Amendment__1-40100-13904-Questions_and_Comments-1.pdf
PDF 233 KB Posted
- Attached to
- 40100 - McNairy Manhole Cover Repair - UPDATED
- Solicitation number
- Event 40100-13904
- Issued by
- Madison County, Tennessee
About this file
This is Amendment #1 to an Invitation to Bid (ITB #40100-13904) issued by the Tennessee Department of Transportation (TDOT) for McNairy manhole repairs. The amendment clarifies key project specifications and addresses contractor inquiries submitted prior to the May 15, 2026 written questions deadline. The project involves junction box and manhole cover repair and replacement at 15 locations along State Route 15 in McNairy County, with work to be completed within 45 calendar days from Purchase Order issuance. The amendment confirms that new manhole lids do not require covers, specifies the use of hi-early strength concrete for all lid fabrication as solid covers, and clarifies that TDOT is not enforcing standard concrete cure times or seven- to 28-day waiting periods; contractors may transport and install lids at their discretion once confident no damage will occur. The bid opening occurred on May 8, 2026 at 1:00 PM CDT, with bids closing on June 10, 2026 at 1:00 PM CDT.
The amendment adds Performance Bond and Payment Bond requirements to the Terms and Conditions sections 8.5 and 8.6, respectively, addressing a bidder inquiry about bonding. Certified payroll submissions are not required. A bidders list will be made available during the Open File Period in the procurement file following the Intent to Award notification. The amendment clarifies that project duration may extend beyond the initial 45-day completion window to account for setup time, material ordering, and concrete curing periods, though no specific contract term extensions are formally documented in this amendment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Event_40100-13904_Clarification.pdf | ||
| Example_Images.docx | DOCX document | |
| 40100-0000588622_13904-TC.docx | DOCX document | |
| Amendment__1-40100-13904-Questions_and_Comments.pdf | ||
| ADA_Specifications_McNairy_Manholes.docx | DOCX document | |
| 40100_-_McNairy_Manhole_Cover_Repair.pdf | ||
| ADA_Specifications_McNairy_Manholes.docx | DOCX document | |
| 40100_-_McNairy_Manhole_Cover_Repair.pdf | ||
| Example_Images.docx | DOCX document | |
| 40100-0000588622_13904-TC.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB # 40100-13904– Questions & Comments Page 1 of 1
STATE OF TENNESSEE
DEPARTMENT OF TRANSPORTATION
INVITATION TO BID (ITB) # 40100-13904
AMENDMENT #1 FOR MCNAIRY MANHOLE REPAIRS
DATE: 05/20/2026
ITB # 40100-13904 IS AMENDED AS FOLLOWS:
1. State responses to questions and comments in the table below amend and clarify this ITB.
Any restatement of ITB text in the Question/Comment column shall NOT be construed as a change in the actual wording of the ITB document.
Comments, Questions and Answers # ITB Section Question/Comment Answer 1 Terms &
Conditions Is there a bond required?
Please reference below Summary of Changes for the added language into the Terms and Conditions.
2 Terms & Conditions
Certified payroll?
Certified payrolls are not required to be submitted.
3 Specifications New lids have manhole covers left out as depicted in photo’s?
That is correct. No lids necessary.
4 Specifications The project time would need to be 160 days instead of 45 days due to set up time, ordering materials and there is a time frame of 105 days for cure time.
TDOT is not holding the contractor to the normal cure times or waiting for 7 or 28 day breaks. The lids can be transported and set when the contractor is confident in doing so without damage. In the Specifications Scope of Work Section d.ii. states “use hi-early strength concrete for all lid fabrication as solid covers”.
5 General Will there also be a bidders list posted?
Yes, it will be available during the Open File Period in the procurement file after the Intent to Award is sent out.
2. Summary of Changes.
Performance Bond language has been added to the Terms and Conditions, Section 8.5.
Payment Bond language has been added to the Terms and Conditions, Section 8.6.