Anan 95-percent Drawings.pdf
PDF 29 MB Posted
- Solicitation number
- 12010920R0008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment006.pdf | ||
| FH20-I-0077.PDF | ||
| Amendment 005.pdf | ||
| Amendment 004.pdf | ||
| 7 - Ex Admin Bldg.zip | ZIP file | |
| 9 - Upper Falls.zip | ZIP file | |
| 5 - Ex Obs - Shelter.zip | ZIP file | |
| Errata Sheet.docx | DOCX document | |
| 3 - Ex Obs - Lower Deck.zip | ZIP file | |
| 1 - Ex Obs - Upper Deck.zip | ZIP file | |
| 6 - Ex Obs - Trail.zip | ZIP file | |
| 4 - Ex Obs - Toilet Bldg.zip | ZIP file | |
| 0 - General.zip | ZIP file | |
| 2 - Ex Obs - Stairs.zip | ZIP file | |
| 8 - High Tide Access.zip | ZIP file | |
| Amendment 003.pdf | ||
| Final Construction Drawing Specifications.pdf | ||
| Final Construction Drawings.pdf | ||
| Amendment 002.pdf | ||
| Geological Report.pdf | ||
| Soil and Water.pdf | ||
| Amendment 001.pdf | ||
| SF24-16d Bid Bond Form.pdf | ||
| 12010920R0008_Anan_Observatory_RFP.pdf | ||
| Water_Quality_Mgmt_BMPs_April2012.pdf | ||
| Wage Determination AK2020001.pdf | ||
| Anan 95-percent Technical Specifications.pdf | ||
| 12010920R0008_Anan_Observatory_RFP.pdf | ||
| Photographs.pdf |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION
VICINITY MAP
TRAVEL DIRECTIONS:
SHEET OF
UNITED STATES DEPARTMENT OF AGRICULTURE
FOREST SERVICE
ANAN WILDLIFE OBSERVATORY RECONSTRUCTION
THE ANAN WILDLIFE OBSERVATORY IS LOCATED 35 AIR MILES SE OF WRANGELL, ALASKA, ON THE
CLEVELAND PENINSULA. ACCESS TO ANAN BAY IS BY A 35-MINUTE FLOAT PLANE FLIGHT OR
90-MINUTE BOAT RIDE FROM WRANGELL. THE TRAILHEAD IS LOCATED ON THE SHORE OF ANAN BAY, AT THE MOUTH OF THE SALTWATER LAGOON. THE HALF MILE TRAIL LEADS THROUGH THE RAIN
FOREST ALONG THE EDGE OF THE LAGOON TO ANAN CREEK, WHICH IT FOLLOWS BRIEFLY BEFORE
REACHING THE OBSERVATORY SITE. THE LATITUDE AND LONGITUDE OF THE OBSERVATORY SITE ARE
APPROXIMATELY 56.179032° N, -131.883935° W.
PROJECT LOCATION
JUNE 26, 2020 95% CONSTRUCTION DOCUMENTS
RECOMMENDED BY:
APPROVED:
DIRECTOR OF ENGINEERING DATE
FOREST SUPERVISOR DATE
B
L I T
T L
E
J
U
S F
A
N A
N
O
B S
E R
V A
T O
R Y
C
D S
C
A D
S
H E
E T
S A
N A
N
O
B S
E R
V A
T O
R Y
D
W G
ALASKA
(R-10) ALASKA REGION
TONGASS NATIONAL FOREST
WRANGELL RANGER DISTRICT
INDEX OF SHEETS
SHEET SHEET TITLE DATE
1 COVER SHEET
2 ABBREVIATIONS & NOTES
3 VICINITY MAP
4 SITE SURVEY - EXISTING CONDITIONS
5 SITE SURVEY - ROCK PROBES
6 OBSERVATORY AREA DEMO PLAN
7 OBSERVATORY AREA LAYOUT PLAN
8 TRAIL ALIGNMENT PLAN
9 TRAIL RESTORATION PLAN
10 OBSERVATORY AND TRAILS DETAILS
11 TRAILHEAD AREA DEMOLITION
12 TRAILHEAD AREA LAYOUT PLAN
RELOCATED OBSERVATORY SHELTER
DETAILS
14 GENERAL NOTES
15 FRAMING PLAN
LOWER DECK FRAMING PLANS & STAIR
FOUNDATION DETAIL
17 LOWER DECK SECTION AND ELEVATION
18 LOWER DECK SECTION AND ELEVATION
19 SPIRAL STAIRCASE LANDING DETAILS
20 SPIRAL STAIRCASE LANDING DETAILS
21 SPIRAL STAIRCASE LANDING DETAILS
22 UPPER DECK FOUNDATION DETAILS
23 UPPER DECK FRAMING DETAILS
24 UPPER DECK FRAMING DETAILS
25 FRAMING SECTION AND DETAILS
WALKWAY SECTION DETAILS AND RAILING
DETAILS
ELECTRICAL LEGEND, SPECIFICATIONS, AND
PLANS
28 ELECTRICAL SPECIFICATIONS
29 ELECTRICAL DETAILS AND SCHEDULES
REVIEWED BY:
DISTRICT RANGER DATE
FOREST ENGINEERING STAFF OFFICER DATE
FOREST RECREATION STAFF OFFICER DATE
DIRECTOR OF RECREATION DATE
lwild02 Not For Construction
REVISION SYMBOL
DETAIL
SECTION/ELEVATION
DETAIL IDENTIFICATION
SHEET IDENTIFICATION
SHEET IDENTIFICATION
DETAIL IDENTIFICATION
REVISION NUMBER
ABBREVIATIONS: GENERAL NOTES:
Note:
1. ADDITIONAL ABBREVIATIONS, SYMBOLS AND INDICATORS MAY APPEAR IN THESE DRAWINGS.
REFER TO APPROPRIATE SHEETS FOR IDENTIFICATION AND CLARIFICATION.
4%
SPOT ELEVATION
SLOPE
EXISTING GRADE
PROPOSED GRADE
& AND
@ AT
CENTERLINE
Ø DIAMETER OR ROUND
A
ADJ ADJACENT
AGGR AGGREGATE
APPROX APPROXIMATE
B
B&B BALLED AND BURLAP
BLDG BUILDING
BOW BOTTOM OF WALL
BR BAREROOT
C
CF CUBIC FOOT/FEET
CG CONTAINER GROWN
CO CONTRACTING OFFICER
CONC CONCRETE
CONT CONTINUOUS
CTR CENTER
CY CUBIC YARD(S)
D
DEC DEPARTMENT OF
ENVIRONMENTAL
CONSERVATION
DEMO DEMOLISH, DEMOLITION
DET DETAIL
DIA DIAMETER
DIM DIMENSION
E
E EAST
EA EACH
ELEC ELECTRICAL
ELEV ELEVATION
EQ EQUAL
EX. EXISTING
EXT EXTERIOR
F
FND FOUNDATION
FFE FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FT FOOT/FEET
FTG FOOTING
G
GA GAUGE
GALV GALVANIZED
GR GRADE
H
HORZ HORIZONTAL
HP HIGH POINT
HT HEIGHT
I
ID INSIDE DIAMETER
IN INCH
L
LF LINEAL FEET
LP LOW POINT
M
MAX MAXIMUM
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
N
N NORTH
NFS NON-FROST SUSCEPTIBLE
NO NUMBER
NTS NOT TO SCALE
O
OC ON CENTER
OD OUTSIDE DIAMETER
P
PT PRESSURE TREATED
R
R RADIUS
REF REFERENCE
REINF REINFORCED
REV REVISION
S
S SOUTH
SECT SECTION
SF SQUARE FOOT
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STA STATION
STD STANDARD
STRUCT STRUCTURAL
SY SQUARE YARD
T
TBD TO BE DETERMINED
TEMP TEMPORARY
TOW TOP OF WALL
TYP TYPICAL
U
UON UNLESS OTHERWISE NOTED
V
VERT VERTICAL
VIF VERIFY IN FIELD
W
W WEST
W/ WITH
W/O WITHOUT
WP WATERPROOF
WWF WELDED WIRE FABRIC
/MESH
100.10
L
C
L
C
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
NO. REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/2 6/2
0 1 2:
B
LI
TT
LE
J:
\U
SF
-1 9-
A
NA
N
OB
SE
RV
AT
OR
Y
CD
S\
2 - C
AD
\S
HE
ET
S-
AN
AN
O
BS
ER
VA
TO
RY
.D
W G;
DRAWING SHEET NO.
DATE
ANAN WILDLIFE
OBSERVATORY
RECONSTRUCTION
TONGASS NATIONAL
FOREST
WRANGELL RANGER DISTRICT
6/26/2020 FS090523_R102013_L1-002.dwg
Corvus Design
BL
PB
ALASKA REGION
USF-19-01
R10
95% SUBMITTAL
ABBREVIATIONS
& NOTES
1. SURVEY CONTROL POINTS ARE NOTED ON PLANS. MAINTAIN ON-SITE SURVEY
CONTROL DURING CONSTRUCTION.
2. THE CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION STAKING AND
THE SECURITY OF STAKING DURING CONSTRUCTION. ANY RE-STAKING DUE
TO THIRD PARTY DAMAGE OR ENVIRONMENTAL DAMAGE OR OBSCURATION IS
THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
3. ALL CONSTRUCTION IN THE CONTRACT DOCUMENTS SHALL USE THE ON-SITE
SURVEY CONTROL POINTS. FIELD VERIFY LOCATIONS AND ELEVATIONS, AND
REPORT ANY DISCREPANCY TO THE C.O.
4. KEEP A CURRENT, CLEAN, DRY SET OF THE RECORD DRAWINGS AND ANY
AMENDMENTS TO IT AND A SET OF TECHNICAL SPECIFICATION ON-SITE AT ALL
TIMES. REDLINE ACTUAL LOCATIONS AND DIMENSIONS FOR VERTICAL AND
HORIZONTAL LOCATIONS OR PROPOSED CONSTRUCTION, UTILITIES,
STRUCTURES, SERVICES AND OTHER DETAILS NOT SHOWN ON THE ORIGINAL
DRAWINGS. SUBMIT RECORD DRAWINGS TO THE C.O. UPON COMPLETION OF
THE WORK.
5. A LICENSED LAND SURVEYOR SHALL SURVEY THE NECESSARY COORDINATES
FOR THE CONSTRUCTION OF THE PROJECT. THE SURVEYOR MUST CERTIFY IN
A LETTER TO THE C.O. THAT THESE COORDINATES AND ELEVATIONS
CONFORM TO THE APPROVED PLANS AND SPECIFICATIONS. ANY DEVIATIONS
SHALL BE NOTED IN THE LETTER AND THEN RESOLVED WITH THE C.O. BEFORE
INSTALLATION OF ANY SITE IMPROVEMENTS.
6. NOTIFY THE C.O. PRIOR TO BEGINNING CONSTRUCTION IF A CONFLICT EXISTS
AND/OR A DESIGN MODIFICATION IS REQUIRED .
7. VERIFY THE EXISTENCE OF ALL UNDERGROUND CONSTRUCTION WITHIN THE
LIMITS OF WORK BEFORE COMMENCING NEW CONSTRUCTION.
8. OBTAIN ALL PERMITS REQUIRED TO COMPLETE THE PROJECT.
9. THE CONTRACTOR SHALL PREPARE AN EROSION AND SEDIMENT CONTROL
PLAN AND STORM WATER POLLUTION PREVENTION PLAN FOR C.O. AND DEC
APPROVAL.
REFERENCE INDICATIONS:
95% NOTE: THIS SHEET WILL BE EDITED TO REMOVE INFORMATION INCLUDED WITHIN SPECIFICATIONS, AND TO
ONLY SHOW INFORMATION AND ABBREVIATIONS USED IN RELEVANT SHEETS.
95% Note: Does USFS have an archive # format for this part of the tittleblock?
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
NO. REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/2 6/2
0 1 2:
B
LI
TT
LE
J:
\U
SF
-1 9-
A
NA
N
OB
SE
RV
AT
OR
Y
CD
S\
2 - C
AD
\S
HE
ET
S-
AN
AN
O
BS
ER
VA
TO
RY
.D
W G;
DRAWING SHEET NO.
DATE
ANAN WILDLIFE
OBSERVATORY
RECONSTRUCTION
TONGASS NATIONAL
FOREST
WRANGELL RANGER DISTRICT
6/26/2020 FS090523_R102013_L1-002.dwg
Corvus Design
BL
PB
ALASKA REGION
USF-19-01
R10
95% SUBMITTAL
VICINITY MAP
NORTH
ANAN CREEK TRAIL
ANAN BAY CABIN (FOR
REFERENCE ONLY).
TRAILHEAD AREA
HIGH TIDE ACCESS AN
BEGINNING OF EXISTING
AGGREGATE TRAIL
ANAN WILDLIFE
OBSERVATORY.
95% NOTE: FOR STRUCTURAL DESIGN PURPOSES, A NUMBER OF SITE
SECTION WERE DEVELOPED BY SURVEY. SHOULD THESE BE INCLUDED
FOR 100% SET AS ADDITIONAL INFORMATION FOR CONTRACTOR?
95% NOTE: WE NORMALLY PROVIDE SURVEY AS PROVIDED
BY SURVEYOR. WE WILL ISSUE THEM PROJECT TITLEBLOCK
TO REISSUE THIS SHEET TO BE CONSISTENT WITH SET.
95% NOTE: PROPOSED PROJECT
INFORMATION TO BE REMOVED FROM
EXISTING CONDITIONS SURVEY.
95% NOTE: 100% SET WILL INCLUDE PROBE
DEPTHS FOR CONTRACTOR'S INFORMATION.
EXISTING CONCRETE
WALL TO REMAIN
EXISTING TOILET
STRUCTURE
EXISTING SHELTER
EXISTING SPRING BOARD
STUMP TO BE PROTECTED.
EXISTING TREES AND
OTHER VEGETATION
TO BE PROTECTED
LIMIT OF WORK -
OBSERVATORY AREA
APPROX. LOCATION OF
OLD "PIT TOILET" VAULT
ANAN CREEK
DEMOLITION SUMMARY
REMOVE OBSERVATORY SHELTER AND REINSTALL AT THE TRAILHEAD.
REPLACE ANY ROTTEN OR DAMAGED MATERIAL DURING REASSEMBLY OF
SHELTER, SEE SPECS. SEE SHEET 13 FOR DETAILS AND PLACEMENT OF
SHELTER.
REMOVE TOILET STRUCTURE AND REINSTALL AT A LOCATION DETERMINED BY
THE C.O. APPROXIMATELY 300 FEET NORTH OF THE TRAILHEAD AT THE
LOCATION OF THE EXISTING ADMINISTRATION BUILDING. STAKE TOILET
STRUCTURE CORNERS FOR C.O. APPROVAL. IF TRANSPORTATION OF FULLY
ASSEMBLED STRUCTURE IS NOT POSSIBLE, DISASSEMBLE AND REINSTALL WITH
IN KIND MATERIALS. REPLACE ANY DAMAGED MATERIAL DURING
RELOCATION/REASSEMBLY.
REMOVE ALL MATERIAL FROM LOWER DECK, INCLUDING BUT NOT LIMITED TO
DECKING, BEAMS, JOISTS, POSTS, GUARDRAIL SYSTEMS, CANOPY SYSTEM, AND
FOOTING AND FOUNDATION COMPONENTS.
REMOVE ALL MATERIAL FROM STAIRS CONNECTING UPPER AND LOWER DECKS,
INCLUDING BUT NOT LIMITED TO DECKING, BEAMS, JOISTS, POSTS, GUARDRAIL
SYSTEMS, AND FOOTING AND FOUNDATION COMPONENTS. CUT ALL EXISTING
BOLTS, BRACKETS, OR OTHER ELEMENTS CAST INTO ROCK OR EXISTING
CONCRETE WALL FLUSH WITH SURFACE. REMOVE ALL CONCRETE FOOTINGS
FROM UNDER STEPS. IF CONCRETE FOOTINGS CANNOT BE FULLY REMOVED,
TOP OF FOOTING TO BE LEFT 6" BELOW SOFT SURFACES OR FLUSH WITH ROCK
SURFACES (SEE DETAIL 3/10 FOR INTENT).
REMOVE ALL MATERIAL FROM UPPER DECK INCLUDING BUT NOT LIMITED TO
DECKING, BEAMS, JOISTS, POSTS, FOOTING AND FOUNDATION COMPONENTS,
AND GUARDRAIL SYSTEMS. REMOVE ALL CONCRETE FOOTING AND
FOUNDATION COMPONENTS FROM UNDER PLATFORM. IF CONCRETE PILES
CANNOT BE FULLY REMOVED, TOP OF FOOTING TO BE LEFT 6" BELOW
ADJACENT FINISHED SURFACE (SEE DETAIL 3/10). REHABILITATE PER DETAIL
3/10 (A,B,C,D).
EXCAVATE TRAIL TO A MIN. OF 6" BELOW ADJACENT GRADE. CONTRACTOR MAY
USE THIS MATERIAL FOR NEW TRAIL CONSTRUCTION IF MATERIAL IS SUITABLE
AND WITH C.O. APPROVAL. BACKFILL WITH EXCESS EXCAVATION PER DETAIL
2/10.
NO EQUIPMENT OR DEMOLITION MATERIALS TO ENTER THE CREEK.
EXISTING TREE TO BE FELLED, CUT, DEBARKED, AND LOCATED PER C.O.
DIRECTION TO ACCT AS HABITAT ENHANCEMENT.
GENERAL DEMOLITION NOTES
1. REMOVE DEMOLITION ITEMS, DEBRIS, AND WASTE OFF NATIONAL FOREST
SYSTEM LAND, AND IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL
WASTE DISPOSAL REGULATIONS AND POLICIES UNLESS OTHERWISE NOTED.
2. UNLESS OTHERWISE NOTED, FILL ALL VOIDS CREATED FROM THE DEMOLITION
WORK WITH UNSUITABLE MATERIAL, TOPPED WITH SOIL AND REVEGETATED.
3. IF DESTRUCTION AND/OR DAMAGE OCCURS, REPLACE THE EFFECTED ITEM(S) IN
KIND AT NO EXPENSE TO THE OWNER.
4. PROTECT EXISTING VEGETATION FROM DAMAGE. FLAG VEGETATION IDENTIFIED
IN DRAWINGS TO BE REMOVED AND OBTAIN APPROVAL FROM C.O. PRIOR TO
REMOVAL.
5. FLAG TREES FOR REMOVAL AND NOTIFY C.O. IN ADVANCE OF FELLING. ALL
TREES TO BE REMOVED MUST BE APPROVED BY C.O.
NORTH
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
NO. REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/2 6/2
0 1 2:
B
LI
TT
LE
J:
\U
SF
-1 9-
A
NA
N
OB
SE
RV
AT
OR
Y
CD
S\
2 - C
AD
\S
HE
ET
S-
AN
AN
O
BS
ER
VA
TO
RY
.D
W G;
DRAWING SHEET NO.
DATE
ANAN WILDLIFE
OBSERVATORY
RECONSTRUCTION
TONGASS NATIONAL
FOREST
WRANGELL RANGER DISTRICT
6/26/2020 FS090523_R102013_L1-002.dwg
Corvus Design
BL
PB
ALASKA REGION
USF-19-01
R10
95% SUBMITTAL
OBSERVATORY
AREA DEMO
PLAN
00' 10' 20' 30'
SCALE: 1" = 10'-0" @22x34
OBSERVATORY AREA - DEMOLITION PLAN1
Elevation
Station
TRAIL PROFILE
-0+25 0+00 1+00 1+25
-0+25 0+00 1+00 1+25
APPROXIMATE LOCATION
OF OLD 'PIT TOILET" VAULT
PROPOSED
OBSERVATORY
RAMP
65.89
E 6098546.3865 N 3183347.4607
LEGEND
CUT (1.5H: 1V)
FILL (1.5H: 1V)
NORTH
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
NO. REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/2 6/2
0 1 2:
B
LI
TT
LE
J:
\U
SF
-1 9-
A
NA
N
OB
SE
RV
AT
OR
Y
CD
S\
2 - C
AD
\S
HE
ET
S-
AN
AN
O
BS
ER
VA
TO
RY
.D
W G;
DRAWING SHEET NO.
DATE
ANAN WILDLIFE
OBSERVATORY
RECONSTRUCTION
TONGASS NATIONAL
FOREST
WRANGELL RANGER DISTRICT
6/26/2020 FS090523_R102013_L1-002.dwg
Corvus Design
BL
PB
ALASKA REGION
USF-19-01
R10
95% SUBMITTAL
TRAIL
ALIGNMENT
PLAN
SEE THIS SHEET
NORTH
95% NOTE: TRAIL DESIGN CRITERIA CURRENTLY INCLUDES A 12% MAX.
LONGITUDINAL SLOPE AND THE USE OF 1.5H:1V SLOPES FOR CUT AND FILL SLOPES.
00' 20' 40' 60'
SCALE: 1" = 20'-0" @22x34
KEY PLAN1
00' 10' 20' 30'
SCALE: 1" = 10'-0" @22x34
TRAIL ALIGNMENT PLAN2
SCALE: NTS @22x34
TRAIL PROFILE3
65.89
A
H
G
F
1 2 3
A
H
G
F
1 2 3
PROPOSED TRAIL
APPROXIMATE LOCATION
OF OLD 'PIT TOILET" VAULT
EXISTING TRAIL
PROPOSED RAMP
PROPOSED
OBSERVATION
DECK
APPROXIMATE LOCATION
OF OLD 'PIT TOILET" VAULT
EXISTING SPRING BOARD
STUMP TO BE PROTECTED.
SOIL AND SALVAGE LEGEND
AREA FROM WHICH SOIL SHALL BE
REMOVED AND STOCKPILED
AREA FROM WHICH TRAIL SURFACE
SHALL BE REMOVED
AREA TO EXCAVATE TO BEDROCK.
INTENT IS TO MAXIMIZE MOVEMENT
BELOW BRIDGE AND PROVIDE
POSITIVE DRAINAGE. TAPER SOFT
SLOPES BACK AT 2H:1v.
65.89
A
H
G
F
1 2 3
A
H
G
F
1 2 3
PROPOSED TRAIL
APPROXIMATE LOCATION
OF OLD 'PIT TOILET" VAULT
EXISTING TRAIL
PROPOSED RAMP
PROPOSED
OBSERVATION
DECK
APPROXIMATE LOCATION
OF OLD 'PIT TOILET" VAULT
EXISTING SPRING BOARD
STUMP TO BE PROTECTED.
REVEGETATION LEGEND
PRIORITY USE OF VEGETATION
MATS
SECONDARY USE OF VEGETATION
MATS WITH PRIORITY ON SLOPES.
REMAINDER OF AREAS TO BE
REVEGETATED WITH SALVAGED
SOILS AND SEED MIX.
NORTH
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
NO. REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/2 6/2
0 1 2:
B
LI
TT
LE
J:
\U
SF
-1 9-
A
NA
N
OB
SE
RV
AT
OR
Y
CD
S\
2 - C
AD
\S
HE
ET
S-
AN
AN
O
BS
ER
VA
TO
RY
.D
W G;
DRAWING SHEET NO.
DATE
ANAN WILDLIFE
OBSERVATORY
RECONSTRUCTION
TONGASS NATIONAL
FOREST
WRANGELL RANGER DISTRICT
6/26/2020 FS090523_R102013_L1-002.dwg
Corvus Design
BL
PB
ALASKA REGION
USF-19-01
R10
95% SUBMITTAL
TRAIL
RESTORATION
PLAN
NORTH
95% NOTE: EXTENT OF REVEGETATION WILL BE FINALIZED TO MATCH LIMITS OF TRAIL
DISTURBANCE BASED ON FINAL TRAIL LENGTH, ALIGNMENT, AND SLOPES.
NOTE: REVEGETATE ALL AREAS OF EXISTING EXPOSED SOILS,
AND THOSE DISTURBED BY DEMOLITION AND CONSTRUCTION .
REVEGETATE EXISTING TRAIL WHERE DEMOLISHED, AND
AREAS DISTURBED BY CONSTRUCTION PER DETAIL 2/11.
00' 10' 20' 30'
SCALE: 1" = 10'-0" @22x34
SOIL AND SALVAGE PLAN2
00' 10' 20' 30'
SCALE: 1" = 10'-0" @22x34
REVEGETATION PLAN1
95% NOTE: DRAWING WILL BE EXPANDED TO
INCLUDE SMALL AREAS OF REVEGETATION
FOR REMAINDER OF SITE.
5'-0"
1-2% SLOPE TO
DOWNHILL SIDE
SLOPE STRUCTURAL
FILL AT 2H:1V
TRAIL SECTION - SET IN SLOPE
TRAIL SECTION - ABOVE GRADE
5'-0"
1-2% SLOPE TO
DOWNHILL SIDE
SLOPE STRUCTURAL
FILL AT 2H:1V
5'-0"
1-2% SLOPE TO
DOWNHILL SIDE
GRADE 1.5:1 MAX TO MEET
EXISTING GRADES
SLOPE STRUCTURAL
FILL AT 2H:1V
2" DEPTH AGGREGATE
SURFACE COURSE, GRADING
COMPACTED E-1
6" MIN. DEPTH WEAR
COURSE D1 MATERIAL
SLOPE STRUCTURAL
FILL AT 2H:1V TO MEET
EXISTING GRADE
SUBBASE
MATERIAL
COMPACTED
IN PLACE
TRAIL SECTION - FLUSH WITH GRADE
14" MIN. DEPTH COMPACTED
BASE COURSE
2" DEPTH AGGREGATE
SURFACE COURSE,
GRADING COMPACTED E-1
6" MIN. DEPTH WEAR
COURSE D1 MATERIAL
SLOPE STRUCTURAL
FILL AT 2H:1V TO MEET
EXISTING GRADE
SUBBASE
MATERIAL
COMPACTED
IN PLACE
14" MIN. DEPTH
COMPACTED BASE COURSE
2" DEPTH AGGREGATE
SURFACE COURSE,
GRADING COMPACTED E-1
6" MIN. DEPTH WEAR
COURSE D1 MATERIAL
SLOPE STRUCTURAL
FILL AT 2H:1V TO MEET
EXISTING GRADE
SUBBASE
MATERIAL
COMPACTED
IN PLACE
14" MIN. DEPTH
COMPACTED BASE COURSE
6" DEPTH SOIL AND VEGETATION MAT
GRADE 1.5:1 MAX TO MEET
EXISTING GRADES
SOIL AND VEGETATION MAT
GRADE 1.5:1 MAX TO MEET
EXISTING GRADES
SOIL AND REVEGETATION
FGFG
FG
FILL VOID WITH SOIL (OR
EXCESS EXCAVATION) AND
REVEGETATION MAT TO BE
FLUSH WITH ADJACENT
AFTER LIGHT COMPACTION.
EXISTING ADJACENT GRADE
EXISTING TRAIL SUBGRADE
FLUSH TRAIL - REMOVAL FLUSH TRAIL - REVEGETATION
EXISTING ADJACENT GRADE
MIN. AGGREGATE/SOIL
REMOVAL TO LEVEL 6" BELOW
EXISTING ADJACENT GRADE
MIN. AGGREGATE/SOIL
REMOVAL TO LEVEL 6" BELOW
EXISTING ADJACENT GRADE
EXISTING TRAIL SUBGRADE EXISTING TRAIL SUBGRADE
RAISED TRAIL - REMOVAL RAISED TRAIL - REVEGETATION
FILL VOID WITH SOIL (OR
EXCESS EXCAVATION) AND
REVEGETATION MAT TO BE
FLUSH WITH ADJACENT AFTER
SETTLING.
SUBGRADE: LOOSEN SURFACE
PRIOR TO PLACEMENT OF MAT
M i n
INSTALL STOCKPILED VEGETATION
MAT AND SOIL PER SPECIFICATIONS
FG
FG
EXISTING
SUBGRADE
0'-6"
FG
EXISTING
CONC.
FOOTING TO
BE REMOVED
B. CONCRETE FOOTING IN SOILS & ANCHORED TO ROCK
A. CONCRETE FOOTING IN SOILS
DEMOLITION REVEGETATION DEMOLITION REVEGETATION
CONC. FOOTING
INSTALL SOIL AND
REVEGETATION TO
DISTURBED AREAS
EXISTING
CONC.
FOOTING TO
BE REMOVED
PRIORITIZE FILL
WITH NON-USABLE
EXCAVATION
EXISTING
SUBGRADE
CONNECTIONS
TO BE CUT
FLUSH TO
ROCK
ROCK ROCK
C. CONCRETE PILES ANCHORED TO EXPOSED ROCK D. CONCRETE PILES ANCHORED TO EXPOSED ROCK WITH ANGULAR MODIFIED ROCK SURFACE
ADJUST SURFACE OF ALTERED
ROCK TO BLEND IN WITH
ADJACENT ROCK SURFACE
DEMOLITION FINISHED SURFACE
ROCK ROCK ROCK
DEMOLITION FINISHED SURFACE
ROCK
EXISTING
CONC.
FOOTING TO
BE REMOVED
EXISTING
CONC.
FOOTING TO
BE REMOVED
0'-6"
CONNECTIONS
TO BE CUT
FLUSH TO
ROCK
CONNECTIONS
TO BE CUT
FLUSH TO
ROCK
CONNECTIONS
TO BE CUT
FLUSH TO
ROCK
REMOVE ALL
CONCRETE FROM
SURFACES
REMOVE ALL
CONCRETE FROM
SURFACES
CONCRETE FOOTING COMPLETELY REMOVEDCONCRETE FOOTING PARTIALY REMOVED
INSTALL SOIL AND
REVEGETATION TO
DISTURBED AREAS
EXCAVATE/FILL AS NEEDED FOR
INSTALLATION OF ABUTMENT.
SEE STRUCTURAL
FOR BOARDWALK
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
NO. REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/2 6/2
0 1 2:
B
LI
TT
LE
J:
\U
SF
-1 9-
A
NA
N
OB
SE
RV
AT
OR
Y
CD
S\
2 - C
AD
\S
HE
ET
S-
AN
AN
O
BS
ER
VA
TO
RY
.D
W G;
DRAWING SHEET NO.
DATE
ANAN WILDLIFE
OBSERVATORY
RECONSTRUCTION
TONGASS NATIONAL
FOREST
WRANGELL RANGER DISTRICT
6/26/2020 FS090523_R102013_L1-002.dwg
Corvus Design
BL
PB
ALASKA REGION
USF-19-01
R10
95% SUBMITTAL
OBSERVATORY
AND TRAILS
DETAILS
SCALE: NTS @22x34
VEGETATION MAT4
SCALE: NTS @22x34
TRAIL SECTION1
SCALE: NTS @22x34
BOARDWALK - TRANSITION5
SCALE: NTS @22x34
EXISTING TRAIL - DEMOLITION AND REVEGETATION2
SCALE: NTS @22x34
EXISTING FOOTINGS - DEMOLITION AND REVEGETATION3
95% NOTE: DETAILS TO BE REFINED WITH USFS FOR DRAINAGE.
GENERAL DEMOLITION NOTES
1. DEMOLITION ITEMS, DEBRIS, AND WASTE MUST BE REMOVED AND DISPOSED OF OFF NATIONAL FOREST SYSTEM
LAND AND IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL WASTE DISPOSAL REGULATIONS AND
POLICIES. UNLESS OTHERWISE NOTED.
2. FILL VOIDS CREATED FROM THE DEMOLITION WORK WITH SUITABLE MATERIAL UNLESS OTHERWISE NOTED.
3. NO TREES ARE TO BE REMOVED OR DAMAGED UNLESS SHOWN ON THE DRAWINGS OR DIRECTED BY THE C.O. TO
DO SO.
4. FLAG TREES FOR REMOVAL AND NOTIFY PROJECT ENGINEER 48 HOURS IN ADVANCE OF FELLING. ALL TREES TO
BE REMOVED MUST BE APPROVED BY C.O.
5. FALL, BUCK AND STACK ALL FELLED TREES PER C.O. DIRECTION.
DEMOLITION SUMMARY
EXISTING THREE-SIDED TRAILHEAD STRUCTURE (8.05'X7.25'X8.45'). REMOVE ALL MATERIAL FROM EXISTING
THREE-SIDED TRAILHEAD STRUCTURE, INCLUDING BUT NOT LIMITED TO ALL FOUNDATION COMPONENTS.
REMOVE AND REINSTALL THE EXISTING STEEL BEAR PROOF CONTAINER AS SHOWN IN DRAWING 1/13. REMOVE
AND REINSTALL THE EXISTING INTERPRETIVE SIGNS AS SHOWN IN DRAWING 1/13.
CLEAR AND GRUB EXISTING VEGETATION AND SOIL TO CREATE LEVEL PAD FLUSH WITH ADJACENT TRAIL GRADE.
SLOPE 1% TOWARDS EDGES OF PAD.
DEMOLITION OF ADMIN. BUILDING
TOILET STRUCTURE TO BE RELOCATED APPROX. 300 FT NORTH
AT THE LOCATION OF THE EXISTING ADMINISTRATION BUILDING.
EXISTING TREE TO BE RETAINED
AND PROTECTED (TYP.)
PROPOSED EXTENT OF EXCAVATION
FOR NEW BUILDING PAD.
APPROX. LOCATION OF
EXISTING VERTICAL CUT SLOPE
APPROX. EXTENT OF FLAT
AREA NEEDED FOR PLACEMENT
OF RELOCATED STRUCTURE
TREE TO BE REMOVED
HATCH SHOWS EXTENT OF
PROPOSED ROCK REMOVAL
EXISTING STONE STEPS
EXISTING THREE
SIDED STRUCTURE
EXISTING TRAIL
TOILET STRUCTURE DEMOLITION NOTES
1. DEMOLITION ITEMS, DEBRIS, AND WASTE MUST BE
REMOVED OFF NATIONAL FOREST SYSTEM LAND AND IN
ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL
WASTE DISPOSAL REGULATIONS AND POLICIES, UNLESS
OTHERWISE NOTED.
2. NO TREES ARE TO BE REMOVED OR DAMAGED UNLESS
SHOWN ON THE DRAWINGS OR DIRECTED BY THE C.O.
TO DO SO.
3. FLAG TREES FOR REMOVAL AND NOTIFY PROJECT
ENGINEER 48 HOURS IN ADVANCE OF FELLING. ALL
TREES TO BE REMOVED MUST BE APPROVED BY C.O.
4. FALL, BUCK AND STACK ALL FELLED TREES PER C.O.
DIRECTION.
ADMINISTRATION BUILDING
DEMOLITION NOTES
1. LOCATION: EXISTING ADMINISTRATION BUILDING IS
12'-2" X 16'-2" WITH AN ATTACHED 12'-2" X 3'-9"
PORCH.
3. NO TREES ARE TO BE REMOVED OR DAMAGED
UNLESS SHOWN ON THE DRAWINGS OR DIRECTED
BY THE C.O. TO DO SO.
4. FLAG TREES FOR REMOVAL AND NOTIFY PROJECT
ENGINEER 48 HOURS IN ADVANCE OF FELLING. ALL
TREES TO BE REMOVED MUST BE APPROVED BY
C.O.
5. FALL, BUCK AND STACK ALL FELLED TREES PER C.O.
DIRECTION.
16'-2"
3'-9"
BUILDING PLAN
PHOTO 1
PHOTO 2
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
NO. REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/2 6/2
0 1 2:
B
LI
TT
LE
J:
\U
SF
-1 9-
A
NA
N
OB
SE
RV
AT
OR
Y
CD
S\
2 - C
AD
\S
HE
ET
S-
AN
AN
O
BS
ER
VA
TO
RY
.D
W G;
DRAWING SHEET NO.
DATE
ANAN WILDLIFE
OBSERVATORY
RECONSTRUCTION
TONGASS NATIONAL
FOREST
WRANGELL RANGER DISTRICT
6/26/2020 FS090523_R102013_L1-002.dwg
Corvus Design
BL
PB
ALASKA REGION
USF-19-01
R10
95% SUBMITTAL
TRAILHEAD
AREA
DEMOLITION
11NORTH
00' 5' 10' 15'
SCALE: 1" = 5'-0" @22x34
TRAILHEAD STRUCTURE DEMOLITION PLAN2
95% NOTE: PHOTOS WILL BE ADDED OF ADMIN.
BUILDING FOR CONTRACTOR INFORMATION.
SCALE: NTS @22x34
TOILET STRUCTURE DEMOLITION PLAN2
SCALE: NTS @22x34
ADMINISTRATION BUILDING - DEMOLITION PLAN3
EXISTING TRAIL
EXISTING TREES
SIGN: "WELCOME TO ANAN"
NOTE: ALL WORK NIC UNLESS NOTED OTHERWISE.
SIGNS: DIRECTIONAL
BEAR-PROOF CONTAINER
OBSERVATION SHELTER - EXISTING CONDITIONS
(2) INTERPRETIVE SIGNS TO BE
REINSTALLED INSIDE OF
SHELTER. PLACEMENT TO BE
FIELD LOCATED W/ C.O.
11'-10
"6'-10
7'-4
PLAN
FRONT ELEVATION SIDE ELEVATION
BOARDWALK, RAMP, OR
STAIRS TO TRANSITION
TO GRADE (TBD)
RELOCATED
TOILET BUILDING
CONC. PIER
COMPACTED AGGREGATE
COMPACTED SUBGRADE
EX. FG
95% NOTE: KEEP FLOOR STRUCTURE RAISED AND FREE DRAINING, AND PROVIDE EITHER
RAMPED, BOARDWALK OR STAIR ACCESS DEPENDING ON SITE CONDITIONS.
RELOCATED FLOOR
STRUCTURE PER
EXISTING
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
NO. REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/2 6/2
0 1 2:
B
LI
TT
LE
J:
\U
SF
-1 9-
A
NA
N
OB
SE
RV
AT
OR
Y
CD
S\
2 - C
AD
\S
HE
ET
S-
AN
AN
O
BS
ER
VA
TO
RY
.D
W G;
DRAWING SHEET NO.
DATE
ANAN WILDLIFE
OBSERVATORY
RECONSTRUCTION
TONGASS NATIONAL
FOREST
WRANGELL RANGER DISTRICT
6/26/2020 FS090523_R102013_L1-002.dwg
Corvus Design
BL
PB
ALASKA REGION
USF-19-01
R10
95% SUBMITTAL
TRAILHEAD
AREA LAYOUT
PLAN
95% NOTES: SHOW LOCATION OF TOILET
BUILDING REINSTALLATION ON PLANS.
95% NOTES: SIGN DETAILS
TO BE DEVELOPED.
NORTH
SCALE:
TRAILHEAD AREA - LAYOUT PLAN1
1/8" = 1'-0" @22x34
SCALE: NTS @22x34
TOILET STRUCTURE - EXISTING CONDITIONS2
SCALE: NTS @22x34
TOILET BUILDING SECTION3
REINSTALLED OBSERVATORY SHELTER
EXISTING TRAIL
PROPOSED EXTENT OF LEVEL AREA FOR NEW SHELTER.
EXCAVATE EXISTING SURFACE MATERIAL AS NEEDED TO
PROVIDE CLEARANCE AROUND OBSERVATORY SHELTER AS
SHOWN. GRADE TO PROVIDE POSITIVE DRAINAGE.
DESIGN NOTES:
1. ORIENT RIDGE PERPENDICULAR TO TRAIL
2. BLOCK OFF SIDE OPENING
2'-0" 2'-0"6'-0"
3'-0"4'-0"3'-0"
FRONT ELEVATION
S I D
E
E
L E
V A
T I O
N
S I D
E
E
L E
V A
T I O
N
REAR ELEVATION
NOTE: THIS DETAIL IS
ILLUSTRATIVE ONLY.
INFORMATION IS FROM
ORIGINAL CONSTRUCTION
DRAWINGS
MIN. 1'-0"
FG
TIMBER DECKING
D-LOGS (TYP.)
CONCRETE STEM WALL
LEDGER (TYP.)
BEAM
POST
EXISTING SUBGRADE
COMPACTED AGGREGATE FOOTING
AGGREGATE WEAR COURSE
2'-0"
0'-6"
AT GRADE GRAVEL PAD, SIM. SEE 1/10.
95% NOTE: NEEDS FINAL COORDINATION FOR
EXCAVATION, TREE REMOVAL, AND FOOTING DESIGN.
ADJACENT EDGE OF
PROPOSED EXCAVATION
NORTH
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
NO. REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/2 6/2
0 1 2:
B
LI
TT
LE
J:
\U
SF
-1 9-
A
NA
N
OB
SE
RV
AT
OR
Y
CD
S\
2 - C
AD
\S
HE
ET
S-
AN
AN
O
BS
ER
VA
TO
RY
.D
W G;
DRAWING SHEET NO.
DATE
ANAN WILDLIFE
OBSERVATORY
RECONSTRUCTION
TONGASS NATIONAL
FOREST
WRANGELL RANGER DISTRICT
6/26/2020 FS090523_R102013_L1-002.dwg
Corvus Design
BL
PB
ALASKA REGION
USF-19-01
R10
95% SUBMITTAL
RELOCATED
OBSERVATORY
SHELTER DETAILS
SCALE:
REINSTALLED OBSERVATION SHELTER - LAYOUT PLAN1
3/8" = 1'-0" @22x34
SCALE: NTS @22x34
REINSTALLED OBSERVATION SHELTER FOUNDATION2
SCALE: NTS @22x34
OBSERVATION SHELTER - EXISTING CONDITIONS3
95% NOTES: LEVEL OF CONTRACTOR
DIRECTION FOR REHABILITATION
SHOWN ON SHEETS TO BE CONFIRMED.
REFERENCE SPECIFICATIONS.
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
NO. REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/2 4/2
0 2 3:
D
AV
IN
B
LU
BA
UG
H G:
\20
\L
\L
-E
SE
RI
ES
.D W
G;
DRAWING SHEET NO.
DATE
ANAN WILDLIFE
OBSERVATORY
RECONSTRUCTION
TONGASS NATIONAL
FOREST
WRANGELL RANGER DISTRICT
6/26/2020 FS090523_R102013_L1-002.dwg
RSA Engineering
DB
FWS
ALASKA REGION
L9255
R10
95% SUBMITTAL
ELECTRICAL LEGEND,
SPECIFICATIONS,
AND PLANS
GENERAL NOTES:
OVERALL ELECTRICAL SITE PLAN
1" = 500' (APPROXIMATELY)
ENLARGED ELECTRICAL PLAN - OBSERVATORY
1" = 10'-0"
LEGEND
SHEET NOTES:
ELECTRICAL SPECIFICATIONS (CONTINUED ON NEXT SHEET)
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
NO. REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/2 4/2
0 2 3:
D
AV
IN
B
LU
BA
UG
H G:
\20
\L
\L
-E
SE
RI
ES
.D W
G;
DRAWING SHEET NO.
DATE
ANAN WILDLIFE
OBSERVATORY
RECONSTRUCTION
TONGASS NATIONAL
FOREST
WRANGELL RANGER DISTRICT
6/26/2020 FS090523_R102013_L1-002.dwg
RSA Engineering
DB
FWS
ALASKA REGION
L9255
R10
95% SUBMITTAL
ELECTRICAL
SPECIFICATIONS
ELECTRICAL SPECIFICATIONS
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
NO. REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
6/2 4/2
0 2 3:
D
AV
IN
B
LU
BA
UG
H G:
\20
\L
\L
-E
SE
RI
ES
.D W
G;
DRAWING SHEET NO.
DATE
ANAN WILDLIFE
OBSERVATORY
RECONSTRUCTION
TONGASS NATIONAL
FOREST
WRANGELL RANGER DISTRICT
6/26/2020 FS090523_R102013_L1-002.dwg
RSA Engineering
DB
FWS
ALASKA REGION
L9255
R10
95% SUBMITTAL
ELECTRICAL
DETAILS AND
SCHEDULES
LOAD SUMMARY
SHEET NOTES:
GENERAL NOTES:
CONDUIT & WIRE SCHEDULE
ELECTRICAL EQUIPMENT DETAIL
1" = 1'-0"
GROUNDING DETAIL
NO SCALE
POWER ONE-LINE DIAGRAM
NO SCALE
TELECOM AND CAMERA DETAIL
NO SCALE
| 2020-06-26 Anan 95% Landscape Set |
| Sheets and Views |
| Sheets-Anan Observatory-1 |
| Decking and Structural Concept |
| Spiral Staircase Options |
| Decking and Structural Concept(2) |
| Demo Plan |
| Demo Plan(2) |
| Guardrail |
| Shelter Elevations |
| Demo Summary Table |
| Trail Section - Cut |
| Soil Salvage Plan |
| Soil Salvage Legend |
| Demolition Notes |
| Trai Profile |
| Trail Enlargment |
| Structure Plan |
| Key Plan(2) |
| Trail Plan |
| Soil Salvage Plan(2) |
| Key Plan(3) |
| Demo Plan(3) |
| Demolition General Notes |
| Bathroom Building |
| Shelter Plan |
| Shelter Details |
| Demolition Notes(2) |
| REVEGETATION - TRAIL ABOVE GRADE |
| Grid Coordinates |
| REVEGETATION MAT |
| Shelter Section |
| DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK |
| TOILED BUILDING - FOUNDATION |
| SIGN - INTERPRETIVE |
| BEAR-PROOF CONTAINER |
| BOARDWALK - TRANSITION |
| Trailhead Enlargement |
| Trail Cut and Fill Legend |
| TRAILHEAD AREA - LAYOUT PLAN |
| Observation Site Survey |
| TRAILHEAD AREA - LAYOUT PLAN(2) |
| Bathroom Building(2) |
| TOILED BUILDING - FOUNDATION(2) |
| TOILET STRUCTURE DEMOLITION PLAN |
| ADMINISTRATION BUILDING - DEMOLITION PLAN |
| Sheets-Anan Observatory-2 |
| Decking and Structural Concept |
| Spiral Staircase Options |
| Decking and Structural Concept(2) |
| Demo Plan |
| Demo Plan(2) |
| Guardrail |
| Shelter Elevations |
| Demo Summary Table |
| Trail Section - Cut |
| Soil Salvage Plan |
| Soil Salvage Legend |
| Demolition Notes |
| Trai Profile |
| Trail Enlargment |
| Structure Plan |
| Key Plan(2) |
| Trail Plan |
| Soil Salvage Plan(2) |
| Key Plan(3) |
| Demo Plan(3) |
| Demolition General Notes |
| Bathroom Building |
| Shelter Plan |
| Shelter Details |
| Demolition Notes(2) |
| REVEGETATION - TRAIL ABOVE GRADE |
| Grid Coordinates |
| REVEGETATION MAT |
| Shelter Section |
| DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK |
| TOILED BUILDING - FOUNDATION |
| SIGN - INTERPRETIVE |
| BEAR-PROOF CONTAINER |
| BOARDWALK - TRANSITION |
| Trailhead Enlargement |
| Trail Cut and Fill Legend |
| TRAILHEAD AREA - LAYOUT PLAN |
| Observation Site Survey |
| TRAILHEAD AREA - LAYOUT PLAN(2) |
| Bathroom Building(2) |
| TOILED BUILDING - FOUNDATION(2) |
| TOILET STRUCTURE DEMOLITION PLAN |
| ADMINISTRATION BUILDING - DEMOLITION PLAN |
| Sheets-Anan Observatory-3 |
| Decking and Structural Concept |
| Spiral Staircase Options |
| Decking and Structural Concept(2) |
| Demo Plan |
| Demo Plan(2) |
| Guardrail |
| Shelter Elevations |
| Demo Summary Table |
| Trail Section - Cut |
| Soil Salvage Plan |
| Soil Salvage Legend |
| Demolition Notes |
| Trai Profile |
| Trail Enlargment |
| Structure Plan |
| Key Plan(2) |
| Trail Plan |
| Soil Salvage Plan(2) |
| Key Plan(3) |
| Demo Plan(3) |
| Demolition General Notes |
| Bathroom Building |
| Shelter Plan |
| Shelter Details |
| Demolition Notes(2) |
| REVEGETATION - TRAIL ABOVE GRADE |
| Grid Coordinates |
| REVEGETATION MAT |
| Shelter Section |
| DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK |
| TOILED BUILDING - FOUNDATION |
| SIGN - INTERPRETIVE |
| BEAR-PROOF CONTAINER |
| BOARDWALK - TRANSITION |
| Trailhead Enlargement |
| Trail Cut and Fill Legend |
| TRAILHEAD AREA - LAYOUT PLAN |
| Observation Site Survey |
| TRAILHEAD AREA - LAYOUT PLAN(2) |
| Bathroom Building(2) |
| TOILED BUILDING - FOUNDATION(2) |
| TOILET STRUCTURE DEMOLITION PLAN |
| ADMINISTRATION BUILDING - DEMOLITION PLAN |
| Sheets-Anan Observatory-4 |
| Decking and Structural Concept |
| Spiral Staircase Options |
| Decking and Structural Concept(2) |
| Demo Plan |
| Demo Plan(2) |
| Guardrail |
| Shelter Elevations |
| Demo Summary Table |
| Trail Section - Cut |
| Soil Salvage Plan |
| Soil Salvage Legend |
| Demolition Notes |
| Trai Profile |
| Trail Enlargment |
| Structure Plan |
| Key Plan(2) |
| Trail Plan |
| Soil Salvage Plan(2) |
| Key Plan(3) |
| Demo Plan(3) |
| Demolition General Notes |
| Bathroom Building |
| Shelter Plan |
| Shelter Details |
| Demolition Notes(2) |
| REVEGETATION - TRAIL ABOVE GRADE |
| Grid Coordinates |
| REVEGETATION MAT |
| Shelter Section |
| DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK |
| TOILED BUILDING - FOUNDATION |
| SIGN - INTERPRETIVE |
| BEAR-PROOF CONTAINER |
| BOARDWALK - TRANSITION |
| Trailhead Enlargement |
| Trail Cut and Fill Legend |
| TRAILHEAD AREA - LAYOUT PLAN |
| Observation Site Survey |
| TRAILHEAD AREA - LAYOUT PLAN(2) |
| Bathroom Building(2) |
| TOILED BUILDING - FOUNDATION(2) |
| TOILET STRUCTURE DEMOLITION PLAN |
| ADMINISTRATION BUILDING - DEMOLITION PLAN |
| Sheets-Anan Observatory-5 |
| Decking and Structural Concept |
| Spiral Staircase Options |
| Decking and Structural Concept(2) |
| Demo Plan |
| Demo Plan(2) |
| Guardrail |
| Shelter Elevations |
| Demo Summary Table |
| Trail Section - Cut |
| Soil Salvage Plan |
| Soil Salvage Legend |
| Demolition Notes |
| Trai Profile |
| Trail Enlargment |
| Structure Plan |
| Key Plan(2) |
| Trail Plan |
| Soil Salvage Plan(2) |
| Key Plan(3) |
| Demo Plan(3) |
| Demolition General Notes |
| Bathroom Building |
| Shelter Plan |
| Shelter Details |
| Demolition Notes(2) |
| REVEGETATION - TRAIL ABOVE GRADE |
| Grid Coordinates |
| REVEGETATION MAT |
| Shelter Section |
| DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK |
| TOILED BUILDING - FOUNDATION |
| SIGN - INTERPRETIVE |
| BEAR-PROOF CONTAINER |
| BOARDWALK - TRANSITION |
| Trailhead Enlargement |
| Trail Cut and Fill Legend |
| TRAILHEAD AREA - LAYOUT PLAN |
| Observation Site Survey |
| TRAILHEAD AREA - LAYOUT PLAN(2) |
| Bathroom Building(2) |
| TOILED BUILDING - FOUNDATION(2) |
| TOILET STRUCTURE DEMOLITION PLAN |
| ADMINISTRATION BUILDING - DEMOLITION PLAN |
| Sheets-Anan Observatory-6 |
| Decking and Structural Concept |
| Spiral Staircase Options |
| Decking and Structural Concept(2) |
| Demo Plan |
| Demo Plan(2) |
| Guardrail |
| Shelter Elevations |
| Demo Summary Table |
| Trail Section - Cut |
| Soil Salvage Plan |
| Soil Salvage Legend |
| Demolition Notes |
| Trai Profile |
| Trail Enlargment |
| Structure Plan |
| Key Plan(2) |
| Trail Plan |
| Soil Salvage Plan(2) |
| Key Plan(3) |
| Demo Plan(3) |
| Demolition General Notes |
| Bathroom Building |
| Shelter Plan |
| Shelter Details |
| Demolition Notes(2) |
| REVEGETATION - TRAIL ABOVE GRADE |
| Grid Coordinates |
| REVEGETATION MAT |
| Shelter Section |
| DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK |
| TOILED BUILDING - FOUNDATION |
| SIGN - INTERPRETIVE |
| BEAR-PROOF CONTAINER |
| BOARDWALK - TRANSITION |
| Trailhead Enlargement |
| Trail Cut and Fill Legend |
| TRAILHEAD AREA - LAYOUT PLAN |
| Observation Site Survey |
| TRAILHEAD AREA - LAYOUT PLAN(2) |
| Bathroom Building(2) |
| TOILED BUILDING - FOUNDATION(2) |
| TOILET STRUCTURE DEMOLITION PLAN |
| ADMINISTRATION BUILDING - DEMOLITION PLAN |
| Sheets-Anan Observatory-7 |
| Decking and Structural Concept |
| Spiral Staircase Options |
| Decking and Structural Concept(2) |
| Demo Plan |
| Demo Plan(2) |
| Guardrail |
| Shelter Elevations |
| Demo Summary Table |
| Trail Section - Cut |
| Soil Salvage Plan |
| Soil Salvage Legend |
| Demolition Notes |
| Trai Profile |
| Trail Enlargment |
| Structure Plan |
| Key Plan(2) |
| Trail Plan |
| Soil Salvage Plan(2) |
| Key Plan(3) |
| Demo Plan(3) |
| Demolition General Notes |
| Bathroom Building |
| Shelter Plan |
| Shelter Details |
| Demolition Notes(2) |
| REVEGETATION - TRAIL ABOVE GRADE |
| Grid Coordinates |
| REVEGETATION MAT |
| Shelter Section |
| DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK |
| TOILED BUILDING - FOUNDATION |
| SIGN - INTERPRETIVE |
| BEAR-PROOF CONTAINER |
| BOARDWALK - TRANSITION |
| Trailhead Enlargement |
| Trail Cut and Fill Legend |
| TRAILHEAD AREA - LAYOUT PLAN |
| Observation Site Survey |
| TRAILHEAD AREA - LAYOUT PLAN(2) |
| Bathroom Building(2) |
| TOILED BUILDING - FOUNDATION(2) |
| TOILET STRUCTURE DEMOLITION PLAN |
| ADMINISTRATION BUILDING - DEMOLITION PLAN |
| Sheets-Anan Observatory-8 |
| Decking and Structural Concept |
| Spiral Staircase Options |
| Decking and Structural Concept(2) |
| Demo Plan |
| Demo Plan(2) |
| Guardrail |
| Shelter Elevations |
| Demo Summary Table |
| Trail Section - Cut |
| Soil Salvage Plan |
| Soil Salvage Legend |
| Demolition Notes |
| Trai Profile |
| Trail Enlargment |
| Structure Plan |
| Key Plan(2) |
| Trail Plan |
| Soil Salvage Plan(2) |
| Key Plan(3) |
| Demo Plan(3) |
| Demolition General Notes |
| Bathroom Building |
| Shelter Plan |
| Shelter Details |
| Demolition Notes(2) |
| REVEGETATION - TRAIL ABOVE GRADE |
| Grid Coordinates |
| REVEGETATION MAT |
| Shelter Section |
| DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK |
| TOILED BUILDING - FOUNDATION |
| SIGN - INTERPRETIVE |
| BEAR-PROOF CONTAINER |
| BOARDWALK - TRANSITION |
| Trailhead Enlargement |
| Trail Cut and Fill Legend |
| TRAILHEAD AREA - LAYOUT PLAN |
| Observation Site Survey |
| TRAILHEAD AREA - LAYOUT PLAN(2) |
| Bathroom Building(2) |
| TOILED BUILDING - FOUNDATION(2) |
| TOILET STRUCTURE DEMOLITION PLAN |
| ADMINISTRATION BUILDING - DEMOLITION PLAN |
| Sheets-Anan Observatory-9 |
| Decking and Structural Concept |
| Spiral Staircase Options |
| Decking and Structural Concept(2) |
| Demo Plan |
| Demo Plan(2) |
| Guardrail |
| Shelter Elevations |
| Demo Summary Table |
| Trail Section - Cut |
| Soil Salvage Plan |
| Soil Salvage Legend |
| Demolition Notes |
| Trai Profile |
| Trail Enlargment |
| Structure Plan |
| Key Plan(2) |
| Trail Plan |
| Soil Salvage Plan(2) |
| Key Plan(3) |
| Demo Plan(3) |
| Demolition General Notes |
| Bathroom Building |
| Shelter Plan |
| Shelter Details |
| Demolition Notes(2) |
| REVEGETATION - TRAIL ABOVE GRADE |
| Grid Coordinates |
| REVEGETATION MAT |
| Shelter Section |
| DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK |
| TOILED BUILDING - FOUNDATION |
| SIGN - INTERPRETIVE |
| BEAR-PROOF CONTAINER |
| BOARDWALK - TRANSITION |
| Trailhead Enlargement |
| Trail Cut and Fill Legend |
| TRAILHEAD AREA - LAYOUT PLAN |
| Observation Site Survey |
| TRAILHEAD AREA - LAYOUT PLAN(2) |
| Bathroom Building(2) |
| TOILED BUILDING - FOUNDATION(2) |
| TOILET STRUCTURE DEMOLITION PLAN |
| ADMINISTRATION BUILDING - DEMOLITION PLAN |
| Sheets-Anan Observatory-10 |
| Decking and Structural Concept |
| Spiral Staircase Options |
| Decking and Structural Concept(2) |
| Demo Plan |
| Demo Plan(2) |
| Guardrail |
| Shelter Elevations |
| Demo Summary Table |
| Trail Section - Cut |
| Soil Salvage Plan |
| Soil Salvage Legend |
| Demolition Notes |
| Trai Profile |
| Trail Enlargment |
| Structure Plan |
| Key Plan(2) |
| Trail Plan |
| Soil Salvage Plan(2) |
| Key Plan(3) |
| Demo Plan(3) |
| Demolition General Notes |
| Bathroom Building |
| Shelter Plan |
| Shelter Details |
| Demolition Notes(2) |
| REVEGETATION - TRAIL ABOVE GRADE |
| Grid Coordinates |
| REVEGETATION MAT |
| Shelter Section |
| DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK |
| TOILED BUILDING - FOUNDATION |
| SIGN - INTERPRETIVE |
| BEAR-PROOF CONTAINER |
| BOARDWALK - TRANSITION |
| Trailhead Enlargement |
| Trail Cut and Fill Legend |
| TRAILHEAD AREA - LAYOUT PLAN |
| Observation Site Survey |
| TRAILHEAD AREA - LAYOUT PLAN(2) |
| Bathroom Building(2) |
| TOILED BUILDING - FOUNDATION(2) |
| TOILET STRUCTURE DEMOLITION PLAN |
| ADMINISTRATION BUILDING - DEMOLITION PLAN |
| Sheets-Anan Observatory-11 |
| Decking and Structural Concept |
| Spiral Staircase Options |
| Decking and Structural Concept(2) |
| Demo Plan |
| Demo Plan(2) |
| Guardrail |
| Shelter Elevations |
| Demo Summary Table |
| Trail Section - Cut |
| Soil Salvage Plan |
| Soil Salvage Legend |
| Demolition Notes |
| Trai Profile |
| Trail Enlargment |
| Structure Plan |
| Key Plan(2) |
| Trail Plan |
| Soil Salvage Plan(2) |
| Key Plan(3) |
| Demo Plan(3) |
| Demolition General Notes |
| Bathroom Building |
| Shelter Plan |
| Shelter Details |
| Demolition Notes(2) |
| REVEGETATION - TRAIL ABOVE GRADE |
| Grid Coordinates |
| REVEGETATION MAT |
| Shelter Section |
| DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK |
| TOILED BUILDING - FOUNDATION |
| SIGN - INTERPRETIVE |
| BEAR-PROOF CONTAINER |
| BOARDWALK - TRANSITION |
| Trailhead Enlargement |
| Trail Cut and Fill Legend |
| TRAILHEAD AREA - LAYOUT PLAN |
| Observation Site Survey |
| TRAILHEAD AREA - LAYOUT PLAN(2) |
| Bathroom Building(2) |
| TOILED BUILDING - FOUNDATION(2) |
| TOILET STRUCTURE DEMOLITION PLAN |
| ADMINISTRATION BUILDING - DEMOLITION PLAN |
| Sheets-Anan Observatory-12 |
| Decking and Structural Concept |
| Spiral Staircase Options |
| Decking and Structural Concept(2) |
| Demo Plan |
| Demo Plan(2) |
| Guardrail |
| Shelter Elevations |
| Demo Summary Table |
| Trail Section - Cut |
| Soil Salvage Plan |
| Soil Salvage Legend |
| Demolition Notes |
| Trai Profile |
| Trail Enlargment |
| Structure Plan |
| Key Plan(2) |
| Trail Plan |
| Soil Salvage Plan(2) |
| Key Plan(3) |
| Demo Plan(3) |
| Demolition General Notes |
| Bathroom Building |
| Shelter Plan |
| Shelter Details |
| Demolition Notes(2) |
| REVEGETATION - TRAIL ABOVE GRADE |
| Grid Coordinates |
| REVEGETATION MAT |
| Shelter Section |
| DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK |
| TOILED BUILDING - FOUNDATION |
| SIGN - INTERPRETIVE |
| BEAR-PROOF CONTAINER |
| BOARDWALK - TRANSITION |
| Trailhead Enlargement |
| Trail Cut and Fill Legend |
| TRAILHEAD AREA - LAYOUT PLAN |
| Observation Site Survey |
| TRAILHEAD AREA - LAYOUT PLAN(2) |
| Bathroom Building(2) |
| TOILED BUILDING - FOUNDATION(2) |
| TOILET STRUCTURE DEMOLITION PLAN |
| ADMINISTRATION BUILDING - DEMOLITION PLAN |
| Sheets-Anan Observatory-13 |
| Decking and Structural Concept |
| Spiral Staircase Options |
| Decking and Structural Concept(2) |
| Demo Plan |
| Demo Plan(2) |
| Guardrail |
| Shelter Elevations |
| Demo Summary Table |
| Trail Section - Cut |
| Soil Salvage Plan |
| Soil Salvage Legend |
| Demolition Notes |
| Trai Profile |
| Trail Enlargment |
| Structure Plan |
| Key Plan(2) |
| Trail Plan |
| Soil Salvage Plan(2) |
| Key Plan(3) |
| Demo Plan(3) |
| Demolition General Notes |
| Bathroom Building |
| Shelter Plan |
| Shelter Details |
| Demolition Notes(2) |
| REVEGETATION - TRAIL ABOVE GRADE |
| Grid Coordinates |
| REVEGETATION MAT |
| Shelter Section |
| DEMO - CONCRETE PILE BURIED AND ANCHORED TO ROCK |
| TOILED BUILDING - FOUNDATION |
| SIGN - INTERPRETIVE |
| BEAR-PROOF CONTAINER |
| BOARDWALK - TRANSITION |
| Trailhead Enlargement |
| Trail Cut and Fill Legend |
| TRAILHEAD AREA - LAYOUT PLAN |
| Observation Site Survey |
| TRAILHEAD AREA - LAYOUT PLAN(2) |
| Bathroom Building(2) |
| TOILED BUILDING - FOUNDATION(2) |
| TOILET STRUCTURE DEMOLITION PLAN |
| ADMINISTRATION BUILDING - DEMOLITION PLAN |
| 172094 Anan |
| Anan 95% Electrical Set - 6-26-20 |
| Sheets and Views |
| L9255-Eseries-E101 |
| L9255-Eseries-E102 |
| L9255-Eseries-E103 |
File details come from the government source that posted it. Updated .