Amendment 004.pdf
PDF 227 KB Posted
- Solicitation number
- 12010920R0008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment006.pdf | ||
| FH20-I-0077.PDF | ||
| Amendment 005.pdf | ||
| 7 - Ex Admin Bldg.zip | ZIP file | |
| 9 - Upper Falls.zip | ZIP file | |
| 5 - Ex Obs - Shelter.zip | ZIP file | |
| Errata Sheet.docx | DOCX document | |
| 3 - Ex Obs - Lower Deck.zip | ZIP file | |
| 1 - Ex Obs - Upper Deck.zip | ZIP file | |
| 6 - Ex Obs - Trail.zip | ZIP file | |
| 4 - Ex Obs - Toilet Bldg.zip | ZIP file | |
| 0 - General.zip | ZIP file | |
| 2 - Ex Obs - Stairs.zip | ZIP file | |
| 8 - High Tide Access.zip | ZIP file | |
| Amendment 003.pdf | ||
| Final Construction Drawing Specifications.pdf | ||
| Final Construction Drawings.pdf | ||
| Amendment 002.pdf | ||
| Geological Report.pdf | ||
| Soil and Water.pdf | ||
| Amendment 001.pdf | ||
| SF24-16d Bid Bond Form.pdf | ||
| 12010920R0008_Anan_Observatory_RFP.pdf | ||
| Water_Quality_Mgmt_BMPs_April2012.pdf | ||
| Anan 95-percent Drawings.pdf | ||
| Wage Determination AK2020001.pdf | ||
| Anan 95-percent Technical Specifications.pdf | ||
| 12010920R0008_Anan_Observatory_RFP.pdf | ||
| Photographs.pdf |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12010920R0008 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
JUNEAU AK 99802
709 WEST 9TH STREET
ALASKA REGIONAL OFFICE
08/27/20200004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/10/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
12010920R0008 Anan Wildlife Observatory Reconstruction
This Amendment replaces the Schedule of Supplies/Services in its entirety (see pages 2-3 of this Amendment). A summary of the changes follows:
1. CLIN 0001 has been broken into additional subCLINs (0001AA - 0001AH). These subCLINs will be used for price evaluation purposes. When the contract is awarded, CLIN 0001 will be awarded as a single firm-fixed price amount;
2. The Quantity of CLIN 0002AB has been changed from 15 to 16;
3. Additional clarities have been included in the Incentive descriptions in Section B.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
MARI MEINERS
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Contract Line Items (CLINs):
Item # Schedule of Supplies/Services Quantity Pay Unit Unit Price Amount 0001 Observatory Reconstruction
0001AA Mobilization 1 LS $ $ 0001AB Demolition: All demolition including decks, walkways, staircases, footings, trail segment, and old administrative structure
1 LS $ $
0001AC Trail construction at observatory 1 LS $ $ 0001AD Upper deck reconstruction 1 LS $ $ 0001AE Lower deck reconstruction 1 LS $ $ 0001AF Spiral staircase construction 1 LS $ $ 0001AG Construction of new shelter and furnishings 1 LS $ $ 0001AH Removal and reinstallation of existing observation structure and existing outhouse, and new trailhead signage. Includes site development at the site of the old administrative structure.
1 LS $ $
Total Item(s) 0001: $ 0002 Early Delivery Incentives
0002AA Incentive A 1 LS $100,000.00 $100,000.00 0002AB Incentive B, Not to Exceed $48,000.00 16 DAY $3,000.00 $48,000.00 0002AC Incentive C 1 LS $10,000.00 $10,000.00
Total Item(s) 0002: $158,000.00 1001 Option Item 1: Power and Communication Systems
1001AA Furnish and Install all power, communication, and video systems
1 LS $ $
Total Item(s) 1001: $
LS – Lump Sum
Additional Terms:
1) Quoters must submit prices for all Items in the Schedule of Items above. Item 0002 prices are pre-filled and not subject to additional price changes.
2) Disclosure of the Magnitude of Construction Projects:
Between $1,000,000 and $5,000,000.
3) Mobilization does not include on-site construction activities including the movement of personnel, materials, or equipment within the project site.
4) Payment for bond premiums in accordance with (IAW) Federal Acquisition Regulation ((FAR) 48 CFR Chapter 1) Clause 52.232-5 Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Mobilization.
5) Payment will be made IAW Section G.2. only for those Items listed on the Schedule of Items above.
6) The Government anticipates awarding a firm-fixed-price contract, with additional incentives under FAR 16.402-3 for early delivery on Contract Line Item Numbers (CLIN) 0001 and option item 1001 if exercised. Incentives available are reflected in the schedule and below as CLINS 0002AA, 0002AB and 0002AC. Incentives that are not earned by the dates specified will be removed from the contrac. All incentives will be fully-funded and obligated upon initial award. The Government must be given 2 weeks prior notice before the Contractor anticipates completion on any Incentive CLIN in order to perform timely inspection and acceptance activities.
7) In order to receive CLIN 0002AA (Incentive A), all items described in CLIN 0001 must be fully complete, inspected, and accepted before 07/01/2021. This completion date of 07/01/2021 is absolute and not subject to negotiation, so the incentive will not be paid if the work is not fully complete, inspected, and accepted by 07/01/2021, and the Default (Fixed-Price Construction) clause at FAR 52.249-10 is explicitly inapplicable to this CLIN.
8) In order to receive the full amount (Not to Exceed $48,000.00) on CLIN 0002AB (Incentive B), the upper deck, the trail at the observatory, and the new shelter must be fully complete, inspected, and accepted on or before 06/15/2021. Partial amounts may be earned after 06/15/2021, with $3,000.00 removed from the available incentive every subsequent day starting on 06/16/2021 (e.g. $45,000.00 available on 6/16/2021; …; $3,000.00 on 6/30/2021, etc.). No incentive under this CLIN will be paid if any of these items (i.e. the upper deck, the trail, or the new shelter) are incomplete, not inspected, or not accepted on 07/01/2021.
9) Incentive C: In order to receive CLIN 0002AC (Incentive C), Option Item 1001 (if awarded) must be fully complete, inspected, and accepted before 07/01/2021. This completion date of 07/01/2021 is absolute and not subject to negotiation, so the incentive will not be paid if the work is not fully complete, inspected, and accepted by 07/01/2021, and the clause at FAR 52.249-10 is explicitly inapplicable to this CLIN.