This document is an Alternate Bid Clearing and Tree Removal Plan for the City of Urbana, Engineering Division, related to the 211 N Race Street Demolition & Site Remediation project. The plan depicts a detailed site map with color-coded routes and areas for clearing and tree removal, specifically outlining the boundaries and scope of work for site preparation. The document includes critical notes for contractors regarding utility locating, site clearing, and potential work impact on adjacent properties.
The plan provides specific guidance for contractors, emphasizing the need to accurately record and locate existing utilities and infrastructure before commencing work. A caution note alerts contractors to coordinate with utility companies to identify and protect existing underground utilities, with a three-working-day notice requirement prior to any excavation. The map shows the project site bounded by Griggs, Locust, and Race Streets, with a stream/creek (marked in blue) running through the property, indicating potential environmental considerations for the site remediation project.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALTERNATE BID -
CLEARING AND TREE
REMOVAL PLAN
NORTH
Feet
1:360.0007
60300 15
AutoCAD SHX Text
GRIGGS STREET
AutoCAD SHX Text
NORTH RACE STREET
AutoCAD SHX Text
WOOD STREET
AutoCAD SHX Text CAUTION - NOTICE TO CONTRACTORS REGARDING EXISTING UTILITIES THE CONTRACTOR MUST CONTACT THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE PERFORMING ANY CONSTRUCTION ACTIVITIES TO REQUEST FIELD LOCATIONS OF THEIR UTILITIES. THE CONTRACTOR MUST BE AWARE THAT SOME EXISTING UTILITIES MAY NOT BE ACCURATELY SHOWN, KNOWN TO EXIST, AND/ OR LOCATED BY LOCAL OR STATE UTILITY COMPANIES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO MAKE NECESSARY ACCOMODATIONS TO ACCURATELY LOCATE ALL EXISTING UTILITIES PRIOR TO COMMENCEMENT OF WORK. ALL EXISTING UTILITIES ON THIS PROJECT SITE AND ON ADJACENT DEVELOPMENTS SHALL REMAIN IN PLACE AND OPERATIONAL AT ALL TIMES DURING CONSTRUCTION. THE CONTRACTOR MUST COORDINATE ANY RELOCATIONS OR MODIFICATIONS TO THE EXISTING UTILITIES WITH THE APPROPRIATE UTILITY COMPANY, THE OWNER, AND THE CITY OF URBANA.
AutoCAD SHX Text ALTERNATE BID - CLEARING AND TREE REMOVAL PLAN NOTES: 1.) THE CONTRACTOR SHALL ACCURATELY RECORD ACTUAL LOCATIONS OF CAPPED UTILITIES AND SUBSURFACE OBSTRUCTIONS THAT WILL REMAIN AFTER DEMOLITION. 2.) THE CONTRACTOR SHALL PROTECT AND MAINTAIN IN A SAFE AND OPERABLE CONDITION UTILITIES THAT ARE TO REMAIN. THE CONTRACTOR SHALL PREVENT INTERRUPTION OF EXISTING UTILITY SERVICE TO OCCUPIED OR USED FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIES HAVING JURISDICTION. THE CONTRACTOR SHALL PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING UTILITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES AND OWNER. 3.) THE CONTRACTOR SHALL NOTIFY ADJACENT OWNERS OF WORK THAT MAY AFFECT THEIR PROPERTY, POTENTIAL NOISE, UTILITY OUTAGES OR DISRUPTIONS. 4.) SHOULD UNEXPECTED HAZARDOUS MATERIALS BE FOUND DURING DEMOLITION OPERATIONS, THE CONTRACTOR SHALL NOTIFY THE OWNER AND ALL GOVERNING AGENCIES, IF NECESSARY, AND CONFORM TO ALL APPLICABLE REGULATORY PROCEDURES. 5.) THE ALTERNATE BID FOR CLEARING AND TREE REMOVAL TO INCLUDE WEST BANK OF THE BONEYARD CREEK ADJACENT TO SITE PROPERTY AND BOTH BANKS OF BONEYARD CREEK SOUTH OF SITE PROPERTY TO THE INDICATED SOUTHWESTERLY LIMIT OF ALTERNATE BID.
AutoCAD SHX Text THREE (3) WORKING DAYS PRIOR TO THE START OF ANY EXCAVATION ON THIS SITE, THE CONTRACTOR SHALL CONTACT J.U.L.I.E. (1-800-892-0123) FOR UTILITY LOCATION INFORMATION.
AutoCAD SHX Text
CLEAR AND REMOVE TREES BOTH SIDES OF CREEK/ PROTECT EXISTING CHAIN-LINK FENCE
AutoCAD SHX Text
PROTECT WING WALL AND BOX STRUCTURE
AutoCAD SHX Text
URBANA
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text Y
AutoCAD SHX Text F
AutoCAD SHX Text
CITY OF URBANA PUBLIC WORKS ENGINEERING DIVISION
AutoCAD SHX Text
DATED:
AutoCAD SHX Text
DESIGNED BY: DAR
AutoCAD SHX Text
DRAWN BY: DAR
AutoCAD SHX Text
CHECKED BY: JCZ
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
OF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
131, 205 & 211 N. RACE ST., URBANA, IL 61801
AutoCAD SHX Text
USD #116 ADULT EDUCATION CENTER SITE
AutoCAD SHX Text 2/03/25
AutoCAD SHX Text
SECTION 23-00670-00-BD
AutoCAD SHX Text
CLEAR AND REMOVE TREES BOTH SIDES OF CREEK/ PROTECT EXISTING CHAIN-LINK FENCE
AutoCAD SHX Text CLEAR AND REMOVE TREES WEST SIDE OF CREEK ONLY/ PROTECT EXISTING CHAIN-LINK FENCE
AutoCAD SHX Text
SOUTH PROPERTY LINE OF FORMER ADULT EDUCATION CENTER SITE
AutoCAD SHX Text
LOCUST STREET
AutoCAD SHX Text
NORTH RACE STREET
AutoCAD SHX Text CLEAR AND REMOVE TREES WEST SIDE OF CREEK ONLY/ PROTECT EXISTING CHAIN-LINK FENCE
AutoCAD SHX Text CLEAR AND REMOVE TREES WEST SIDE OF CREEK ONLY/ PROTECT EXISTING CHAIN-LINK FENCE
AutoCAD SHX Text
ADDENDUM #3 - NEW SHEET
AutoCAD SHX Text
BONEYARD STREAM (CREEK)
AutoCAD SHX Text
BONEYARD STREAM (CREEK)
AutoCAD SHX Text
BONEYARD STREAM (CREEK)