Continuation.docx
DOCX document 12 KB Posted
- Attached to
- Acton District Office Construction Federal contract opportunity
- Solicitation number
- AG-91S8-S-10-0014
About this file
Continuation - SF30
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Continuation (page 2) – SF 30 Solicitation # AG-91S8-S-10-0014
1) Inclusion of Specification 28 13 00 ACCESS CONTROL for a Security Access System in the Acton Office & Warehouse base bid; CCTV system is NOT included in the solicitation. (3 page spec. attached).
2) For Optional fire Station, reference is made on the plans to a structure labeled “Option A”; this structure should be included in the bid for the Fire Station.
3) As a reminder, Section C of the Solicitation page 6 reads as follows (no change):
References in the Drawings (for the Office and Warehouse)to: Add Alt. 1A & 1B Ground Water Source Heat Pump; Add Alt. #2 Turf Block Permeable Pavers; and Add Alt. #4 Carport shall be disregarded. These items shall not be included in the offer submitted.
File details come from the government source that posted it. Updated .