Appendix B - Traffic Permits.pdf

PDF 2 MB Posted

Attached to
BID NO. 256112 LARGE DIAMETER SEWER INSPECTION
Solicitation number
S-KS0043-00016029
Issued by
Marion County, Oregon

About this file

This file comprises multiple permit application forms and traffic control documents for work in right-of-way projects across the City of Salem and Marion County, Oregon. The documents are designed to regulate and authorize construction activities, utility work, and special events within public roadways and right-of-way areas under the jurisdiction of the City of Salem, Marion County Land Development Engineering & Permits (LDEP), and the Oregon Department of Transportation (ODOT). The City of Salem requires three full business days' notice for traffic permits, with applications submitted to the City Project Manager. Work permits are classified as Type A (valid for 30 days) covering sidewalk closures and local right-of-way work, or Type B (valid for 10 closure days within a 30-day period) covering arterial and collector lane closures. Arterial and collector daytime work hours are restricted to 8:30 a.m. to 3:30 p.m. unless otherwise approved. Marion County LDEP applications require submission of site plans via email to MCLDEP@co.marion.or.us, with fees ranging from $50 to $1,000 depending on permit type, plus additional plan check fees calculated as percentages of engineer's estimates for major construction projects.

Applicants must provide contractor certificates of insurance with additional insured endorsements, construction plans, proposed work schedules, cost estimates, traffic control plans, and erosion prevention and sediment control plans where applicable. Marion County requires financial guarantees ranging from 100 to 125 percent of the engineer's estimate depending on rural or urban classifications. For work affecting state highways, ODOT approval is required via a separate application form (OAR 734-055), with applicants required to notify the District Representative at least 48 hours before beginning work and comply with Oregon Utility Notification Center rules by calling 1-800-332-2344. All work must conform to applicable federal, state, and local laws, the Manual on Uniform Traffic Control Devices (MUTCD), and the Oregon Temporary Traffic Control Handbook. Contractors performing full street closures that restrict emergency services must notify the City of Salem Public Works Dispatch Center at 503-588-6311, the school district at 503-399-3100, and the transit district at 503-588-5468 at least 24 hours in advance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix B

Traffic Control Permits

City of Salem

Capital Improvement Projects Work in Right-of-Way Permit Application

PLEASE COMPLETE SECTION 1 OF THIS DOCUMENT.

Notice of three full business days is required (weekends and holidays excluded). Send the completed application to radkins@cityofsalem.net .

SECTION 1: GENERAL INFORMATION

Type A (Valid for 30 days) Closure of sidewalk Closure of local right-of-way, lane, alley, or street Work in collector or arterial, maintaining all travel lanes

Type B (Valid for 10 closure days within a 30-day period)

Closure of one arterial lane Closure of one collector lane Closure of two or more arterial lanes Closure of two or more collector lanes

Site Address_ ________________________________________________________________________ Work Location________________________________________________________________________

Name of Applicant_____________________________________________________________________

Address______________________________________________________________________________

Day Phone________________________________ Evening Phone_______________________________

Email____________________________________________________ Fax________________________

Is applicant the contractor? Yes No If no, provide the contractor’s contact information.

Name of Contractor’s Contact Person_ ___________________________________________________

Day Phone _______________________________ Evening Phone_______________________________

Email____________________________________________________ Fax________________________

Description of Work to Be Done_ ________________________________________________________

City Project Manager________________________________________ City Project Number___________

ARTERIAL AND COLLECTOR DAYTIME WORK HOURS ARE 8:30 A.M. TO 3:30 P.M.

Requested Start Date_ ______________________ Time_____________________ a.m. p.m.

Requested End Date________________________ Time_____________________ a.m. p.m.

Signature of Applicant_____________________________________ Date_______________________

OFFICE USE ONLY

Revised Date _ _______________

Int _____________Date ________

Revised Date _ _______________

Int _____________Date ________

Revised Date _ _______________

Int______________Date ________

For Office Use Only

Traffic Permit #

AMANDA Permit #

Expedited Yes No

AEdelman Text Box

AEdelman Rectangle mailto:radkins@cityofsalem.net mailto:developmentservices%40cityofsalem.net?subject= mailto:developmentservices%40cityofsalem.net?subject= mailto:radkins@cityofsalem.net mailto:radkins@cityofsalem.net mailto:radkins@cityofsalem.net dtps\…\work-in-right-of-way-permit-app-2024-07-01.indd Page 2 of 2

SECTION 2: PERMIT CONDITIONS—TO BE FILLED OUT BY CITY STAFF

Arterial and collector daytime work hours are 8:30 a.m. to 3:30 p.m. unless otherwise required or approved by the City Traffic Engineer.

1. All work shall be done in accordance with all applicable provisions of federal, state, and local laws, ordinances, and administrative rules.

2. All work in public right-of-way and all work which is connected, directly or indirectly, to City of Salem water, sanitary sewer, or storm sewer lines shall be constructed in accordance with applicable City of Salem Standard Construction Specifications.

3. Any full street closure that restricts emergency services requires the contractor to call the City of Salem Public Works Dispatch Center at 503-588-6311 to notify of closures and re-openings.

4. Permittee shall indemnify, defend, and save harmless the City of Salem, its officers, employees, and agents from any and all claims arising out of or in connection with any work done under this permit.

5. The City Traffic Engineer, or their designee, reserves the right to deny or modify the submitted traffic control plan. Should a problem arise as a result of the approved traffic control, additional traffic control may be required at the permittee’s expense.

6. This permit may be revoked at any time by the Public Works Director or their designee.

Approved Date of Closure________________________________________________________________

Approved Time of Closure________________________________________________________________

ADDITIONAL CONDITIONS OF PERMIT

Contractor shall contact these agencies 24 hours in advance of work:

City of Salem Public Works Dispatch Center 503-588-6311 for full street closure and re-openings that restricts emergency services.

School district 503-399-3100

Transit district 503-588-5468

Traffic signal shall be turned off to flag at intersections. Please contact your inspector at least 5 full business days prior to the start of work.

All traffic control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD), the Oregon Temporary Traffic Control Handbook, and to the satisfaction of the City Traffic Engineer. The traffic control indicated is approved subject to the following conditions:

Approved By_ ____________________________________________ Date_______________________

City of Keizer

Marion County https://pw.intra.co.marion.or.us/Engineering/LDEP/Forms/Application/LDEP Application Cover Sheet.docx Page 1 of 1 Last Revised: 2/17/23

Marion County LDEP Application Cover

Sheet

OREGON

Public Works Land Development Engineering & Permits 5155 Silverton Rd NE Salem, OR 97305

(503) 584-7714 http://co.marion.or.us/PW/Engineering/

Marion County Land Development Engineering & Permits (LDEP) Application Cover Sheet

Permit Applying for Minimum Sections

Required Fee

Work in Right-of-Way 1, 2, 3, 5, 6, 7 $100.00

Major Construction 1, 2, 3, 5, 6, 7 1% of Engineer’s Estimate + Pre-Review Plan Check of 0.5% of Engineer’s Estimate + Post-Review Plan Check of 0.25% of

Engineer’s Estimate

Erosion Prevention and Sediment Control

1, 2, 3, 6, 8 $150.00

Access (Driveway) 1, 2, 3, 6, 9 $50.00

On-site Stormwater 1, 2, 3, 6, 10 $100.00

Event and/or Road Closure 1, 2, 3, 6, 11 Social Activity/Road Closure $150.00

Commercial Activity – Up to 2 Days $500.00

Commercial Activity – 2 Days or More $1,000.00

PUC Work in Right-of-Way 1, 2, 3, 6, 12 $0

Annual Blanket 1, 2, 3, 5, 6, possibly 7 $100.00, $0 for Public Utility Company

Plan Review ONLY 1, 2, 3, 6 0.5% of Engineer’s Estimate

Application Instructions:

• Sections 1, 2, 3, and 6 are required for all applications. Section 4 is only needed if applicable.

• Sections 5, 7, 8, 9, 10, 11, and/or 12 are to be completed as instructed by Section 6.

• Signature and date are required on the last page, complete the fee summary table if applicable.

• Email digital applications and site plans to MCLDEP@co.marion.or.us Note: A site plan is required for all applications (except Annual Blanket applications).

mailto:MCLDEP@co.marion.or.us https://pw.intra.co.marion.or.us/Engineering/LDEP/Forms/Application/General Application 08.25.23.docx Page 1 of 4 Updated 8/25/23

For Internal Use Only

Record Number: ___________________________

Date App Received: _________________________

Instructions:

• Sections 1, 2, 3, and 6 are required for all applications. Section 4 is only needed if applicable.

• Sections 5, 7, 8, 9, 10, 11, and/or 12 are to be completed as instructed by Section 6.

• Signature and date are required on the last page, complete the fee summary table if applicable.

• Email digital applications and site plans to MCLDEP@co.marion.or.us

Note: A site plan is required for all applications (except Annual Blanket applications).

1. Project/Event Information (Required) Project/Event Name:

Detailed Description of Work/Event:

Worksite/Event Address:

Affected/Fronting Parcel or Tax lot #:

Notes:

• Parcel or Tax lot numbers appear like 072W08D000300. Refer to the Marion County GIS Program for assistance.

• A matching parcel number and address is required as a matter of permit traceability, even for work exclusively in public right-of-way.

• If multiple locations are involved identify a primary and list only ONE parcel number and address per application.

Associated Land Use Case(s) – If Applicable:

2. Property Owner Information (Required)

• For work exclusively within right-of-way provide the information of the affected/fronting property owner.

• Enter Customer’s information if work is for a customer and is connecting to private property.

First and Last Name:

Mailing Address:

E-mail:

Primary Phone:

3. Applicant Information (Required) – If PUC enter PUC info ☐Check if same as Owner First and Last Name:

Organization Name:

Mailing Address:

E-mail:

Primary Phone:

4. Agent for Applicant Information (If Applicable)

• An “Agent” is an Applicant’s designated representative

☐Check if same as Owner

☐Check if same as Professional (Section 5)

First and Last Name:

Organization Name:

Mailing Address:

E-mail:

Primary Phone:

Marion County

General Land Development and

Event Permit Application

OREGON

Public Works Land Development Engineering & Permits 5155 Silverton Rd NE Salem, OR 97305

(503) 584-7714 http://co.marion.or.us/PW/Engineering/ mailto:MCLDEP@co.marion.or.us https://gis-marioncounty.opendata.arcgis.com/apps/b41e1f1b340a448682a2cc47fff41b31/explore https://pw.intra.co.marion.or.us/Engineering/LDEP/Forms/Application/General Application 08.25.23.docx Page 2 of 4

5. Licensed Professional Information (If Applicable) Note for PUCs: If using subcontractor, enter subcontractor info. If not, enter PUC info.

If more than one contractor will be used, complete the form linked below and include it with your application:

☐ Licensed Professional Information for Projects with Multiple Contractors Attached.

License Type: Business Name:

License #: E-mail:

First and Last Name: Emergency Phone:

Mailing Address:

Contractor Certificate of Insurance and Additional Insured Endorsement Required. See Marion County Insurance Requirements.

6. General Information (Required) – Check all that apply ☐ Includes Working in the Right-of-Way Complete Section 7 Below and Section 5 Above

• Includes Sidewalk/Roadcuts, Stormwater Drainage, Private Utility work, Major Construction

• Check if applying for Annual Blanket Work in Right-of-Way Permit

☐ Includes Erosion/Sediment Control Complete Section 8 Below

• Includes Erosion Prevention and Sediment Control in area(s) under County jurisdiction

☐ Includes Access (Driveway) Work Complete Section 9 Below

• Rural: Typically includes any access work within the first 20’ of edge of roadway

• Urban: Typically includes any access work between road and back of sidewalk

☐ Includes On-site Stormwater Complete Section 10 Below ☐ Is for an Event and/or Road Closure Complete Section 11 Below ☐ Is Public Utility Company (PUC) Work Complete Section 12 Below and Section 5 Above ☐ Plan Check ONLY No additional sections required. Fee: 0.5% of Engineer’s Estimate

7. Work in the Right-of-Way Application Specific Information Required if “Includes Working in the Right-of-Way” is Checked in Section 6

As applicable to the proposed work, these items may be required for an application to be deemed “Complete”.

Note: Not all applications will require all these items.

☐Construction Plans ☐Proposed Work Schedule ☐Cost Estimate ☐Contractor Certificate of Insurance and Endorsement ☐Traffic Control Plan ☐Proposed After Hours Site Safety Plan

Additional Major Construction Application Specific Information ☐Financial Guarantee Rural: 125% of Eng’s Est. Amount: Type: Urban: 100% of Eng’s Est.

☐Utility Coordination Verification Additional Private Utility Application Specific Information O.U.N.C. District Code Number:

8. Erosion/Sediment Control Application Specific Information Required if “Includes Erosion/Sediment Control” is Checked in Section 6

Required for application to be deemed “Complete”:

☐Erosion Prevention and Sediment Control Plan ☐Proposed Work Schedule

Area to be Disturbed (square feet):

Building Permit # - If Applicable:

https://www.co.marion.or.us/PW/Engineering/permit/Documents/Licensed%20Professional%20Information%20for%20Projects%20with%20Multiple%20Contractors.pdf https://www.co.marion.or.us/PW/Engineering/permit/Documents/COI%20Insurance%20Requirements.pdf https://pw.intra.co.marion.or.us/Engineering/LDEP/Forms/Application/General Application 08.25.23.docx Page 3 of 4

9. Access (Driveway) Application Specific Information Required if “Includes Access (Driveway) Work” is Checked in Section 6 Required for application to be deemed “Complete”: ☐Site Plan or Sketch

Proposed Use of Access: ☐Residential ☐Commercial ☐ Field ☐Farming ☐Other, explain:

Access is to Be (Check all that apply):

☐Constructed (new) ☐Modified (existing, extending culvert, paving, etc.)

☐Change in Use (existing) from ☐Residential ☐Commercial ☐Farming ☐Other, explain:

to ☐Residential ☐Commercial ☐Farming ☐Other, explain:

☐Other (Hardships, etc.):

Type of Surface Proposed: ☐ Concrete (curbed street) ☐ Asphalt ☐ Gravel

10. On-site Stormwater Application Specific Information Required if “Includes On-site Stormwater” is Checked in Section 6 Required for application to be deemed “Complete”: ☐Construction Plans Building Inspection Plumbing Permit # - If Applicable:

Building Inspection Structural Permit # - If Applicable:

11. Event and/or Road Closure Application Specific Information Required if “Is for an Event and/or Road Closure” is Checked in Section 6

Required for application to be deemed “Complete”: ☐Certificate of Insurance and Additional Insured Endorsement Attached

Start Date: End Date:

Start Time: End Time:

Start Location: End Location:

Additional Road Closure Application Specific Information

Required for application to be deemed “Complete”:

☐Traffic Control & Signing Plan ☐Detour Plan

Additional Event Application Specific Information

☐ New Event, never been held in Marion County ☐ Repeat Event, has been permitted previously

Do you want a Pre-Plan Meeting? ☐Yes ☐No Pre-planning meeting with Marion County recommended for new events.

Required for application to be deemed “Complete”:

☐Proposed Traffic Control ☐Proposed Route Map:

Route Map shall show planned route or course, direction of travel, beginning and ending stations, all rest stops, proposed signing/traffic control plan.

☐Proposed Route Map Turn by Turn List ☐Proposed Detour Route Map (if required)

Type of Event:

(Select all that apply)

☐Banner ☐Bicycle ☐Block Party* ☐Filming ☐Pedestrian ☐Parade ☐Other, explain:

Timed Event (ex: bike race)? ☐Yes ☐No *Block Party Event Applications are required to submit proof of notification to all affected neighbors in the form of signatures. See Event Permit FAQ for more information.

Est # of Participants: Est # of Support Vehicles:

Will any Public Agencies Assist? ☐Yes ☐No If yes, list the Contact Info here:

https://www.co.marion.or.us/PW/Engineering/permit/Documents/Event%20Permit%20FAQ.pdf https://pw.intra.co.marion.or.us/Engineering/LDEP/Forms/Application/General Application 08.25.23.docx Page 4 of 4

12. Utility Work Application Specific Information Required if “Is for Public Utility Company (PUC) Work” is Checked in Section 6

Required for application to be deemed “Complete”: ☐ Construction Site Plans Structure Data

If more than 5 structures will be affected by this project, attach the form below in lieu of filling out this section:

☐ Structure Data for Projects Affecting More than 5 Structures Attached

Structure Number:

NJUNS Number (PUC’s Only):

Width of Right-of-Way (if known): ft ft ft ft ft Width of Road: ft ft ft ft ft Edge of Road to Center of Structure: ft ft ft ft ft Structure Type:

Note: This application is not an approved permit and does not authorize the start of work. The Permit will be valid only for those specified roads and right-of-ways under Marion County jurisdiction.

Applicant is responsible for contacting other controlling jurisdictions.

Signature of Applicant Date

Check if

Applies Applying For Amount Fees Due

☐ Work in Right-of-Way $100 $

☐ Major Construction 1% of Engineer’s Estimate $

☐ Pre-Review Plan Check 0.5% of Engineer’s Estimate $

☐ Post-Review Plan Check 0.25% Engineer’s Estimate (Due at permit issuance) $

☐ Erosion/Sediment Control $150 $

☐ Driveway/Access $50 $

☐ On-site Stormwater $100 $

☐ Event/Road Closure See Marion County Event Permit Fees Table on Cover Sheet $

Total $ https://www.co.marion.or.us/PW/Engineering/permit/Documents/Structure%20Data%20for%20Projects%20Affecting%20More%20than%205%20Structures%20-%20FORM.pdf

ODOT

FOR ODOT USE ONLY

APPLICATION AND PERMIT TO OCCUPY OR

PERFORM OPERATIONS UPON A STATE HIGHWAY

See Oregon Administrative Rule, Chapter 734, Division 55

GENERAL LOCATION PURPOSE OF APPLICATION

(TO CONSTRUCT/OPERATE/MAINTAIN)

NO

NO

INSURANCE REQUIRED

BOND REQUIRED

BETWEEN OR NEAR LANDMARKS

HIGHWAY NUMBER COUNTY

DESIGNATED FREEWAY

TYPEPOLE

LINE

BURIED

CABLE

PIPE

LINE

TYPE

TYPE

IN U.S. FOREST

YES NO

HWY. REFERENCE MAP

APPLICANT NAME AND ADDRESS

NO NON-COMMERCIAL SIGN AS DESCRIBED BELOW

YES

YES

REFERENCE:

OAR 734-055

-0035(2)

REFERENCE:

OAR 734-055

-0035(1)

AMOUNT OF BOND

SPECIFIED COMP. DATE

DETAIL LOCATION OF FACILITY (For more space attach additional sheets)

YES

HIGHWAY NAME AND ROUTE NUMBER MIN. VERT. CLEARANCE

COMMENTS (FOR ODOT USE ONLY)

MILE

POINT

MILE

POINT TO

ENGINEERS

STATION TO

ENGINEERS

STATION

SIDE OF HWY OR

ANGLE OF CROSSING

DISTANCE FROM

CENTER OF PVMT R/W LINE

BURIED CABLE OR PIPE SPAN

LENGTHDEPTH/VERT. SIZE AND KIND

CLASS :

PERMIT NUMBER

KEY#

734-3457 (2/2021)

LOCAL GOVERNMENT OFFICIAL SIGNATURE

X

APPLICATION DATE

TITLE

TITLE

When this application is approved by the Department, the applicant is subject to, accepts and approves the terms and provisions contained and attached: and the terms of Oregon Administrative Rules, Chapter 734, Division 55, which is by this reference made a part of this permit.

DISTRICT MANAGER OR REPRESENTATIVE

X

APPLICANT SIGNATURE

X

APPROVAL DATE

DATE

TELEPHONE NO.

IF THE PROPOSED APPLICATION WILL AFFECT THE LOCAL GOVERNMENT, THE APPLICANT SHALL ACQUIRE THE LOCAL GOVERNMENT

OFFICIAL'S SIGNATURE BEFORE ACQUIRING THE DISTRICT MANAGER'S SIGNATURE.

AT LEAST 48 HOURS BEFORE BEGINNING WORK, THE APPLICANT OR HIS CONTRACTOR SHALL NOTIFY THE DISTRICT REPRESENTATIVE______________________________________AT PHONE NO.:___________________________ OR EMAIL OR FAX THIS PAGE TO THE DISTRICT OFFICE AT:_______________________________________________________. SPECIFY TIME AND DATE WORK IS TO OCCUR.

A COPY OF THIS PERMIT AND ALL ATTACHMENTS SHALL BE AVAILABLE AT THE WORK AREA DURING CONSTRUCTION.

ATTENTION: Oregon Law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0001 through OAR 952-001-0090. You may obtain copies of the rules by calling the center at (503) 232-1987.

CALL BEFORE YOU DIG 1-800-332-2344

DESCRIPTION OF DESIRED USE

SPECIAL PROVISIONS (FOR ODOT USE ONLY)

TRAFFIC CONTROL REQUIRED OPEN CUTTING OF PAVED OR SURFACED AREAS ALLOWED

YES [OAR 734- 055- 0100(2)] NO [OAR 734-055-0100(1)]YES [OAR 734- 055- 0025(6)] NO

MISCELLANEOUS OPERATIONS AND/OR FACILITIES AS

DESCRIBED BELOW

MILE

POINT

MILE

POINT TO

ENGINEERS

STATION TO

ENGINEERS

STATION

SIDE OF HWY OR

ANGLE OF CROSSING

DISTANCE FROM

CENTER OF PVMT R/W LINE

BURIED CABLE OR PIPE SPAN

LENGTHDEPTH/VERT. SIZE AND KIND

closure_type_a_sidewalk: Off
closure_type_a_local: Off
closure_type_a_collector-arterial: Off
closure_type_b_arterial_single: Off
closure_type_b_collector_single: Off
closure_type_b_arterial_multiple: Off
closure_type_b_collector_multiple: Off
site_address:
work_location:
applicant_name:
applicant_address:
applicant_phone_day:
applicant_phone_eve:
applicant_email:
applicant_fax:
applicant_contractor: Off
contractor_contact:
contractor_phone_day:
contractor_phone_eve:
contractor_email:
contractor_fax:
work_description:
city_project_manager:
city_project_number:
requested_start_date:
requested_start_time:
start_time: Off
requested_end_date:
requested_end_time:
end_time: Off
Signature of Applicant:
Applicant Date:
AMANDA Permit #:
Expedited:
Yes (1):
No:
Revised Date:
Revised Date (1):
Revised Date (2):
Int:
Date (1):
Int (1):
Date (2):
Date (3):
Int (2):
Approved Date of Closure:
Approved Time of Closure:
City of Salem Public Works Dispatch Center:
Transit district 503-588-5468:
Traffic signal shall be turned off to flag at:
School district 503-399-3100:
Text36:
Text37:
Text38:
Text39:
Approved By:
Date:
ProjectEvent Name:
Detailed Description of WorkEvent:
WorksiteEvent Address:
AffectedFronting Parcel or Tax lot:
Associated Land Use Cases If Applicable:
First and Last Name:
Mailing Address:
Email:
Primary Phone:
Check if same as Owner: Off
First and Last Name_2:
Organization Name:
Mailing Address_2:
Email_2:
Primary Phone_2:
Check if same: Off
Check if same as: Off
First and Last Name_3:
Organization Name_2:
Mailing Address_3:
Email_3:
Primary Phone_3:
Licensed Professional Information for Projects with Multiple Contractors Attached: Off
License Type:
Business Name:
License:
Email_4:
First and Last Name_4:
Emergency Phone:
Mailing Address_4:
Includes Working in the RightofWay Complete Section 7 Below and Section 5 Above: Off
Includes ErosionSediment Control Complete Section 8 Below: Off
Includes Access Driveway Work Complete Section 9 Below: Off
Includes Onsite Stormwater Complete Section 10 Below: Off
Is for an Event andor Road Closure Complete Section 11 Below: Off
Is Public Utility Company PUC Work Complete Section 12 Below and Section 5 Above: Off
Plan Check ONLY No additional sections required Fee 05 of Engineers Estimate: Off
Construction Plans: Off
Proposed Work Schedule: Off
Cost Estimate: Off
Contractor Certificate of Insurance and Endorsement: Off
Traffic Control Plan: Off
Proposed After Hours Site Safety Plan: Off
Financial Guarantee: Off
Amount:
Type:
undefined: Off
OUNC District Code Number:
undefined_2: Off
undefined_3: Off
Area to be Disturbed square feet:
Building Permit If Applicable:
undefined_4: Off
Residential: Off
Commercial: Off
Field: Off
Farming: Off
Other explain: Off
Constructed new: Off
Modified existing extending culvert paving etc: Off
Change in Use existing: Off
Residential_2: Off
Commercial_2: Off
Farming_2: Off
Other explain_2: Off
Residential_3: Off
Commercial_3: Off
Farming_3: Off
Other explain_3: Off
Other Hardships etc: Off
undefined_5: Off
undefined_6: Off
undefined_7: Off
Construction Plans_2: Off
Construction PlansBuilding Inspection Plumbing Permit If Applicable:
Construction PlansBuilding Inspection Structural Permit If Applicable:
Certificate of Insurance and Additional Insured: Off
Start Date:
End Date:
Start Time:
End Time:
Start Location:
End Location:
undefined_8: Off
undefined_9: Off
Do you want a PrePlan Meeting: Off
New Event never been held in Marion County: Off
Repeat Event has been permitted previously: Off
Proposed Traffic Control: Off
Proposed Route Map: Off
Proposed Route Map Turn by Turn List: Off
Proposed Detour Route Map if required: Off
Banner: Off
Bicycle: Off
Block Party: Off
Filming: Off
Pedestrian: Off
Parade: Off
Other explain_4: Off
Est of Participants:
Est of Support Vehicles:
Will any Public Agencies Assist Yes No If yes list the Contact Info here:
undefined_12: Off
If more than 5 structures will be affected by this project attach the form below in lieu of filling out this section: Off
1Structure Number:
2Structure Number:
3Structure Number:
4Structure Number:
5Structure Number:
1NJUNS Number PUCs Only:
2NJUNS Number PUCs Only:
3NJUNS Number PUCs Only:
4NJUNS Number PUCs Only:
5NJUNS Number PUCs Only:
ftStructure Type:
ftStructure Type_2:
ftStructure Type_3:
ftStructure Type_4:
ftStructure Type_5:
fill_29:
fill_30:
fill_31:
fill_32:
fill_33:
fill_34:
fill_35:
fill_36:
fill_37:
Date1_af_date:
ROW1:
ROW2:
ROW3:
ROW4:
ROW5:
Road1:
Road2:
Road3:
Road4:
Road5:
EOR1:
EOR2:
EOR3:
EOR4:
EOR5:
CB1: Off
CB2: Off
CB3: Off
CB4: Off
CB5: Off
CB6: Off
CB7: Off
CB8: Off
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
vert:
pole: Off
landmks:
cable: Off
pipe: Off
noncommsign: Off
Radio Button5: Off
Radio Button6: Off
bond:
date:
address:
stn1:
stn2:
side:
center:
row:
pipesize:
miscdesc:
misc: Off
phone:
comments:
mp1:
mp2:
depth:
span:
permitno:
key1:
class1:
apptele:
Radio Button3: Off
hwyref:
hwynumber:
Reset:
HwyNameRouteNo: [ ]
County2: [ ]
PoleLine: [ ]
BuriedCable: [ ]
PipeLine: [ ]
OAR0256: Off
OAR1002: Off
County1: [ ]
Radio Button4: Off
Print:
mp2-2:
estn1-2:
estn2-2:
crossing-2:
pvmnt-2:
rw-2:
depth-2:
kind-2:
span-2:
appdate1:
title1:
title2:
approvedate:
appdate2:
mp1-2:
fax or email:
rep name:

File details come from the government source that posted it. Updated .