Errata Sheet.docx

DOCX document 17 KB Posted

Attached to
Anan Wildlife Observatory Reconstruction - Solicitation - CANCELED
Solicitation number
12010920R0008
Issued by

View the file

Other files

File Type Posted
Amendment006.pdf PDF
FH20-I-0077.PDF PDF
Amendment 005.pdf PDF
Amendment 004.pdf PDF
7 - Ex Admin Bldg.zip ZIP file
9 - Upper Falls.zip ZIP file
5 - Ex Obs - Shelter.zip ZIP file
3 - Ex Obs - Lower Deck.zip ZIP file
1 - Ex Obs - Upper Deck.zip ZIP file
6 - Ex Obs - Trail.zip ZIP file
4 - Ex Obs - Toilet Bldg.zip ZIP file
0 - General.zip ZIP file
2 - Ex Obs - Stairs.zip ZIP file
8 - High Tide Access.zip ZIP file
Amendment 003.pdf PDF
Final Construction Drawing Specifications.pdf PDF
Final Construction Drawings.pdf PDF
Amendment 002.pdf PDF
Geological Report.pdf PDF
Soil and Water.pdf PDF
Amendment 001.pdf PDF
SF24-16d Bid Bond Form.pdf PDF
12010920R0008_Anan_Observatory_RFP.pdf PDF
Water_Quality_Mgmt_BMPs_April2012.pdf PDF
Anan 95-percent Drawings.pdf PDF
Wage Determination AK2020001.pdf PDF
Anan 95-percent Technical Specifications.pdf PDF
12010920R0008_Anan_Observatory_RFP.pdf PDF
Photographs.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12010920R0008 – Anan Wildlife Observatory Reconstruction Errata Sheet for Drawings and Specifications 08/24/2020

1. General:

a. In the context of soil, replace all instances of “unsuitable” with “unsatisfactory.”

b. Replace all instances of “Observatory Structure” with “Observation Structure.”

2. Amend the Final Construction Drawings as follows:

a. Drawing Sheet 10 – Trail Alignment Plan: Extend proposed contours to meet existing.

b. Drawing Sheet 12 – Observatory Area Details, Detail 1: Change fill slopes to 1.5H:1V.

c. Drawing Sheet 13 – Trailhead Area Signage Plan, Notes: Delete Note 1.

d. Drawing Sheet 15 – Admin Building Area Details, Detail 1: Add note “See Detail 1/Sheet 12 for Aggregate Pad Section Details.”

e. Drawing Sheet 19, Detail A: Add note “Slope on upper deck to be achieved via steel moment frame member placement.”

f. Drawing Sheet 20, Detail A: Add note “Provide half-round gutter on Lower Deck 2nd Floor, above where landing for lower deck 1st floor connect to 1st floor deck. Gutter to match shelter gutters.”

g. Drawing Sheet 28 – Detail D: Wood framed storage box to be on Grid S3. There will be three Gov’t furnished storage tanks under the storage box, and three Gov’t furnished storage tanks inside the toilet room.

h. Drawing Sheet 29, Detail 3 Shelter – Bench: Add note “Provide cedar vertical dividers, between bench base frames, at 2 ft on center. Dividers to provide visitors space to store backpacks and camera equipment during day trips.”

3. Amend the Final Construction Drawing Specifications as follows:

a. Section 32 15 00 – Aggregate Trail, Section 2.3 – Base Course: Delete “Subbase Grading A (2” minus),” replace with “Grading D (Base).”