This document is an amendment to solicitation number AOCACB24R0025 for the Sprinkler Systems Replacement project at the John Adams Building of the Library of Congress in Washington, DC. The amendment incorporates revised attachments, adds new attachments with a summary of specification changes and RFI responses, and updates the list of attachments and a contract clause. The solicitation is for a firm-fixed-price contract to provide supervision, labor, material, and equipment to perform the sprinkler systems replacement work. Key details include a site visit scheduled for August 28, 2024, with attendee lists due by August 26, 2024. The amendment extends the offer due date but does not provide a new date. The procurement is being conducted by the Architect of the Capitol, a civilian federal agency.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Number: AOCACB24R0025 Page 1 of 3

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

09/26/2024

4. REQUISITION/PURCHASE REQ. NUMBER 5. PROJECT NUMBER (If applicable)

LC13017A

9901CODE

Architect of the Capitol Design and Construction Acquisition Division Ford House Building Room H2-263 2nd and D Streets SW Washington, DC 20515

6. ISSUED BY 9901CODE

Architect of the Capitol Design and Construction Acquisition Division Ford House Building Room H2-263 2nd and D Streets SW Washington, DC 20515

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NUMBER

AOCACB24R0025

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

08/15/2024

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment is as follows:

1. Incorporate revised Attachments 1 and 3, which supersede the previous versions in their entirety.

2. Incorporate revised Attachment 3 as a Controlled attachment. Access request is required.

3. Add new Attachments 11 “Summary of Spec. Changes” and 12 “RFIs with AOC Responses”.

4. Update Section J “List of Attachments”.

5. Update clause fill-in for FAR clause 52.236-1.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) John Lingamfelter Contracting Officer

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV.

11/2016) Prescribed by GSA FAR (48 CFR) 53.243

Document Number: AOCACB24R0025 Page 2 of 3

Table of Contents

Section Description Page Number

I Contract Clauses 52.236-1 Performance of Work by the Contractor (Apr 1984)

J List of Attachments J.1 List of Attachments

Document Number: AOCACB24R0025 Page 3 of 3

Section I - Contract Clauses

52.236-1 Performance of Work by the Contractor (Apr 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least fifteen (15) [insert the appropriate number in words followed by numerals in parentheses] percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of clause)

Section J - List of Attachments

J.1 List of Attachments

Item No.

Title Date

1 Section L & M – Revised September 25, 2024 2 LC13017A_Revised IFC Drawings August 15, 2024 3 LC13017A_Revised IFC Specifications REVISED – Revised

(blue text) August 2024

4 Bid Pricing Schedule – Revised September 26, 2024 5 Wage Rates DC20240002 August 2, 2024 6 Employee Rights under Davis-Bacon Act Poster October 2017 7 Sample Certificate of Insurance (COI) No Date 8 USCP Request for Background Check January 2021 9 USCP Off-site Vendor Procedures March 2022

10 Past Performance Questionnaire (PPQ) (SS)_PRIME No Date 11 Summary of Spec. Changes – Added September 26, 2024 12 RFIs with AOC Responses – Added September 26, 2024

File details come from the government source that posted it. Updated .