Amendment006.pdf
PDF 248 KB Posted
- Solicitation number
- 12010920R0008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FH20-I-0077.PDF | ||
| Amendment 005.pdf | ||
| Amendment 004.pdf | ||
| 7 - Ex Admin Bldg.zip | ZIP file | |
| 9 - Upper Falls.zip | ZIP file | |
| 5 - Ex Obs - Shelter.zip | ZIP file | |
| Errata Sheet.docx | DOCX document | |
| 3 - Ex Obs - Lower Deck.zip | ZIP file | |
| 1 - Ex Obs - Upper Deck.zip | ZIP file | |
| 6 - Ex Obs - Trail.zip | ZIP file | |
| 4 - Ex Obs - Toilet Bldg.zip | ZIP file | |
| 0 - General.zip | ZIP file | |
| 2 - Ex Obs - Stairs.zip | ZIP file | |
| 8 - High Tide Access.zip | ZIP file | |
| Amendment 003.pdf | ||
| Final Construction Drawing Specifications.pdf | ||
| Final Construction Drawings.pdf | ||
| Amendment 002.pdf | ||
| Geological Report.pdf | ||
| Soil and Water.pdf | ||
| Amendment 001.pdf | ||
| SF24-16d Bid Bond Form.pdf | ||
| 12010920R0008_Anan_Observatory_RFP.pdf | ||
| Water_Quality_Mgmt_BMPs_April2012.pdf | ||
| Anan 95-percent Drawings.pdf | ||
| Wage Determination AK2020001.pdf | ||
| Anan 95-percent Technical Specifications.pdf | ||
| 12010920R0008_Anan_Observatory_RFP.pdf | ||
| Photographs.pdf |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12010920R0008 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
JUNEAU AK 99802
709 WEST 9TH STREET
ALASKA REGIONAL OFFICE
09/14/20200006
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/10/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
12010920R0008 Anan Wildlife Observatory Reconstruction
This Amendment replaces the Schedule of Items in its entirety. Changes relate to pricing mobilization and are shown in blue strikeout (deletions) and red bold (additions). No other changes are made including no change to the date and time set for receipt of proposals of 10:00 a.m. local Alaska Time on 9/17/2020.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
MARI MEINERS
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
UPDATED – SOLICITATION AMENDMENT 6
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Contract Line Items (CLINs):
Item # Schedule of Supplies/Services Quantity Pay Unit Unit Price Amount 0001 Observatory Reconstruction
0001AA Mobilization for all Base Items Bid (CLIN 0001) and Option Item 1 (CLIN 1001), if awarded.
1 LS $ $
0001AB Demolition: All demolition including upper and lower decks, walkways, staircases, footings, trail segment, and old administrative structure.
1 LS $ $
0001AC Trail construction at observatory 1 LS $ $ 0001AD Upper deck reconstruction 1 LS $ $ 0001AE Construction of new shelter and furnishings 1 LS $ $ 0001AF Removal and reinstallation of existing observation structure and existing outhouse, and new trailhead signage. Includes site development at the site of the old administrative structure.
1 LS $ $
Total Item(s) 0001: $ 1001 Option Item 1: Lower Deck and Spiral Staircase Construction
1001AA Mobilization for Option Item 2 1 (CLIN 1001) 1 LS $ $ 1001AB Lower deck reconstruction 1 LS $ $ 1001AC Spiral staircase construction 1 LS $ $
Total Item(s) 1001: $ 1002 Option Item 2: Power and Communication and Video Systems
1002AA Furnish and Install all power, communication, and video systems
1 LS $ $
Total Item(s) 1002: $
TOTAL ALL ITEMS (0001 + 1001 + 1002): _________________________________________
LS – Lump Sum
Additional Terms:
1) Quoters must submit prices for all Items in the Schedule of Items above.
2) Disclosure of the Magnitude of Construction Projects:
Between $1,000,000 and $5,000,000.
3) Mobilization does not include on-site construction activities including the movement of personnel, materials, or equipment within the project site.
4) Payment for bond premiums in accordance with (IAW) Federal Acquisition Regulation ((FAR) 48 CFR Chapter 1) Clause
52.232-5 Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Mobilization.
5) Payment will be made IAW Section G.2. only for those Items listed on the Schedule of Items above.