About this file
This document is an Acceptance Criteria List (ACL) for two M1 Mirrors (part numbers AL-1788-5220 and AL-1789-9198) for the Advanced Light Source Upgrade (ALS-U) Beamline 5.3.2.1 and 5.3.2.2 projects. The document, released on May 6, 2025, with Revision A, provides a comprehensive verification and testing requirements checklist for the mirrors, with a "Very High" level of care.
The verification process includes multiple stages of documentation and delivery checks, such as reviewing the Factory Acceptance Test Plan (FATP), verifying documentation packages, inspecting shipping plans, and conducting Onsite Acceptance Tests (OSAT). Key verification points include ensuring shipping containers are undamaged, optical surfaces are pristine, and non-contact optical metrology confirms that the optics meet all specified requirements. The document is part of the Lawrence Berkeley National Laboratory's quality assurance process for the ALS-U project, which aims to significantly enhance the brightness and coherent light capabilities of the existing Advanced Light Source facility.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACL Acceptance Criteria List of the New 5.3.2.1 and
5.3.2.2 M1 Mirrors
Release Date: May 6 2025 10:44:26 AM PDT
Document Number: AL-1801-5702 Revision: A
Document Status: Released
Document Type: ACCEPTANCE CRITERIA LIST (ACL)
Category Code: AL6102
O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay th
, 2
D
C C
A ut h K ey : 0
RK
X H
SI
C
Downloaded by: Windchill Watermarker
AL-1801-5702 Rev. A Doc. Status: Released Page 2 of 6
Advanced Light Source Lawrence Berkeley National Laboratory
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Printed hard copies of this document are for reference only.
TABLE OF CONTENTS
1 Revision History
2 Approvals
3 Abbreviations and Acronyms
4 Authorizing Document
5 Reference
6 Acceptance Criteria Listing Form
1 REVISION HISTORY
Rev. CM Number Description of Change A Baseline
2 APPROVALS
The following individual(s) shall review this document:
Reviewer Project Role Dean Kurilich ALS 2.0 Beamline Engineer Christopher Huschke ALS 2.0 Beamline Engineer Arnaud Allezy ALS 2.0 Chief Engineer The following individual(s) reviewed this document:
Reviewed By : dkurilich,chuschke,APAllezy
The following individual(s) shall approve this document:
Approver Project Role Daniele Cocco ALS 2.0 Optical Scientist The following individual(s) approved this document:
Approved By :
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay th
, 2
D
C C
A ut h K ey : 0
RK
X H
SI
AL-1801-5702 Rev. A Doc. Status: Released Page 3 of 6
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
3 ABBREVIATIONS AND ACRONYMS
ACL Acceptance Criteria List ALS-U Advanced Light Source Upgrade CAM Control Account Manager FAT Factory Acceptance Test FATP Factory Acceptance Test Plan FATR Factory Acceptance Test Report IDBL Insertion Device Beamline LBNL Lawrence Berkeley National Laboratory NCR Non-Conformance Report OSAT Onsite Acceptance Test QA Quality Assurance RE Responsible Engineer SN Serial Number TBD To Be Determined UHV Ultra-High Vacuum VLS Variable Line Spacing WBS Work Breakdown Structure WC # Windchill Number XROL LBNL X-Ray Optics Lab
4 AUTHORIZING DOCUMENT
LBNL QA Plan PUB 3111: https://commons.lbl.gov/display/rpm2/Quality+Assurance+Policy
LBNL ALS-U Quality Assurance Plan, AL-1024-3173, https://dcc.lbl.gov/download.php?filename=AL-
1024-3173A.pdf
5 REFERENCE
AL-1778-6137, Technical Specification of the ALS-U M1 Mirrors for BL5321 and BL5322
AL-1782-0333, SOW for Manufacturing of the M1 Mirrors for ALS-U BL 5.3.2.1, 5.3.2.2, 6.3.2, 11.3.2 ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay th
, 2
D
C C
A ut h K ey : 0
RK
X H
SI
https://commons.lbl.gov/display/rpm2/Quality+Assurance+Policy
AL-1801-5702 Rev. A Doc. Status: Released Page 4 of 6
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6 ACCEPTANCE CRITERIA LISTING FORM
Level of Care : ☐ Very High ☐ High ☐ Medium ☐ Low
Prepared by: Group: ALS 2.0
Email: Location:
Phone: Date:
Part Name:
BL 5.3.2.1 M1 MIRROR, ALS-U and BL 5.3.2.2 M1
MIRROR, ALS-U Quantity: 2
Part Number: AL-1788-5220, AL-1789-9198 S/N (if applicable)
NCR Reviewers
Additional Remarks:
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay th
, 2
D
C C
A ut h K ey : 0
RK
X H
SI
AL-1801-5702 Rev. A Doc. Status: Released Page 5 of 6
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Verification and Testing Requirements
ITE
M
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or WITNESSED
VERIFYING
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
01. AL-1782-0333
Receipt of the FATP:
FATP is comprehensive and satisfies the primary objectives
NCR #: PASS ☐ FAIL ☐
INITIALS DATE
02. AL-1782-0333
Receipt of the final documentation package:
Documentation related to all control points made available
03. AL-1782-0333
package:
Deviation request forms attached with the supporting LBNL approval
04. AL-1782-0333
package:
NCR attached with the supporting plan and schedule for resolution of all actions dictated by LBNL
055. AL-1778-6137
package:
FAT results (inspection reports) include a sufficient level of details, presented in a comprehensible way, and satisfy the primary objectives
06. AL-1778-6137
package:
Summary of FAT results shows that the optic meets all requirements ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay th
, 2
D
C C
A ut h K ey : 0
RK
X H
SI
AL-1801-5702 Rev. A Doc. Status: Released Page 6 of 6
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
07. AL-1782-0333
package:
Shipping plan includes a sufficient level of details, presented in a comprehensible way, and meet requirements
RE
PASS ☐ FAIL ☐
08. N/A
Delivery:
Shipping container not damaged and external soft-adhesive shock indicators not triggered
Technician
(UHV)
09. N/A
Air-tight box not damaged
10. N/A
Optical surface not in contact with any materials and optic not damaged
11. N/A
Successful OSAT (non-contact optical metrology) shows that the optic meets all requirements, and test results are consistent with the FATR, or anomalies are understood
Optical
Scientist
(XROL)
12. N/A
Milestone: OSAT completed
All scope items delivered, proceed with
Subcontract closeout
RE
13. N/A Transfer to clean optics storage as applicable.
RE
Use continuation sheet if needed.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: M ay th
, 2
D
C C
A ut h K ey : 0
RK
X H
SI
File details come from the government source that posted it. Updated .