Summary of clarifications/changes in Amendment 03
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary of clarifications/changes in Amendment 03:
SOLICITATION DOCUMENT:
SF- 1442 – Solicitation Offer and Award - Clarification: the address in Block 7 is the address that offers are to be submitted to. Due date is 05/20/10 4:00 pm.
Schedule of Items- Clarification: Base BID Item A SITE WORK , pertains to the entire site including the location of the Optional Item Fire Station.
Section F - Deliveries or Performance : Clarification: the 343 days for performance is for both the base bid and the option, they are expected to run concurrently if both are awarded.
Remove the reference to Work Timing in its entirety.
Section I - Contract Clauses : Include by reference 52.228-5 Insurance—Work on a Government
Installation by reference, and 452.228-71 Insurance Coverage full text.
Section L – Instructions, Conditions, and Notices to Offerors or Respondents: 52.215-1 remove reference to Alternate II.
Delete pages 42-45, replace with Section L Solicitation Instructions revised pages 42 - 43
Section M - EVALUATION FACTORS FOR AWARD – Add this section to the solicitation as pages 44 – 46.
(Clearly identifying Section M, slightly editing the evaluation factors, and removing the proposed format for responding to evaluation factors).
ACTON FINAL SPECIFICATIONS (for base bid items)
Specification 01 18 31 change LEED-NC 2.2 to LEED-NC 3.0
LEED Certification Requirement is clarified: The project was designed to meet LEED Gold and that is the desired level of certification after construction, however the minimum requirement is to meet LEED
Silver.
Specification 01 19 13 1.04 B. clarification: The Commissioning Authority will be hired separately from the construction contract and is NOT the construction contractor’s responsibility.
Specification 03 30 00 is modified to delete Section 3.11.A
Specification 09 29 00 2.1 DRYWALL BOARD
Delete: A. Green Gypsum Board Product: EcoRock by Serious Materials ; Replace with standard gypsum board meeting specifications ASTM C36 and C630 since Serious Materials will not be releasing any more EcoRock until next year.
Specification 31 23 00 The following clarification is provided regarding the type of soil to be used for import: Non-expansive soils meeting the requirements of Specification 31 23 00 as modified for subsection 204.07.1, which states free of organic matter, demolition debris, or other deleterious matter and material greater than 3 inches in size (same requirement for on-site soils).
Specification 33 36 00 – Utility Septic Tanks 2.1 Precast Concrete Septic Tank
A. At Firehouse/Warehouse: 12 GPD 3500 gallon tank changed to 1,200 gallon tank
B. At Main Office Building: 25 GPD, 7000 gallon tank changed to 2,500 gallon tank
ACTON FIRE STATION SPECIFICATIONS – clarification: the Fire Station is not required to be LEED certified.
ACTON CIVIL DRAWINGS - Clarification between Civil Drawings & Geotechnical Report
The layout legend on the “L” drawings call for A/C paving for heavy traffic, The Civil Drawings C-5.5
Paving Detail 3 “Asphalt Concrete” over un-dimensioned class C aggregate base over 12” scarify
& compact sub base.. The geotechnical report Paragraph 6.0 Design Recommendations & paragraph 6.5 recommended asphalt pavement sections show 4” AC surface course, 10”
Aggregate Base course, 12” compacted sub grade for traffic areas.
Clarification : The solicitation provision which incorporates the geotech report into the plans by reference states that the more restricitve spec should be followed. But in this case, the 2 different specs are equivalent, as explained on page 2 of the addendum to the geotechnical report. We are using the typical section shown on 1/C5.5 combined with 2/C5.5 which shows 3" of asphalt concrete over 14" of aggregate base over 12" of compacted sub grade.
GEOTECHNICAL REPORT - Inclusion of boring logs referenced in Geotechnical Report .