Mt Hebron Barracks Complex 1
TABLE OF CONTENTS
FINAL SPECIFICATIONS
MT HEBRON BARRACKS COMPLEX PROJECT
June 2013
Prepared for:
U.S.D.A. Forest Service Klamath National Forest 1711 South Main Street
Yreka, CA 96097
Prepared by:
Stoll Engineering, Inc.
800 Leisha Lane Redding, CA 96001
(530) 243-1760
Mt Hebron Barracks Complex 2
DIVISION 1 – GENERAL REQUIREMENTS
01010 – SUMMARY OF WORK
01040 – PROJECT COORDINATION
01060 – REGULATORY REQUIREMENTS
01300 – SHOP DRAWINGS AND SUBMITTALS
01352 – INDOOR AIR QUALITY MANAGEMENT
01430 – CONTRACTOR QUALITY CONTROL
01511 – CONSTRUCTION FACILITIES
01690 – WASTE MATERIALS MANAGEMENT AND RECYCLING
01700 – PROJECT CLEAN UP
01720 – PROJECT RECORD DOCUMENTS
01730 – OPERATION AND MAINTENANCE DATA
01734 – INDOOR AIR QUALITY
01741 – MANUFACTURER’S WARRANTIES
DIVISION 2 – SITE CONSTRUCTION
02010 – SITE CONDITIONS
02016 – EXISTING UNDERGROUND STRUCTURES
02050 – CLEARING/GRUBBING/DEMOLITION/DEBRIS REMOVAL
02225 – SHORING AND TRENCH SAFETY
02300 – EARTHWORK
02660 – WATER DISTRIBUTION SYSTEM
02705 – PAVING AND RESURFACING
02731 –SEWER SYSTEM
02810 – AUTOMATIC IRRIGATION SYSTEM
DIVISION 3 – CONCRETE
03100 – CONCRETE FORMWORK
03200 – CONCRETE REINFORCEMENT
03300 – CAST-IN-PLACE CONCRETE
DIVISION 4 – MASONRY
NOT USED
DIVISION 5 – METALS
05500 – METAL FABRICATION
Mt Hebron Barracks Complex 3
DIVISION 6 – WOOD AND PLASTICS
06100 – ROUGH CARPENTRY
06190 – WOOD TRUSSES
06195 – PREFABRICATED PLYWOOD WEB JOISTS, RIM JOISTS, AND FLOOR
JOISTS
06200 – FINISH CARPENTRY
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
07115 – BITUMINOUS DAMPPROOFING
07190 – BUILDING PAPER
07200 – BUILDING INSULATION
07251 – SELF-ADHERED MEMBRANE FLASHING
07400 – METAL ROOFING
07466 – FIBER CEMENT SIDING
07600 – FLASHING AND SHEET METAL
07700 – ROOF ACCESSORIES
07900 – JOINT SEALERS
DIVISION 8 – DOORS AND WINDOWS
08111 – STANDARD STEEL DOORS AND PANELS
08211 – FLUSH WOOD DOORS
08310 – ACCESS DOORS AND PANELS
08561 – VINYL WINDOWS
08625 – TUBULAR SKYLIGHTS
08710 – DOOR HARDWARE
08800 – GLASS AND GLAZING
DIVISION 9 – FINISHES
09260 – GYPSUM DRYWALL SYSTEM AND FINISHES
09300 – TILING
09680 – CARPET
09900 – PAINTING
09986 – SANITARY WAINSCOT PANELS
DIVISION 10 – SPECIALTIES
10155 – TOILET COMPARTMENTS
10200 – LOUVERS AND VENTS
10280 – TOILET AND BATH ACCESSORIES
10431 – SIGNS
10520 – FIRE PROTECTION SPECIALTIES
Mt Hebron Barracks Complex 4
DIVISION 11 – EQUIPMENT
11451 – RESIDENTIAL APPLIANCES/FURNITURE
DIVISION 12 – FURNISHINGS
12356 – CASEWORK
DIVISION 13 – SPECIAL CONSTRUCITON
NOT USED
DIVISION 14 – CONVEYING SYSTEMS
NOT USED
DIVISION 15 – MECHANICAL
15010 – GENERAL MECHANICAL REQUIREMENTS
15200 – AUTOMATIC SPRINKLER SYSTEM
15400 – BUILDING PLUMBING
15487 – LIQUIFIED PETROLEUM GAS SYSTEM
15500 – HEATING VENTILATING AND AIR CONDITIONING
DIVISION 16 – ELECTRICAL
16010 –GENERAL PROVISION ELECTRICAL
16050 – BASIC MATERIALS AND METHODS
16400 – SERVICE AND DISTRIBUTION
16510 – LIGHTING FIXTURES
**END OF TABLE OF CONTENTS**
Mt Hebron Barracks Complex 5
SUMMARY OF WORK
SECTION 01010
SUMMARY OF WORK
PART 1 - GENERAL
1.1 PROJECT DESCRIPTION
A. This project consists of (1) demolition of wood frame buildings, foundations, septic systems and misc. site improvements and (2) construction of two single story barracks buildings to include earthwork, site utilities, septic systems, paving and landscaping.
The project “Mt Hebron Barracks Complex” has been prepared for the U.S. Forest Service, Klamath National Forest by Stoll Engineering, Inc.
B. The Contractor should carefully review all sections of the Specifications in order to completely understand the work and all constraints including schedule and material requirements.
C. Contractor is encouraged to proceed in an orderly and expeditious manner based on the schedule constraints shown on the plans or described in the Specifications. All work is to be constructed in strict accordance with the plans and specifications and subject to the terms and conditions of the contract.
D. The work shall conform to the specifications and the Contract Drawings.
E. Location of Work:
The work is located at the Mt Hebron Work Center in the township of Mt Hebron on Old State Highway 97. See vicinity map on drawing T1.0.
F. Contractor’s Duties:
1. Except as specifically noted, provide and pay for:
a. Labor, materials and equipment.
b. Tools, construction equipment and machinery.
c. Water, heat, and utilities required for construction.
d. All other facilities and services necessary for proper execution and completion of work.
2. Pay legally required sales, consumer and use taxes.
3. Conform to the requirements of all permits.
4. Secure and pay for, as necessary for proper execution and completion of the work, applicable permits and licenses.
5. Give required notices.
6. Comply with codes, ordinances, rules, regulations, orders and other legal requirements of public authorities which bear on performance of the work.
Mt Hebron Barracks Complex 6
SUMMARY OF WORK 01010
7. Promptly submit written notice to Engineer of observed variance of contract documents from legal requirements.
8. The Contractor shall obtain his own disposal site for replaced materials and other debris. Prior to the use of disposal sites the Contractor must submit a signed statement from the property owner granting permission to spoil materials and holding The U.S. Forest Service harmless from any and all damages that may result from the spoiling of materials.
9. It is the Contractor's responsibility to obtain all necessary permits and comply with same.
1.2 CONTRACT SCHEDULE
A. On-site work may not commence until a Notice to Proceed has been issued. Submittal submissions and off-site fabrication can commence following receipt of the Notice To Proceed. Contractor shall submit for approval a bar chart construction schedule not later than 15 days after receipt of the Notice To Proceed. Schedule shall 1) cover work in all specification sections, 2) include the inspections called out in section 01430, paragraph 1.02, and 3) be integrated with the Submittal Register specified in Section 01300.
1.3 UTILITIES
A. Contractor shall provide all temporary power required for construction of this work.
Restrooms are not available at the site and must be provide by the contractor.
1.4 CONTRACTOR USE OF PREMISES
A. Construction corporation yards and/or storage areas are the responsibility of the Contractor.
B. Confine operations at site to areas agreed by the Contracting Officer.
C. Do not encumber site with materials or equipment.
D. Do not load structure or roadway with weight that will endanger or render unusable any structures or roadways.
E. Assume full responsibility for protection and safekeeping of products stored on premises.
F. Move any stored products which interfere with operations of Owner.
G. Obtain and pay for use of additional storage of work area for operations.
H. Return all surface areas to their original condition upon completion of the work.
PART 2 - PRODUCTS
Not Used.
PART 3 – EXECUTION
Not Used.
Mt Hebron Barracks Complex 7
SUMMARY OF WORK 01010
PART 4 – MEASUREMENT AND PAYMENT
4.1 MEASUREMENT
A. Contractor shall be required to submit for approval a balanced schedule of values of sufficient detail on which to base monthly progress payments.
4.2 PAYMENT
A. Progress payments will be made as follows:
1. Bonds and insurance may be invoiced 100%, upon proof of payment.
2. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization and General Requirements, or 5 percent of the original contract amount, whichever is less, will be paid.
3. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
4. Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
B. The total of all payments, including bonding, shall not exceed the original contact amount.
**END OF SECTION 01010**
Mt Hebron Barracks Complex 8
PROJECT COORDINATION 01040
SECTION 01040
PROJECT COORDINATION
1.01 SCOPE
A. This Section specifies administrative and supervisory requirements necessary for Project coordination including, but not necessarily limited to:
1. Coordination.
2. Contractor's personnel.
3. General installation provisions.
4. Cleaning and protection.
1.02 COORDINATION
A. Coordination: Coordinate construction activities included under various Sections of these
Specifications to assure efficient and orderly installation of each part of the Work.
Coordinate construction operations included under different Sections of the Specifications that are dependent upon each other for proper installation, connection, and operation.
1. Where installation of one part of the Work is dependent on installation of other components, either before or after its own installation, schedule construction activities in the sequence required to obtain the best results.
2. Where availability of space is limited, coordinate installation of different components to assure maximum accessibility for required maintenance, service and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
B. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials.
1.03 SUBMITTALS
A. Coordination Drawings: Prepare and submit coordination Drawings where close and careful coordination is required for installation of products and materials fabricated offsite by separate entities, and where limited space availability necessitates maximum utilization of space for efficient installation of different components.
1. Indicate required installation sequences.
2. Comply with requirements contained in Section "Submittals."
PART 2 - PRODUCTS
Not Applicable
Mt Hebron Barracks Complex 9
PROJECT COORDINATION 01040
PART 3 - EXECUTION
3.01 GENERAL INSTALLATION PROVISIONS
A. Inspection of Conditions: Require the Installer of each major component to inspect both the substrate and conditions under which Work is to be performed. Do not proceed until unsatisfactory conditions have been corrected in an acceptable manner.
B. Manufacturer's Instructions: Comply with manufacturer's installation instructions and recommendations, to the extent that those instructions and recommendations are more explicit or stringent than requirements contained in Contract Documents.
C. Inspect materials or equipment immediately upon delivery and again prior to installation.
Reject damaged and defective items.
D. Provide attachment and connection devices and methods necessary for securing Work.
Secure Work true to line and level. Allow for expansion and building movement.
E. Visual Effects: Provide uniform joint widths in exposed Work. Arrange joints in exposed
Work to obtain the best visual effect. Refer questionable choices to the Contracting Officer for final decision.
F. Recheck measurements and dimensions, before starting each installation.
G. Install each component during weather conditions and Project status that will ensure the best possible results. Isolate each part of the completed construction from incompatible material as necessary to prevent deterioration.
H. Coordinate temporary enclosures with required inspections and tests, to minimize the necessity of uncovering completed construction for that purpose.
I. Mounting Heights: Where mounting heights are not indicated, install individual components at standard mounting heights recognized within the industry for the particular application indicated. Refer questionable mounting height decisions to the Contracting Officer for final decision.
3.02 CLEANING AND PROTECTION
A. During handling and installation, clean and protect construction in progress and adjoining materials in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.
B. Clean and maintain completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.
**END OF SECTION 01040**
Mt Hebron Barracks Complex 10
REGULATORY REQUIREMENTS 01060
SECTION 01060
REGULATORY REQUIREMENTS
1.01 SCOPE
A. This section describes the codes and standards which apply to the work in this contract.
Additional codes and standard may be cited in sections to which they apply.
1.02 CODES AND STANDARDS
A. The following codes and standards shall apply to the work in this contract:
1. California Building Code (CBC),2010 Edition with latest California Amendments
2. California Plumbing Code (CPC), 2010 Edition with latest California Amend.
3. California Mechanical Code (CMC), 2009 Edition with latest California Amend.
4. National Electrical Code (NEC), 2008 Edition
5. Americans with Disabilities Act (ADA), Architectural Barriers Act (ABA).
6. American Institute of Steel Construction (AISC) Latest Edition.
7. American Iron and Steel Institute (AISI) Latest Edition.
8. American Society for Testing and Materials (ASTM) latest edition.
9. Metal Buildings Manufacturers Association (MBMA).
10. Underwriter's Laboratories, (UL)
11. Architectural Aluminum Manufacturers Association (AMMA)
12. Steel Door Institute, Standard 100
13. American Water Works Association (AWWA)
14. National Fire Protection Association (NFPA)
15. California Fire Code (CFC) 2010 Edition
16. American Gas Association (AGA)
B. Unless otherwise specified in this contract, reference to a specific standard or specification shall mean the latest edition or amendment in effect on the date of the invitation to bid.
1.03 DEFINITIONS
A. Administrative Authority as used in the California Mechanical Code, the California Plumbing Code and the National Electrical Code will be the Contracting Officer.
B. Building Official as used in the California Fire Code, California Building Code and the
California Building Code Standards will be the Contracting Officer.
**END OF SECTION 01060**
Mt Hebron Barracks Complex 11
SHOP DRAWINGS AND SUBMITTALS 01300
SECTION 01300
SHOP DRAWINGS AND SUBMITTALS
1.1 SCOPE:
A. The term submittal means all documents required for determining conformance with the contract as indicated herein. Documents include but are not limited to Shop Drawings, Samples, Catalog Data, Installation Instructions, Certifications and Test Results.
1.2 SUBMITTALS
A. Submittals shall include all pertinent data required to understand the quality of components, dimensional relationships, integration with other materials, assembly techniques, structural aspects, color, finish, texture, and other such characteristics as may be necessary to fully describe the item and its intended use.
B. All submittals shall be transmitted to the Contracting Officer Representative using the
Contract_Transmittal.doc form attached separately to this contract.
PART 2 – PRODUCTS
Not Applicable
PART 3 - EXECUTION
3.1 SUBMITTALS
A. Submit for approval a Submittal Register in spreadsheet format listing all items required under this contract and the estimated date each item will be submitted. Include reference to the specification section and paragraph number.
B. Submittals and shop drawings shall be submitted in a timely fashion to allow 14 calendar days for review by the Government. "No work shall begin until associated shop drawings and submittals are approved".
3.2 SHOP DRAWINGS
A. Original Submittal: Two copies of all shop drawings shall be submitted for approval as required under 3.01, above, prior to fabrication, installation or order placement to allow for checking and coordination.
B. Resubmittal: When a resubmittal is required, one print so indicating will be returned to the Contractor. After revision of the original, a new reproducible and four copies shall be submitted for approval.
C. Approval: Once approved, documents shall be returned to the Contractor and shall be complied with as noted. Variation from the approved documents shall be likewise submitted and approved before being carried out.
Mt Hebron Barracks Complex 12
SHOP DRAWINGS AND SUBMITTALS 01300
3.3 SAMPLES
A. Original Submittal: Two samples of each item for which samples are required, unless otherwise specified, shall be furnished for approval. Approval shall be obtained prior to delivery of the material to the project site. These samples shall be representative of the actual material proposed for use in the project and of sufficient size to demonstrate design, color, texture and finish as they will appear in the completed installation.
B. Resubmittals: All rejected samples will be returned upon request and any or all resubmittals required shall consist of two new samples.
C. Approval: Upon approval, one sample so noted will be returned and the remainder will be retained by the Contracting Officer until completion of the work. When requested, all approved samples will be returned for installation providing identity is maintained in an approved manner until final acceptance of the project.
3.4 CATALOG DATA
A. Submittals: Two copies of catalog data are required for the original submittal and each resubmittal. Catalog data shall be submitted along with shop drawings. One copy will be returned.
B. Data: Each submittal shall have all pertinent data contained therein that is applicable to the item submitted for approval.
3.5 IDENTIFICATION
A. Catalog Data: Each separate catalog brochure or page submitted shall have the identification shown. Catalog of brochures submitted containing multiple items for approval need have only cover identification. In such cases the identification shall include page and catalog item numbers.
B. In the event one or more of the multiple items are not approved in any submittal, the additional copies required will not be requested until all items are approved.
**END OF SECTION 01300**
Mt Hebron Barracks Complex 13
INDOOR AIR QUALITY MANAGEMENT 01352
SECTION 01352
INDOOR AIR QUALITY MANAGEMENT
PART I GENERAL
1.01 SUMMARY
A. Section includes:
1. Special requirements for Indoor Air Quality (IAQ) management during construction operations.
a. Control of emissions during construction.
b. Moisture control during construction.
2. Procedures for testing baseline IAQ. Baseline lAQ requirements specify maximum indoor pollutant concentrations for acceptance of the facility.
1.02 DEFINITIONS
A. Definitions pertaining to sustainable development: As defined in ASTM E2114.
B. Adequate ventilation: Ventilation, including air circulation and air changes, required to cure materials, dissipate humidity, and prevent accumulation of particulates, dust, fumes, vapors, or gases.
C. Hazardous Materials: Any material that is regulated as a hazardous material in accordance with 49 CFR 173, requires a Material Safety Data Sheet (MSDS) in accordance with 29 CFR 1910.1200, or which during end use, treatment, handling, storage, transportation or disposal meets or has components which meet or have the potential to meet the definition of a Hazardous Waste in accordance with 40 CFR
261. Throughout this specification, hazardous material includes hazardous chemicals.
1. Hazardous materials include: pesticides, biocides, and carcinogens as listed by recognized authorities, such as the Environmental Protection Agency (EPA) and the International Agency for Research on Cancer (IARC).
D. Indoor Air Quality (IAQ): The composition and characteristics of the air in an enclosed space that affect the occupants of that space. The indoor air quality of a space refers to the relative quality of air in a building with respect to contaminants and hazards and is determined by the level of indoor air pollution and other characteristics of the air, including those that impact thermal comfort such as air temperature, relative humidity and air speed.
E. Interior final finishes: Materials and products that will be exposed at interior, occupied spaces; including flooring, wallcovering, finish carpentry, and ceilings.
Mt Hebron Barracks Complex 14
F. Packaged dry products: Materials and products that are installed in dry form and are delivered to the site in manufacturer's packaging; including carpets, resilient flooring, ceiling tiles, and insulation.
G. Wet products: Materials and products installed in wet form, including paints, sealants, adhesives, special coatings, and other materials which require curing.
1.03 QUALITY ASSURANCE
A. Inspection and Testing Lab Qualifications: Minimum of 5 years experience in performing the types of testing specified herein.
1.04 PRECONSTRUCTION MEETING
A. After award of Contract and prior to the commencement of the Work, meet with the Contracting Officer to discuss the proposed IAQ Management Plan and to develop mutual understanding relative to details of environmental protection.
1.05 SUBMITTALS
A. Indoor Air Quality (IAQ) Management Plan: Not less than 10 days before the Pre-construction meeting, prepare and submit an IAQ Management Plan including, but not limited to, the following:
1. Procedures for control of emissions during construction. Identify schedule for application of interior finishes.
2. Procedures for moisture control during construction.
a. Identify porous materials and absorptive materials.
b. Identify schedule for inspection of stored and installed absorptive materials.
3. Revise and resubmit Plan as required by The Contracting officer. Approval of Contractor’s Plan will not relieve the Contractor of responsibility for compliance with applicable environmental regulations.
B. Product Data:
1. Submit product data for filtration media used during construction and during operation. Include Minimum Efficiency Reporting Value (MERV).
2. Submit air pressure difference maps for each mode of operation of HVAC.
3. Material Safety Data Sheets: Submit MSDSs for inclusion in Operation and
Maintenance Manual for the following products.
a. Adhesives.
b. Floor and wall patching/leveling materials.
c. Caulking and sealants.
d. Insulating materials.
Mt Hebron Barracks Complex 15
e. Fireproofing and firestopping.
f. Carpet.
g. Paint.
h. Clear finish for wood surfaces.
i. Lubricants.
j. Cleaning products.
C. Inspection and Test Reports:
1. Moisture control inspections.
2. Moisture content testing.
3. Moisture penetration testing.
4. Microbial Growth testing.
PART 2 PRODUCTS
PART 3 EXECUTION
3.01 IAQ MANAGEMENT - EMISSIONS CONTROL
A. During construction operations, follow the recommendations in SMACNA IAQ Guidelines for Occupied Buildings under Construction.
B. HVAC Protection:
1. Seal return registers during construction operations.
2. Provide temporary exhaust during construction operations
3. To the greatest extent possible, isolate and/or shut down the return side of the HVAC system during construction. When ventilation system must be operational during construction activities, provide temporary filters.
C. Source Control: Provide low and zero VOC materials as specified.
D. Pathway Interruption: Isolate areas of work as necessary to prevent contamination of clean or occupied spaces. Provide pressure differentials and/or physical barriers to protect clean or occupied spaces.
E. Housekeeping: During construction, maintain project and building products and systems to prevent contamination of building spaces.
F. Temporary Ventilation: Provide an ACH (air changes per hour) of 1.5 or more and as follows:
1. Provide minimum 48 hour pre-ventilation of packaged dry products prior to installation. Remove from packaging and ventilate in a secure, dry, well-ventilated space free from strong contaminant sources and residues.
Provide a temperature range of 60 degrees F minimum to 90 degree F maximum continuously during the ventilation period. Do not ventilate within limits of Work unless otherwise approved by THE Contracting Officer.
2. Provide adequate ventilation during and after installation of interior wet products and interior final finishes.
Mt Hebron Barracks Complex 16
3. Provide filtration media with a Minimum Efficiency Reporting Value (MERV) of 8 as determined by ASHRAE 52.2 during construction Coordinate with work of Division 15, Heating Ventilating and Air Conditioning (HVAC).
G. Scheduling: Schedule construction operations involving wet products prior to packaged dry products to the greatest extent possible.
H. Flush-Out: After construction ends, prior to occupancy and with all interior finishes installed, perform a building flush-out by supplying a total air volume of 14,000 cu.ft. of outdoor air per sq.ft. of floor area while maintaining an internal temperature of at least 60 degrees F and relative humidity no higher than 60%.
3.2 IAQ MANAGEMENT - MOISTURE CONTROL
A. Housekeeping:
1. Keep materials dry. Protect stored on-site and installed absorptive materials from moisture damage.
2. Verify that installed materials and products are dry prior to sealing and weatherproofing the building envelope.
3. Install interior absorptive materials only after building envelope is sealed and weatherproofed.
B. Inspections: Document and report results of inspections; state whether of not inspections indicate satisfactory conditions.
1. Examine materials for dampness as they arrive. If acceptable to Contracting Officer, dry damp materials completely prior to installation; otherwise, reject materials that arrive damp.
2. Examine materials for mold as they arrive and reject materials that arrive contaminated with mold.
3. Inspect stored and installed absorptive materials regularly for dampness and mold growth. Inspect weekly. Where stored on-site or installed absorptive materials become wet, notify Contracting Officer. Inspect for damage. If acceptable to Contracting Officer, dry completely prior to closing in assemblies; otherwise, remove and replace with new materials.
4. Basement: Monitor basement (if applicable) and crawlspace humidity (if applicable), and dehumidify when relative humidity is greater than 85 percent for more than 2 weeks or at the first sign of mold growth.
5. Site drainage: Verify that final grades of site work and landscaping drain surface water and ground water away from the building.
6. Weather-proofing: Inspect moisture control materials as they are being installed. Include the following:
Mt Hebron Barracks Complex 17
a. Air barrier: Verify air barrier is installed without punctures and/or other damage. Verify air barrier is sealed completely.
b. Flashing: Verify correct shingling of the flashing for roof, walls, windows, doors, and other penetrations.
c. Insulation layer: Verify insulation is installed without voids.
d. Roofing: In accordance with ASTM D7186 Standard Practice for
Quality Assurance Observation of Roof Construction and Repair.
7. Plumbing: Verify satisfactory pressure test of pipes and drains is performed before closing in and insulating lines.
8. HVAC: Inspect HVAC system to verify:
1. condensate pans are sloped and plumbed correctly;
2. access panels are installed to allow for inspection and cleaning of coils and ductwork downstream of coils;
3. ductwork and return plenums are air sealed;
4. duct insulation is installed and sealed; and
5. chilled water line and refrigerant line insulation are installed and sealed.
C. Schedule:
1. Schedule work such that absorptive materials, including but not limited to porous insulations, paper-faced gypsum board, ceiling tile, and finish flooring, are not installed until they can be protected from rain and construction-related water.
2. Weather-proof as quickly as possible. Schedule installation of moisture-control materials, including but not limited to air barriers, flashing, exterior sealants and roofing, at the earliest possible time.
D. Testing for Moisture Content: Test moisture content of porous materials and absorptive materials to ensure that they are dry before sealing them into an assembly. Document and report results of testing. Where tests are not satisfactory, dry materials and retest. If satisfactory results cannot be obtained with retest, remove and replace with new materials.
1. Concrete: Moisture test as per one or more of the following; unless otherwise indicated, acceptable upper limits for concrete are < 4% top inch;
< 85% headspace RH; <3 lbs/1000ft2/day:
a. ASTM D4263 Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method
b. ASTM F1869 Test Method for Measuring Moisture Vapor Emission
Rate of Concrete Subfloor Using Anhydrous Calcium Chloride
c. ASTM F2170 Test Method for Determining Relative Humidity in
Concrete Floor Slabs Using In Situ Probes
2. Wood: Moisture test as per ASTM D4444 - Standard Test Methods for Use and Calibration of Hand-Held Moisture Meters; unless otherwise indicated
Mt Hebron Barracks Complex 18 acceptable upper limits for wood products are < 20% at center of piece; < 15% at surface.
3. Gypsum Board, Gypsum Plaster, Insulation, and other absorptive materials:
Moisture test with a Pinless Moisture Meter to assess patterns of moisture, if any.
E. Testing for Moisture Penetration:
1. Windows: Test as per ASTM E1105 Test Method for Field Determination of Water Penetration of Installed Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform or Cyclic Static Air Pressure Difference; unless otherwise indicated, acceptable upper limits are no leakage for 15 minutes.
2. Horizontal Waterproofing (not roofing): Test as per ASTM D5957 Standard Guide for Flood Testing Horizontal Waterproofing Installations; acceptable upper limits are no leakage for 15 minutes.
3. Exterior Walls:
a. Air tightness of the enclosure test: ASTM E779 Standard Test Method for Determining Air Leakage Rate by Fan Pressurization or ASTM E1827 Standard Test Methods for Determining Air tightness of Buildings Using an Orifice Blower Door.
b. Water Leakage: Review as per ASTM E2128 Standard Guide for Evaluating Water Leakage of Building Walls.
F. Testing for Support of Microbial Growth: Test and report in accordance with
ASTM D6329 Standard Guide for Developing Methodology for Evaluating the Ability of Indoor Materials to Support Microbial Growth Using Static Environmental Chambers. Indicate susceptibility of product or material to colonization and amplification of microorganisms. Identify microorganisms and conditions of testing.
1. Normal conditions: Perform testing at 35 degrees Centigrade and 50 percent relative humidity.
2. Extreme conditions: Perform worst case scenarios screening tests by providing an atmosphere where environmental conditions may be favorable for microbial growth.
3. Perform testing for the following:
a. Fireproofing material on appropriate substrate.
b. Wallcovering.
**END OF SECTION 01352**
Mt Hebron Barracks Complex 19
CONTRACTOR QUALITY CONTROL 01430
SECTION 01430
CONTRACTOR QUALITY CONTROL
1.1 SCOPE: This work of this Section shall consist of the Contractor providing quality control to ensure compliance with the drawings, specifications, and provisions of the contract. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification. See FAR Clause 52.246-12 Inspection of Construction.
1.2 GOVERNMENT TESTING/INSPECTION: The Government may at its option monitor the testing and inspection of the Contractor and may perform additional testing/inspections to verify compliance with the contract documents. In addition to the Contractors everyday inspections the Government will perform the following inspections: foundation, rough framing/shear, rough-in; plumbing, electrical and mechanical and final inspection. Contractor shall coordinate the Government inspections with the work progress and provide a lead time of one week.
1.3 RELATED WORK: The work shall be in accordance with the following specifications.
Section 02300 Earthwork Section 03300 Cast-In-Place Concrete Section 07200 Building Insulation
1.4 MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for the work of this Section.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1 RECORDS: Prepare an “Inspector’s Daily Record of Construction Operations” detailing testing/inspection results including deficiencies and corrective action taken.
Submit a copy of the daily record within one working day of the work being performed.
Maintain complete and accurate testing and inspection records and submit these with the PROJECT RECORD DOCUMENTS specified in Section 01720. The person with overall responsibility for the testing and inspection shall certify that “the information contained in these records is accurate and that all work documented herein complies with the requirements of the contract.
3.2 QUALITY CONTROL SYSTEM:
A. The Contractor shall provide and maintain a quality control system that will ensure that all services, supplies, and construction required under this contract conform to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to ensure that all supplies, services, and construction conform to the contract requirements.
Mt Hebron Barracks Complex 20
B. Quality Control Plan - The Contractor shall submit in writing the following:
1. Authorities and responsibilities of inspection and testing personnel.
2. Experience and qualifications of inspection and testing personnel to be and name and location of any testing facility to be used.
C. Approval of Quality Control Plan - The Contractor's proposed quality control plan for all items requiring quality control shall be submitted to the Contracting Officer for review prior to the Contractor commencing work. Within 10 working days of receipt of plan, the Contracting Officer shall notify the Contractor whether the plan adequately covers quality control requirements. Construction work shall not be performed prior to Contractor's receipt of written approval of the proposed plan. The Contractor shall submit to the Contracting Officer, in writing, any proposed changes in the approved quality control plan or personnel. Proposed changes shall not be put into effect until approved in writing by the Contracting Officer.
D. Sampling, Testing and Inspection- The Contractor shall provide and maintain appropriate measuring and testing devices, equipment, and supplies to accomplish the required measurement, testing, and inspection in a timely manner. Tests, measurements, and certifications shall be made as required by the drawings and specifications. The Contractor shall take samples and perform inspections and tests necessary to achieve the quality of construction required by the contract and make required measurements of work under this contract performed onsite or offsite.
Sampling and testing frequency for specific items shall be AS SHOWN ON THE DRAWINGS, Specifications or in the table below.
TABLE
Item
Certification or Test Required
Cert. or Test by
Required test
Frequency
02300 Compaction PE D 1 per material type 02300 Compaction PE F 4 random per each building, paved area and material type
03300 Cert. of Agg.
Gradation and Design Mix
SC 1 per proposed mix design
03300 Test Cylinders PE 3 per truck 03300 Slump Test PE 1 per truck 03300 Air Entrainment Test PE 1 per truck 03300 Batch Cert. SC 1 per truck 07200 Quality Insulation
Installation
HERS CA
Titl
Prior to closing-in.
Mt Hebron Barracks Complex 21
Key to “Cert. Or Test by”: SC:
CC:
PE:
HERS:
Certification by supplier or manufacturer Certification and/or testing by contractor Contractor sampling and testing under the direction of and certified by a registered Engineer or certified lab.
Contractor provided special inspector certified by the California Energy Commission (CEC) to rate buildings in California according to the Home Energy Rating System
Key to “Required Test”:
content
D:
F:
Maximum density and optimum moisture
Field density and moisture content
If there is no entry under this column, refer to the parent specification to determine the test(s) required. Field density tests shall be performed in the presence of the Contracting Officer and at locations agreed upon with the Contracting Officer.
Where “random sample” is specified in this table, it is to be a statistically random sample.
3.3 RECORDS OF INSPECTION, TESTS, AND MEASUREMENT:
A. Inspection and Tests - The Contractor shall maintain current records of all inspections and tests performed.
The following format or one containing the following information will be acceptable to the government:
Project:
Contract No.
Test Date Station Standard Results Test by (Initials)
The Contractor shall certify in writing that all inspections and tests were performed in accordance with specifications and applicable ASTM or AASHTO Standards.
3.4 CERTIFICATIONS AND MEASUREMENTS:
A. Offsite Produced Materials - The Contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements shown on the Drawings or stated in the specifications. Incidental purchases needed to remedy minor shortages of material shall be certified by the Contractor.
B. Quantity Measurements - The Contractor shall make all measurements for computation of quantities for all work items except those specified for payment by
Mt Hebron Barracks Complex 22
Designed Quantity (DQ). The Contractor shall compute the quantities for periodic progress payments; the Contracting Officer will compute the quantities for the final payment based on measurements taken by the contractor. All Contractor measurements are subject to verification. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities. The Contractor shall certify in writing as to the accuracy of the measurements and computations submitted.
3.5 ACCEPTANCE: Acceptance of the quality control plan does not imply any warranty by the Government that the plan will result in consistent contract compliance. It is the Contractors responsibility to demonstrate such compliance.
**END OF SECTION 01430**
Mt Hebron Barracks Complex 23
CONSTRUCTION FACILITIES 01511
SECTION 01511
CONSTRUCTION FACILITIES
PART 1 GENERAL
1.1 SCOPE: The work of this section includes providing all temporary facilities and controls needed for the project. The Contractor shall furnish all equipment, labor, materials and incidentals necessary to hook up, install and maintain the facilities. Such facilities include but are not limited to:
A. Sanitary facilities and construction office.
B. Directional signs, safety signs and barricades.
C. Temporary utilities such as water, electricity, natural gas and telephone service.
1.2 MEASUREMENT AND PAYMENT: No separate payment will be made for the work specified in this section. Such payment will be included in Item 01900, Mobilization.
3.1 SANITARY FACILITIES: The Contractor shall provide temporary sanitary facilities for all workers and maintain the facilities in a clean and sanitary state.
3.2 UTILITIES: The Contractor shall make all arrangements necessary to hook-up temporary electricity, water and telephones. Utilities are at or adjacent to the jobsite.
3.3 REMOVAL: The Contractor shall remove temporary facilities and controls as progress of the work will permit or as directed by the Contracting Officer.
3.05 COSTS: The Contractor shall pay all fees and costs for the hook-up, installation, use, maintenance, and removal of temporary facilities and controls.
**END OF SECTION 01511**
Mt Hebron Barracks Complex 24
WASTE MATERIALS AND MANAGEMENT 01690
SECTION 01690
WASTE MATERIALS MANAGEMENT AND RECYCLING
1.01 SUMMARY
A. This Section includes required salvage and recycling of the following waste materials and applies to all such listed waste materials produced during the course of this con-tract.
1. Land Clearing Debris: Solid waste generated solely from land clearing operations, such as stumps and trees.
a. See Division 2 "Site Clearing" section for requirements for salvage and processing of designated materials to produce mulch for use in landscape construction for this project. Material required for production of landscape mulch is not classified as "land clearing debris.
2. Concrete, Masonry, and Other Inert Fill Material: Concrete, brick, rock, clean soil not intended for other on-site use, broken up asphalt pavement containing no ABC stone, clay, concrete, or other contaminants, and other inert material.
3. Metals: Metal scrap including iron, steel, copper, brass, and aluminum.
4. Untreated Wood: Unpainted, untreated dimensional lumber, plywood, oriented strand board, masonite, particleboard, and wood shipping pallets.
5. Gypsum Wallboard Scrap: Excess drywall construction materials including cuttings, other scrap, and excess materials.
6. Salvaged Materials: Reusable lumber, fixtures, and building supplies.
7. Cardboard: Clean, corrugated cardboard such as used for packaging, etc.
8. Paper: Discarded office refuse such as unwanted files, correspondence, etc.
9. Plastic Buckets: Containers for various liquid and semi-solid or viscous construction materials and compounds.
10. Beverage Containers: Aluminum, glass, and plastic containers.
11. Other Mixed Construction and Demolition Waste: Solid waste resulting solely from construction, remodeling, repair, or demolition operations on pavement, buildings, or other structures exclusive of waste materials listed herewith.
Mt Hebron Barracks Complex 25
WASTE MATERIALS MANAGEMENT AND RECYCLING 01690
B. Non-Recyclable Waste: Collect and segregate non-recyclable waste for delivery to a permitted landfill site.
1. Mixed Solid Waste: Solid waste usually collected as a municipal service, exclusive of waste materials listed above.
C. Hazardous Waste: Control and disposal of hazardous waste is specified in Division 1 "Environmental Protection" section.
1.02 DEFINITIONS
A. Waste Materials are defined as large and small pieces of the materials indicated which are excess to the contract requirements and generally include materials which are to be salvaged from existing construction and items of trimmings, cuttings and damaged goods resulting from new installations, which can not be effectively used in the Work.
1.03 SUBMITTALS
A. Construction Waste Management Plan:
1. Before start of construction, submit a construction waste management plan indicating proposal on how to collect, segregate, and dispose of all construction wastes and debris produced by the work of this Contract.
Include description of on-site reprocessing and re-use opportunities.
2. Include estimated costs associated with recycling, salvaging, and reusing materials and address source reduction of material use.
3. Identify area specifically for construction and demolition waste recycling.
4. Show compliance with regulations specified under "Quality Assurance" article below. Include a list of recycling facilities to which indicated recyclable materials will be distributed for disposal.
5. Identify materials that are not recyclable or otherwise conservable that must be disposed of in a landfill or other means acceptable under governing State and local regulations.
6. List permitted landfills and/or other disposal means to be employed.
7. Indicate any instances where compliance with requirements of this specification does not appear to be possible and request resolution from the Contracting Officer.
B. Documents:
1. Delivery Receipts: Provide to the Contracting Officer delivery receipts for waste materials salvaged and sent to permitted waste materials processors or recyclers within 48 hours of delivery that indicate the location and name of firm accepting recyclable waste materials, types of materials, net weights of each type, date of delivery and value of materials.
Mt Hebron Barracks Complex 26
2. Track the weight of construction waste that are landfilled and the weight of construction, demolition, and land clearing that are recycled. Calculate the recycling percentage by weight or volume, but be consistent throughout. Do not include hazardous waste and excavation soil in the calculations. The following estimate can be used to convert waste materials from volume to weight:
Material Density Lbs/CY
a. Cardboard 100
b. Gypsum Wallboard 500
c. Mixed Waste 350
d. Rubble 1,400
e. Steel 1,000
f. Wood 300
1.04 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with requirements of the State of California’s “Integrated Solid Waste Management Regulations” and applicable local ordinances and regulations. Contact Information: California Integrated Waste Management Board, 8800 Cal Center Dr. Sacramento, CA 95826 , Phone: (916) 255-2296
B. Disposal Sites, Recyclers, and Waste Materials Processors: Use only facilities properly permitted by the State of California, and by local authorities where applicable.
C. California Recycling Information:
http://www.ciwmb.ca.gov/Recycle/#WhereRecycle
D. Pre-Construction Waste Management Conference: Prior to beginning work at the site, schedule and conduct a conference to review the Construction Waste Management Plan and discuss procedures, schedules and specific requirements for waste materials recycling and disposal. Discuss coordination and interface between the Contractor and other construction activities. Identify and resolve problems with compliance with requirements. Record minutes of the meeting, identifying all conclusions reached and matters requiring further resolution.
1. Attendees: The Contractor and related Contractor personnel associated with the work of this section, including personnel to be in charge of the waste management program defined here as the Construction Quality Manager;
the Contracting Officer; and such additional Government personnel as the Contracting Officer deems appropriate.
http://www.ciwmb.ca.gov/Recycle/#WhereRecycle
Mt Hebron Barracks Complex 27
2. Plan Revision: Make any revisions to the Construction Waste Management Plan agreed upon during the meeting and incorporate resolutions agreed to be made subsequent to the meeting. Submit the revised plan to the Contracting Officer for approval.
E. Implementation:
1. Designate an on-site party responsible for instructing workers and implementing the Construction Waste Management Plan.
2. Distribute copies of the Construction Waste Management Plan to the job site foreman and each subcontractor.
3. Include waste management and recycling in worker orientation. Provide on-site instruction on appropriate separation, handling, recycling, and salvaging methods to be used by all parties at the appropriate stages of the work at the site. Include waste management and recycling discussion in pre-fabrication meetings with subcontractors and fabricators. Also include discussion of waste management and recycling in regular job meetings and job safety meetings conducted during the course of work at the site.
4. Institute monthly reporting and feedback on waste management to access progress and address problems. Post this information for all construction personnel to read.
1.05 STORAGE AND HANDLING
A. Site Storage: Remove all indicated recyclable materials from the work location to approved containers daily.
B. Position covered containers for recyclable waste materials at a designated location on the Project Site. Select a location for the recyclable materials containers separated from that of general waste and rubbish containers. Provide separate collection containers for a minimum of the following materials:
1. Untreated lumber.
2. Gypsum wallboard.
3. Paper, paper products, and cardboard.
4. Plastics.
5. Metals.
6. Glass.
7. Other salvageable materials.
C. Change out loaded containers for empty ones as demand requires, but not less than monthly.
D. Handling: Deposit all indicated recyclable materials in the containers in a clean (no mud, adhesives, solvents, petroleum contamination), debris-free condition. Do not deposit contaminated materials into the containers until such time as such materials have been cleaned.
Mt Hebron Barracks Complex 28
E. If the contamination chemically combines with the material so that it can not be cleaned, do not deposit into the recycle containers. In such case, request resolution by the Construction Quality Manager as to disposal of the contaminated material.
Directions from the Construction Quality Manager do not relieve the Contractor from compliance with all legal and regulatory requirements for disposal, nor shall such directions cause a request for modification of the Contract.
1.06 PROJECT/SITE CONDITIONS
A. Environmental Requirements: Transport recyclable waste materials from the Work Area to the recycle containers and carefully deposit in the containers without excess noise and interference with other activities, in a manner to minimize noise and dust.
Reclose container covers immediately after materials are deposited.
B. Do not place recyclable waste materials on the ground adjacent to a container.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXECUTION
3.01 WASTE MANAGEMENT
A. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste.
Comply with Division 1 Section "Execution Requirements " for progress cleaning requirements.
B. Implement waste management procedures in accordance with approved construction waste management plan. Maintain procedure throughout the life of this Contract.
C. Source Separation: Separate, store, protect, and handle at the project site all identified recyclable and salvageable waste products to prevent contamination of materials and maximize recyclability and salvageability of materials.
D. Arrange for the regular collection, transport from the site, and delivery to respective approved recycling centers of indicated recyclable waste materials. Maintain records accessible to the Contracting Officer for verification of construction waste materials recycling.
E. Delivery Receipts: Arrange for timely pickups from the site or deliveries to approved recycling facilities of designated waste materials to keep construction site clear and prevent contamination of recyclable materials. Keep and maintain records of all de-liveries to recycling facilities and all pickups of waste materials at the site by others as specified above.
F. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work.