Appendix A-B.pdf
PDF 2 MB Posted
- Attached to
- Hill AFB Base Integrated Environmental Support Tasks (BIEST) Federal contract opportunity
- Solicitation number
- W9123822R0011
About this file
This solicitation requests proposals for a firm fixed-price environmental support services contract at Hill Air Force Base in Utah. The US Army Corps of Engineers Sacramento District will award a contract to provide tasks including air quality evaluation, data management, hazardous material management and containment response, emergency planning, water quality evaluation, environmental systems management, and NEPA support. Proposals are due on January 10, 2022. The contract will utilize the NAICS code 541620 for environmental consulting services with a small business size standard of $16.5 million. Wage determinations are set forth in the solicitation. The contractor must be registered in the System for Award Management database.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9123822R0011 Amend 0004.pdf | ||
| W9123822R0011 Amend 0004 Conform.pdf | ||
| W9123822R0011 Amend 0003.pdf | ||
| Hill BIEST RFP Inquiries and Answers (For Information Only).pdf | ||
| Attachment 4 - HILL BIEST Pricing Sheet v2.xlsx | XLSX spreadsheet | |
| W9123822R0011 Amend 0002.pdf | ||
| W9123822R0011 Amend 0002 Conform.pdf | ||
| Attachment 4 - Hill BIEST Pricing Sheet_v1.xlsx | XLSX spreadsheet | |
| W9123822R0011 Amend 0001 Conform.pdf | ||
| W9123822R0011 Amend 0001.pdf | ||
| Hill BIEST Site Visit 12-6-2021 (for informational purposes only).mp4 | MP4 file | |
| W91238-22-R-0011 BIEST Solicitation.pdf | ||
| Attachments 1-3.pdf | ||
| Tech Exhibits A-Y.pdf | ||
| Property Memorandum (For informational pursposes only).pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix A
Contract Data Requirements List
Section CDRL Deliverable Daft
Copies
Final
Copies
Due Date
3.0.1 0001 Contract Kick Off N/A N/A 30 days after award
3.0.2 0002 Project Management
Plan
1 1 Draft 30 days after award
Final 60 days after award
3.1.1 A0001 Evaluate and Assess
Base Operations HAFB
1 1 Monthly
3.1.1 A0002 Evaluate and Assess
Base Operations UTTR
1 1 Monthly
3.1.1 A0003 Emissions Testing 1 1 Draft – January 5
Final -January 31st
3.1.1 A0004 General Conformity 1 1 As Completed
3.1.2.1 A0005 Main Base AEI 1 1 Draft February 1st
Final March 1st
3.1.2.2 A0006 UTTR AEI 1 1 Draft February 1st
Final March 1st
3.1.2.3 A0007 AEI Follow-up w/ State
of Utah
1 1 As needed
3.1.2.4 A0008 Main Base GHG Report 1 1 Draft February 15th
Final March 1st
3.1.2.5 A0009 Burn Schedule 1 1 Draft February 1st
Final March 1st
3.1.2.6 A0010 Refrigerant Reporting 1 1 As completed
3.1.3 A0011 Annual/Semi Annual
Compliance Report -
HAFB
1 1 Draft January 15th & July 15th
Final January 15th & July 15th
3.1.3. A0012 Annul/Semi Annual
Compliance Report -
UTTR
1 1 Draft January 15th & July 15th
3.1.3 A0013 Deviation Reports 2 2 As Needed
3.1.3 A0014 Initial Notification
Reports
2 2 As Needed
3.1.4 A0015 New Source Review
Permit Application
2 2 As Needed
3.1.4 A0016 Flexibility Notices 2 2 As Needed
3.1.4 A0017 Notices of Intent / TVOP
Administration
Amendments
2 2 As Needed
3.1.4 A0018 Notice of Intent
Exemption Requests
2 2 As Needed
3.1.4 A0019 TVOP Update
Applications
2 2 As Needed
3.1.6.2 A0020 Emergency Episode
Plans
2 2 As Needed
3.1.6.5 A0021 Asbestos and Lead Base
Paint Plans
4 4 Draft December 1st
Final December 31st
3.1.7 A0022 Environmental
Compliance
Administration and
Communications
2 2 As Needed
3.1.8 A0023 Site Specific
Documentation
2 2 As Needed
3.1.8 A0024 Non-Compliance
Documentation
2 2 As Needed
3.1.8 A0025 Specific Activities 2 2 As Needed
3.1.9 A0026 Aerospace NESHAP
Semiannual Compliance
Reports
4 4 Draft January 15th & July 15th
3.1.9 A0027 Various Other
Semiannual NESHAP
Reports
4 4 Draft January 15th & July 15th
Final January 15th & July 15th
3.1.9 A0028 Semi-Annaul NSPS
Boiler Report
2 2 Draft December 15th & January 1st
Final June 15th & July 1st
3.1.9 A0029 Annual OB/OD Report 2 2 Draft December 15th
Final January 1st
3.2.2 B0001 HAFB Tier II Report 1 1 Draft January 25th
Final February 13th
3.2.3 B0002 UTTR Tier II Report 1 1 Draft January 25th
Final February 13th
3.2.4 B0003 HAFB TRI Form R 1 1 1st Draft February 01
2nd Draft March 01
Final March 31
3.2.4 B0004 Letter Report Justifying
Exclusions of LMTF from TRI Report
1 1 1st Draft February 01
2nd Draft March 01
Final March 31
3.2.5 B0005 UTTR TRI Form R 1 1 1st Draft February 01
2nd Draft March 01
Final March 31
3.3.1.1 C0001 Work Plan 1 1 Annual, Prior to Beginning IWCS
Study
3.3.2.1 C0002 Database for GIS
Mapping
1 1 Draft Mar 1
Final Mar 15
3.3.2.1 C0003 Quantity and Quality of
Industrial Waste
Collection System
Discharges Annual
Group and Yearly Group
Study
1 1 Draft Feb 15
Final Mar 15
3.3.2.1 C0004 NDSD Hill Wastewater
evaluation
0 1 Mar 15
3.3.2.2 C0005 Test Results 0 1 Monthly 1st of each month
3.3.2.2 C0006 Hill AFB Industrial
Waste Treatment Plant
Monthly Compliance
Report
0 1 Monthly 1st of each month
3.3.3.1 C0007 Summary Report
Industrial Monitoring and Sampling Analysis
Results
1 1 Draft January 22
Final February 28
3.3.3.1 C0008 Stormwater Discharge
Monitoring Reports
1 1 Draft January 22
Final February 28
3.3.3.2 C0009 Deicing agendas and
minutes
0 1 Bi – Annually
3.3.3.2 C0010 Annual Site Compliance
Evaluation Audit Report
1 1 Draft February 15
Final March 15
3.3.3.3 C0011 Workplace Posters 50
Copties
November 5
3.3.3.3 C0012 Workplace Fact Sheets
(MSGP)
1 1 Draft August 1
Final September 1
3.3.3.3 C0013 Priority Area Fact Sheets
(MS4)
1 1 Draft January 28
Final February 25
3.3.3.4 C0014 Training (Briefing) 1 1 Draft 30 Calendar Days before
Briefing
Final 2 business days before
Briefing
3.3.3.5 C0015 Illicit Discharge
Investigation Report
1 1 Draft 15 Calendar days after investigation
Final 15 Calendar days from
Comments
3.3.3.5 C0016 Dry Weather Screening
Report
1 1 Draft December 23
Final February 2
3.3.3.5 C0017 Construction Site
Inspections
0 1 2 Business Days after each inspection
3.3.3.5 C0018 Pre-Construction Site
Plan Review
0 1 1 Business Day after each review
3.3.3.5 C0019 MS4/SWMP Annual
Report with supporting documentation
1 1 Draft August 15
Final September 3
3.3.3.5 C0020 High Priority Area
Report
1 1 Draft January 28 2023
Draft February 28 2023
3.3.3.5 C0021 Updated Base Wide
Drainage Map
1 December 24
3.3.3.5 C0022 Program Successes and
Failures Analysis Report
1 1 Draft December 31
Final 14 Calendar days of receipt of comments
3.3.3.5 C0023 Stormwater Brochures 1 1 Draft October 29
Final December 03
3.3.3.5 C0024 Stormwater Inlet
Marking Technical
Memorandum
1 December 24
3.3.3.5 C0025 Design Criteria
Document
1 1 Draft January 05
Final February 15
3.3.3.5 C0026 Pollution Prevention and
Good Housekeeping –
Municipal Facility
Inventory
1 1 Draft February 15
Final March 15
3.3.3.5 C0027 Annual Long-Term BMP
Inspection Report
1 March 15
3.3.4.7 C0028 Stormwater Management
Plan (HILL SWMP)
1 1 Draft October 15 2025
Final January 15 2026
3.3.5.1 C0029 Stormwater Pollution
Prevention Plan (HILL
SWPPP, MSGP)
1 1 Draft January 15 2024
Final February 2024
3.4.3.7 D0001 Response Action
Documentation
1 1 Draft 14 days of completion of clean up
Final 14 days after comments received
3.5.1.6 E0001 Oil Water Separator
Inspection Report
0 1 Due Quarterly
Due by the 10th of each month following December, March, June, September
3.5.2 E0002 Hill AFB Annual Waste
Stream Certification
1 1 Due to State and Air Force
Annually
Draft January 15
Final 14 days after comments
3.5.2 E0003 Hill AFB Biennial
Report
1 1 Due to State annually by 1 March of each even-numbered year for odd-numbered year data. Draft due to
Hill AFB by January 15, Final report due 14 days after comments received.
3.5.2.1 E0004 Analysis of Waste
Volumes and Disposal
0 1 Monthly
Due 5th of every month
3.5.2.1 E0005 Monthly Waste Reports 1 1 Monthly. Drafts due by the 10th of each month for the previous month.
Final reports due for distribution to tenants/organizations within 5 working days of receipt of comments.
3.5.2.1 E0006 Review of Interfund
Reports
0 1 Due to 75 CEG/CEIE within 1 working day of receipt.
3.5.3.1 E0007 Part B Permit Renewal
Application
1 1 Draft December 31 2022
Final March 31 2023
Base Year & Option Year 1 Only
3.5.3.4 E0008 UTTR Biennial Report 1 1 Due to State annually by 1 March of each even-numbered year for odd-numbered year data. Draft due to
Hill AFB by January 15, Final report due 14 days after comments received.
3.5.3.6 E0009 Soil Sampling Report 1 1 Field Work Completed by Mid
November
Draft 120 days after Field Work is complete.
Final Report Due 14 Days after
Field Work
Final Due 14 days after comments
Option Year 1 & Option Year 3
Only
3.5.3.7 E0010 Land Use Assessment
Letter Report
1 1 Due Annually
Draft Due March 01
Final Due 14 days after comments
3.5.3.8 E0011 Report of Wastes
Treated at the TTU
1 1 Due Annually
Draft Due January 15
Final Due 14 days after comments
3.5.3.8 E0012 UTTR Annual Waste
Stream Certification
1 1 Due to the State and Air Force
Annually
Draft March 1
Final Due 14 Days after comments
3.5.3.9 E0013 Waste Minimization
Statement
1 1 Due to State and Air Force
Annually
Draft February15
Final 14 days after comments
3.5.3.10 E0014 Report Evaluating
Alternatives to OB/OD
Treatment Technology
1 1 Due to the State and Air Force
Annually
Draft February 15
Final March 31
3.5.3.11 E0015 Risk Assessment
Evaluation
1 1 Draft Due August 31
Final Due 30 Days after comments
Base Year Only
3.6.2 F0001 HAZMAT Inventory
Audit Analysis Report
0 1 Quarterly by the 30th of each month following the end of a quarter
3.6.2 F0002 Compliance Assessment
Checklist Updates
0 1 As needed
3.6.3 F0003 Updated EESOH-MIS
HM Training Materials and EESOH-MIS HM user Guides for Hill AFB
0 1 Twice yearly within 30 days of release of request, a new EESOH-
MIS HM version, or updated local procedures.
3.6.4 F0004 HMMP Team Meeting
Presentations, Agendas and Meeting Minutes
1 1 At least biannually, but no more than quarterly. Agendas - Drafts due
15 working days prior to meeting and finals due 5 working days prior to meeting. Presentations - Drafts due 5 working days prior to meeting and finals due 1 working day prior to meeting. Meeting minutes -
Drafts due 5 working days following meeting and final due within 5 working days of receipt of comments.
3.6.5 F0005 Custom Reports 0 1 As needed within 5 working days of customer requests.
3.6.12 F0006 Submittal of
BCRs/DIREPs to
EESOH-MIS Help Desk
0 1 As needed within 5 working days of identification of problem.
3.6.15 F0007 Monthly Progress
Reports
0 1 Monthly by the 10th of each month.
3.7.1 G0001 ICP and Spill
Management Plan
Technical Amendments
0 1 Annually for years that a full plan update is not required. Due by 1
November.
3.7.2.5 G0002 Five Year Integrated
Contingency Plan
Update
0 1 Draft report due on 30 August 2025.
Final report due by 1 November
2025 or ten (10) business days after comments received, whichever comes first.
3.8.2 H0001 EMS Training Updates 1 1 As required to maintain EMS conformance. Draft due within 30 days of request from Hill AFB EMS
Coordinator. Final due within 14 days of receipt of comments.
3.8.3 H0002 Environmental Action
Plans
1 1 As needed. Draft due within 30 days of request from Hill AFB EMS
Coordinator. Final due within 14 days of receipt of comments.
3.8.3 H0003 EMS Audit and Gap
Analysis Results
0 1 As required to maintain EMS conformance. Due within 14 days of the completion of each audit.
3.8.4 H0004 EMS CFT and ESOHC
Meeting Presentations, 1 1 Quarterly for the EMS CFT; at least biannually but no more than quarterly for the ESOHC. Agendas -
Agendas and Meeting
Minutes
Drafts due 15 working days prior to meeting and finals due 5 working days prior to meeting. Presentations
- Drafts due 5 working days prior to meeting and finals due 1 working day prior to meeting. Meeting minutes - Drafts due 5 working days following meeting and final due within 5 working days of receipt of comments.
3.8.5 H0005 Monthly Progress
Reports
0 1 Monthly by the 10th of each month.
3.9.1 I0001 Monthly Metric Progress
Report for Converting
Hard-Copy
Documentation to
Electronic Format
0 1 Due by the 5th of each month.
3.10.1.1 J0001 Quarterly Solid Waste
Reports
1 Draft due 30 days following the end of each quarter. Final report due 7 days after comments received.
3.10.1.1 J0002 Quarterly Landfill Fee
Reports
1 1 Due by April 10, July 10, October
10, and January 10 to meet the submission deadline to UDEQ of the 15th of the first month of each quarter.
3.10.1.2 J0003 Annual Landfill Reports 1
2 Due to State annually by 1 March.
Draft due to Hill AFB by January
15, Final report due 14 days after comments received.
3.10.1.3 J0004 Integrated Solid Waste
Management Plan
Review
1 Review and draft proposed changes, if any, submitted by 31 October (to be approved in 4th quarter CFT meeting). Final report due 14 days after comments received.
3.10.1.4 J0005 Qualified Recycling Plan
Business Plan Review
1 Review and draft proposed changes, if any, submitted by 31 October (to be approved in 4th quarter CFT meeting). Final report due 14 days after comments received.
3.10.2.1 J0006 QRP Committee
Briefing Slides
1 1 Draft due 10 days prior to meeting.
Final due 4 days prior to meeting.
3.10.2.1 J0007 QRP Committee
Meeting Minutes
1 1 Draft due 2 days following meeting.
Final due 10 days following meeting.
3.10.2.1 J0008 Recyclable Material
Processing Business
Case Analysis
1 As needed and prior to initiating processing of a recyclable material stream.
APPENDIX B Building Layouts
APPENDIX C Building Layouts
| CDRL |
| Appendix B Building Layout |
File details come from the government source that posted it. Updated .