This document is a Florida Department of Environmental Protection (FDEP) General Permit for Domestic Wastewater Collection/Transmission Systems, issued to Brevard County Utility Services for the C-17 Lift Station project. The permit, numbered 0200176-039-DWC/CG, was issued on July 10, 2024, and expires on July 09, 2029, covering the construction of 420 linear feet of 12-inch and 52 linear feet of 16-inch gravity sewer with four manholes, a lift station, and 300 linear feet of 12-inch force main. The project will connect to the BCUD Sykes Creek Wastewater Treatment Facility and requires obtaining departmental clearance before placing the facilities into operation.

The permit outlines specific requirements for use, including reporting obligations for abnormal events, spill notifications, and compliance with environmental regulations. The document stipulates that new or modified collection/transmission facilities can be placed into operation 3-10 days after submitting the required form, depending on the absence or presence of substantial deviations. The permit does not relieve the permittee of obtaining additional permits, such as dredge and fill permits, and emphasizes the importance of conforming to the project description to avoid potential enforcement actions and penalties.

View the file

Other files

File Type Posted
REVISED_B-7-25-40_Notice_of_Award.pdf PDF
B-7-25-40_Notice_of_Award.pdf PDF
Bid_Tabulation_-_Intent_to_Award.pdf PDF
Bid_Tabulation_-_Names_Only.pdf PDF
Bid_Tabulation_-_Names_Only.pdf PDF
Revised_Price_Sheet.pdf PDF
Revised_Price_Sheet.pdf PDF
Addendum_2.pdf PDF
Revised_Price_Sheet.pdf PDF
Addendum_2.pdf PDF
Addendum_2.pdf PDF
FPL_Power_Line_OSHA_Minimum.pdf PDF
Addendum_2.pdf PDF
FPL_Power_Line_OSHA_Minimum.pdf PDF
REVISED_Bid_Set.pdf PDF
Addendum_1.pdf PDF
REVISED_Bid_Set.pdf PDF
REVISED_Bid_Set.pdf PDF
Addendum_1.pdf PDF
Addendum_1.pdf PDF
B-7-25-40_Inv_&_Specs.pdf PDF
B-7-25-40_Inv_&_Specs.pdf PDF
B-7-25-40_Inv_&_Specs.pdf PDF
B-7-25-40_Inv_&_Specs.pdf PDF
Appendix_B_-_FDEP_Sewer_Permit.pdf PDF
Appendix_B_-_FDEP_Sewer_Permit.pdf PDF
Attachment_B_-_Technical_Specifications.pdf PDF
Attachment_C_-_Drawings.pdf PDF
PRINTING_INSTRUCTIONS.pdf PDF
Attachment_C_-_Drawings.pdf PDF
Appendix_B_-_FDEP_Sewer_Permit.pdf PDF
Appendix_E_-_Geotechnical_Report.pdf PDF
Attachment_C_-_Drawings.pdf PDF
PRINTING_INSTRUCTIONS.pdf PDF
Appendix_C_-_Brevard_County_ROW_Permit.pdf PDF
Appendix_E_-_Geotechnical_Report.pdf PDF
Attachment_A_-_Draft_Contract.pdf PDF
Appendix_A_-_Approved_Manufactures_List.pdf PDF
Appendix_C_-_Brevard_County_ROW_Permit.pdf PDF
Appendix_D_-_FDOT_Utility_Permit.pdf PDF
PRINTING_INSTRUCTIONS.pdf PDF
Appendix_A_-_Approved_Manufactures_List.pdf PDF
Appendix_C_-_Brevard_County_ROW_Permit.pdf PDF
Attachment_C_-_Drawings.pdf PDF
PRINTING_INSTRUCTIONS.pdf PDF
Appendix_E_-_Geotechnical_Report.pdf PDF
Appendix_E_-_Geotechnical_Report.pdf PDF
Attachment_A_-_Draft_Contract.pdf PDF
Attachment_B_-_Technical_Specifications.pdf PDF
Attachment_B_-_Technical_Specifications.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix B FDEP Sewer Permit

NOTIFICATION OF ACCEPTANCE OF USE OF A GENERAL PERMIT

PERMITTEE: PERMIT NUMBER: 0200176-039-DWC/CG

Brevard County Utility Services ISSUE DATE: July 10, 2024 2725 Judge Fran Jamieson Way A-213 EXPIRATION DATE: July 09, 2029

Viera, FL 32940 COUNTY: Brevard

Edward Fontanin, Director PROJECT NAME: Brevard County Lift Station C-

CONNECTED TO: BCUD Sykes Creek WWTF

Email: utility.development@brevardfl.gov FACILITY ID: FLA102695

Dear Mr. Fontanin:

This letter acknowledges receipt of your Notification/Application for Constructing a Domestic Wastewater Collection/Transmission System for the subject project. Our office received the Notice on July 10, 2024.

This project includes the construction of 420 LF of 12-inch and 52 LF of 16-inch gravity sewer with four manholes, a lift station and 300 LF of 12-inch force main.

This is to advise you that the Department does not object to your use of such a General Permit.

Please note the attached requirements apply to your use of this General Permit for constructing the proposed domestic wastewater collection/transmission system.

You are further advised that the construction activity must conform to the description contained in your Notification/Application for Constructing a Domestic Wastewater Collection/Transmission System and that any deviation will subject the permittee to enforcement action and possible penalties.

Sincerely, Osama Mahmoud Engineer

Permitting and Waste Cleanup Program cc: Tucker Hunter, PE, Kimley Horn, tucker.hunter@kimley-horn.com

FDEP: Charles LeGros, Reggie Phillips, Osama Mahmoud

FLORIDA DEPARTMENT OF

Environmental Protection

Central District Office

3319 Maguire Blvd., Suite 232

Orlando, Florida 32803

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton

Secretary mailto:utility.development@brevardfl.gov mailto:tucker.hunter@kimley-horn.com

REQUIREMENTS FOR USE OF THE GENERAL PERMIT FOR DOMESTIC

WASTEWATER COLLECTION/TRANSMISSION SYSTEMS:

1. This general permit is subject to the general permit conditions of Rule 62-4.540, F.A.C., as applicable. This rule is available at the Department’s Internet site at:

http://www.dep.state.fl.us/legal/Rules/shared/62-4/62-4.pdf [62-4.540]

2. This general permit does not relieve the permittee of the responsibility for obtaining a dredge and fill permit where it is required. [62-604.600(6)(b)1]

3. This general permit cannot be revised, except to transfer the permit. [62-604.600(6)(b)2]

4. This general permit will expire five years from the date of issuance. If the project has been started and not completed by that time, a new permit must be obtained before the expiration date in order to continue work on the project. [62-4.030]

5. Upon completion of construction of the collection/transmission system project, and before placing the facilities into operation for any purpose other than testing for leaks or testing equipment operation, the permittee shall obtain clearance from the Department. This clearance may be obtained expeditiously using the Department’s

Business Portal at http://www.fldepportal.com/go/ (via “Submit” then “Registration/Notification” and “Submit

Notifications to FDEP”. The submission is for “Division of Water Resource Management Domestic/Industrial

Wastewater” and the submittal type is “Request for Approval to Place a Domestic Wastewater

Collection/Transmission System into Operation”).

For further clarification contact:

(Osama Mahmoud), (407) 897-4125

Osama.mahmoud@dep.state.fl.us

3319 Maguire Blvd, Suite 232

Orlando, Florida 32803-3767

6. New or modified collection/transmission facilities can be placed into operation 3 days after Form 62-

604.300(3)(b), (adopted and incorporated by reference in paragraph 62-604.300(3)(b), F.A.C., effective October

4, 2021, http://www.flrules.org/Gateway/reference.asp?No=Ref-13560), is submitted and received by the

Department or delegated local program, provided no substantial deviations are noted on Form 62-604.300(3)(b) and the Department or delegated local program does not notify the permittee of public health or environmental concerns regarding placing the facilities into operation.

When substantial deviations are noted on Form 62-604.300(3)(b), (adopted and incorporated by reference in paragraph 62-604.300(3)(b), F.A.C., effective October 4, 2021), http://www.flrules.org/Gateway/reference.asp?No=Ref-13560), new or modified collection/transmission facilities can be placed into operation 10 days after Form 62-604.300(3)(b) is submitted unless the Department or delegated local program notifies the permittee of public health or environmental concerns regarding placing the facilities into operation.

[62-604.700(3) and (4)]

7. Abnormal events shall be reported to the Department’s Central District Office in accordance with Rule 62-

604.550, F.A.C. For unauthorized spills of wastewater in excess of 1000 gallons per incident, or where information indicates that public health or the environment may be endangered, oral reports shall be provided to the STATE WATCH OFFICE TOLL FREE NUMBER (800)320-0519 as soon as practical, but no later than 24 hours from the time the permittee or other designee becomes aware of the circumstances. Unauthorized releases or spills less than 1000 gallons per incident are to be reported orally to the Department’s Central District Office within 24 hours from the time the permittee, or other designee becomes aware of the circumstances. [62-604.550] http://www.dep.state.fl.us/legal/Rules/shared/62-4/62-4.pdf http://www.fldepportal.com/go/ mailto:Osama.mahmoud@dep.state.fl.us http://www.flrules.org/Gateway/reference.asp?No=Ref-13560 http://www.flrules.org/Gateway/reference.asp?No=Ref-13560