Questions_ _Answers2.pdf

PDF 288 KB Posted

Attached to
Mt. Hebron Barracks Complex Construction Federal contract opportunity
Solicitation number
AG-9AC7-S-13-0112
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Questions Answers

View the file

Other files for this federal contract opportunity

Other files attached to Mt. Hebron Barracks Complex Construction, newest first.
File Type Posted
Amend4_plus_summary.pdf PDF
Updated_Maps_Pkg.pdf PDF
Rev._Sections_08710_09650_11451.pdf PDF
Questions_ _Answers4.pdf PDF
CA9_dvb_080913.pdf PDF
Mt_Hebron_Amendment_3.pdf PDF
Amend2_MtHebronBarracks.pdf PDF
newSF_24.pdf PDF
Amendment_2FAR_clauses.pdf PDF
NewM_HebronBarracksDrawings_24x36.pdf PDF
RevSchedule.pdf PDF
SF30_Amendment1.pdf PDF
Questions_ _Answers.pdf PDF
RevSECTION_02050.pdf PDF
RevSec08710_pg175.pdf PDF
SF_24_Bid_Bond.pdf PDF
Contract_Transmittal_Form.pdf PDF
Mt_Hebron_Barracks_Complex_Final_Specifications.pdf PDF
CA9_rev_12 _071913.pdf PDF
Updated_Mt_Hebron_Barracks_Complex_11x17_Drawings.pdf PDF
AG-9AC7-S-13-0112.pdf PDF
Updated_Mt_Hebron_Barracks_Complex_24x36_Drawings.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mt Hebron Barracks Complex

AG-9AC7-S-13-0112

Questions and Answers – 8/2/2013

Q1: The drawings (Sheet A3.1, West Elevation/4) makes reference to a “SEAMLESS GUTTER”.

The specification does not seem to address the gutter/downspout system directly. The specified Metal Sales and McElroy roof systems are not available with seamless gutters. The gutter system they utilize is available in maximum 40’ sections. A seamless gutter system would require a custom on-site fabrication that would be more costly.

Is the Government willing to consider a gutter system with sealed joints, If so, what is the minimum acceptable material length: 20, 30, 40 feet?

A.1: The government specifies a seamless gutter system; the Metal Sales and McElroy roof systems mentioned refers to Section 07400, Metal Roofing as they are known manufacturers of the metal roofing material that meet the specifications. These manufacturers are not referenced in specification 07700 2.01 D & E describing the Gutters and Downspouts. The requirement at 07700 is to match roof color and finish with no specific manufacturer addressed.

Q2: The bid bond in the contract documents has an expiration date that is in 2012. Can you please forward the bid bond that you would like us to use

A.2: GSA updated the form after the solicitation was issued and extended the expiration date of the form; no changes were made. The updated form is uploaded with this amendment however if bid guarantees are already in process the previous version of the form is acceptable..

NOTE: It was discovered that the original 24 x 36 drawings only had page 1 formatted to print at that size. The file was reformatted and posted on 7/30/13 to print at the designated size.

No changes were made to the drawings.