Appendix 1-Projected Totals.docx
DOCX document 228 KB Posted
- Attached to
- Customer Satisfaction Survey (CSS) RFP
- Solicitation number
- HTC711-20-R-R021
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix 1 Projected DP3 CSS Totals
The chart below depicts the estimated survey totals expected to be accomplished, starting with a phased-in approach in the base year (8 months) and estimates for (4) option years at full performance levels.
CSS 01 = Stage 1 (Pre-Move) Survey CSS 02 = Stage 2 (Physical Move) Survey CSS03 – Stage 3 (Physical Move/Post Move) Survey CSS04 – Stage 4 (Claims) Survey
The below chart depicts the estimated number of surveys to be collected for the Optional Item for GPC Surveys (12 month basis). GPC surveys will be collected in up to 3 stages at the survey totals indicated below:
image1.jpeg image2.jpeg
File details come from the government source that posted it. Updated .