The document is the City of Urbana's Utility and Right-of-Way (ROW) Permit Standards, a comprehensive manual detailing regulations and procedures for working within public right-of-way. The standards cover a wide range of activities including utility installations, pavement patching, sidewalk repairs, tree protection, directional signage, and special use permits for purposes like rain gardens, bioswales, and sidewalk cafés. The manual provides detailed technical specifications, application requirements, and guidelines for contractors, utility companies, and property owners conducting work in city-owned rights-of-way, with specific instructions on permitting, insurance, bonding, traffic control, and restoration of disturbed areas.

The document outlines specific fees, such as an $80 utility and right-of-way permit fee, and requires contractors to obtain necessary permits, provide certificates of insurance, and comply with city and state regulations. It includes technical details on pavement cuts, utility installations, landscaping restoration, and special use provisions, with appendices covering traffic control standards, highway authority agreements, and licensing for activities like sidewalk cafés. The standards are designed to ensure public safety, protect city infrastructure, and maintain the integrity of public spaces during construction and utility work, with provisions for inspections, maintenance, and potential penalties for non-compliance.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISED 01/01/2022

UTILITY AND RIGHT-OF-WAY

PERMIT STANDARDS

TABLE OF CONTENTS

INTRODUCTION ------------------------------------------------------------------------------------ 1

UTILITY AND RIGHT-OF-WAY PERMIT APPLICATION FORM ---------------------- 4

STREET FUNCTIONAL CLASSIFICATION MAP ------------------------------------------ 7

TREE PROTECTION DETAILS ----------------------------------------------------------------- 8

DRIVEWAY DETAILS ------------------------------------------------------------------------------ 11

PAVEMENT PATCHING DETAILS ------------------------------------------------------------- 15

SEWER CONSTRUCTION DETAILS ---------------------------------------------------------- 27

SIDEWALK DETAILS ------------------------------------------------------------------------------ 36

SIGNS -------------------------------------------------------------------------------------------------- 41

UTILITY CUTS DETAILS ------------------------------------------------------------------------- 50

LANDSCAPING DETAIL --------------------------------------------------------------------------- 58

APPENDIX A—TRAFFIC CONTROL STANDARDS -------------------------------------- 60

APPENDIX B—HIGHWAY AUTHORITY SUPPLEMENTAL

AGREEMENT TEMPLATE ----------------------------------------------------------------------- 61

APPENDIX C— SPECIAL USE OF PUBLIC RIGHT-OF-WAY ------------------------- 70

APPENDIX D - CAFÉ LICENSES -------------------------------------------------------------- 79

APPENDIX E—APPLICATION FOR SPACE IN MODULAR NEWS

RACK AT THE COURTHOUSE BLOCK ------------------------------------------------------ 82

Revised 01/01/2022

Introduction to Utility and Right-of-Way Permits

Utility and Right-Of-Way Permits are issued and inspected by the City of Urbana Engineering Division located in the Public Works Department at 706 South Glover Avenue in Urbana.

Any time an individual, contractor, or utility needs to perform work within the City owned right-of-way, whether in the road, along the sidewalk, on the shoulder or in the ditch, a Utility and Right-of- Way Permit is required. Any time an individual, contractor, or utility needs to perform work on a sanitary lateral regardless of location a Utility and Right-of-Way Permit is required.

The purpose of the permit is twofold: 1) to ensure that work conducted in the right-of-way does not constitute a danger to the traveling public or the individuals performing the work, 2) that the completed work does not degrade the right-of-way or City infrastructure thereby resulting in increased maintenance or replacement costs to the taxpayer.

What is Right-Of-Way?

The right-of-way is public property and includes any public thoroughfare such as a street, road or alley. It also usually includes the median, utility poles, sidewalks, and the area immediately adjacent to the street. A good rule of thumb is that the back of the sidewalk (side nearest to the residence) and the street is part of the right-of-way. Private property begins behind the right-of-way.

Utility and Right-Of-Way Standards Frequently Asked Questions

What Projects Require Utility and Right-Of-Way Permits?

Examples include:

• Sidewalk repairs

• Sewer or Storm line repairs and connections

• Driveway repairs or installations

• Culvert installations

• Storm drain installation

• Utility repair or installation

• Private water & sewer line repairs and connections

• Sidewalk construction where there is an existing curb

Landscaping work (i.e. gardening, planting) done in the City right-of-way requires a Landscape License not a Utility and Right-Of-Way Permit.

If you need assistance in determining if your project requires a Utility and Right-Of-Way Permit please contact the Engineering Division at (217) 384-2342.

Where do I get a copy of the Utility and Right-Of-Way Permit application?

Copies of the Utility and Right-Of-Way permit and standard details are available:

• On the Internet at:

http://urbanaillinois.us/UROW_Permits

• At the Public Works Department front office.

What paperwork do I submit when applying for a Utility and Right-Of-Way Permit?

• Completed Utility and Right-Of-Way Permit application

• Traffic Control Plan (if applicable)

• Site Plan (clearly showing proposed work)

• Current Certificate of Liability Insurance with the City of Urbana listed as a Certificate Holder and endorsed as an Additional Insured. The following language should be used in the description section: “The City of Urbana, its agents, and employees are listed as additional insured from [date to date].” The certificate of Liability Insurance must be on file at the Public Works Department.

http://urbanaillinois.us/UROW_Permits

Utility and Right-Of-Way Standards Frequently Asked Questions

• Current Surety Bond in the amount of $10,000 must be on file at the Public Works Department. This is a separate bond from that required by the Urbana-Champaign Sanitary District.

*If you are not sure if you have these items on file with us, please call and we can let you know. A Utility and Right-Of-Way Permit will not be processed without both the complete insurance statement and the bond in the correct amount.

• Permit Fee

How much does a Utility and Right-Of-Way Permit cost?

The fee for a Utility and Right-Of-Way Permit is $80.00.

Where do I drop off my Permit application at?

The front desk at Public Works will accept and process Utility and Right-Of-Way Permit applications and fees from 7:30 a.m. to 5 p.m. Monday through Friday.

How long will it take to get a Utility and Right-Of-Way Permit?

Typically Utility and Right-Of-Way Permits are approved within 1 to 3 business days after they have been received. Please submit your completed application at least 24 hours prior to the commencing any activity in the right-of-way requiring a permit. A minimum of 24 hours’ notice is required for inspections by Public Works personnel. That will provide the time necessary to verify accuracy of your paperwork and to schedule an inspection time. Keep in mind that road closures require a 72 hour advance warning.

How long is my Utility and Right-Of-Way Permit good for?

The Utility and Right-Of-Way Permit is good for the duration of the specific project location that the Permit was applied for. A Utility and Right-of-Way Permit cannot be used at multiple locations.

What happens if I do not get a Utility and Right-Of-Way Permit for my project?

Failure to obtain a permit for work being performed in the City right-of-way or on a sanitary lateral carries a minimum fine of $160.

If concrete is to be poured as part of the project, applicant must contact the Engineering Division at (217) 384-2342 for an inspection prior to the placement of any concrete.

Public Works Department 706 Glover Avenue

Urbana, IL 61802

(217) 384-2342

FAX (217) 384-2400

UTILITY AND RIGHT OF WAY PERMIT

Project Name_____________________________________________________

Project Address___________________________________________________

Date _______/_______/__________

Applicant __________________________________________________________

Mailing Address ________________________________________________________________________ (Street) (City, State, Zip)

Phone# __________________________________ Mobile# ______________________________________

Email Address (print clearly) _______________________________________________________________

Sub-Contractor(s) _______________________________________________________________________________

Mailing Address _________________________________________________________________________ (Street) (City, State, Zip)

Phone# __________________________________ Mobile# _______________________________________

Email Address (print clearly) ________________________________________________________________

Description of work _____________________________________________________________________________

Geographic Location of Work_____________________________________________________________________

Proposed Utility and ROW Activities

[ ] Sanitary sewer lateral excavation* (Requires a UCSD permit from Urbana-Champaign Sanitary District)

UCSD Permit Number:____________________

[ ] Storm sewer lateral excavation or sump pump discharge

[ ] Utility repair or installation by directional bore (other than sewer-related)

[ ] Utility repair or installation (other than sewer-related)

Installation Method: [ ] Aerial [ ] Directional Bore [ ] Open Trench

[ ] Driveway Approach

Type of Curb: [ ] Depressed [ ] Mountable [ ] Saw cut

Material Type: [ ] Asphalt [ ] Concrete [ ] Brick

[ ] Sidewalk Repair or Replacement Material Type: [ ] Concrete [ ] Brick

[ ] Dumpster or Portable Storage Container (POD) located in ROW

For Office Use Only

Permit Fee $90.00

Permit #: ____________

Check #: ____________

[ ] Parking Lane Closure

Do you need a Road / Alley / Sidewalk closure? ** Yes or No

[ ] Complete Road Closure [ ] Lane Closure [ ] Sidewalk Closure

Date / Time to be closed _____/_____/_______ __________AM/PM

Date / Time to be opened _____/_____/_______ __________AM/PM

Will trees on City ROW be affected? Yes or No

Will on-street parking be affected? Yes or No

[ ] Traffic Control plan attached (if required)

[ ] Site plan attached

Is Liability Insurance on file with the City? Yes / No / N/A

Is Bonding on file with the City? Yes / No / N/A

Proposed starting date: _____/_____/_______ Proposed completion date: _____/_____/_______

*SANITARY SEWER LATERAL REPAIRS UNDER PAVEMENT OR SIDEWALK MAY BE ELIGIBLE FOR CITY

PAVEMENT REIMBURSEMENT PROGRAM. PLEASE CONTACT (217) 384-2342 TO INQUIRE ABOUT

PAVEMENT REIMBURSEMENT PROGRAM.

**COMPLETE ROAD CLOSURES AND LANE CLOSURES REQUIRE 72 HOURS NOTICE AND APPROVAL

FROM THE CITY OF URBANA PUBLIC WORKS DEPARTMENT

IT IS UNDERSTOOD THAT THE WORK AUTHORIZED BY THIS PERMIT SHALL BE COMPLETE WITHIN 180

DAYS OF THE DATE OF APPROVAL; OTHERWISE THIS PERMIT SHALL BECOME NULL AND VOID.

NO WORK SHALL BEGIN UNTIL AN APPROVED UTILITY AND ROW PERMIT IS ISSUED.

Signature of Applicant______________________________________________ Date _____/_____/_______

Printed Name ______________________________________________

THIS PERMIT IS SUBJECT TO THE CONDITIONS AND RESTRICTIONS PRINTED ON THE REVERSE SIDE OF THIS

PERMIT AND ALL ATTACHED STANDARDS.

PERMIT CONDITIONS

1. All construction and safety practices shall be in compliance with the current edition of the Illinois Department of Transportation “The Standard

Specifications for Road & Bridge Construction”.

2. All O.S.H.A. and other Federal and State safety regulations shall be adhered to.

3. All details and/or notes attached to the submitted plans shall be incorporated into the approved plans.

4. All traffic control shall comply with the current edition of the “Manual on Uniform Traffic Control Devices for Streets & Highways”.

5. All trench excavation work shall comply with the current edition of the “Standard Specifications for Sewer and Water Main Construction in the State of Illinois”.

6. All work requires an inspection before concrete pours or excavation backfill. Please call the Utility and Right-of-Way Technician at (217) 384- 2342 to schedule an appointment 24 hours in advance.

7. 24 hours prior to the start or restart of any construction the contractor shall notify the Utility and Right-of-Way Technician’s office at (217) 384- 2342.

8. The contractor shall not trim, cut or in any way disturb any City trees or shrubbery without the approval of the City Arborist (217) 384-2342 or his authorized representative as stated in the Urbana Tree Ordinance No. 7677-24. Should the work site be located near any City-owned tree(s) the contractor shall contact the City Arborist 24 hours prior to the start of the construction.

9. No changes shall be made from the approved plans without the written or verbal approval of the Utility and Right-of-Way Technician.

10. Upon completion of the construction the contractor shall restore the work site to a condition equal to or better than the existing condition or at the direction of the Utility and Right-of-Way Technician, according to section 20-507 of the Code of Ordinances.

11. In order to avoid utility and street light cable conflict, the contractor shall be responsible for contacting J.U.L.I.E. for public utility locations a minimum of 48 hours (two working days) prior to excavation. CALL 811 OR 1-800-892-0123 to place a local request.

12. At any time that there is damage to a utility, the contractor shall notify the appropriate parties immediately and shall be liable for the cost of repair should the contractor be found at fault.

13. Any utility information, including sewer tap location, provided by the City is based on judgment and information currently available to the City Engineer or his agent. This information is made available to the general public upon request. The City of Urbana shall not be responsible for any discrepancies between information made available and actual field locations. Actual locations of utilities and taps may vary from the information on file. It shall be the sole responsibility of the permit holder or user of the information to determine the exact utility locations in the field. The City of Urbana does not guarantee the condition or the functional capacity of said utilities and/or sewer taps.

14. Inspections performed by the City do not remove the requirements for the work performed to comply with all local, state, and federal rules, ordinances, and standards.

15. An Erosion Control Permit is required on disturbed areas over 2,000 square-feet.

ADDITIONAL COMMENTS

Centennial Farm Rd

Sq uir e F arm

R d

I - 74

Co R d 1

0 E

(fu tur e)

N Hi gh C ro ss

R d

0'

(future) 80'

E Oaks Rd 60'

Airport Rd 80'

S R ac e S t

Cu nn ing ha m Av e ( Rt

E Main St

(future) 60'

S V ine

St

E Curtis Rd 100'

Ford Harris Rd (Co Rd 2000 N) 80'

E Windsor Rd 100'

Olympian Rd 60'

E University Ave (Rt 150)

Ph ilo

R d

0'

N Co tto nw oo d R d ( Co

R d 1

0 E

Leverett Rd (Co Rd 2125 N)

N Lin co ln

Av e

E Washington St

S L inc oln Av e

(future) 200'

E Old Church Rd (Co Rd 1200 N) 100'

E Florida Ave

S H igh

C ro ss R d ( Rt

0)

S C ott on wo od R d ( Co

R d 1

0 E

Oa k S t

An de rso n S

Lin co ln

Colorado Ave

Ker Ave

W Green St

E Mumford Dr

Brow nfie ld R d

W Florida Ave

Perkins Rd 60'

Wi llo w Rd

Leverett Rd (Co Rd 2100 N) 80'

Co Rd 1900 N

W Illinois St

My ra

Ri dg e D r

Go od wi n A ve

Springfield Ave

E McHenry St

N Br oa dw ay A

E Anthony Dr 60'

W Curtis Rd 100'

W Windsor Rd 100'

N Co ler

Amber Ln

Ma rti n R d (

Co R d 1

0 E

Bradley Ave

E Curtis Rd (Co Rd 1250 N) 100'

E Washington St 80'

E Illinois St

Ki nc h S

S R ac e S

E Anthony Dr

Wi llo

W Oaks Rd 66'

Perkins Rd 66'

E Green St

S Smith Rd

Pf efe r R d

W Kenyon Rd

S O rch ard

E Windsor Rd (Co Rd 1400 N) 100'

W University Ave (Rt 45 & 150)

S L ier ma n A

Church St

W Olympian Dr 200'

E Washington St (Co Rd 1550 N) 80'

Napleton Way

W Old Church Rd (Co Rd 1200 N) 100'

S G oo dw in

Va nc e R

W Washington St

E Oaks Rd 66'

N Ra ce

Vin e S

Slayback St

E Country Club Rd

N Beringer Cir

N Wr igh t S

S H igh

C ro ss R d ( Rt

0)

(future)

Wi llo

(fu tur e)

(future)

(future)

(fu tur e)

(future) 60'

(future) 60'

(fu tur e)

(future)

(fu tur e)

Lin co ln

E

I-74 E

I-74 W

Ph ilo

R d

Leverett Rd

S R ac e S t

Airport Rd

E Curtis Rd

N Hig h C ros s R d

Cu nn ing ha m Av e

E Ford Harris Rd

N Co tto nw oo d R d

E Windsor Rd

S H igh

C ros s R d

Olympian Rd

S C ott on wo od R d

E Main St

2100N

2000N

S V ine

St

1850N

1600N

E Old Church Rd

E Oaks Rd

1400N

N Lin co ln

Av e

1250N

E Washington St

S F ou rth St

1650N

An de rso n S t

1200N

1900N

Wi llo w Rd

E Florida Ave

E University Ave

Ma rtin

R d

S S ixt h S t

Oa k S t

Brownfield Rd

Perkins Rd

Kerr Ave

Colorado Ave

Fairlawn Dr

W Main St

S F ifth

St N

Fif th

St

Scovill St

Hazelwood Dr

W Windsor Rd

1825N

S B us ey Av e

E Marriott Rd

S T hir d S t

S L inc oln Av e

N Fo urt h S t

S Cottage Grove Ave

Gregory Dr

E

E

Ap oll o D r

E

E

Hill St

Eads St

1950N

N We st Ar row he ad D r

N O ak

St

Butzow Dr

Trails Dr

1700N

N Coler Ave Stoughton St

1525N

W Pennsylvania Ave

Clark St

S G oo dw in

Av e

S S mi th Rd

Do ds on D r

Sherwin Dr

Gl ov er Av e

S W rig ht St

Abbey Rd

Div isio n A ve

W Nevada St

St Marys Rd

E Bradley Ave

Barracks Dr

E

E Clark St

W California Ave

Peabody Dr

E White St

Olympian Dr

Shurts St

E Michigan Ave

E Kirby Ave

Co un try vie w Rd

Columbia Blvd

Villa Ln

Gu rth

D r

Vance Rd

Ca rro ll A ve

La no re Dr

Marc Trl

GH Baker Dr

E Church St

Ira St

S M ath ew s A ve

Paul Ave

Griggs St

Ea ste rn Av e

Eu clid

St

Ar t B art ell

R d

Eliot Dr

Gerty Dr

Mercury Dr

E Armory Ave

Ab erc orn St

Liberty Ave

Ph illip s D r

Kyle St

E Hill St

Wilber Ave

Je ffe rso n D r

N Six th St

Sk ylin e D r

Br ad y L n

Saint Mary's Rd

Willard St

W Oregon St

Au sti n D r

Haydon Dr

W Country Club Rd

Aero Pl

E Springfield Ave

Tatman Dr

Wallace Ave

Northwood Dr

Bu rlis on D r Ba rtlo w

Rd

Sa lin e C t

Lin vie w Av e

Ro we na D r

E Olympian Dr

E Eureka St

Brian Pl

Ma cA rth ur

Dr

E Beardsley Ave

College Ct

Bliss Dr

Grove St

Hamilton Ave

E Elm St

W Park St

Po nd

St

Burkwood Dr

Mitchem Dr Brighton Dr

Gr an ge D r

Galena St

Barr Ave

Fairfield Dr

E California Ave

Rocky Ln

Holcomb Dr

Bo ud rea u D r

Peach Tree St

Sh erw in C ir

Plantation Pt

Bra d D r

Wilson Rd

Be rkl ey Av e

E Water St

Yankee Ridge Ln

Bridle Ln

Ashmore Dr

Concord Rd

E Park St

E Oregon St

Bethume Ct

E Curtis Rd

S L inc oln Av e

E Old Church Rd

E Windsor Rd

W Park St

Peabody Dr

S W rig ht St

Hill St

E

S W rig ht St

E Park St

Wi llo w Rd

N Lin co ln

Av e

1600E

Gerty Dr

E p

Legend Functional Classification

Interstate Major Arterial Major Arterial (future) Minor Arterial Minor Arterial (future) Major Collector Major Collector (future) Minor Collector Minor Collector (future) Local Roads Urbana Corporate Limits Urbana ETJ

Print Date: 10/24/2017 Aerial Photo: Spring 2017FUNCTIONAL CLASSIFICATION MAP

QUICK REFERENCE TO TREE PROTECTION ZONE

Tree/Shrub Protection (above ground)

The contractor or permit holder shall be responsible for protecting all public trees and shrubs located on the public right-of-way. Existing trees/shrubs subject to construction activity shall be boxed, fenced or otherwise protected before any work is started. The trees/shrubs to be protected, the method of protection, and the dimensions involved shall follow the guidelines of the City Arborist, or if special conditions warrant adjustment, be determined by the City Arborist in conjunction with the contractor or permit holder. Once assembled, no boxing, fencing or other protection device shall be removed without prior approval of the City Arborist or City Inspector and there shall be no construction activity or material within the enclosure.

Shrubs and small trees shall be boxed or fenced in such a manner as to encompass the entire drip line area of the tree (Figure 1). In no case shall the enclosure be less than 4 feet from the center line of the tree. Medium to large trees shall be boxed or fenced in a manner to encompass as much of the drip line area of the tree as possible as determined by property and right of way boundaries (Figure 2). In no case shall the protective device be closer than 12 feet from the center line of the tree except in those portions bordered by the public sidewalk or curb, in which case the protective device shall be offset 1 foot wherever possible.

Tree Diameter Distance of fencing from tree trunk *

Up to 4 inches Min 4 feet

4.1 – 9 inches Min 6 feet

9.1 – 14 inches Min 12 feet

14.1 – 19 inches Min 16 feet

19.1 and greater Min 20 feet

*Minimum distances listed are required unless waived by City Arborist. If available space permits greater distances for tree protection a distance of one foot from tree trunk for every one inch in tree diameter is preferred but not required.

12’

Utility Installations (underground)

All installations of underground utilities upon the public right-of-way are subject to approval by the City. Any and all installations that impact on public trees due to underground conflicts (roots) are specifically subject to the review and approval of the City Arborist before the project starts.

Trenching and Tunneling – Open trenching in the root zone of public trees is prohibited unless it falls outside the drip line of a tree’s canopy (Figure 3). All trees where there is insufficient space to bypass the drip line by trenching must be tunneled. In no case shall the tunnel be less than 2 feet in depth. When the tunneling procedure is required, the distance of the tunnel from the face of the tree is determined by the diameter of the tree 4 1/2 feet above the ground line. Unless specified otherwise by the City Arborist, all dimensions apply as illustrated in Figure 4 with the quick reference table.

Since the cutting of larger roots is unavoidable in a trenching operation, all roots over 2 inches in diameter must be cut cleanly. All trenches should not stay open longer than necessary and must be properly barricaded.

Tree Diameter (a) (at 4 1/2 feet above ground)

Distance of trenching from tree trunk (b)

Recommended depth of tunnel or trench (c)

Up to 4 inches Min 4 feet 24 inches

4.1 – 9 inches Min 6 feet 30 inches

9.1 – 14 inches Min 12 feet 30 inches

14.1 – 19 inches Min 16 feet 36 inches

19.1 and greater Min 20 feet 36 inches

*Minimum distances listed are required unless waived by City Arborist. If available space permits greater distances for tree protection, such as to drip line, are preferred but not required.

Augering - Tree root zones shall be protected by augering in the manner described below. Tree diameter is measured 4 1/2 feet above the ground. The minimum depth of auger within the tree protection zone, as defined above, shall be 24 inches below the soil surface. No trenching within the protection zone of the tree shall be permitted.

Tree Diameter Augering Instructions

Up to 4 inches Auger 4 feet from the face of tree in all directions if trench will be located within or intersect this radius.

4.1 – 9 inches Auger 6 feet from the face of tree in all directions if trench will be located within or intersect this radius.

9.1 – 14 inches Auger 12 feet from the face of tree in all directions if trench will be located within or intersect this radius.

14.1 – 19 inches Auger 16 feet from the face of tree in all directions if trench will be located within or intersect this radius.

19.1 or greater Auger 20 feet from the face of tree in all directions if trench will be located within or intersect this radius.

Revised 01/01/2022 DETAIL PAV-00 15

PAVEMENT PATCHING

CONCRETE REQUIREMENTS

CONTRACTOR shall utilize a Class PV / SI Mixture as specified in Article 1020.04 of the IDOT Standard Specifications for Road and Bridge Construction latest edition for all concrete street pavement patches.

When directed by the City Engineer, the CONTRACTOR shall utilize a Class PP-1 Early Strength Mixture (2 day mix) as specified in Article 1020.04 of the IDOT Standard Specifications for Road and Bridge Construction latest edition.

HOT-MIX ASPHALT REQUIREMENTS

When directed by the City Engineer patches over 50’ in length or 300 SQ FT in hot-mix asphalt streets shall be constructed according to detail UTL-02 and the requirements for a class B patch with HMA resurfacing in Section 442 of the IDOT Standard Specifications for Road and Bridge Construction latest edition.

The HMA mixture requirements for the surface course shall be IL-9.5 mixture composition, N50 design density, and PG 70-22 binder grade. The frictional requirements shall be mixture D for all arterials and major collectors, and mixture C for all minor collectors and local roads.

If the Contractor elects to remove the HMA pavement using self-propelled milling machine, the material shall be taken to the Urbana Landscape Recycling Center, 1210 East University Avenue, Urbana.

Revised 01/01/2022 DETAIL PAV-09 24

CURB AND GUTTER

REPLACEMENT REQUIREMENTS

Contractor shall match existing style and dimensions for any curb and gutter removed during construction activities.

See Details PAV-10 & PAV-11 for standard curb and gutter dimensions.

Revised 01/01/2022 DETAIL PAV-10 25

Revised 01/01/2022 DETAIL PAV-11 26

Revised 01/01/2022 DETAIL SEW-09 35

SEWER LATERAL ABANDONMENT

The sewer service lateral shall be exposed and properly sealed at a point outside the limits of demolition, within five feet of the property line or easement boundary. Sewer service laterals that are to be abandoned will be securely closed at the pipe end with a cap fitting or plug. Cap fittings shall be manufactured and provide a watertight seal, without the use of adhesives or epoxies. All pipe cap fittings shall be subject to approval by the Public Works Director or their designee prior to installation.

Contractor shall provide at least 3 dimensional ties to the end of the abandoned lateral to the Utility and Right-of-Way Inspector.

Properties may re-use previously sealed and abandoned sewer service laterals. Sewer laterals must have an internal television inspection completed all the way to the public sewer pipe prior to re-use of the lateral. The Director of Public Works or their designee must review televising report and pipe data (material and diameter) and approve re-use of a sewer lateral. Property owner is solely responsible to assure the condition of the remaining pipe to be re-used.

Revised 01/01/2022 DETAIL SID-00 36

SIDEWALKS

PROWAG STANDARDS

All sidewalks shall be built or replaced in accordance with the latest Proposed Accessibility Guidelines for Pedestrian Facilities in Public Right-Of-Way (PROWAG) standards. The latest PROWAG standards are available at http://www.access-board.gov

WIDTH OF SIDEWALK REPLACEMENT

CONTRACTOR shall match the existing sidewalk width for sidewalk repairs or replacements less than 100-feet in length that do not include sidewalks ramps. A 5-ft wide sidewalk shall be provided for any repairs or replacements over 100-ft in length or that include sidewalk ramps. The 5-ft wide sidewalk shall be tapered back to the existing sidewalk utilizing a 5-ft transition panel.

Revised 01/01/2022 DETAIL SID-04 40

BRICK SIDEWALK REPAIRS

REPLACEMENT BRICK POLICY FOR CONTRACTORS AND UTILITIES

Utility companies and contractors shall be responsible for preserving the existing bricks and replacing any broken or damaged bricks while working within the public right-of-way. Replacement bricks shall match the existing brick pavement in pattern, dimension, texture and color to the satisfaction of the City of Urbana’s Right-of-Way Inspector.

Brick sidewalk repairs shall be completed in accordance with Detail SID-01 from the City of Urbana’s Right-of-Way Standards. Brick street repairs shall be completed in accordance with Detail UTL-03 from the City’s Right-of-Way Standards.

The City of Urbana will not supply any replacement sidewalk brick or street brick to the utility companies or contractors from the City’s brick stockpile.

REPLACEMENT BRICK POLICY FOR PROPERTY OWNERS

REPAIRING OR MAINTAINING A BRICK SIDEWALK

The City will provide bricks and/or barricades for the resident, if needed, at no cost to the resident.

Residents are required to obtain a right-of-way permit to proceed with the project.

Residents may not worsen the condition of the sidewalk or leave the sidewalk in disrepair for an unreasonable amount of time. If either situation occurs, the City will intervene to correct the situation.

Revised 01/01/2022 DETAIL SIG-00 41

SIGNS IN PUBLIC RIGHT-OF-WAY

Signs that are for short-term, timed use shall be allowed in the City’s right-of-way as long as the signs are removed immediately following the event. Such signs would include garage sale signs, political campaign signs, significant University of Illinois events (i.e. IHSA tournaments) and fund-raising advertisements for non-profit agencies (i.e. UBA events, Festival of Lights).

No such signs shall be affixed to any City or utility infrastructure including traffic signals, streetlights, street sign posts, utility poles, hydrants, etc. but rather shall be attached to a self-supported stake or post.

Signs that have no definitive time for removal shall not be allowed in the City’s right-of-way. Such signs would include newspaper stands, real estate signs, and home business signs or advertising, except as allowed in the Urbana Zoning Ordinance, Section IX-5-13.

If these signs were placed in the right-of-way, the City will attempt to notify the owner of the signs and ask that the signs be removed immediately (within 48 hours). If the owner cannot be located or does not remove the signs, the City shall remove the signs and notify the owner where to collect the signs. If the owner of the signs cannot be located, the signs will be discarded after thirty (30) days. Otherwise, the signs would be discarded five (5) days after notification.

The owner of a property may remove any political campaign sign directly in front of said property placed in the public right-of-way.

Revised 01/01/2022 DETAIL SIG-01 42

DIRECTIONAL SIGNS

IN PUBLIC RIGHT-OF-WAY

I. GENERAL

Need for Supplemental Signing

It is frequently desirable to inform drivers of major traffic generators and certain motorist services in the area. Information relating to those developments that generate a large volume of non-repetitive traffic foreign to the area are shown on supplemental guide signs when they meet the required criteria outlined in this policy.

This policy has been developed to regulate and ensure the consistent use of supplemental guide signs for traffic generators and motorist services. This policy applies to all guides and information signing placed on City-maintained right-of-way.

Purpose of Criteria and Limitations

Criteria are necessary for determining which traffic generators and motorist services are displayed on supplemental guide signs so that the facilities shown are the one generating the greatest need for information on the part of motorists unfamiliar with an area.

Such criteria must also limit the number of signs installed, thereby minimizing the confusion that may occur when motorists are presented more information than they can rapidly comprehend. It also assures fair and consistent treatment of requests for signing to such facilities.

The establishment of criteria, however, does not mean that information concerning all facilities which meet the criteria will automatically be shown on supplemental guide signs. Signing for traffic generators and motorist services is considered as secondary to basic regulatory, warning, and directional signing. Therefore, before a supplemental guide sign for a traffic generator or motorist service is installed, sufficient longitudinal space along the highway must exist to accommodate the placement of the sign without interfering or conflicting with other necessary traffic control devices.

Revised 01/01/2022 DETAIL SIG-02 43

Consideration will also be given to such factors as the space available along streets and the congestion of the area.

Signing for a motorist service or traffic generator, when qualified under the criteria in Table 1 or 2, will be installed by the City only after a request is received from an official of either type of facility.

Such criteria must also limit the number of signs installed, thereby minimizing the confusion that may occur when motorists are presented more information than they can rapidly comprehend. It also assures fair and consistent treatment of requests for signing to such facilities.

The establishment of criteria, however, does not mean that information concerning all facilities which meet the criteria will automatically be shown on supplemental guide signs. Signing for traffic generators and motorist services is considered as secondary to basic regulatory, warning, and directional signing. Therefore, before a supplemental guide sign for a traffic generator or motorist service is installed, sufficient longitudinal space along the highway must exist to accommodate the placement of the sign without interfering or conflicting with other necessary traffic control devices. Consideration will also be given to such factors as the space available along streets and the congestion of the area.

Signing for a motorist service or traffic generator, when qualified under the criteria in Table 1 or 2, will be installed by the City only after a request is received from an official of either type of facility.

Supplemental guide signs shall conform to the provisions of the Illinois Manual on Uniform Traffic Control Devices. All signs shall be approved by the City as to color, size, message and specific location. All signs shall be installed by the City. The expense of the sign and its installation shall be borne by the requestor.

Revised 01/01/2022 DETAIL SIG-03 44

II. SIGNING FOR TRAFFIC GENERATORS

Criteria for Traffic Generator Signing

The following types of traffic generators are to be considered for signing. The specific qualifying criteria for each type of traffic generator are shown in Table 1. Those values that vary annually, such as student enrollment or annual attendance, shall be based upon the average value for the two previous years.

• Transportation Facilities

• Educational Institutions

• Correctional Institutions

• Health Care Facilities

• Recreational & Cultural Facilities

• Historical Facilities

• Government Facilities

• Business Districts

Supplemental guide signs for the qualifying generator shall be erected in advance of the street or road that provides the most logical and convenient route to the facility. In determining whether there is adequate signing to direct the motorist to the facility the City will consider such factors as the directness of the route, the miles involved, and the environment in which signs are installed.

Information relating to more than three facilities shall not be displayed in advance of an intersection.

Revised 01/01/2022 DETAIL SIG-04 45

In the event there are more than three qualifying traffic generators, the three facilities most necessary to the motorist shall be shown. In determining which signs are most necessary, the City will consider such factors as the amount of traffic generated, closeness to the intersection, and the ease of locating the facility.

Reference to a specific traffic generator shall be removed at such time as that generator is no longer functioning or fails to meet the criteria.

Location of Signs

If a separate supplemental guide sign is erected, it shall be located at least 200 feet in advance of the primary guide sign, if one exists. If a primary guide sign is not present, the supplemental sign shall be placed 200 to 700 feet in advance of the intersection.

Sign Design

The legend and background colors shall be as shown in Table 1. If different color(s) and logo(s) are desired than shown in Table 1; approval must be granted by the Committee of the Whole. Signs normally carry the full name of the traffic generator(s) and appropriate arrow indications, however, appropriate abbreviations and logo symbols may be considered.

Revised 01/01/2022 DETAIL SIG-05 46

III. SIGNING FOR MOTORIST SERVICES

Criteria for Motorist Service Signing

The following types of motorist services are to be considered for signing. The specific qualifying criteria for each type of motorist service are shown in Table 2.

• Camping Facilities

• Police and County Sheriff Headquarters

• Hospitals

• Tourist Information Centers

In determining whether adequate directional information is provided, the City will consider factors which include, but are not limited to, the directness of the route, the miles involved, and the environment in which the signs are installed.

Reference to a specific motorist service shall be removed at such time as that service is no longer available or fails to meet the criteria.

Location of Signs

The location of signing for motorist’s services shall conform to the requirements for traffic generator signs covered in Section II (B). Hospital symbol signs for hospital meeting the criteria established in Table 2 are to be located in advance of the intersection that provides the most direct and best route to the facility. In determining the most direct and best route, the City will consider all relevant conditions including directness of the route, congestion of the route, speed of travel, length of travel, and ease of locating the facility.

Sign Design

Motorist service signs shall have a white legend on a blue background and all shall indicate only the type of service available and an appropriate arrow. Qualifying hospitals will be signed with a Hospital Symbol sign as opposed to the work message, “HOSPITAL.” The hospital name shall be displayed on a plate above the hospital symbol sign where two or more qualifying hospitals are served by the same route.

R ev is ed

1/

/2

D

ET

AI

L

SI

G

-0

D

IR

EC

TI

O N

A L

SI

G

N S

IN

P

U B

LI

C

R

IG

H T-

O F-

W

AY

TA

B

LE

T R

AF

FI

C G

EN

ER

AT

O

R C

R

IT

ER

IA

C

LA

SS

IF

IC

AT

IO

IT

EX

AM

PL

ES

SI

G

O

LO

Tr an sp or ta tio n Fa ci lit ie s

Ai rp or t:

C om m er ci al a irp or t w ith s ch ed ul ed s er vi ce a nd id en tif ie on th of fic ia l S ta te m ap ai lro ad

S ta tio n:

P ro vi di ng ra ilr oa d pa ss en ge r s er vi ce , i

.e . A

M

TR

AK

Bu s

Te rm in al

H an dl in g o r m or e bu se s pe r w ee k

Fe rr y:

O pe ra te d by e ith er p riv at e or p ub lic o rg an iz at io ns hi te o n

G re en

Ed uc at io na l

In st itu tio

Po st

-h ig h-sc ho ol in st itu tio ns h av in g a m in im um o f 5 fu ll-tim e eq ui va le nt s tu de nt s.

ol le ge

U ni ve rs ity

, 4

Ye ar

, S em in ar y

Ju ni or , T ra de

S ch oo l, C om m un ity te o n G at e sc ho ol fo r s pe ci al e du ca tio n Sc ho ol fo r t he H an di ca pp ed or re ct io na l In st itu

Fe de ra l o r S ta te o pe ra te d C or re ct io na l C en te r, Yo ut h

C am p W hi te o n

G

H ea lth C ar e

Fa ci lit ie s M en ta l h ea lth re si de nt ia l c ar e fa ci lit y lic en se d by th e

St at e or v et er s’ ho sp ita l l is te d on th e of fic ia l S ta te m ap

M en ta l H ea lth Z on e

C en te r, Ve te ra ns

H os pi ta l

W hi te o n G ec re at io na l a nd ul tu ra l F ac ilit ie s

Th e fa ci lit y m us t b e op en to th e ge ne ra l p ub lic a nd h av e a m in im um nu al a tte nd an ce o f 5

0, 0.

Am us em en t P ar k, Aq ua riu m

Ar bo re tu m

Ar ch eo lo gi ca l S ite

Au di to riu m , B al l

Pa rk

, C on ve nt io n

H al l

Fa irg ro un d, F or es t Pr es er ve , M us eu m

N at ur e

Pr es er

Pa rk , P la ne ta riu m

St ad iu m

, Z oo te o n Br ow n ut do or re cr ea tio na l f ac ilit y pr ov id ed b y yo ut h or ga ni za tio n an d op ye

-ro un d w ith a m in im um a nn ua l a tte nd an ce o f 5

,0

Bo y/ G irl S co ut

C am p, C hu rc h C am p, -H am p, Y M

C A/

YW

C

A C p is ed

1/

/2

D

ET

AI

L

SI

G

-0

EC

TI

O N

A L

SI

G

N S

IN

P

U B

LI

C

R

IG

H T-

O F-

LE

T R

AF

FI

C G

EN

ER

AT

O

R C

R

IT

SS

IF

IC

AT

IT

N

C O is to ric al F ac ilit ie s

Sp ec ia l l oc al h is to ric al a ttr ac tio n op en y ea r-r ou nd w ith n o ch ar ge to th e pu bl ic o r a ny S ta te h is to ric al s ite li st ed o n th e of fic ia l S ta te m ap

H is to ric al H om e/

Bu ild in g

In di an S ite

M um en t C ov er ed B rid ge io na l C em et er y

W hi te o n Br ow n

G ov er nm en t F ac ilit ie s

An y bu ild in g co m pl ex w ith e m pl oy ee s th at is u til iz ed b y a

Lo ca l, St at e, o r F ed er al g ov er nm en t a ge nc y.

Am un iti on P la nt

At om ic

E ne rg y

C om m is si

In st al la tio n M ilit ar y Ba se e or

F ed er al

R es ea rc h Fa ci lit y

W hi te o n G

Bu si ne ss

D is tri ct s Th e m ar ke d ro ut e m us t p as s w ith in th e m un ic ip al li m its a nd n ot c lo se r th an

½ m ile to th e ce nt ra l b us in es s di st ric t o f a c om m un ity w ith le ss th

0, po pu la n te o n

G is ed

1/

/2

D

ET

AI

L

SI

G

-0

EC

TI

O N

A L

SI

G

N S

IN

P

U B

LI

C

R

IG

H T-

O F-

LE

M O

TO

R

IS

T

SE

RV

IC

E

C R

IT

SS

IF

IC

AT

IT

N C

O pi ng

F ac ilit ie s

O pe n to th e ge ne ra l p ub lic a nd m ee tin g th e fo llo w in g:

in im um o f 2 sp ac es

To ile t, te le ph on e, a nd a de qu at e su pp ly o f d rin ki ng w pe n

-h ou rs p er d ay fo r a t l ea st m on th s of th e ye

Le ss th an ro ad m ile s in ru ra l a re a an d m ile in u rb an a re a fro m th e in te rs ec n.

om m er ci al pg ro un d C on se rv at io n

Ar ou nt y Pa rk

S ta te P ar k

W hi te o n Bl ue e Po lic e an d

C ou nt y

Sh iff dq ua rte rs t b e st af fe d an d op en to th e pu bl ic ho ur s a da y.

dq ua rte rs s ha ll no t b e m or e th an m ile fr om th e in te rs ec te o n os pi ta ls t b e a ho sp ita l l oc at ed w ith in fi ve m ile s fro m th e in te rs ec

Sy bo lic

W te o n

To ur is t I nf or m at io n

C en te rs

Th fa ci lit y sh al l n ot b e m or e th an m ile fr om th e in te rs ec tio n an d m us t b e op er at ed b y or ga ni za tio n su ch a s ci vi c cl ub s, c ha m be rs o f c om m er ce , o r p riv at e en te rp ris es , w ith n o at te m pt m ad e to p ro m ot e th e se rv ic e gr ou p to th e to ur is ts s ee ki ng in fo rm at io n, a lth ou gh th e gr ou p m ay b e id en tif ie d.

In fo rm at io n m us t b e av ai la bl e at le as t 8 h ou rs p er d ay , 7 d ay s pe r w ee k, a nd fo r a m in im um of c on tin uo us m on th s ou t o f t he y ea r.

S ig ns m us t b e re m ov ed o r c ov er ed d ur in g th e of f se as on

Ad eq ua te o ff-st re et p ar ki ng m us t b e pr ov id ed

Th e in fo rm at io n sh al l b e di st rib ut ed fr ee , w ith n o at te m pt to p ro m ot e an y on e to ur is t s er vi ce ov a no th er

A de ta ile d m ap o f t he a re a m us t b e di sp la ye d at th e ce nt er

Th e ce nt er s ha ll no t b e on th e gr ou nd s or in c on ne ct io n w ith a c om m er ci al b us in es s su pp ly in g m ot or is t s er vi ce s su ch a s ga s, fo od , l od gi ng , o r c am pi ng

It m ay b e lo ca te d on g ro un ds o cc up ie d by a n um be r o f b us in es se s, s uc h as a s ho pp in g ce nt er , b ut th e fa ci lit y m us t b e w el l r em ov ed fr om th e co m m er ci al s tru ct ur es

Ac ce ss to th e ce nt er m us t b e av ai la bl e w ith ou t p as si ng th ro ug h a co m m er ci al s tru ct ur e or b us in es s.

Revised 01/01/2022 DETAIL UTL-00 50

UTILITY CUTS

BACKFILL REQUIREMENTS

Controlled Low Strength Material (CLSM) shall be required for backfilling utility cuts on all arterial and major collector streets. CLSM backfill shall be in accordance with Section 20-2.21B of the Standard Specifications for Water & Sewer Construction in Illinois latest edition.

See Street Functional Classification Map on Page 7 of the Utility and ROW Permit Standard Details for the location of arterial and major collector streets.

Granular materials or CLSM may be used to backfill utility cuts on minor collector streets and local streets. Granular backfill shall be in accordance with Section 20- 2.2.20B of the Standard Specifications for Water & Sewer Construction in Illinois latest edition.

DIRECTIONAL BORING REQUIREMENTS

CONTRACTOR may submit plans for installation of utilities via directional boring subject to the approval of the Engineer. Prior to plan submittal CONTRACTOR shall follow JULIE guidelines for Large Projects found at https://www.illinois1call.com/large-project/

Plans shall include the following:

• Planned Bore path with a 2’ minimum horizontal separation between all utilities and 5’ between proposed utility and City Sewers.

• Locations of other utilities within or adjacent to the proposed bore path must be shown. Plans shall be submitted to existing utilities in the project area to confirm locations and depths.

• Locate and show all substructures.

• Show Public right-of-way widths and locations and any additional private easements required.

• Specify sewers and/or sewer service laterals to be televised.

• Determine the need for traffic control and/or flagmen and include the provisions in the contract requirements along with the appropriate drawings.

Revised 01/01/2022 DETAIL UTL-01 51

Before installation the CONTRACTOR shall complete the following:

• Notify adjacent land owners of the proposed construction two (2) weeks prior to beginning construction via direct mailings and door hangers. Mailings and/or door hangers shall advise the occupants of the home or business of the planned boring operation and alert them of potential for utility damage. The door hanger shall contain the contact name and the contact phone number of the utility responsible for the boring operation. The door hanger shall instruct the property owner to contact the utility prior contacting the City.

• Notify adjacent land owners that they need to locate their buried facilities when applicable via direct mailings and / or permitted hand fliers.

• Erect and maintain a project sign with minimum dimensions of 3’x3’ on each street where work is being performed stating the following: Name of project, Name of Project contact, and Project contact phone number.

• Field verify location of all utilities and substructures shown on the plans.

• All public sanitary and storm sewers in the project area shall be televised using a recording device, prior to and after construction. CONTRACTOR may elect to televise sewer service laterals in the project area. Submit copies of the recording to the City Engineer with a plan view referencing the location of the sewer(s) relative to the recording.

• Pot hole, hand dig, or vacuum excavate, all utility services that were not televised or otherwise confirmed within eighteen (18) inches of either side of proposed bore path.

• Erosion Control measures shall be specified to insure sediments do not enter the storm water system. Erosion control fence shall be required around excavations. Inlet filter bags shall be required.

• Provide appropriate traffic control measures in accordance with the IDOT highway standards.

At any time that there is damage to a utility, the contractor shall notify the appropriate parties immediately and shall be liable for the cost of repair should the contractor be found at fault.

Revised 01/01/2022 DETAIL LAN-00 58

LANDSCAPING

LANDSCAPE REQUIREMENTS

Upon completion of the construction the contractor shall restore the work site to a condition equal to or better than the existing condition or at the direction of the Utility and Right-of-Way Technician, within ten days after completion of the work, according to section 20-507 of the Code of Ordinances.

When directed by the City Engineer, the CONTRACTOR shall place temporary seeding, erosion control blanket(s), or sod when work is completed outside of seeding times (April 1 to June 15 and August 1 to November 1).

All methods shall meet the requirements of the IDOT Standard Specifications for Road and Bridge Construction latest edition. Temporary Seeding section 1081.15 (g), Erosion Control Blanket section 251.04, and Sod section 252.

APPENDIX A

TRAFFIC CONTROL STANDARDS

Please consult current edition of the Manual on Uniform Traffic Control Devices (MUTCD) published by the Federal Highway Administration for traffic control details and standards.

A copy of the manual can be downloaded from:

https://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm

Contractor shall submit a traffic control plan for the proposed construction work in City Right-Of-Way. Traffic control plan will be subject to City review and approval prior to beginning any work.

https://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm

APPENDIX B

SUPPLEMENTAL HIGHWAY AUTHORITY AGREEMENT TEMPLATE

After recording return to:

City of Urbana Legal Division 400 S. Vine Street Urbana, IL 61801

SUPPLEMENTAL AGREEMENT

This Supplemental Agreement (“Supplemental Agreement”) is entered into this _____ day of ____________, 20__ by and between ___________________________ as owner or operator of underground storage tank(s) (“Owner/Operator”), and the City of Urbana, Illinois (“Highway Authority”), as follows:

1. This Supplemental Agreement is not binding upon the Highway Authority until it is executed by the undersigned representative of the Highway Authority and prior to execution, this Supplemental Agreement constitutes an offer by Owner/Operator.

2. Owner/Operator stipulates:

a. Owner/Operator is pursuing a corrective action of a Site and of the right-of-way adjacent to the boundary of the Site located at _____________________, Urbana, Illinois

(the “Site”).

b. Attached as Exhibit A is a site map that shows the area of estimated contaminant-impacted soil and groundwater at the time of this Supplemental Agreement in the right-of-way above Tier 1 residential levels under 35 Ill. Admin. Code Part 742.

Also attached as Exhibit A is a table that shows the concentration of contaminants of concern, hereinafter “Contaminants,” in the soil and groundwater within the area described in Exhibit A and that shows the applicable Tier 1 soil remediation objectives for residential property and Tier 1 objectives for groundwater of the Illinois Pollution

Control Board that are exceeded. The right-of-way, and only the right-of-way, as described in Exhibit B, hereinafter the “Right-of-Way,” adjacent to the Site is subject to this Supplemental Agreement. As the drawings in the Exhibits are not plats, the boundary of the Right-of-Way in the Exhibits may be an approximation of the actual

Right-of-Way lines. In the event that either the Highway Authority or Owner/Operator determines that the area of estimated contaminant impacted soil and groundwater has expanded or materially changed, the Parties shall amend Exhibit A of this Agreement to reflect the estimated contaminant impacted soil and groundwater. Also, in the event the

Highway Authority expands the right-of-way by acquiring all or part of the Site property or a property adjacent to the Site property which is or may be contaminated, the Parties shall amend Exhibit A and Exhibit B of this Agreement to reflect the estimated contaminant impacted soil and groundwater and describe and depict the right-of-ways.

c. The Illinois Emergency Management Agency has assigned incident number

__________ to this release at the Site.

d. Owner/Operator intends to request risk-based, site specific soil and/or groundwater remediation objectives from Illinois Environmental Protection Agency

(“IEPA”) under 35 Ill. Admin. Code Part 742.

e. Under these rules, use of risk-based, site-specific remediation objectives in the

Right-of-Way may require the use of a Highway Authority Agreement as defined in

35 Ill. Admin. Code Section 742.1020.

3. The Highway Authority stipulates:

The Highway Authority holds a fee simple interest or a dedication for highway purposes in the Right-of-Way, or the Right-of-Way is a platted street, and the Highway

Authority has jurisdiction of the Right-of-Way. As such, the Highway Authority exercises sole control over the use of groundwater beneath the Right-of-Way and over access to the soil beneath the Right-of-Way because a permit is required for said access.

4. The parties stipulate that:

a. They have agreed to enter into a Highway Authority Agreement regarding the

Right-of-Way in the form attached as…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .