AL-1884-5021 Rev B - ACL.pdf

PDF 774 KB Posted

Attached to
ALS-U BPM Jumper Cables - Brackets
Solicitation number
AM202604-13
Issued by

About this file

This is an Acceptance Criteria List (ACL) for SR BPM jumper cable brackets under the Advanced Light Source Upgrade Project at Lawrence Berkeley National Laboratory. The document (AL-1884-5021, Revision B) was released on March 30, 2026, and establishes quality assurance requirements for approximately 250 sets of jumper cable bracket components.

The ACL specifies four primary acceptance criteria to be verified by the Beam Diagnostics group: visual inspection confirming correct label application and absence of visible damage or workmanship defects; dimension verification of critical measurements (height, width, thickness) against drawing specifications; tap hole inspection ensuring correct size, thread quality, depth, and cleanliness per drawing requirements; and material certification review to confirm compliance with specified requirements. All acceptance criteria are designated as "Low" level of care and require 10% sample inspection of the SR BPM jumper cable brackets. Supporting documentation references 13 component drawings (AL-1791-5257 through AL-1863-8575) detailing various support brackets, adapter plates, and acrylic covers that comprise the jumper cable bracket assembly. The verification process includes pass/fail checkboxes, nonconformance report tracking, and signature blocks for inspection data documentation. Contact information for the prepared document is provided through Changchun Sun (CCSUN@lbl.gov, 510-486-7710) of the Beam Diagnostics group at Lawrence Berkeley National Laboratory.

View the file

Other files

File Type Posted
UPDATED - AL-1856-3588B.pdf PDF
STEP FILES - SR ARC RAFT DIAGNOSTISC(1).zip ZIP file
Price Proposal Schedule Attachment B.xlsx XLSX spreadsheet
AL-1887-8364 Rev A.pdf PDF
AL-1856-3588 Rev A.pdf PDF
AL-1880-8281 Rev B.pdf PDF
AL-1834-5302 Rev D.pdf PDF
AL-1827-8073 Rev D.pdf PDF
Sample Subcontract - 7864777.docx DOCX document
Past Performance Reference Information Form.docx DOCX document
AL-1809-0433 Rev C.pdf PDF
AL-1791-5257 Rev G.pdf PDF
AL-1809-0424 Rev E.pdf PDF
Rep-Cert Form - BPM Brackets.docx DOCX document
AL-1881-8087 Rev C - SOW.pdf PDF
AL-1856-3584 Rev B.pdf PDF
AL-1827-8092 Rev C.pdf PDF
RFQ - Brackets BPM Jumper Cable.docx DOCX document
AL-1863-8575 Rev C.pdf PDF
AL-1834-5301 Rev C.pdf PDF
AL-1799-0821 Rev D.pdf PDF
AL-1834-6726 Rev C.pdf PDF
AL-1871-5458 Rev B.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Advanced Light Source Upgrade Project Lawrence Berkeley National Laboratory

All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.

Printed hard copies of this document are for reference only.

SR BPM Jumper Cable Bracket ACL

SR BPM jumper cable bracket ACL

Release Date: Mar 30 2026 2:47:38 PM PDT

Document Number: AL-1884-5021 Revision: B

Document Status: Released

Document Type: ACCEPTANCE CRITERIA LIST (ACL)

Category Code: AL7001

O ffi ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

0t h, D

C C

A ut h K ey : Q

3C 5X

4W Y8

B

Downloaded by: Changchun Sun at April 02, 2026 08:45:51

AL-1884-5021 Rev. B Doc. Status: Released Page 2 of 8

All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.

TABLE OF CONTENTS

1 Revision History2

2 Approvals2

3 Abbreviations and Acronyms2

4 Authorizing Document2

5 Reference3

6 Acceptance Criteria Listing Form7

1 REVISION HISTORY

Rev. CM Number Description of Change A Baseline B Update Supporting Document ID

2 APPROVALS

The following individual(s) shall approve this document:

Approver Project Role Changchun Sun CAM and Technical Lead Jiani Niu QA Manager Windchill Approved / Concurred By jianiniu

3 ABBREVIATIONS AND ACRONYMS

ALS Advanced Light Source QA Quality Assurance

4 AUTHORIZING DOCUMENT

LBNL QA Plan PUB 3111: https://commons.lbl.gov/display/rpm2/Quality+Assurance+Policy

LBNL ALS-U Quality Assurance Plan, AL-1024-3173, https://dcc.lbl.gov/download.php?filename=AL-

1024-3173A.pdf ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

0t h, D

C C

A ut h K ey : Q

3C 5X

4W Y8

B

Downloaded by: Changchun Sun at April 02, 2026 08:45:51 https://commons.lbl.gov/display/rpm2/Quality+Assurance+Policy https://dcc.lbl.gov/download.php?filename=AL-1024-3173A.pdf https://dcc.lbl.gov/download.php?filename=AL-1024-3173A.pdf

AL-1884-5021 Rev. B Doc. Status: Released Page 3 of 8

All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.

5 REFERENCE

Table 1 Reference document to perform ACL

ID LBNL ID Description Illustration Note

1 AL-1791-5257 PTC SUPPORT BRACKET

2 AL-1799-0821

PTC BOX COVER,

ACRYLIC

3 AL-1809-0424

PTC SUPPORT

BRACKET, SIDE MOUNT

4 AL-1809-0433

COVER, ACRYLIC, PTC

SIDE MOUNT ASSY

ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

0t h, D

C C

A ut h K ey : Q

3C 5X

4W Y8

AL-1884-5021 Rev. B Doc. Status: Released Page 4 of 8

All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.

5 AL-1827-8073

PTC SUPPORT

BRACKET, LEFT SIDE

MOUNT

6 AL-1827-8092

COVER, ACRYLIC, PTC

LEFT SIDE MOUNT

ASSY

7 AL-1834-5301 PTC, ADAPTER PLATE

8 AL-1834-5302

PTC, ADAPTER PLATE

SINGLE S5R1

9 AL-1834-6726

PTC, ADAPTER PLATE,

SINGLE, SLOTTED

ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

0t h, D

C C

A ut h K ey : Q

3C 5X

4W Y8

AL-1884-5021 Rev. B Doc. Status: Released Page 5 of 8

All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.

10 AL-1856-3584

SR, BPM CABLE

SUPPORT BRKT

11 AL-1856-3588

INTERFACE BRKT

12 AL-1871-5458

SUPPORT BRKT, BASE

MOUNT

ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

0t h, D

C C

A ut h K ey : Q

3C 5X

4W Y8

AL-1884-5021 Rev. B Doc. Status: Released Page 6 of 8

All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.

13 AL-1863-8575

SUPPORT BRKT, R1

OFFSET

ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

0t h, D

C C

A ut h K ey : Q

3C 5X

4W Y8

All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.

6 ACCEPTANCE CRITERIA LISTING FORM

Level of Care : ☐ Very High ☐ High ☐ Medium ☒ Low

Prepared by: Changchun Sun Group: Beam Diagnostics

Email: CCSUN@lbl.gov Location: Lawrence Berkeley National Lab

Phone: 510-486-7710 Date: Feb, 2026

Part Name: Jumper cable bracket Quantity: ~250 set

Part Number: See Section 5 for individual component S/N (if applicable)

NCR Reviewers

Additional Remarks:

Inspect samples (10%) of SR BPM jumper cable brackets ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

0t h, D

C C

A ut h K ey : Q

3C 5X

4W Y8

B mailto:CCSUN@lbl.gov

AL-1884-5021 Rev. B Doc. Status: Released Page 8 of 8

All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.

ITE

M

NO.

REQ ID /

DCC doc #

CHARACTERISTIC OR TEST TO

BE CONDUCTED, VERIFIED or

WITNESSED

SUPPORTING

DOCUMENT ID VERIFYING

ENTITY

NonConformance

Report # if NCR exists

PASS / FAIL

DATE

VERIFICATION

REPORT/

INSPECTION DATA

1.

Visual inspection:

1. Verify that all labels are correctly applied and match the applicable drawing

2. Confirm that the part shows no visible damage, defects, or workmanship issues.

See Section 5 for individual component

Beam

Diagnostics

NCR #: PASS ☐ FAIL ☐

INITIALS DATE

2.

Dimension Verification:

1. Verify that critical

(height, width, thickness) dimensions meet the requirements specified

See Section 5 for individual component

Beam

Diagnostics

3.

Tap hole inspection:

1. Inspect all tapped holes for correct size, thread quality, and depth per drawing requirements.

2. Ensure threads are clean and free of damage or contamination

See Section 5 for individual component

Beam

Diagnostics

4.

Review material certification:

1. Verify that material certifications are provided and comply with the requirements

See Section 5 for individual component

Beam

Diagnostics ci al ly R el ea se d

To th e

LB

N L

D oc um en t C on tr ol

C en te r

Re le as ed

: M ar ch

0t h, D

C C

A ut h K ey : Q

3C 5X

4W Y8

File details come from the government source that posted it. Updated .