Anan 95-percent Drawings.pdf

PDF 29 MB Posted

Attached to
Anan Wildlife Observatory Reconstruction - Solicitation - CANCELED
Solicitation number
12010920R0008
Issued by

View the file

Other files

File Type Posted
Amendment006.pdf PDF
FH20-I-0077.PDF PDF
Amendment 005.pdf PDF
Amendment 004.pdf PDF
7 - Ex Admin Bldg.zip ZIP file
9 - Upper Falls.zip ZIP file
5 - Ex Obs - Shelter.zip ZIP file
Errata Sheet.docx DOCX document
3 - Ex Obs - Lower Deck.zip ZIP file
1 - Ex Obs - Upper Deck.zip ZIP file
6 - Ex Obs - Trail.zip ZIP file
4 - Ex Obs - Toilet Bldg.zip ZIP file
0 - General.zip ZIP file
2 - Ex Obs - Stairs.zip ZIP file
8 - High Tide Access.zip ZIP file
Amendment 003.pdf PDF
Final Construction Drawing Specifications.pdf PDF
Final Construction Drawings.pdf PDF
Amendment 002.pdf PDF
Geological Report.pdf PDF
Soil and Water.pdf PDF
Amendment 001.pdf PDF
SF24-16d Bid Bond Form.pdf PDF
12010920R0008_Anan_Observatory_RFP.pdf PDF
Water_Quality_Mgmt_BMPs_April2012.pdf PDF
Wage Determination AK2020001.pdf PDF
Anan 95-percent Technical Specifications.pdf PDF
12010920R0008_Anan_Observatory_RFP.pdf PDF
Photographs.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION

VICINITY MAP

TRAVEL DIRECTIONS:

SHEET OF

UNITED STATES DEPARTMENT OF AGRICULTURE

FOREST SERVICE

ANAN WILDLIFE OBSERVATORY RECONSTRUCTION

THE ANAN WILDLIFE OBSERVATORY IS LOCATED 35 AIR MILES SE OF WRANGELL, ALASKA, ON THE

CLEVELAND PENINSULA. ACCESS TO ANAN BAY IS BY A 35-MINUTE FLOAT PLANE FLIGHT OR

90-MINUTE BOAT RIDE FROM WRANGELL. THE TRAILHEAD IS LOCATED ON THE SHORE OF ANAN BAY, AT THE MOUTH OF THE SALTWATER LAGOON. THE HALF MILE TRAIL LEADS THROUGH THE RAIN

FOREST ALONG THE EDGE OF THE LAGOON TO ANAN CREEK, WHICH IT FOLLOWS BRIEFLY BEFORE

REACHING THE OBSERVATORY SITE. THE LATITUDE AND LONGITUDE OF THE OBSERVATORY SITE ARE

APPROXIMATELY 56.179032° N, -131.883935° W.

PROJECT LOCATION

JUNE 26, 2020 95% CONSTRUCTION DOCUMENTS

RECOMMENDED BY:

APPROVED:

DIRECTOR OF ENGINEERING DATE

FOREST SUPERVISOR DATE

B

L I T

T L

E

J

U

S F

A

N A

N

O

B S

E R

V A

T O

R Y

C

D S

C

A D

S

H E

E T

S A

N A

N

O

B S

E R

V A

T O

R Y

D

W G

ALASKA

(R-10) ALASKA REGION

TONGASS NATIONAL FOREST

WRANGELL RANGER DISTRICT

INDEX OF SHEETS

SHEET SHEET TITLE DATE

1 COVER SHEET

2 ABBREVIATIONS & NOTES

3 VICINITY MAP

4 SITE SURVEY - EXISTING CONDITIONS

5 SITE SURVEY - ROCK PROBES

6 OBSERVATORY AREA DEMO PLAN

7 OBSERVATORY AREA LAYOUT PLAN

8 TRAIL ALIGNMENT PLAN

9 TRAIL RESTORATION PLAN

10 OBSERVATORY AND TRAILS DETAILS

11 TRAILHEAD AREA DEMOLITION

12 TRAILHEAD AREA LAYOUT PLAN

RELOCATED OBSERVATORY SHELTER

DETAILS

14 GENERAL NOTES

15 FRAMING PLAN

LOWER DECK FRAMING PLANS & STAIR

FOUNDATION DETAIL

17 LOWER DECK SECTION AND ELEVATION

18 LOWER DECK SECTION AND ELEVATION

19 SPIRAL STAIRCASE LANDING DETAILS

20 SPIRAL STAIRCASE LANDING DETAILS

21 SPIRAL STAIRCASE LANDING DETAILS

22 UPPER DECK FOUNDATION DETAILS

23 UPPER DECK FRAMING DETAILS

24 UPPER DECK FRAMING DETAILS

25 FRAMING SECTION AND DETAILS

WALKWAY SECTION DETAILS AND RAILING

DETAILS

ELECTRICAL LEGEND, SPECIFICATIONS, AND

PLANS

28 ELECTRICAL SPECIFICATIONS

29 ELECTRICAL DETAILS AND SCHEDULES

REVIEWED BY:

DISTRICT RANGER DATE

FOREST ENGINEERING STAFF OFFICER DATE

FOREST RECREATION STAFF OFFICER DATE

DIRECTOR OF RECREATION DATE

lwild02 Not For Construction

REVISION SYMBOL

DETAIL

SECTION/ELEVATION

DETAIL IDENTIFICATION

SHEET IDENTIFICATION

SHEET IDENTIFICATION

DETAIL IDENTIFICATION

REVISION NUMBER

ABBREVIATIONS: GENERAL NOTES:

Note:

1. ADDITIONAL ABBREVIATIONS, SYMBOLS AND INDICATORS MAY APPEAR IN THESE DRAWINGS.

REFER TO APPROPRIATE SHEETS FOR IDENTIFICATION AND CLARIFICATION.

4%

SPOT ELEVATION

SLOPE

EXISTING GRADE

PROPOSED GRADE

& AND

@ AT

CENTERLINE

Ø DIAMETER OR ROUND

A

ADJ ADJACENT

AGGR AGGREGATE

APPROX APPROXIMATE

B

B&B BALLED AND BURLAP

BLDG BUILDING

BOW BOTTOM OF WALL

BR BAREROOT

C

CF CUBIC FOOT/FEET

CG CONTAINER GROWN

CO CONTRACTING OFFICER

CONC CONCRETE

CONT CONTINUOUS

CTR CENTER

CY CUBIC YARD(S)

D

DEC DEPARTMENT OF

ENVIRONMENTAL

CONSERVATION

DEMO DEMOLISH, DEMOLITION

DET DETAIL

DIA DIAMETER

DIM DIMENSION

E

E EAST

EA EACH

ELEC ELECTRICAL

ELEV ELEVATION

EQ EQUAL

EX. EXISTING

EXT EXTERIOR

F

FND FOUNDATION

FFE FINISHED FLOOR ELEVATION

FG FINISHED GRADE

FT FOOT/FEET

FTG FOOTING

G

GA GAUGE

GALV GALVANIZED

GR GRADE

H

HORZ HORIZONTAL

HP HIGH POINT

HT HEIGHT

I

ID INSIDE DIAMETER

IN INCH

L

LF LINEAL FEET

LP LOW POINT

M

MAX MAXIMUM

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

N

N NORTH

NFS NON-FROST SUSCEPTIBLE

NO NUMBER

NTS NOT TO SCALE

O

OC ON CENTER

OD OUTSIDE DIAMETER

P

PT PRESSURE TREATED

R

R RADIUS

REF REFERENCE

REINF REINFORCED

REV REVISION

S

S SOUTH

SECT SECTION

SF SQUARE FOOT

SIM SIMILAR

SPEC SPECIFICATION

SQ SQUARE

SS STAINLESS STEEL

STA STATION

STD STANDARD

STRUCT STRUCTURAL

SY SQUARE YARD

T

TBD TO BE DETERMINED

TEMP TEMPORARY

TOW TOP OF WALL

TYP TYPICAL

U

UON UNLESS OTHERWISE NOTED

V

VERT VERTICAL

VIF VERIFY IN FIELD

W

W WEST

W/ WITH

W/O WITHOUT

WP WATERPROOF

WWF WELDED WIRE FABRIC

/MESH

100.10

L

C

L

C

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

NO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/2 6/2

0 1 2:

B

LI

TT

LE

J:

\U

SF

-1 9-

A

NA

N

OB

SE

RV

AT

OR

Y

CD

S\

2 - C

AD

\S

HE

ET

S-

AN

AN

O

BS

ER

VA

TO

RY

.D

W G;

DRAWING SHEET NO.

DATE

ANAN WILDLIFE

OBSERVATORY

RECONSTRUCTION

TONGASS NATIONAL

FOREST

WRANGELL RANGER DISTRICT

6/26/2020 FS090523_R102013_L1-002.dwg

Corvus Design

BL

PB

ALASKA REGION

USF-19-01

R10

95% SUBMITTAL

ABBREVIATIONS

& NOTES

1. SURVEY CONTROL POINTS ARE NOTED ON PLANS. MAINTAIN ON-SITE SURVEY

CONTROL DURING CONSTRUCTION.

2. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION STAKING AND

THE SECURITY OF STAKING DURING CONSTRUCTION. ANY RE-STAKING DUE

TO THIRD PARTY DAMAGE OR ENVIRONMENTAL DAMAGE OR OBSCURATION IS

THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

3. ALL CONSTRUCTION IN THE CONTRACT DOCUMENTS SHALL USE THE ON-SITE

SURVEY CONTROL POINTS. FIELD VERIFY LOCATIONS AND ELEVATIONS, AND

REPORT ANY DISCREPANCY TO THE C.O.

4. KEEP A CURRENT, CLEAN, DRY SET OF THE RECORD DRAWINGS AND ANY

AMENDMENTS TO IT AND A SET OF TECHNICAL SPECIFICATION ON-SITE AT ALL

TIMES. REDLINE ACTUAL LOCATIONS AND DIMENSIONS FOR VERTICAL AND

HORIZONTAL LOCATIONS OR PROPOSED CONSTRUCTION, UTILITIES,

STRUCTURES, SERVICES AND OTHER DETAILS NOT SHOWN ON THE ORIGINAL

DRAWINGS. SUBMIT RECORD DRAWINGS TO THE C.O. UPON COMPLETION OF

THE WORK.

5. A LICENSED LAND SURVEYOR SHALL SURVEY THE NECESSARY COORDINATES

FOR THE CONSTRUCTION OF THE PROJECT. THE SURVEYOR MUST CERTIFY IN

A LETTER TO THE C.O. THAT THESE COORDINATES AND ELEVATIONS

CONFORM TO THE APPROVED PLANS AND SPECIFICATIONS. ANY DEVIATIONS

SHALL BE NOTED IN THE LETTER AND THEN RESOLVED WITH THE C.O. BEFORE

INSTALLATION OF ANY SITE IMPROVEMENTS.

6. NOTIFY THE C.O. PRIOR TO BEGINNING CONSTRUCTION IF A CONFLICT EXISTS

AND/OR A DESIGN MODIFICATION IS REQUIRED .

7. VERIFY THE EXISTENCE OF ALL UNDERGROUND CONSTRUCTION WITHIN THE

LIMITS OF WORK BEFORE COMMENCING NEW CONSTRUCTION.

8. OBTAIN ALL PERMITS REQUIRED TO COMPLETE THE PROJECT.

9. THE CONTRACTOR SHALL PREPARE AN EROSION AND SEDIMENT CONTROL

PLAN AND STORM WATER POLLUTION PREVENTION PLAN FOR C.O. AND DEC

APPROVAL.

REFERENCE INDICATIONS:

95% NOTE: THIS SHEET WILL BE EDITED TO REMOVE INFORMATION INCLUDED WITHIN SPECIFICATIONS, AND TO

ONLY SHOW INFORMATION AND ABBREVIATIONS USED IN RELEVANT SHEETS.

95% Note: Does USFS have an archive # format for this part of the tittleblock?

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

NO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/2 6/2

0 1 2:

B

LI

TT

LE

J:

\U

SF

-1 9-

A

NA

N

OB

SE

RV

AT

OR

Y

CD

S\

2 - C

AD

\S

HE

ET

S-

AN

AN

O

BS

ER

VA

TO

RY

.D

W G;

DRAWING SHEET NO.

DATE

ANAN WILDLIFE

OBSERVATORY

RECONSTRUCTION

TONGASS NATIONAL

FOREST

WRANGELL RANGER DISTRICT

6/26/2020 FS090523_R102013_L1-002.dwg

Corvus Design

BL

PB

ALASKA REGION

USF-19-01

R10

95% SUBMITTAL

VICINITY MAP

NORTH

ANAN CREEK TRAIL

ANAN BAY CABIN (FOR

REFERENCE ONLY).

TRAILHEAD AREA

HIGH TIDE ACCESS AN

BEGINNING OF EXISTING

AGGREGATE TRAIL

ANAN WILDLIFE

OBSERVATORY.

95% NOTE: FOR STRUCTURAL DESIGN PURPOSES, A NUMBER OF SITE

SECTION WERE DEVELOPED BY SURVEY. SHOULD THESE BE INCLUDED

FOR 100% SET AS ADDITIONAL INFORMATION FOR CONTRACTOR?

95% NOTE: WE NORMALLY PROVIDE SURVEY AS PROVIDED

BY SURVEYOR. WE WILL ISSUE THEM PROJECT TITLEBLOCK

TO REISSUE THIS SHEET TO BE CONSISTENT WITH SET.

95% NOTE: PROPOSED PROJECT

INFORMATION TO BE REMOVED FROM

EXISTING CONDITIONS SURVEY.

95% NOTE: 100% SET WILL INCLUDE PROBE

DEPTHS FOR CONTRACTOR'S INFORMATION.

EXISTING CONCRETE

WALL TO REMAIN

EXISTING TOILET

STRUCTURE

EXISTING SHELTER

EXISTING SPRING BOARD

STUMP TO BE PROTECTED.

EXISTING TREES AND

OTHER VEGETATION

TO BE PROTECTED

LIMIT OF WORK -

OBSERVATORY AREA

APPROX. LOCATION OF

OLD "PIT TOILET" VAULT

ANAN CREEK

DEMOLITION SUMMARY

REMOVE OBSERVATORY SHELTER AND REINSTALL AT THE TRAILHEAD.

REPLACE ANY ROTTEN OR DAMAGED MATERIAL DURING REASSEMBLY OF

SHELTER, SEE SPECS. SEE SHEET 13 FOR DETAILS AND PLACEMENT OF

SHELTER.

REMOVE TOILET STRUCTURE AND REINSTALL AT A LOCATION DETERMINED BY

THE C.O. APPROXIMATELY 300 FEET NORTH OF THE TRAILHEAD AT THE

LOCATION OF THE EXISTING ADMINISTRATION BUILDING. STAKE TOILET

STRUCTURE CORNERS FOR C.O. APPROVAL. IF TRANSPORTATION OF FULLY

ASSEMBLED STRUCTURE IS NOT POSSIBLE, DISASSEMBLE AND REINSTALL WITH

IN KIND MATERIALS. REPLACE ANY DAMAGED MATERIAL DURING

RELOCATION/REASSEMBLY.

REMOVE ALL MATERIAL FROM LOWER DECK, INCLUDING BUT NOT LIMITED TO

DECKING, BEAMS, JOISTS, POSTS, GUARDRAIL SYSTEMS, CANOPY SYSTEM, AND

FOOTING AND FOUNDATION COMPONENTS.

REMOVE ALL MATERIAL FROM STAIRS CONNECTING UPPER AND LOWER DECKS,

INCLUDING BUT NOT LIMITED TO DECKING, BEAMS, JOISTS, POSTS, GUARDRAIL

SYSTEMS, AND FOOTING AND FOUNDATION COMPONENTS. CUT ALL EXISTING

BOLTS, BRACKETS, OR OTHER ELEMENTS CAST INTO ROCK OR EXISTING

CONCRETE WALL FLUSH WITH SURFACE. REMOVE ALL CONCRETE FOOTINGS

FROM UNDER STEPS. IF CONCRETE FOOTINGS CANNOT BE FULLY REMOVED,

TOP OF FOOTING TO BE LEFT 6" BELOW SOFT SURFACES OR FLUSH WITH ROCK

SURFACES (SEE DETAIL 3/10 FOR INTENT).

REMOVE ALL MATERIAL FROM UPPER DECK INCLUDING BUT NOT LIMITED TO

DECKING, BEAMS, JOISTS, POSTS, FOOTING AND FOUNDATION COMPONENTS,

AND GUARDRAIL SYSTEMS. REMOVE ALL CONCRETE FOOTING AND

FOUNDATION COMPONENTS FROM UNDER PLATFORM. IF CONCRETE PILES

CANNOT BE FULLY REMOVED, TOP OF FOOTING TO BE LEFT 6" BELOW

ADJACENT FINISHED SURFACE (SEE DETAIL 3/10). REHABILITATE PER DETAIL

3/10 (A,B,C,D).

EXCAVATE TRAIL TO A MIN. OF 6" BELOW ADJACENT GRADE. CONTRACTOR MAY

USE THIS MATERIAL FOR NEW TRAIL CONSTRUCTION IF MATERIAL IS SUITABLE

AND WITH C.O. APPROVAL. BACKFILL WITH EXCESS EXCAVATION PER DETAIL

2/10.

NO EQUIPMENT OR DEMOLITION MATERIALS TO ENTER THE CREEK.

EXISTING TREE TO BE FELLED, CUT, DEBARKED, AND LOCATED PER C.O.

DIRECTION TO ACCT AS HABITAT ENHANCEMENT.

GENERAL DEMOLITION NOTES

1. REMOVE DEMOLITION ITEMS, DEBRIS, AND WASTE OFF NATIONAL FOREST

SYSTEM LAND, AND IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL

WASTE DISPOSAL REGULATIONS AND POLICIES UNLESS OTHERWISE NOTED.

2. UNLESS OTHERWISE NOTED, FILL ALL VOIDS CREATED FROM THE DEMOLITION

WORK WITH UNSUITABLE MATERIAL, TOPPED WITH SOIL AND REVEGETATED.

3. IF DESTRUCTION AND/OR DAMAGE OCCURS, REPLACE THE EFFECTED ITEM(S) IN

KIND AT NO EXPENSE TO THE OWNER.

4. PROTECT EXISTING VEGETATION FROM DAMAGE. FLAG VEGETATION IDENTIFIED

IN DRAWINGS TO BE REMOVED AND OBTAIN APPROVAL FROM C.O. PRIOR TO

REMOVAL.

5. FLAG TREES FOR REMOVAL AND NOTIFY C.O. IN ADVANCE OF FELLING. ALL

TREES TO BE REMOVED MUST BE APPROVED BY C.O.

NORTH

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

NO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/2 6/2

0 1 2:

B

LI

TT

LE

J:

\U

SF

-1 9-

A

NA

N

OB

SE

RV

AT

OR

Y

CD

S\

2 - C

AD

\S

HE

ET

S-

AN

AN

O

BS

ER

VA

TO

RY

.D

W G;

DRAWING SHEET NO.

DATE

ANAN WILDLIFE

OBSERVATORY

RECONSTRUCTION

TONGASS NATIONAL

FOREST

WRANGELL RANGER DISTRICT

6/26/2020 FS090523_R102013_L1-002.dwg

Corvus Design

BL

PB

ALASKA REGION

USF-19-01

R10

95% SUBMITTAL

OBSERVATORY

AREA DEMO

PLAN

00' 10' 20' 30'

SCALE: 1" = 10'-0" @22x34

OBSERVATORY AREA - DEMOLITION PLAN1

Elevation

Station

TRAIL PROFILE

-0+25 0+00 1+00 1+25

-0+25 0+00 1+00 1+25

APPROXIMATE LOCATION

OF OLD 'PIT TOILET" VAULT

PROPOSED

OBSERVATORY

RAMP

65.89

E 6098546.3865 N 3183347.4607

LEGEND

CUT (1.5H: 1V)

FILL (1.5H: 1V)

NORTH

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

NO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/2 6/2

0 1 2:

B

LI

TT

LE

J:

\U

SF

-1 9-

A

NA

N

OB

SE

RV

AT

OR

Y

CD

S\

2 - C

AD

\S

HE

ET

S-

AN

AN

O

BS

ER

VA

TO

RY

.D

W G;

DRAWING SHEET NO.

DATE

ANAN WILDLIFE

OBSERVATORY

RECONSTRUCTION

TONGASS NATIONAL

FOREST

WRANGELL RANGER DISTRICT

6/26/2020 FS090523_R102013_L1-002.dwg

Corvus Design

BL

PB

ALASKA REGION

USF-19-01

R10

95% SUBMITTAL

TRAIL

ALIGNMENT

PLAN

SEE THIS SHEET

NORTH

95% NOTE: TRAIL DESIGN CRITERIA CURRENTLY INCLUDES A 12% MAX.

LONGITUDINAL SLOPE AND THE USE OF 1.5H:1V SLOPES FOR CUT AND FILL SLOPES.

00' 20' 40' 60'

SCALE: 1" = 20'-0" @22x34

KEY PLAN1

00' 10' 20' 30'

SCALE: 1" = 10'-0" @22x34

TRAIL ALIGNMENT PLAN2

SCALE: NTS @22x34

TRAIL PROFILE3

65.89

A

H

G

F

1 2 3

A

H

G

F

1 2 3

PROPOSED TRAIL

APPROXIMATE LOCATION

OF OLD 'PIT TOILET" VAULT

EXISTING TRAIL

PROPOSED RAMP

PROPOSED

OBSERVATION

DECK

APPROXIMATE LOCATION

OF OLD 'PIT TOILET" VAULT

EXISTING SPRING BOARD

STUMP TO BE PROTECTED.

SOIL AND SALVAGE LEGEND

AREA FROM WHICH SOIL SHALL BE

REMOVED AND STOCKPILED

AREA FROM WHICH TRAIL SURFACE

SHALL BE REMOVED

AREA TO EXCAVATE TO BEDROCK.

INTENT IS TO MAXIMIZE MOVEMENT

BELOW BRIDGE AND PROVIDE

POSITIVE DRAINAGE. TAPER SOFT

SLOPES BACK AT 2H:1v.

65.89

A

H

G

F

1 2 3

A

H

G

F

1 2 3

PROPOSED TRAIL

APPROXIMATE LOCATION

OF OLD 'PIT TOILET" VAULT

EXISTING TRAIL

PROPOSED RAMP

PROPOSED

OBSERVATION

DECK

APPROXIMATE LOCATION

OF OLD 'PIT TOILET" VAULT

EXISTING SPRING BOARD

STUMP TO BE PROTECTED.

REVEGETATION LEGEND

PRIORITY USE OF VEGETATION

MATS

SECONDARY USE OF VEGETATION

MATS WITH PRIORITY ON SLOPES.

REMAINDER OF AREAS TO BE

REVEGETATED WITH SALVAGED

SOILS AND SEED MIX.

NORTH

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

NO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/2 6/2

0 1 2:

B

LI

TT

LE

J:

\U

SF

-1 9-

A

NA

N

OB

SE

RV

AT

OR

Y

CD

S\

2 - C

AD

\S

HE

ET

S-

AN

AN

O

BS

ER

VA

TO

RY

.D

W G;

DRAWING SHEET NO.

DATE

ANAN WILDLIFE

OBSERVATORY

RECONSTRUCTION

TONGASS NATIONAL

FOREST

WRANGELL RANGER DISTRICT

6/26/2020 FS090523_R102013_L1-002.dwg

Corvus Design

BL

PB

ALASKA REGION

USF-19-01

R10

95% SUBMITTAL

TRAIL

RESTORATION

PLAN

NORTH

95% NOTE: EXTENT OF REVEGETATION WILL BE FINALIZED TO MATCH LIMITS OF TRAIL

DISTURBANCE BASED ON FINAL TRAIL LENGTH, ALIGNMENT, AND SLOPES.

NOTE: REVEGETATE ALL AREAS OF EXISTING EXPOSED SOILS,

AND THOSE DISTURBED BY DEMOLITION AND CONSTRUCTION .

REVEGETATE EXISTING TRAIL WHERE DEMOLISHED, AND

AREAS DISTURBED BY CONSTRUCTION PER DETAIL 2/11.

00' 10' 20' 30'

SCALE: 1" = 10'-0" @22x34

SOIL AND SALVAGE PLAN2

00' 10' 20' 30'

SCALE: 1" = 10'-0" @22x34

REVEGETATION PLAN1

95% NOTE: DRAWING WILL BE EXPANDED TO

INCLUDE SMALL AREAS OF REVEGETATION

FOR REMAINDER OF SITE.

5'-0"

1-2% SLOPE TO

DOWNHILL SIDE

SLOPE STRUCTURAL

FILL AT 2H:1V

TRAIL SECTION - SET IN SLOPE

TRAIL SECTION - ABOVE GRADE

5'-0"

1-2% SLOPE TO

DOWNHILL SIDE

SLOPE STRUCTURAL

FILL AT 2H:1V

5'-0"

1-2% SLOPE TO

DOWNHILL SIDE

GRADE 1.5:1 MAX TO MEET

EXISTING GRADES

SLOPE STRUCTURAL

FILL AT 2H:1V

2" DEPTH AGGREGATE

SURFACE COURSE, GRADING

COMPACTED E-1

6" MIN. DEPTH WEAR

COURSE D1 MATERIAL

SLOPE STRUCTURAL

FILL AT 2H:1V TO MEET

EXISTING GRADE

SUBBASE

MATERIAL

COMPACTED

IN PLACE

TRAIL SECTION - FLUSH WITH GRADE

14" MIN. DEPTH COMPACTED

BASE COURSE

2" DEPTH AGGREGATE

SURFACE COURSE,

GRADING COMPACTED E-1

6" MIN. DEPTH WEAR

COURSE D1 MATERIAL

SLOPE STRUCTURAL

FILL AT 2H:1V TO MEET

EXISTING GRADE

SUBBASE

MATERIAL

COMPACTED

IN PLACE

14" MIN. DEPTH

COMPACTED BASE COURSE

2" DEPTH AGGREGATE

SURFACE COURSE,

GRADING COMPACTED E-1

6" MIN. DEPTH WEAR

COURSE D1 MATERIAL

SLOPE STRUCTURAL

FILL AT 2H:1V TO MEET

EXISTING GRADE

SUBBASE

MATERIAL

COMPACTED

IN PLACE

14" MIN. DEPTH

COMPACTED BASE COURSE

6" DEPTH SOIL AND VEGETATION MAT

GRADE 1.5:1 MAX TO MEET

EXISTING GRADES

SOIL AND VEGETATION MAT

GRADE 1.5:1 MAX TO MEET

EXISTING GRADES

SOIL AND REVEGETATION

FGFG

FG

FILL VOID WITH SOIL (OR

EXCESS EXCAVATION) AND

REVEGETATION MAT TO BE

FLUSH WITH ADJACENT

AFTER LIGHT COMPACTION.

EXISTING ADJACENT GRADE

EXISTING TRAIL SUBGRADE

FLUSH TRAIL - REMOVAL FLUSH TRAIL - REVEGETATION

EXISTING ADJACENT GRADE

MIN. AGGREGATE/SOIL

REMOVAL TO LEVEL 6" BELOW

EXISTING ADJACENT GRADE

MIN. AGGREGATE/SOIL

REMOVAL TO LEVEL 6" BELOW

EXISTING ADJACENT GRADE

EXISTING TRAIL SUBGRADE EXISTING TRAIL SUBGRADE

RAISED TRAIL - REMOVAL RAISED TRAIL - REVEGETATION

FILL VOID WITH SOIL (OR

EXCESS EXCAVATION) AND

REVEGETATION MAT TO BE

FLUSH WITH ADJACENT AFTER

SETTLING.

SUBGRADE: LOOSEN SURFACE

PRIOR TO PLACEMENT OF MAT

M i n

INSTALL STOCKPILED VEGETATION

MAT AND SOIL PER SPECIFICATIONS

FG

FG

EXISTING

SUBGRADE

0'-6"

FG

EXISTING

CONC.

FOOTING TO

BE REMOVED

B. CONCRETE FOOTING IN SOILS & ANCHORED TO ROCK

A. CONCRETE FOOTING IN SOILS

DEMOLITION REVEGETATION DEMOLITION REVEGETATION

CONC. FOOTING

INSTALL SOIL AND

REVEGETATION TO

DISTURBED AREAS

EXISTING

CONC.

FOOTING TO

BE REMOVED

PRIORITIZE FILL

WITH NON-USABLE

EXCAVATION

EXISTING

SUBGRADE

CONNECTIONS

TO BE CUT

FLUSH TO

ROCK

ROCK ROCK

C. CONCRETE PILES ANCHORED TO EXPOSED ROCK D. CONCRETE PILES ANCHORED TO EXPOSED ROCK WITH ANGULAR MODIFIED ROCK SURFACE

ADJUST SURFACE OF ALTERED

ROCK TO BLEND IN WITH

ADJACENT ROCK SURFACE

DEMOLITION FINISHED SURFACE

ROCK ROCK ROCK

DEMOLITION FINISHED SURFACE

ROCK

EXISTING

CONC.

FOOTING TO

BE REMOVED

EXISTING

CONC.

FOOTING TO

BE REMOVED

0'-6"

CONNECTIONS

TO BE CUT

FLUSH TO

ROCK

CONNECTIONS

TO BE CUT

FLUSH TO

ROCK

CONNECTIONS

TO BE CUT

FLUSH TO

ROCK

REMOVE ALL

CONCRETE FROM

SURFACES

REMOVE ALL

CONCRETE FROM

SURFACES

CONCRETE FOOTING COMPLETELY REMOVEDCONCRETE FOOTING PARTIALY REMOVED

INSTALL SOIL AND

REVEGETATION TO

DISTURBED AREAS

EXCAVATE/FILL AS NEEDED FOR

INSTALLATION OF ABUTMENT.

SEE STRUCTURAL

FOR BOARDWALK

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

NO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/2 6/2

0 1 2:

B

LI

TT

LE

J:

\U

SF

-1 9-

A

NA

N

OB

SE

RV

AT

OR

Y

CD

S\

2 - C

AD

\S

HE

ET

S-

AN

AN

O

BS

ER

VA

TO

RY

.D

W G;

DRAWING SHEET NO.

DATE

ANAN WILDLIFE

OBSERVATORY

RECONSTRUCTION

TONGASS NATIONAL

FOREST

WRANGELL RANGER DISTRICT

6/26/2020 FS090523_R102013_L1-002.dwg

Corvus Design

BL

PB

ALASKA REGION

USF-19-01

R10

95% SUBMITTAL

OBSERVATORY

AND TRAILS

DETAILS

SCALE: NTS @22x34

VEGETATION MAT4

SCALE: NTS @22x34

TRAIL SECTION1

SCALE: NTS @22x34

BOARDWALK - TRANSITION5

SCALE: NTS @22x34

EXISTING TRAIL - DEMOLITION AND REVEGETATION2

SCALE: NTS @22x34

EXISTING FOOTINGS - DEMOLITION AND REVEGETATION3

95% NOTE: DETAILS TO BE REFINED WITH USFS FOR DRAINAGE.

GENERAL DEMOLITION NOTES

1. DEMOLITION ITEMS, DEBRIS, AND WASTE MUST BE REMOVED AND DISPOSED OF OFF NATIONAL FOREST SYSTEM

LAND AND IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL WASTE DISPOSAL REGULATIONS AND

POLICIES. UNLESS OTHERWISE NOTED.

2. FILL VOIDS CREATED FROM THE DEMOLITION WORK WITH SUITABLE MATERIAL UNLESS OTHERWISE NOTED.

3. NO TREES ARE TO BE REMOVED OR DAMAGED UNLESS SHOWN ON THE DRAWINGS OR DIRECTED BY THE C.O. TO

DO SO.

4. FLAG TREES FOR REMOVAL AND NOTIFY PROJECT ENGINEER 48 HOURS IN ADVANCE OF FELLING. ALL TREES TO

BE REMOVED MUST BE APPROVED BY C.O.

5. FALL, BUCK AND STACK ALL FELLED TREES PER C.O. DIRECTION.

DEMOLITION SUMMARY

EXISTING THREE-SIDED TRAILHEAD STRUCTURE (8.05'X7.25'X8.45'). REMOVE ALL MATERIAL FROM EXISTING

THREE-SIDED TRAILHEAD STRUCTURE, INCLUDING BUT NOT LIMITED TO ALL FOUNDATION COMPONENTS.

REMOVE AND REINSTALL THE EXISTING STEEL BEAR PROOF CONTAINER AS SHOWN IN DRAWING 1/13. REMOVE

AND REINSTALL THE EXISTING INTERPRETIVE SIGNS AS SHOWN IN DRAWING 1/13.

CLEAR AND GRUB EXISTING VEGETATION AND SOIL TO CREATE LEVEL PAD FLUSH WITH ADJACENT TRAIL GRADE.

SLOPE 1% TOWARDS EDGES OF PAD.

DEMOLITION OF ADMIN. BUILDING

TOILET STRUCTURE TO BE RELOCATED APPROX. 300 FT NORTH

AT THE LOCATION OF THE EXISTING ADMINISTRATION BUILDING.

EXISTING TREE TO BE RETAINED

AND PROTECTED (TYP.)

PROPOSED EXTENT OF EXCAVATION

FOR NEW BUILDING PAD.

APPROX. LOCATION OF

EXISTING VERTICAL CUT SLOPE

APPROX. EXTENT OF FLAT

AREA NEEDED FOR PLACEMENT

OF RELOCATED STRUCTURE

TREE TO BE REMOVED

HATCH SHOWS EXTENT OF

PROPOSED ROCK REMOVAL

EXISTING STONE STEPS

EXISTING THREE

SIDED STRUCTURE

EXISTING TRAIL

TOILET STRUCTURE DEMOLITION NOTES

1. DEMOLITION ITEMS, DEBRIS, AND WASTE MUST BE

REMOVED OFF NATIONAL FOREST SYSTEM LAND AND IN

ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL

WASTE DISPOSAL REGULATIONS AND POLICIES, UNLESS

OTHERWISE NOTED.

2. NO TREES ARE TO BE REMOVED OR DAMAGED UNLESS

SHOWN ON THE DRAWINGS OR DIRECTED BY THE C.O.

TO DO SO.

3. FLAG TREES FOR REMOVAL AND NOTIFY PROJECT

ENGINEER 48 HOURS IN ADVANCE OF FELLING. ALL

TREES TO BE REMOVED MUST BE APPROVED BY C.O.

4. FALL, BUCK AND STACK ALL FELLED TREES PER C.O.

DIRECTION.

ADMINISTRATION BUILDING

DEMOLITION NOTES

1. LOCATION: EXISTING ADMINISTRATION BUILDING IS

12'-2" X 16'-2" WITH AN ATTACHED 12'-2" X 3'-9"

PORCH.

3. NO TREES ARE TO BE REMOVED OR DAMAGED

UNLESS SHOWN ON THE DRAWINGS OR DIRECTED

BY THE C.O. TO DO SO.

4. FLAG TREES FOR REMOVAL AND NOTIFY PROJECT

ENGINEER 48 HOURS IN ADVANCE OF FELLING. ALL

TREES TO BE REMOVED MUST BE APPROVED BY

C.O.

5. FALL, BUCK AND STACK ALL FELLED TREES PER C.O.

DIRECTION.

16'-2"

3'-9"

BUILDING PLAN

PHOTO 1

PHOTO 2

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

NO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/2 6/2

0 1 2:

B

LI

TT

LE

J:

\U

SF

-1 9-

A

NA

N

OB

SE

RV

AT

OR

Y

CD

S\

2 - C

AD

\S

HE

ET

S-

AN

AN

O

BS

ER

VA

TO

RY

.D

W G;

DRAWING SHEET NO.

DATE

ANAN WILDLIFE

OBSERVATORY

RECONSTRUCTION

TONGASS NATIONAL

FOREST

WRANGELL RANGER DISTRICT

6/26/2020 FS090523_R102013_L1-002.dwg

Corvus Design

BL

PB

ALASKA REGION

USF-19-01

R10

95% SUBMITTAL

TRAILHEAD

AREA

DEMOLITION

11NORTH

00' 5' 10' 15'

SCALE: 1" = 5'-0" @22x34

TRAILHEAD STRUCTURE DEMOLITION PLAN2

95% NOTE: PHOTOS WILL BE ADDED OF ADMIN.

BUILDING FOR CONTRACTOR INFORMATION.

SCALE: NTS @22x34

TOILET STRUCTURE DEMOLITION PLAN2

SCALE: NTS @22x34

ADMINISTRATION BUILDING - DEMOLITION PLAN3

EXISTING TRAIL

EXISTING TREES

SIGN: "WELCOME TO ANAN"

NOTE: ALL WORK NIC UNLESS NOTED OTHERWISE.

SIGNS: DIRECTIONAL

BEAR-PROOF CONTAINER

OBSERVATION SHELTER - EXISTING CONDITIONS

(2) INTERPRETIVE SIGNS TO BE

REINSTALLED INSIDE OF

SHELTER. PLACEMENT TO BE

FIELD LOCATED W/ C.O.

11'-10

"6'-10

7'-4

PLAN

FRONT ELEVATION SIDE ELEVATION

BOARDWALK, RAMP, OR

STAIRS TO TRANSITION

TO GRADE (TBD)

RELOCATED

TOILET BUILDING

CONC. PIER

COMPACTED AGGREGATE

COMPACTED SUBGRADE

EX. FG

95% NOTE: KEEP FLOOR STRUCTURE RAISED AND FREE DRAINING, AND PROVIDE EITHER

RAMPED, BOARDWALK OR STAIR ACCESS DEPENDING ON SITE CONDITIONS.

RELOCATED FLOOR

STRUCTURE PER

EXISTING

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

NO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/2 6/2

0 1 2:

B

LI

TT

LE

J:

\U

SF

-1 9-

A

NA

N

OB

SE

RV

AT

OR

Y

CD

S\

2 - C

AD

\S

HE

ET

S-

AN

AN

O

BS

ER

VA

TO

RY

.D

W G;

DRAWING SHEET NO.

DATE

ANAN WILDLIFE

OBSERVATORY

RECONSTRUCTION

TONGASS NATIONAL

FOREST

WRANGELL RANGER DISTRICT

6/26/2020 FS090523_R102013_L1-002.dwg

Corvus Design

BL

PB

ALASKA REGION

USF-19-01

R10

95% SUBMITTAL

TRAILHEAD

AREA LAYOUT

PLAN

95% NOTES: SHOW LOCATION OF TOILET

BUILDING REINSTALLATION ON PLANS.

95% NOTES: SIGN DETAILS

TO BE DEVELOPED.

NORTH

SCALE:

TRAILHEAD AREA - LAYOUT PLAN1

1/8" = 1'-0" @22x34

SCALE: NTS @22x34

TOILET STRUCTURE - EXISTING CONDITIONS2

SCALE: NTS @22x34

TOILET BUILDING SECTION3

REINSTALLED OBSERVATORY SHELTER

EXISTING TRAIL

PROPOSED EXTENT OF LEVEL AREA FOR NEW SHELTER.

EXCAVATE EXISTING SURFACE MATERIAL AS NEEDED TO

PROVIDE CLEARANCE AROUND OBSERVATORY SHELTER AS

SHOWN. GRADE TO PROVIDE POSITIVE DRAINAGE.

DESIGN NOTES:

1. ORIENT RIDGE PERPENDICULAR TO TRAIL

2. BLOCK OFF SIDE OPENING

2'-0" 2'-0"6'-0"

3'-0"4'-0"3'-0"

FRONT ELEVATION

S I D

E

E

L E

V A

T I O

N

S I D

E

E

L E

V A

T I O

N

REAR ELEVATION

NOTE: THIS DETAIL IS

ILLUSTRATIVE ONLY.

INFORMATION IS FROM

ORIGINAL CONSTRUCTION

DRAWINGS

MIN. 1'-0"

FG

TIMBER DECKING

D-LOGS (TYP.)

CONCRETE STEM WALL

LEDGER (TYP.)

BEAM

POST

EXISTING SUBGRADE

COMPACTED AGGREGATE FOOTING

AGGREGATE WEAR COURSE

2'-0"

0'-6"

AT GRADE GRAVEL PAD, SIM. SEE 1/10.

95% NOTE: NEEDS FINAL COORDINATION FOR

EXCAVATION, TREE REMOVAL, AND FOOTING DESIGN.

ADJACENT EDGE OF

PROPOSED EXCAVATION

NORTH

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

NO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/2 6/2

0 1 2:

B

LI

TT

LE

J:

\U

SF

-1 9-

A

NA

N

OB

SE

RV

AT

OR

Y

CD

S\

2 - C

AD

\S

HE

ET

S-

AN

AN

O

BS

ER

VA

TO

RY

.D

W G;

DRAWING SHEET NO.

DATE

ANAN WILDLIFE

OBSERVATORY

RECONSTRUCTION

TONGASS NATIONAL

FOREST

WRANGELL RANGER DISTRICT

6/26/2020 FS090523_R102013_L1-002.dwg

Corvus Design

BL

PB

ALASKA REGION

USF-19-01

R10

95% SUBMITTAL

RELOCATED

OBSERVATORY

SHELTER DETAILS

SCALE:

REINSTALLED OBSERVATION SHELTER - LAYOUT PLAN1

3/8" = 1'-0" @22x34

SCALE: NTS @22x34

REINSTALLED OBSERVATION SHELTER FOUNDATION2

SCALE: NTS @22x34

OBSERVATION SHELTER - EXISTING CONDITIONS3

95% NOTES: LEVEL OF CONTRACTOR

DIRECTION FOR REHABILITATION

SHOWN ON SHEETS TO BE CONFIRMED.

REFERENCE SPECIFICATIONS.

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

NO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/2 4/2

0 2 3:

D

AV

IN

B

LU

BA

UG

H G:

\20

\L

\L

-E

SE

RI

ES

.D W

G;

DRAWING SHEET NO.

DATE

ANAN WILDLIFE

OBSERVATORY

RECONSTRUCTION

TONGASS NATIONAL

FOREST

WRANGELL RANGER DISTRICT

6/26/2020 FS090523_R102013_L1-002.dwg

RSA Engineering

DB

FWS

ALASKA REGION

L9255

R10

95% SUBMITTAL

ELECTRICAL LEGEND,

SPECIFICATIONS,

AND PLANS

GENERAL NOTES:

OVERALL ELECTRICAL SITE PLAN

1" = 500' (APPROXIMATELY)

ENLARGED ELECTRICAL PLAN - OBSERVATORY

1" = 10'-0"

LEGEND

SHEET NOTES:

ELECTRICAL SPECIFICATIONS (CONTINUED ON NEXT SHEET)

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

NO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/2 4/2

0 2 3:

D

AV

IN

B

LU

BA

UG

H G:

\20

\L

\L

-E

SE

RI

ES

.D W

G;

DRAWING SHEET NO.

DATE

ANAN WILDLIFE

OBSERVATORY

RECONSTRUCTION

TONGASS NATIONAL

FOREST

WRANGELL RANGER DISTRICT

6/26/2020 FS090523_R102013_L1-002.dwg

RSA Engineering

DB

FWS

ALASKA REGION

L9255

R10

95% SUBMITTAL

ELECTRICAL

SPECIFICATIONS

ELECTRICAL SPECIFICATIONS

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

NO. REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

6/2 4/2

0 2 3:

D

AV

IN

B

LU

BA

UG

H G:

\20

\L

\L

-E

SE

RI

ES

.D W

G;

DRAWING SHEET NO.

DATE

ANAN WILDLIFE

OBSERVATORY

RECONSTRUCTION

TONGASS NATIONAL

FOREST

WRANGELL RANGER DISTRICT

6/26/2020 FS090523_R102013_L1-002.dwg

RSA Engineering

DB

FWS

ALASKA REGION

L9255

R10

95% SUBMITTAL

ELECTRICAL

DETAILS AND

SCHEDULES

LOAD SUMMARY

SHEET NOTES:

GENERAL NOTES:

CONDUIT & WIRE SCHEDULE

ELECTRICAL EQUIPMENT DETAIL

1" = 1'-0"

GROUNDING DETAIL

NO SCALE

POWER ONE-LINE DIAGRAM

NO SCALE

TELECOM AND CAMERA DETAIL

NO SCALE

2020-06-26 Anan 95% Landscape Set
Sheets and Views
Sheets-Anan Observatory-1
Decking and Structural Concept
Spiral Staircase Options
Decking and Structural Concept(2)
Demo Plan
Demo Plan(2)
Guardrail
Shelter Elevations
Demo Summary Table
Trail Section - Cut
Soil Salvage Plan
Soil Salvage Legend
Demolition Notes
Trai Profile
Trail Enlargment
Structure Plan
Key Plan(2)
Trail Plan
Soil Salvage Plan(2)
Key Plan(3)
Demo Plan(3)
Demolition General Notes
Bathroom Building
Shelter Plan
Shelter Details
Demolition Notes(2)
REVEGETATION - TRAIL ABOVE GRADE
Grid Coordinates
REVEGETATION MAT
Shelter Section
DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK
TOILED BUILDING - FOUNDATION
SIGN - INTERPRETIVE
BEAR-PROOF CONTAINER
BOARDWALK - TRANSITION
Trailhead Enlargement
Trail Cut and Fill Legend
TRAILHEAD AREA - LAYOUT PLAN
Observation Site Survey
TRAILHEAD AREA - LAYOUT PLAN(2)
Bathroom Building(2)
TOILED BUILDING - FOUNDATION(2)
TOILET STRUCTURE DEMOLITION PLAN
ADMINISTRATION BUILDING - DEMOLITION PLAN
Sheets-Anan Observatory-2
Decking and Structural Concept
Spiral Staircase Options
Decking and Structural Concept(2)
Demo Plan
Demo Plan(2)
Guardrail
Shelter Elevations
Demo Summary Table
Trail Section - Cut
Soil Salvage Plan
Soil Salvage Legend
Demolition Notes
Trai Profile
Trail Enlargment
Structure Plan
Key Plan(2)
Trail Plan
Soil Salvage Plan(2)
Key Plan(3)
Demo Plan(3)
Demolition General Notes
Bathroom Building
Shelter Plan
Shelter Details
Demolition Notes(2)
REVEGETATION - TRAIL ABOVE GRADE
Grid Coordinates
REVEGETATION MAT
Shelter Section
DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK
TOILED BUILDING - FOUNDATION
SIGN - INTERPRETIVE
BEAR-PROOF CONTAINER
BOARDWALK - TRANSITION
Trailhead Enlargement
Trail Cut and Fill Legend
TRAILHEAD AREA - LAYOUT PLAN
Observation Site Survey
TRAILHEAD AREA - LAYOUT PLAN(2)
Bathroom Building(2)
TOILED BUILDING - FOUNDATION(2)
TOILET STRUCTURE DEMOLITION PLAN
ADMINISTRATION BUILDING - DEMOLITION PLAN
Sheets-Anan Observatory-3
Decking and Structural Concept
Spiral Staircase Options
Decking and Structural Concept(2)
Demo Plan
Demo Plan(2)
Guardrail
Shelter Elevations
Demo Summary Table
Trail Section - Cut
Soil Salvage Plan
Soil Salvage Legend
Demolition Notes
Trai Profile
Trail Enlargment
Structure Plan
Key Plan(2)
Trail Plan
Soil Salvage Plan(2)
Key Plan(3)
Demo Plan(3)
Demolition General Notes
Bathroom Building
Shelter Plan
Shelter Details
Demolition Notes(2)
REVEGETATION - TRAIL ABOVE GRADE
Grid Coordinates
REVEGETATION MAT
Shelter Section
DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK
TOILED BUILDING - FOUNDATION
SIGN - INTERPRETIVE
BEAR-PROOF CONTAINER
BOARDWALK - TRANSITION
Trailhead Enlargement
Trail Cut and Fill Legend
TRAILHEAD AREA - LAYOUT PLAN
Observation Site Survey
TRAILHEAD AREA - LAYOUT PLAN(2)
Bathroom Building(2)
TOILED BUILDING - FOUNDATION(2)
TOILET STRUCTURE DEMOLITION PLAN
ADMINISTRATION BUILDING - DEMOLITION PLAN
Sheets-Anan Observatory-4
Decking and Structural Concept
Spiral Staircase Options
Decking and Structural Concept(2)
Demo Plan
Demo Plan(2)
Guardrail
Shelter Elevations
Demo Summary Table
Trail Section - Cut
Soil Salvage Plan
Soil Salvage Legend
Demolition Notes
Trai Profile
Trail Enlargment
Structure Plan
Key Plan(2)
Trail Plan
Soil Salvage Plan(2)
Key Plan(3)
Demo Plan(3)
Demolition General Notes
Bathroom Building
Shelter Plan
Shelter Details
Demolition Notes(2)
REVEGETATION - TRAIL ABOVE GRADE
Grid Coordinates
REVEGETATION MAT
Shelter Section
DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK
TOILED BUILDING - FOUNDATION
SIGN - INTERPRETIVE
BEAR-PROOF CONTAINER
BOARDWALK - TRANSITION
Trailhead Enlargement
Trail Cut and Fill Legend
TRAILHEAD AREA - LAYOUT PLAN
Observation Site Survey
TRAILHEAD AREA - LAYOUT PLAN(2)
Bathroom Building(2)
TOILED BUILDING - FOUNDATION(2)
TOILET STRUCTURE DEMOLITION PLAN
ADMINISTRATION BUILDING - DEMOLITION PLAN
Sheets-Anan Observatory-5
Decking and Structural Concept
Spiral Staircase Options
Decking and Structural Concept(2)
Demo Plan
Demo Plan(2)
Guardrail
Shelter Elevations
Demo Summary Table
Trail Section - Cut
Soil Salvage Plan
Soil Salvage Legend
Demolition Notes
Trai Profile
Trail Enlargment
Structure Plan
Key Plan(2)
Trail Plan
Soil Salvage Plan(2)
Key Plan(3)
Demo Plan(3)
Demolition General Notes
Bathroom Building
Shelter Plan
Shelter Details
Demolition Notes(2)
REVEGETATION - TRAIL ABOVE GRADE
Grid Coordinates
REVEGETATION MAT
Shelter Section
DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK
TOILED BUILDING - FOUNDATION
SIGN - INTERPRETIVE
BEAR-PROOF CONTAINER
BOARDWALK - TRANSITION
Trailhead Enlargement
Trail Cut and Fill Legend
TRAILHEAD AREA - LAYOUT PLAN
Observation Site Survey
TRAILHEAD AREA - LAYOUT PLAN(2)
Bathroom Building(2)
TOILED BUILDING - FOUNDATION(2)
TOILET STRUCTURE DEMOLITION PLAN
ADMINISTRATION BUILDING - DEMOLITION PLAN
Sheets-Anan Observatory-6
Decking and Structural Concept
Spiral Staircase Options
Decking and Structural Concept(2)
Demo Plan
Demo Plan(2)
Guardrail
Shelter Elevations
Demo Summary Table
Trail Section - Cut
Soil Salvage Plan
Soil Salvage Legend
Demolition Notes
Trai Profile
Trail Enlargment
Structure Plan
Key Plan(2)
Trail Plan
Soil Salvage Plan(2)
Key Plan(3)
Demo Plan(3)
Demolition General Notes
Bathroom Building
Shelter Plan
Shelter Details
Demolition Notes(2)
REVEGETATION - TRAIL ABOVE GRADE
Grid Coordinates
REVEGETATION MAT
Shelter Section
DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK
TOILED BUILDING - FOUNDATION
SIGN - INTERPRETIVE
BEAR-PROOF CONTAINER
BOARDWALK - TRANSITION
Trailhead Enlargement
Trail Cut and Fill Legend
TRAILHEAD AREA - LAYOUT PLAN
Observation Site Survey
TRAILHEAD AREA - LAYOUT PLAN(2)
Bathroom Building(2)
TOILED BUILDING - FOUNDATION(2)
TOILET STRUCTURE DEMOLITION PLAN
ADMINISTRATION BUILDING - DEMOLITION PLAN
Sheets-Anan Observatory-7
Decking and Structural Concept
Spiral Staircase Options
Decking and Structural Concept(2)
Demo Plan
Demo Plan(2)
Guardrail
Shelter Elevations
Demo Summary Table
Trail Section - Cut
Soil Salvage Plan
Soil Salvage Legend
Demolition Notes
Trai Profile
Trail Enlargment
Structure Plan
Key Plan(2)
Trail Plan
Soil Salvage Plan(2)
Key Plan(3)
Demo Plan(3)
Demolition General Notes
Bathroom Building
Shelter Plan
Shelter Details
Demolition Notes(2)
REVEGETATION - TRAIL ABOVE GRADE
Grid Coordinates
REVEGETATION MAT
Shelter Section
DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK
TOILED BUILDING - FOUNDATION
SIGN - INTERPRETIVE
BEAR-PROOF CONTAINER
BOARDWALK - TRANSITION
Trailhead Enlargement
Trail Cut and Fill Legend
TRAILHEAD AREA - LAYOUT PLAN
Observation Site Survey
TRAILHEAD AREA - LAYOUT PLAN(2)
Bathroom Building(2)
TOILED BUILDING - FOUNDATION(2)
TOILET STRUCTURE DEMOLITION PLAN
ADMINISTRATION BUILDING - DEMOLITION PLAN
Sheets-Anan Observatory-8
Decking and Structural Concept
Spiral Staircase Options
Decking and Structural Concept(2)
Demo Plan
Demo Plan(2)
Guardrail
Shelter Elevations
Demo Summary Table
Trail Section - Cut
Soil Salvage Plan
Soil Salvage Legend
Demolition Notes
Trai Profile
Trail Enlargment
Structure Plan
Key Plan(2)
Trail Plan
Soil Salvage Plan(2)
Key Plan(3)
Demo Plan(3)
Demolition General Notes
Bathroom Building
Shelter Plan
Shelter Details
Demolition Notes(2)
REVEGETATION - TRAIL ABOVE GRADE
Grid Coordinates
REVEGETATION MAT
Shelter Section
DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK
TOILED BUILDING - FOUNDATION
SIGN - INTERPRETIVE
BEAR-PROOF CONTAINER
BOARDWALK - TRANSITION
Trailhead Enlargement
Trail Cut and Fill Legend
TRAILHEAD AREA - LAYOUT PLAN
Observation Site Survey
TRAILHEAD AREA - LAYOUT PLAN(2)
Bathroom Building(2)
TOILED BUILDING - FOUNDATION(2)
TOILET STRUCTURE DEMOLITION PLAN
ADMINISTRATION BUILDING - DEMOLITION PLAN
Sheets-Anan Observatory-9
Decking and Structural Concept
Spiral Staircase Options
Decking and Structural Concept(2)
Demo Plan
Demo Plan(2)
Guardrail
Shelter Elevations
Demo Summary Table
Trail Section - Cut
Soil Salvage Plan
Soil Salvage Legend
Demolition Notes
Trai Profile
Trail Enlargment
Structure Plan
Key Plan(2)
Trail Plan
Soil Salvage Plan(2)
Key Plan(3)
Demo Plan(3)
Demolition General Notes
Bathroom Building
Shelter Plan
Shelter Details
Demolition Notes(2)
REVEGETATION - TRAIL ABOVE GRADE
Grid Coordinates
REVEGETATION MAT
Shelter Section
DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK
TOILED BUILDING - FOUNDATION
SIGN - INTERPRETIVE
BEAR-PROOF CONTAINER
BOARDWALK - TRANSITION
Trailhead Enlargement
Trail Cut and Fill Legend
TRAILHEAD AREA - LAYOUT PLAN
Observation Site Survey
TRAILHEAD AREA - LAYOUT PLAN(2)
Bathroom Building(2)
TOILED BUILDING - FOUNDATION(2)
TOILET STRUCTURE DEMOLITION PLAN
ADMINISTRATION BUILDING - DEMOLITION PLAN
Sheets-Anan Observatory-10
Decking and Structural Concept
Spiral Staircase Options
Decking and Structural Concept(2)
Demo Plan
Demo Plan(2)
Guardrail
Shelter Elevations
Demo Summary Table
Trail Section - Cut
Soil Salvage Plan
Soil Salvage Legend
Demolition Notes
Trai Profile
Trail Enlargment
Structure Plan
Key Plan(2)
Trail Plan
Soil Salvage Plan(2)
Key Plan(3)
Demo Plan(3)
Demolition General Notes
Bathroom Building
Shelter Plan
Shelter Details
Demolition Notes(2)
REVEGETATION - TRAIL ABOVE GRADE
Grid Coordinates
REVEGETATION MAT
Shelter Section
DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK
TOILED BUILDING - FOUNDATION
SIGN - INTERPRETIVE
BEAR-PROOF CONTAINER
BOARDWALK - TRANSITION
Trailhead Enlargement
Trail Cut and Fill Legend
TRAILHEAD AREA - LAYOUT PLAN
Observation Site Survey
TRAILHEAD AREA - LAYOUT PLAN(2)
Bathroom Building(2)
TOILED BUILDING - FOUNDATION(2)
TOILET STRUCTURE DEMOLITION PLAN
ADMINISTRATION BUILDING - DEMOLITION PLAN
Sheets-Anan Observatory-11
Decking and Structural Concept
Spiral Staircase Options
Decking and Structural Concept(2)
Demo Plan
Demo Plan(2)
Guardrail
Shelter Elevations
Demo Summary Table
Trail Section - Cut
Soil Salvage Plan
Soil Salvage Legend
Demolition Notes
Trai Profile
Trail Enlargment
Structure Plan
Key Plan(2)
Trail Plan
Soil Salvage Plan(2)
Key Plan(3)
Demo Plan(3)
Demolition General Notes
Bathroom Building
Shelter Plan
Shelter Details
Demolition Notes(2)
REVEGETATION - TRAIL ABOVE GRADE
Grid Coordinates
REVEGETATION MAT
Shelter Section
DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK
TOILED BUILDING - FOUNDATION
SIGN - INTERPRETIVE
BEAR-PROOF CONTAINER
BOARDWALK - TRANSITION
Trailhead Enlargement
Trail Cut and Fill Legend
TRAILHEAD AREA - LAYOUT PLAN
Observation Site Survey
TRAILHEAD AREA - LAYOUT PLAN(2)
Bathroom Building(2)
TOILED BUILDING - FOUNDATION(2)
TOILET STRUCTURE DEMOLITION PLAN
ADMINISTRATION BUILDING - DEMOLITION PLAN
Sheets-Anan Observatory-12
Decking and Structural Concept
Spiral Staircase Options
Decking and Structural Concept(2)
Demo Plan
Demo Plan(2)
Guardrail
Shelter Elevations
Demo Summary Table
Trail Section - Cut
Soil Salvage Plan
Soil Salvage Legend
Demolition Notes
Trai Profile
Trail Enlargment
Structure Plan
Key Plan(2)
Trail Plan
Soil Salvage Plan(2)
Key Plan(3)
Demo Plan(3)
Demolition General Notes
Bathroom Building
Shelter Plan
Shelter Details
Demolition Notes(2)
REVEGETATION - TRAIL ABOVE GRADE
Grid Coordinates
REVEGETATION MAT
Shelter Section
DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK
TOILED BUILDING - FOUNDATION
SIGN - INTERPRETIVE
BEAR-PROOF CONTAINER
BOARDWALK - TRANSITION
Trailhead Enlargement
Trail Cut and Fill Legend
TRAILHEAD AREA - LAYOUT PLAN
Observation Site Survey
TRAILHEAD AREA - LAYOUT PLAN(2)
Bathroom Building(2)
TOILED BUILDING - FOUNDATION(2)
TOILET STRUCTURE DEMOLITION PLAN
ADMINISTRATION BUILDING - DEMOLITION PLAN
Sheets-Anan Observatory-13
Decking and Structural Concept
Spiral Staircase Options
Decking and Structural Concept(2)
Demo Plan
Demo Plan(2)
Guardrail
Shelter Elevations
Demo Summary Table
Trail Section - Cut
Soil Salvage Plan
Soil Salvage Legend
Demolition Notes
Trai Profile
Trail Enlargment
Structure Plan
Key Plan(2)
Trail Plan
Soil Salvage Plan(2)
Key Plan(3)
Demo Plan(3)
Demolition General Notes
Bathroom Building
Shelter Plan
Shelter Details
Demolition Notes(2)
REVEGETATION - TRAIL ABOVE GRADE
Grid Coordinates
REVEGETATION MAT
Shelter Section
DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK
TOILED BUILDING - FOUNDATION
SIGN - INTERPRETIVE
BEAR-PROOF CONTAINER
BOARDWALK - TRANSITION
Trailhead Enlargement
Trail Cut and Fill Legend
TRAILHEAD AREA - LAYOUT PLAN
Observation Site Survey
TRAILHEAD AREA - LAYOUT PLAN(2)
Bathroom Building(2)
TOILED BUILDING - FOUNDATION(2)
TOILET STRUCTURE DEMOLITION PLAN
ADMINISTRATION BUILDING - DEMOLITION PLAN
172094 Anan
Anan 95% Electrical Set - 6-26-20
Sheets and Views
L9255-Eseries-E101
L9255-Eseries-E102
L9255-Eseries-E103

File details come from the government source that posted it. Updated .