the plans.
3. A note sta ng the contractor is responsible for submi ng a back-up MOT plan to FDOT in the event of work requiring a road closure on N Courtenay Pkwy will be included on the plans for the resubmi al.
4. Kimley Horn will confirm if the sub-base can be updated to 12” in the repair detail.
5. FDOT will confirm if the area of milling and resurfacing can be reduced to avoid impacts with loops on N
Courtenay Pkwy.
6. Once all of the above are addressed we will resubmit to FDOT and if everything is addressed. The permit will have the condi on that the above-men oned plans be submi ed to FDOT prior to the preconstruc on mee ng with FDOT.
Please let me know if this is not consistent or if I missed anything.
Thank you, Katie C. Sweetman, P.E.
Engineer III Brevard County U lity Services Department 2725 Judge Fran Jamieson Way, A-213 Viera, FL 32940-6602 Office: 321-350-8380 Cell: 321-482-4396
PLEASE NOTE: Florida has a broad public records law. This agency is a public en ty and is subject to Chapter 119 of the Florida Statute concerning public records. Email communica ons are covered under such laws and may be subject to public disclosure.
Approved 2024-H-590-00196
"Under Florida Law, email addresses are Public Records. If you do not want your e-mail address released in response to public record requests, do not send electronic mail to this entity. Instead, contact this office by phone or in writing."
Approved 2024-H-590-00196
DATE
AS SHOWN
SHEET NUMBER
No. REVISIONS DATE BY CHECKED BY
SCALE
DESIGNED BY
DRAWN BY
KHA PROJECT
SHEET NUMBER
No. REVISIONS DATE BY
DATE
AS SHOWN
CHECKED BY
SCALE
DESIGNED BY
DRAWN BY
KHA PROJECT
DATE:
LICENSED PROFESSIONAL
DATE:
A. TUCKER HUNTER
88634ATH
BPR
AJC
149850012
AUGUST 2024 LIFT STATION C-17 REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDAWWW.KIMLEY-HORN.COM CA 00035106
7341 OFFICE PARK PLACE, SUITE 102, MELBOURNE, FL 32940
PHONE: 321-430-1138
© 2024 KIMLEY-HORN AND ASSOCIATES, INC.
3 FDOT RAI #1 08/19/2024 BPR
1FDOT PERMIT FIGURE
NORTH
LOCATION OF
CONSTRUCTION ON
FDOT ROW (SEE PLAN
SHEETS C-1 - C-3)
PROPOSED LIFT
STATION C-17
PROPOSED 12" SANITARY SEWER
CONNECT TO EXISTING
20" FORCE MAIN
PROPOSED DOGHOUSE
MANHOLE MH-01
PROPOSED 12" FORCE MAIN
CONNECT FORCE MAIN TO
EXISTING 10" FORCE MAIN
ON CATALINA ISLE DRIVE
PROPOSED MANHOLE
MH-02
PROPOSED 12"
SANITARY SEWER
PROPOSED
MANHOLE MH-03
PROPOSED
MANHOLE MH-04
EXISTING LIFT STATION C-17
FILL EXISTING 12"
SANITARY SEWER WITH
EXCAVATABLE FLOWABLE
FILL AND PLACE SANITARY
SEWER OUT OF SERVICE
EXISTING 20" FORCE
MAIN
PROPOSED 40' X 40'
LIFT STATION SITE
RIGHT OF WAY
CATALINA ISLE DRIVE
N . C
O U
R
TEN
AY PKW
Y
EXISTING MANHOLE
EXISTING GRAVITY SEWER
TO BE ABANDONED
PROPOSED GATE VALVE
NOTES:
1. CONTRACTOR TO COORDINATE WITH FDOT PRIOR TO CONSTRUCTION.
2. CONTRACTOR TO REPLACE LOOP SYSTEM IN ROADWAY IF DAMAGED.
*APPROXIMATE LOCATION
3. CONTRACTOR TO PROVIDE MOT PLAN TO BREVARD COUNTY UTILITY
SERVICES DEPARTMENT AND FLORIDA DEPARTMENT OF
TRANSPORTATION PRIOR TO CONSTRUCTION. A BACKUP MOT PLAN IS
TO BE PROVIDED TO THE FLORIDA DEPARTMENT OF TRANSPORTATION
IN THE EVENT OF WORK REQUIRING A ROAD CLOSURE ON N.
COURTENAY PARKWAY.
4. CONTRACTOR TO PROVIDE SIGNED AND SEALED SHEETING AND
SHORING PLANS TO EOR AND BREVARD COUNTY PRIOR TO
CONSTRUCTION.
5. CONTRACTOR TO PROVIDE A DEWATERING PLAN TO BREVARD COUNTY
UTILITY SERVICES DEPARTMENT AND FLORIDA DEPARTMENT OF
TRANSPORTATION PRIOR TO CONSTRUCTION.
EXISTING LOOP SYSTEM*
FILL EXISTING 12' FORCE MAIN
WITH EXCAVATABLE
FLOWABLE FILL AND PLACE
FORCE MAIN OUT OF SERVICE
Approved 2024-H-590-00196
A. TUCKER HUNTER
88634AJC
CPV
SNR
149850012
AUGUST 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
© BREVARD COUNTY GENERAL NOTES
FDOT GENERAL NOTES
1. ALL WORK PERFORMED WITHIN THE FDOT RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH 2024/2025 EDITION OF FDOT DESIGN
STANDARDS, 2022 FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND THE 2017 UTILITY ACCOMMODATION
MANUAL.
2. ALL EXCAVATIONS WITHIN TEN (10) FEET OF THE TRAVEL LANES AND GREATER THAN THREE (3) INCHES DEEP MUST BE FILLED IN OR HAVE A SHOULDER TREATMENT PLACED AT THE DROP-OFF PER INDEX #102-600 OF FDOT 2021/22 STANDARDS PLANS INDEXES AT THE END OF
THE WORK DAY.
3. CONTRACTOR SHALL CONTACT FDOT TWO WEEKS IN ADVANCE AND SET UP A PRE-CONSTRUCTION MEETING PRIOR TO STARTING ANY
WORK IN FDOT RIGHT OF WAY.
4. ALL TRAFFIC CONTROL DEVICES MUST BE IN PLACE BEFORE WORK CAN START.
5. MAINTENANCE OF TRAFFIC TO BE SUPERVISED BY A FDOT CERTIFIED WORK TRAFFIC SUPERVISOR.
6. ENGINEER'S CERTIFICATIONS TOGETHER WITH AS-BUILT PLANS ARE REQUIRED TO BE SUBMITTED WITHIN 30 DAYS OF COMPLETION
WORK WITHIN FDOT RIGHT-OF-WAY.
7. IT WILL BE THE RESPONSIBILITY OF THE PERMITTEE TO REPAIR ANY DAMAGE TO FDOT FACILITIES CAUSED BY CONSTRUCTION OF THE
PROJECT.
8. PERMITTEE SHALL NOT BEGIN THE WORK WITHIN THE FDOT RIGHT-OF-WAY UNTIL A FDOT INSPECTOR IS PRESENT AT THE JOB SITE AND
AGREES THAT PROPER PREPARATIONS HAVE BEEN MADE.
9. SOD ALL UNPAVED AREAS WITHIN FDOT RIGHT-OF-WAY THAT ARE DISTURBED BY CONSTRUCTION PER FDOT STANDARDS PLANS INDEX #570-010.
10. SAW CUT ON SHOULDER'S EDGE OF PAVEMENT TO PROVIDE SMOOTHER JOINTS.
11. ALL AFFECTED SIDEWALKS, RAMPS, AND CROSSWALKS, WILL BE BUILT AND INSPECTED TO MEET CURRENT ADA REQUIREMENTS.
12. ALL SIDEWALK TO BE REMOVED AND REPLACED FROM JOINT TO JOINT AND HAVE 12" EXPANSION JOINTS (PREFORMED JOINT FILLER)
PLACED BETWEEN OLD AND NEW SIDEWALK.
13. PERMITTEE SHALL NOT COMMENCE USE OF CONNECTION PRIOR TO FINAL INSPECTION AND FINAL ACCEPTANCE BY DEPARTMENT.
FAILURE TO COMPLY WITH PERMIT CONDITION MAY RESULT IN REVOCATION OF THE PERMIT AND CLOSURE OF DRIVEWAY PER FL RULE
CHAPTER 14-96.
BREVARD COUNTY PUBLIC WORKS GENERAL NOTES
1. CONTRACTOR TO FOLLOW FDOT STANDARD SPECIFICATIONS SECTION 125 EXCAVATION FOR STRUCTURES AND PIPE.
2. SHORING SHALL BE REQUIRED FOR EXCAVATIONS WITHIN 8 FEET FROM THE EDGE OF PAYMENT OR 3 FEET FROM THE EDGE OF
SIDEWALK.
3. CONTRACTOR SHALL UTILIZE DITCHES, PIPES, AND/OR PUMPS AS NECESSARY TO MAINTAIN THE EXISTING DRAINAGE DURING ALL PHASES OF CONSTRUCTION. THE ADJACENT PROPERTIES ARE LOCATED IN UNINCORPORATED BREVARD COUNTY. THE SITE DRAINAGE SHALL NOT ADVERSELY IMPACT HISTORICAL DRAINAGE OR CAUSE DRAINAGE ISSUES FOR THE UNINCORPORATED BREVARD AREAS.
4. IF ANY SIGNAGE IN THE BREVARD COUNTY RIGHT-OF-WAY IS REMOVED, IT SHALL BE REPLACED IN ACCORDANCE WITH B.C.L.D. EXHIBIT 26.
5. ANY SIGN, PAVEMENT MARKINGS, OR RPM'S THAT ARE DAMAGED DURING THE INSTALLATION OF THE NEW FORCE MAIN OR REMOVAL OF THE FORCE MAIN SHALL BE REPLACED, RESTRIPED, OR REINSTALLED AS PART OF THIS PROJECT. IF ANY SIGNS OR POSTS ARE DAMAGED, PLEASE REFER TO B.C.L.D. EXHIBIT 26 FOR THE REPLACEMENT REQUIREMENTS. THIS IS ALSO TO INCLUDE ANY PAVEMENT MARKINGS OR
RPM'S THAT ARE DAMAGED 100 FT TO EITHER SIDE OF THE PROJECT LIMITS.
6. IF ANY STOP SIGNS OR REGULATORY SIGNS ARE REQUIRED TO BE TAKEN DOWN DURING THE WORK DAY HOURS, THEY SHALL BE REINSTALLED OR RELOCATED IMMEDIATELY AND BEFORE THE CONTRACTOR LEAVES THE SITE FOR THE DAY.
7. IF ANY STOP SIGN IS TAKEN DOWN OR RELOCATED, CONTRACTOR IS TO REPLACE SIGN NEXT TO, OR AS CLOSE AS POSSIBLE TO, THE
STOP BAR IT IS PERTAINING TO.
8. CONTRACTOR TO ACQUIRE ALL PERMITS AS REQUIRED FOR STRUCTURAL COMPONENTS INCLUDING, BUT NOT LIMITED TO, RETAINING WALLS, MASONRY WALLS, FENCING, ETC. A BUILDING PERMIT IS REQUIRED FOR ALL STRUCTURAL COMPONENTS.
9. BREVARD COUNTY TRAFFIC OPERATION (SIGNAL AND ITS) SHALL BE CONTACTED 72 HRS. PRIOR TO ANY WORK WITHIN THE R/W OR AROUND THE SIGNAL AT THE SR 3 INTERSECTION. THE CONTACT NUMBER IS (321) 455-1440.
10. ALL PAVEMENT MARKINGS REPLACED WITHIN BREVARD COUNTY RIGHT-OF-WAY MUST BE THERMOPLASTIC.
11. ALL PAVEMENT MARKINGS TO BE REINSTALLED PER FDOT STANDARD PLANS FY 2024-2025 INDEX 711-001 PAVEMENT MARKINGS.
BREVARD COUNTY PUBLIC WORKS ENGINEERING STANDARD DEVELOPMENT NOTES
G-4 Approved
2024-H-590-00196
(A)ARV (AUTOMATIC) AIR RELEASE VALVE
A/C AIR CONDITIONING
A/VV AIR/VACUUM AIR VALVE
AAV AUTOMATIC AIR VENT
ABAN ABANDON(ED)
ABFV ACTUATED BUTTERFLY VALVE
ABRSV ABRASIVE
ABS ACRYLONITRILE BUTADIENE STYRENE
AB-xx AUGER BORING (e.g. AB-1)
ACCMP ASPHALT-COATED CORRUGATED METAL
PIPE
ACCV AIR CUSHION CHECK VALVE
ACP ASBESTOS CEMENT PIPE
ADH ADHESIVE
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AG AMMONIA GAS
AIR AIR PIPE
AL ALUMINUM
ALT ALTERNATE
AMM AMMONIATOR
AOD ANGLE OF DEFLECTION
APPROX APPROXIMATE
AS AMMONIA SOLUTION
ASSY ASSEMBLY
B/W BOTH WAYS
BCV BALL CHECK VALVE
BF BLIND FLANGE
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BGO BURIED GEAR OPERATOR
BI BLACK IRON
BIP BLACK IRON PIPE
BITUM BITUMINOUS OR BITUMASTIC
BLDG BUILDING
BM BENCH MARK
BOC BACK OF CURB
BOS BOTTOM OF SLAB
BOT BOTTOM
BSP BLACK STEEL PIPE
BTWN BETWEEN
BV BALL VALVE
BW BUTT WELD
BWW BACKWASH WATER
B-xx BORING (e.g. B-1)
C&G CURB AND GUTTER
C.F. CUBIC FOOT
C.I. CUBIC INCH
C.Y. CUBIC YARD
C/C CENTER TO CENTER
CA COMPRESSED AIR
CAP CAPACITY
CATV CABLE TELEVISION
CAV COMBINATION AIR VALVE
CBP CHLORINE BOOSTER PUMP
CCC CHLORINE CONTACT CHAMBER
CE CHLORINATED EFFLUENT
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CI CAST IRON
CIP CAST IRON PIPE
CISP CAST IRON SOIL PIPE
CJ CONSTRUCTION JOINT
CL, ℄ CENTER LINE
CL2 CHLORINE GAS
CLF CHAIN LINK FENCE
CLR CLEAR(ANCE)
CMP CORRUGATED METAL PIPE
CMPA CORRUGATED METAL PIPE ARCH
CO CLEAN OUT
CO2 CARBON DIOXIDE
COAG COAGULANT
CONC CONCENTRATE
CONN CONNECTION
CONSTR CONSTRUCT(ION)
CONT CONTINUATION
COP COPPER PIPE
CP CONCRETE PIPE
CPA CONCRETE PIPE ARCH
CPLG COUPLING
CPP CONCRETE PRESSURE PIPE
CPVC CHLORINATED POLYVINYL CHLORIDE
CR CONCENTRIC REDUCER
CS CHLORINE SOLUTION
CV CHECK VALVE
CYL CYLINDER
D DRAIN
DEG DEGREE
DEMO DEMOLITION
DF DIESEL FUEL
DI DUCTILE IRON
DIA DIAMETER
DIAG. DIAGONAL
DIM DIMENSION
DIP DUCTILE IRON PIPE
DIR DIRECTION
DISCH DISCHARGE
DJ DISMANTLING JOINT
DMH DROP MANHOLE
DN DOWN
DR DIMENSION RATIO
DV DIAPHRAGM VALVE
DW DISINFECTED WATER
DWG DRAWING
DWV DRAIN, WASTE, AND VENT
E EAST(ING)
E.F. EACH FACE
E.W. EACH WAY
EA EACH
ECC ECCENTRIC
EFF EFFLUENT
EGO ELEVATED GEAR OPERATOR
EJ EXPANSION JOINT
EL(EV) ELEVATION
ELAST ELASTOMERIC
ELL ELBOW
EMER EMERGENCY
EOP EDGE OF PAVEMENT
EPDM ETHYLENE PROPYLENE DIENE
MONOMER
EQUIP EQUIPMENT
EST ESTIMATE(D)
EVA ELECTRIC VALVE ACTUATOR
EX(IST) EXISTING
EXP EXPANSION
EXT EXTERIOR
F/F FACE TO FACE
FAB FABRICATE(D)
FC FLEXIBLE COUPLING
FCA FLANGED COUPLING ADAPTER
FCV FLOW-CONTROL VALVE
FD FLOOR DRAIN
FE FILTER(ED) EFFLUENT
FF FINISH FLOOR
FH FIRE HYDRANT
FIG FIGURE
FIN FINISH(ED)
FL FLUORIDE
FLEX FLEXIBLE
FLG FLANGE(D)
FLR FLOOR
FM FORCE MAIN
FO(L)(C) FIBER OPTIC (LINE)(CONDUIT)
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBERGLASS REINFORCED PLASTIC
FT FOOT OR FEET
FV FOOT VALVE
FW FINISHED WATER
GA GAUGE
GAL GALLON(S)
GALV GALVANIZED
GBW GAC BACKWASH
GIP GALVANIZED IRON PIPE
GJ GROOVE JOINT
GND GROUND
GO GEAR OPERATED
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPS GALLONS PER SECOND
GR GRADE
GS GALVANIZED STEEL
GSP GALVANIZED STEEL PIPE
GSR GROUND STORAGE RESERVOIR
GST GROUND STORAGE TANK
GV GATE VALVE
HB HOSE BIBB
HD HEAVY-DUTY
HDD HORIZ. DIRECTIONAL DRILL
HDPE HIGH-DENSITY POLYETHYLENE
HFA HYDROFLUOSILICIC ACID
HFCA HARNESSED FLANGED COUPLING
ADAPTER
HORIZ HORIZONTAL
HP HORSEPOWER
HPA HIGH PRESSURE AIR
HR HOUR
HSP HIGH SERVICE PUMP
HT HEIGHT
HVA HYDRAULIC VALVE ACTUATOR
HVAC HEATING, VENTILATION, AND AIR
CONDITIONING
HW HOT WATER
HWL HIGH WATER LEVEL
HYD HYDRAULIC
ID INSIDE DIAMETER
IN INCH(ES)
INF INFLUENT
INV INVERT
IP IRON PIPE
IPS INTERNATIONAL PIPE STANDARD
IR INTERNAL RECYCLE
IW IRRIGATION WATER
JB JUNCTION BOX
JT JOINT
KGV KNIFE GATE VALVE
L,LT LEFT
LAB LABORATORY
LAM LAMINATE OR LAMINATION
LAT LATERAL
LB(S) POUND(S)
LEN LENGTH
LF LINEAR FEET
LHDPE LINEAR HIGH-DENSITY POLYETHYLENE
LS LIME SLURRY
LSS LIME STABILIZED SLUDGE
LWL LOW WATER LEVEL
MAINT MAINTAIN OR MAINTENANCE
MAN MANUAL(LY)
MAX MAXIMUM
MCC MOTOR CONTROL CENTER
ME(S) MITERED END (SECTION)
MECH MECHANICAL
MF MICROFILTRATION
MFR MANUFACTURE(R)
MG MILLION GALLONS
MGD MILLION GALLONS PER DAY
MH MANHOLE
MI MILE(S)
MIN MINIMUM
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
ML MIXED LIQUOR
MPH MILES PER HOUR
MRPP METAL REINFORCED PLASTIC PIPE
MTD MOUNTED
MV MOTORIZED VALVE
MW MANWAY
MWL MEAN WATER LEVEL
N NORTH(ING)
N.C. NORMALLY CLOSED
N.I.C. NOT IN CONTRACT
N.O. NORMALLY OPEN
N/A NOT APPLICABLE
NaOCl SODIUM HYPOCHLORITE
NE NORTHEAST
NF NANOFILTRATION
NIC NOT IN CONTRACT
NO., # NUMBER
NOM NOMINAL
NPT NATIONAL PIPE TAPER
NPW NON-POTABLE WATER
NSFC NOT SHOWN FOR CLARITY
NTS,N.T.S. NOT TO SCALE
NW NORTHWEST
O&M OPERATION AND MAINTENANCE
O.C. ON CENTERS
O/E OR EQUAL
O/O OUTSIDE TO OUTSIDE
O2 OXYGEN
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OFF OFFSET
OH OVER HEAD
OP ORIFICE PLATE
OPER OPERATOR
OPP OPPOSITE
OPT OPTION(AL)
OVF OVERFLOW
P/L PROPERTY LINE
PA PROCESS AIR
PBV PLASTIC BALL VALVE
PC POINT OF CURVE
PE PLAIN END
PEP POLYETHYLENE PIPE
PERM PERMEATE
PG PRESSURE GAUGE
PGL PROPOSED GRADE LINE
PJ PUSH-ON JOINT
PM PROCESS MECHANICAL
PNV PINCH VALVE
POB POINT OF BEGINNING
POI POINT OF INTERSECTION
POJ PUSH-ON JOINT
POL POLYMER
PPD POUNDS PER DAY
PPM PARTS PER MILLION
PREFAB PREFABRICATED
PRES PRESSURE
PROP PROPOSED
PRV PRESSURE REDUCING VALVE
PRW PROCESS WATER
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT OF TANGENCY
PV PLUG VALVE
PVC POLYVINYL CHLORIDE
PVC-D POLYVINYLCHLORIDE (DOUBLE
CONTAINED)
PVDF POLYVINYLIDENE FLUORIDE (KYNAR)
PVMT PAVEMENT
PW POTABLE WATER
Q FLOW
QTY QUANTITY
R,RT RIGHT
R/W, R.O.W. RIGHT OF WAY
RAD., R. RADIUS
RAS RETURN ACTIVATED SLUDGE
RAW RAW WATER
RCB REINFORCED CONCRETE BOX
RCP REINFORCED CONCRETE PIPE
RCPA REINFORCED CONCRETE PIPE ARCH
RCW RECLAIMED WATER
REBAR REINFORCING STEEL
RED REDUCER
REEW REUSE EFFLUENT WATER
REF REFERENCE
REINF REINFORCE(D)(ING)(MENT)
REJ RO REJECT
REQ'D REQUIRED
REW RETURN EFFLUENT WATER
RJ RESTRAINED JOINT (BELL)
RMJ RESTRAINED MECHANICAL JOINT
RNG RANGE
RO REVERSE OSMOSIS
ROC RADIUS OF CURVATURE
RPM REVOLUTIONS PER MINUTE
RPZBP REDUCED PRESSURE ZONE BACKFLOW
PREVENTER
RR RAILROAD
RS RAW SEWAGE
RW RECLAIMED WATER
RWW RAW WASTEWATER
S SOUTH
S.F. SQUARE FOOT
S.I. SQUARE INCH
S.O. SIDE OPERATED
S.STL STAINLESS STEEL
S.Y. SQUARE YARD
SA SAMPLE LINE
SAN SANITARY
SB-xx SOIL BORING (e.g. SB-1)
SCH SCHEDULE
SCV SILENT CHECK VALVE
SD STORM DRAIN
SDR STANDARD DIMENSION RATIO
SE SOUTHEAST
SEC SECTION
SEFF SECONDARY EFFLUENT
SF SQUARE FOOT OR FEEET
SHT SHEET(ED)(ING)
SIM SIMILAR
SL SLUDGE
SLV SLEEVE
SM SHEET METAL
SOL SOLUTION
SP SOIL PIPE
SPEC(S) SPECIFICATION(S)
SPT-xx STANDARD PENETRATION TEST BORING
(e.g. SPT-1)
SQ SQUARE
SS SANITARY SEWER
SSE SUBSTANDARD EFFLUENT
ST SAMPLE TAP
STA STATION
STD STANDARD
STL STEEL
STORM STORMWATER
STR STRAIGHT
SUP SUPERNATANT
SV SOLENOID VALVE
SVC SERVICE
SVW SERVICE WATER
SW SOUTHWEST
SWD SIDEWATER DEPTH
SYM SYMBOL
SYMM SYMMETRICAL
T&B TOP AND BOTTOM
T.O.C. TOP OF CONCRETE
T.O.S. TOP OF SLAB
T.S. TAPPING SLEEVE
T.V. TAPPING VALVE
TAN TANGENT
TBM TEMPORARY BENCH MARK
TB-xx TEST BORING-xx (e.g. TB-1)
TDH TOTAL DYNAMIC HEAD
TEL TELEPHONE
TEMP TEMPORARY
TH TEST HOLE
THD THREAD(ED)
THK THICK(NESS)
TJ TIED JOINT
TOB TOP OF BANK
TOC TOP OF CURB
TOS TOE OF SLOPE
TS THICKENED SLUDGE
TV TELEVISION
TWP TOWNSHIP
TYP TYPICAL
UD UNDERDRAIN
UG UNDERGROUND
UGE UNDERGROUND ELECTRIC
UON UNLESS OTHERWISE NOTED
UTC UNDERGROUND TELEPHONE CABLE
UTIL UTILITY
UV ULTRAVIOLET
VAC VACUUM
VAR VARIES
VB VALVE BOX
VC VERTICAL CURVE
VCP VITRIFIED CLAY PIPE
VEL VELOCITY
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
VTR VENT THROUGH ROOF
W WEST
W.L. WATER LEVEL
W.P. WALL PIPE (WITH WATER STOP)
W/ WITH
W/O WITHOUT
WAS WASTE ACTIVATED SLUDGE
WCO WALL CLEAN OUT
WF WIDE FLANGE
WH WALL HYDRANT
WM WATER MAIN
WPR WORKING PRESSURE
WS(P) WELDED STEEL (PIPE)
WT WEIGHT
WTF WATER TREATMENT FACILITY
WTP WATER TREATMENT PLANT
WW WASTEWATER
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
WWTF WASTEWATER TREATMENT FACILITY
WWTP WASTEWATER TREATMENT PLANT
XFER TRANSFER
XLHDPE CROSS LINKED HIGH-DENSITY
POLYETHYLENE
YD YARD(S)
YH YARD HYDRANT
YR YEAR(S)
NOTE: THIS LEGEND IS FOR GENERAL REFERENCE. NOT ALL ABBREVIATIONS, SYMBOLS, PROCESSES, MATERIALS, OR FITTINGS MAY BE USED IN THIS DESIGN, NOR IS THIS LEGEND COMPREHENSIVE. REFER TO INDIVIDUAL DRAWING LEGEND(S) IF SYMBOLS ARE NOT LISTED. INDIVIDUAL DISCIPLINE STANDARD LEGENDS SUPERCEDE THIS GENERAL LEGEND, IF PROVIDED.
SECTION OR DETAIL
NUMBER/LETTER
SCALE:
A
M-1
DETAIL
N.T.S.DRAWING WHERE
DETAIL IS
REFERENCED
DETAIL/SECTION REFERENCES
DETAIL OR SECTION
NUMBER/LETTER
SHEET WHERE DETAIL
IS FOUND
OPTIONAL HAT
(INDICATES VIEW DIRECTION)
SECTION CUT AND
DIRECTION TAIL (ROTATED
AS REQUIRED)
STANDARD ABBREVIATIONSCIVIL SYMBOLS LEGEND
NOTE (TYP)
ANNOTATION, SINGLE
LEADER (INDICATING
TYPICAL AT MULTIPLE
LOCATIONS)
NOTE
ANNOTATION,
MULTIPLE LEADERS
INDICATING DISCRETE
TARGETS
VIEWPORT OR FEATURE
BREAK INDICATOR
VIEW FRAME EXTENT
(WITH DRAWING LOCATION
REFERENCE)
SEE SHEET xxx
STANDARD NORTH
ARROW (ROTATED AS
REQUIRED)
GRAPHIC SCALE
NORTH ARROW
DRAFTING LEGEND PROCESS PIPING LEGEND (DOUBLE-LINE OR 3D)
SD
SD
PROPOSED CONTOUR
EXISTING CONTOUR
PROPOSED STORM PIPE
EXISTING SPOT ELEVATION
PROPOSED ELEVATION
PROPOSED TOP OF CURB/
PROPOSED GRATE INLET
EXISTING STORM PIPE
PROPOSED CURB INLET
EXISTING GRATE INLET
PROPOSED STORM MANHOLE
PAVEMENT ELEVATION
PROPOSED DIRECTION OF
SURFACE WATER RUNOFF
PROPOSED YARD DRAIN
SHEET FROM WHERE DETAIL IS
FIRST REFERENCED
A M-2
NORTH
(HORIZONTAL AND/OR
VERTICAL AS REQUIRED)
HALF
VIEWPORT
SCALE
FULL
VIEWPORT
SCALE
DOUBLE
VIEWPORT
SCALE
PROCESS PIPING LEGEND (SINGLE-LINE)
EXISTING OVERHEAD LINE
EXISTING WATER MAIN
EXISTING UNDERGROUND TELE.COMM. LINE
PROPOSED SANITARY SEWER
EXISTING REUSE MAIN
EXISTING FORCE MAIN
PROPOSED SANITARY MANHOLE
PROPOSED SANITARY SERVICE
EXISTING FIBER OPTIC LINE
EXISTING NATURAL GAS LINE
UT
W W
OHE
RW RW
FM
FOC
GAS
MECHANICAL JOINT FITTINGS
FLANGED FITTINGS
SOLVENT WELD FITTINGS
BALL VALVE (SOLVENT WELD SHOWN)
GATE VALVE (FLANGED SHOWN)
PLUG VALVE (FLANGED SHOWN)
BUTTERFLY VALVE (FLANGED SHOWN,
WHEEL OPERATED)
BUTTERFLY VALVE (WAFER, LEVER
OPERATED)
GLOBE CHECK VALVE (FLANGED SHOWN)
SWING CHECK VALVE (FLANGED SHOWN)
PIPE COUPLING
EXPANSION JOINT, FLANGED
FLOW CONTROL VALVE (FLANGED SHOWN)
VENTURI FLOW METER (FLANGED SHOWN)
V-CONE FLOW METER (FLANGED SHOWN)
MAGNETIC FLOW METER (FLANGED SHOWN)
PROPELLER FLOW METER (FLANGED SHOWN)
BUTT-WELD FITTINGS (S.STL SHOWN)
SECONDARYPRIMARY SECONDARYPRIMARY
EXISTING SANITARY SEWERS
PROPOSED FORCE MAIN
A. TUCKER HUNTER
88634AJC
CPV
SNR
149850012
AUGUST 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
SYMBOLS AND
ABBREVIATIONS G-5Approved
2024-H-590-00196
CPV
SNR
149850012
AUGUST 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
NORTH
KEY SHEET G-6Approved 2024-H-590-00196
D
88634AJC
CPV
SNR
149850012
AUGUST 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
PLAN AND PROFILE
STA: 10+00 TO 11+69 C-1
N O
R
TH
Approved 2024-H-590-00196
CPV
SNR
149850012
AUGUST 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
PLAN AND PROFILE
STA: 11+69 TO 14+74 C-2
NORTH
Approved 2024-H-590-00196
D
88634AJC
CPV
SNR
149850012
AUGUST 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
N O
R
TH
ROADWAY
RESTORATION PLAN C-3
NORTH
Approved 2024-H-590-00196
�$�����7�8�&�.�(�5���+�8�1�7�(�5
�˙�˙�ˇ�����$�-�&
�&�3�9
�6�1�5
�$�8�*�8�6�7����������
�/�,�)�7���6�7�$�7�,�2�1���&�����ˆ �5�(�3�/�$�&�(�0�(�1�7
�3�5�(�3�$�5�(�'���)�2�5
�%�5�(�9�$�5�'���&�2�8�1�7�<���8�7�,�/�,�7�<���6�(�5�9�,�&�(�6 �%�5�(�9�$�5�'���&�2�8�1�7�< �)�/�2�5�,�'�$
�‰ �)�'�2�7���'�(�7�$�,�/�6 �'���ˆApproved 2024-H-590-00196
CPV
SNR
149850012
AUGUST 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
© FDOT DETAILS D-8Approved 2024-H-590-00196
CPV
SNR
149850012
AUGUST 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
© FDOT DETAILS D-9Approved 2024-H-590-00196
NOTES:
1. LONGITUDINAL CUTS SHALL REQUIRE OVERLAY/RESURFACE OF THE COMPLETE WIDTH OF
THE TRAVELED WAY.
2. CUTS AT AN INTERSECTION OF STREETS SHALL REQUIRE A COMPLETE OVERLAY/
RESURFACING TO THE END OF ALL RETURN RADII AND ALSO TO A POINT TEN (10) FEET
BEYOND THE CUT, WHICHEVER IS GREATER.
3. ACTUAL REQUIREMENTS WILL BE AS STATED ON THE APPROVED PERMIT AND DRAWINGS.
4. BASE REPLACEMENT SHALL BE 12-IN THICK LIMEROCK BASE (MIN. LBR 100).
5. FLEXIBLE PAVEMENT SHALL BE STRUCTURAL COURSE SP-12.5 (2-INCH), AND FRICTION
COURSE FC-12.5 (2-INCH).
6. ALL JOINT CUTS SHALL BE MECHANICALLY SAW CUT.
7. IF PERMANENT ASPHALT IS NOT APPLIED WITHIN 24-HRS OF WORK, MIN 2" TEMPORARY
COLD PATCH REQUIRED.
8. SUB-GRADE TO BE COMPACTED TO 98% MIN DENSITY AS DETERMINED BY AASHTO T-180.
CUT AREA TO BE PLATED OR PROTECTED.
TRENCH WIDTH =
PIPE DIAMETER +
2'-0" (MIN)
VARIES
FRICTION COURSE FC-12.5 (2")
STRUCTURAL COURSE SP-12.5 (2")
VARIES
SAWCUT
(TYP)
IF NEEDED, MILL 2" AND
RESURFACE WITH FRICTION
COURSE FC-12.5 (2")
UNDISTURBED
EARTH
SUBGRADE
(COMPACTED TO
98% MAX DENSITY)
2'-0" MIN12" LIMEROCK BASE
(MIN LBR 100)
12" TYPE B STABILIZATION
(MIN LBR 40)
1:1 CUT SLOPE OR
TRENCH BOX
A. TUCKER HUNTER
88634AJC
CPV
SNR
149850012
AUGUST 2024
LIFT STATION C-17
REPLACEMENT
PREPARED FOR
BREVARD COUNTY UTILITY SERVICES
BREVARD COUNTY FLORIDA
FDOT ROADWAY
RESTORATION DETAIL D-10Approved
2024-H-590-00196 kimley-horn.com 7341 Office Park Pl Ste 102, Melbourne, FL 32940 321-430-1138
August 21, 2024
Re: Lift Station C-17 Replacement Comment Response FDOT Utility Permit 2024-H-590-00196
Dear Mr. Shrestha, Kimley Horn has reviewed the comments provided by the Florida Department of Transportation (FDOT) on July 26, 2024. Our responses in regard to the FDOT review of the Lift Station C-17 Replacement project are provided below.
1. Traffic control Plan: Please provide detailed MOT plans for this job (Such as number of lanes to be closed, barrier wall requirement and detour information if any).
Response: Per the FDOT meeting on August 14, 2024, with Brevard County Utility Services Department (BCUSD), FDOT, and Kimley-Horn, the Contractor is to provide MOT plan to BCUSD and FDOT prior to construction. A backup MOT plan is to be provided to the FDOT in the event of work requiring a road closure on N. Courtenay Parkway. See note 3 on Sheet 1, note 5 on Sheets C-1 and C-2, and note 2 on Sheet C-3.
2. Please reflect the offset for the proposed sewer line from the edge of the pavement in the plan view.
Response: A dimension of the offset for the proposed sewer line from the edge of the pavement has been added to the plan view of Sheet C-1.
3. Please confirm the depth of the proposed Sewer line and Force main in sheet C-1 and C-2. The depth of sewer line reflects to be very deep which is not common.
Response: The depths of the proposed sewer main and force main were provided by the surveyor of the Lift Station C-17 project to include the gravity sewer inverts and a test hole of the existing utilities. Dimensions for the depths of the proposed utilities have been added to Sheets C-1 and C-2.
4. Considering the depth of the proposed Force main and Sewer line, Is there any dewatering plan for this operation?
Response: Per the FDOT meeting on August 14, 2024, with BCUSD, FDOT, and Kimley-Horn, dewatering is anticipated during construction and a dewatering plan will be submitted by the Contractor prior to beginning construction. See note 5 on Sheet 1, note 7 on Sheets C- 1 and C-2, and note 8 on Sheet C-3.
5. Please provide a cross-section view for the full restoration work.
Response: A detail of the cross-section view for the full roadway restoration has been added to Sheet D-10. Approved
2024-H-590-00196
6. Sheet 1 states that the existing Sewer line and Force main which will be out of service will be abandoned. Please refer to UAM section 3.16.10 and FDOT specification 555.4.1.3 and correct the verbiage.
Response: The callouts regarding placing the existing sanitary sewer and force main out of service have been updated and included on Sheets 1 and C-1.
7. See UAM sec 2.4 for additional submittal detail requirements.
Response: Acknowledged. Per the FDOT meeting on August 14, 2024, with BCUSD, FDOT, and Kimley-Horn, Index 102-600, Sheet 8 of 11 was added to Sheet D-9.
Please feel free to contact me at tucker.hunter@kimley-horn.com or (407) 982-3064 should you have any questions regarding this response letter.
Sincerely, Tucker Hunter, P.E.
Project Manager
Attachments:
Appendix A: Lift Station C-17 Replacement Revised Plans
Approved 2024-H-590-00196
APPENDIX A
FDOT RAI LETTER
Appendix E
Site Photos
SR-3
Ex. 20" Force Main (approx.)
Ex. 12" Force Main (to be abandoned)
Ex. 12" gravity main (to be abandoned)
N. Courtenay Parkway - SR-3 (facing North)
Proposed 12" gravity main
Approved 2024-H-590-00196
SR-3
Proposed 12" gravity main (approx.)
Ex. 20" force main (approx.)
N. Courtenay Parkway - SR-3 (facing south)
Approved 2024-H-590-00196
Catalina Isle Drive
Proposed 12" gravity main (approx.)
Proposed manhole (approx.)Proposed 12" gravity main (approx.)
Proposed 12" force main (approx.)
Existing 20" force main (approx.)
Catalina Isle Drive (facing west)
Approved 2024-H-590-00196
File details come from the government source that posted it. Updated .