Appendix A Example Performance Requirement Summaries.docx

DOCX document 14 KB Posted

Attached to
Air Quality Monitoring Support for Mark Twain National Forest
Solicitation number
12444524Q0015
Issued by

About this file

This document provides examples of performance requirement summaries for an air quality monitoring support contract. The contract requires operational service support for an air quality testing station operated in partnership between the Mark Twain National Forest and the University of California, Davis. The contractor must provide site maintenance and on-ground operations, while UC Davis covers testing instruments, troubleshooting, and replacement parts. Performance metrics include sampling air every Tuesday and providing samples that meet UC Davis standards at least 85% of the time. Surveillance will be conducted by UC Davis through monitoring samples, information, and ensuring requirements are met. The solicitation is set aside for small businesses and will be conducted according to FAR Parts 12, 13, and 19 by the Department of Agriculture Forest Service.

View the file

Other files

File Type Posted
7. Experience Questionnaire.docx DOCX document
Appendix C Example Guide - Inspection List.docx DOCX document
Appendix D Daily Diary.pdf PDF
3. Maps.pdf PDF
4. 2024 Calendar.pdf PDF
Appendix B Example Discrepancy Report.docx DOCX document
2. Quality Assurance Surveillance Plan (QASP).docx DOCX document
6. Sampler Maintenance by Site Operators.pdf PDF
5. Taney County SCA WD 2015-5103.txt TXT text file
OM-RFQ 12444524Q0015.pdf PDF
1. Performance Work Statement (PWS).docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix A: Example Performance Requirement Summaries The following documents are examples only, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.

EXAMPLE- 1

PERFORMANCE REQUIREMENT SUMMARY

Performance Task (PWS Reference)

Performance Indicator

Performance Standard

Acceptable Quality Level (AQL)

Method of Surveillance

Air samples need to be taken every Tuesday or on days that allow the system to test without disrupting the monitoring

UC Davis will be monitoring the samples that the contract will be providing
UC Davis will be checking on the samples that are provided
85% of samples should be up to standard for UC Davis
UC Davis will monitor the samples and information that the contractor will provide

File details come from the government source that posted it. Updated .