Appendix B Ge Recycling Report Templates.pdf
PDF 127 KB Posted
- Attached to
- Germainium (Ge) Recycling Program Federal contract opportunity
- Solicitation number
- SP8000-21-R-0011
- Issued by
- Defense Logistics Agency
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Germanium (Ge) Recycling Combined Synopsis Amendment01.pdf | ||
| Attachment 2 Ge Recycling Example Inventory.pdf | ||
| Attachment 1 PWS.pdf | ||
| Appendix A ESOHMSs and ORPP Ge recycling 2020.pdf | ||
| Att 6 Ge Recycling Program pricing spreadsheet -Solicitation.xlsx | XLSX spreadsheet | |
| SF 1449 SP800021R0011.pdf | ||
| Combine Synopsis-Solicitation.pdf | ||
| Attachment 5 CLIN v.7.pdf | ||
| Attachment 3 Ge Recycyling Specifications for Ingots.pdf | ||
| Attachment 4 Past Performance for Ge Recycling.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix B
Report Templates
Baseline GFM Report – Section 3.1 Sorting GFM Entity/organization performing process: ____________________________
Value Units
Total mass contained Ge DLC coated GFM ____________ _____
Direct measurement or estimated? (circle/highlight one)
Total mass contained Ge Th coated GFM (nearest 500 g) ____________ _____
Direct measurement or estimated? (circle/highlight one)
Total mass contained Ge in de-coated Ge GFM ______________ ______
Total mass contained Ge in material contractor designates as non-recoverable (nearest 500 g) ____________ _____
Direct measurement or estimated ? (circle/highlight one or both, as applicable)
Total mass contained Ge in contractor-generated non-recoverable Ge window material as a result of contractor handling in sorting activities (nearest 500 g) ____________ _____
Direct measurement or estimated ? (circle/highlight one or both, as applicable)
Total mass on non-recoverable Ge material (nearest 200 g) ______________ ______
Additional notes:
Name of person submitting report: _________________________________________
Signature: _________________________________________
Baseline GFM Report – Section 3.3 Disassembly for DLC/Th coated (circle one)
Entity/organization performing process: ________________________
Total mass contained Ge in non-recoverable DLC coated GFM (nearest 200 g) ____________ ______
Total mass contained Ge in non-recoverable Th coated GFM (nearest 200 g) ______________ ______
Total mass contained Ge in recoverable DLC coated GFM (nearest 200 g) ____________ ______
Percent mass loss ____________ ______
Total mass contained Ge in recoverable Th coated GFM (direct measurement) ______________ ______
Percent mass loss ____________ ______
Mass of non-Ge containing GFM received (including all packaging and other material contributing to gross weight received) ______________ ______
Total mass contained Ge in determined by subtraction of non-Ge containing subassembly material, packaging, etc. from mass of received DLC coated GFM ____________ ______
Total mass contained Ge in determined by subtraction of non-Ge containing subassembly material, packaging, etc. from mass of received Th coated GFM ____________ ______
Baseline GFM Report – Section 3.5 DLC de-coating
Total mass clean, dry, de-coated Ge GFM (nearest gram) ____________ _____
Total mass loss as percent mass based on received material (post-subassembly mass DLC coated Ge)
(not to exceed 6%) (nearest percent) ____________ _____
Not to exceed 6% (nearest percent)
Purity (mass percent Ge) clean, dry, de-coated Ge ____________ _____
Methodology for determining purity of Ge
Verification material is clean of DLC coating – name of verifying person
Baseline GFM Report – Section 3.6 Th de-coating
Total mass clean, dry, de-coated Ge GFM (nearest gram) ____________ _____
Total mass loss as percent mass based on received material (post-subassembly mass Th coated Ge) (not to exceed 8%) (nearest percent) ____________ _____
Purity (mass percent Ge) clean, dry, de-coated Ge ____________ _____
Methodology for determining purity of Ge
Verification material is clean of Th coating – name of verifying person
Baseline GFM Report – Section 3.8 Zone refining
(a) Reported total mass Ge GFM received from de-coating * ____________ _____
(b) Measured total mass Ge GFM received from de-coating*
(nearest gram) ____________ _____
(c) Discrepancy between report and measured mass*
(measured mass – reported mass)/measured mass x 100% ______________
Total mass Ge GFM returned for remedial de-coating ______________ ______
Total mass received GFM from remedial de-coating ______________ ______
*ADJUST (a), (b), (c) as necessary, based on remedial de-coating
Total mass zone refined polycrystalline Ge ingots
(nearest gram) ____________ ______
Percent mass loss due to zone refining with respect to measured total mass of Ge GFM received (b) (not to exceed 4% by mass) ____________ ______
Purity polycrystalline zone refined Ge ingots (percent mass Ge) ____________ ______
Methodology for determining purity
CHAIN OF CUSTODY RECORD
DLA Strategic Materials Route 5, Building #12 Scotia, NY 12302
Project name: Contract / MIPR / WKO No:
Tel (518) 370-3347 ♦ Fax (518) 370-0323 Contractor Project/Contract Manager: Strategic Materials COR name:
Prime Contractor name:
Prime Contractor ph: GFM identifying/lot No(s):
Prime Contractor fax:
Prime Contractor Address:
Prime Contractor email:
Instructions: The original CHAIN OF CUSTODY RECORD (CoCR), with original signatures, always follows the identified GFM. Once the relinquishing party relinquishes the GFM and the original CoCR from their physical custody to the receiving party's physical custody, the relinquishing party must maintain a copy of the CoCR with all signatures leading to the point at which the relinquishing party transfers physical custody to the receiving party; and this CoCR copy must be maintained in each relinquishing party's records until the contract is closed or terminated.
Relinquished by (Scotia Depot employee name): Date/Time Received by (name, company, address): Date/time
Authorized official signature Authorized official signature
Relinquished by (name, company, address): Date/Time Received by (name, company, address): Date/time
Authorized official signature Authorized official signature
Relinquished by (name, company, address): Date/Time Received by (name, company, address): Date/time
Authorized official signature Authorized official signature