Appendix B1_Bid Alternates_CHR Immersive Learning Lab.pdf
PDF 232 KB Posted
- Solicitation number
- IFB1 GMAA 2026000184 4
- Issued by
- Denver County, Denver City, Colorado
About this file
This is a Bid Alternates form from the State of Colorado Office of the State Architect, State Buildings Program, for the Auraria Higher Education Center's Cherry Creek Immersive Learning Lab project (Project No. 1004388). The form provides the framework for bidders to submit pricing for optional work modifications to the base bid. The document specifies that additive alternates and deductive alternates are mutually exclusive—only one category may be used in a single bid submission. Additive Alternate A.A.1 involves replacing three fire dampers in specification section 01 23 00, 3.1 A.2, with pricing to be provided by the bidder. The form includes designated line items for up to ten additive alternates and ten deductive alternates, though only the first additive alternate is detailed in this document.
The form requires bidders to enter pricing for selected alternates, which will modify the base bid amount upon acceptance. All alternate descriptions and detailed specifications are referenced in the primary contract documents. Bidders must complete the form by entering their company name, authorized signature, and date. No pricing amounts, funding sources, or contract term information is specified in this particular form, as it serves as a template for bidders to propose costs for the specified alternates during the bidding process.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBP-6.131
Rev 7/2025 R1
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
BID ALTERNATES
Institution or Agency:
Project No./Project Name:
INSTRUCTIONS:
1. Refer to Item #8 in the Instructions to Bidders (SBP-6.12) for additional alternate information.
2. Additive alternates will not be used if deductible alternates are used. Deductible alternates will not be used if additive alternates are used.
3. Refer to the contract documents for thorough description(s) of the alternates.
4. If alternates are accepted, the base bid will be modified by the amount entered below.
ADDITIVE ALTERNATES
Alt. # Description of Additive Alternate Spec. Section Pricing
A.A.1 $
A.A.2 $
A.A.3 $
A.A.4 $
A.A.5 $
A.A.6 $
A.A.7 $
A.A.8 $
A.A.9 $
A.A.10 $ lanexxTX Line lanexxTX Line
SBP-6.131
Rev 7/2025 R1
DEDUCTIVE ALTERNATES
Alt. # Description of Deductive Alternate Spec. Section Pricing
D.A.1
D.A.2 $
D.A.3 $
D.A.4 $
D.A.5 $
D.A.6 $
D.A.7 $
D.A.8 $
D.A.9 $
D.A.10 $
THE BIDDER
BY_________________________________________________________________
Company Name
BY__________________________________________________________________
Signature Date
| BID ALTERNATES |
| INSTRUCTIONS: |
| ADDITIVE ALTERNATES |
| DEDUCTIVE ALTERNATES |
| THE BIDDER |
| TextInput.127: Auraria Higher Education Center |
| TextInput.173: 1004388 / Cherry Creek Immersive Learning Lab |
| TextInput: |
| AA1: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: Replace three (3) Fire Dampers |
| AA1S: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: 01 23 00, 3.1 A.2. |
| AA1P: |
| 0: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 1: |
| DA1: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1S: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| DA1P: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
Company Name:
File details come from the government source that posted it. Updated .