Continuation.docx

DOCX document 12 KB Posted

Attached to
Acton District Office Construction Federal contract opportunity
Solicitation number
AG-91S8-S-10-0014
Issued by
Department of Agriculture Forest Service R5-Pacific Southwest Region

About this file

Continuation - SF30

View the file

Other files for this federal contract opportunity

Other files attached to Acton District Office Construction, newest first.
File Type Posted
Section_09650.pdf PDF
Section 09513.pdf PDF
SF 30 Acton Amendment No. 4 pdf.pdf PDF
Summary of Changes.pdf PDF
Summary of Amendment 03.pdf PDF
Boring Logs.pdf PDF
SF 30 Acton Amendment No. 3.pdf PDF
AGAR 452.288-71 Insurance.pdf PDF
SECTION M.pdf PDF
Section L.pdf PDF
SF 30 Acton Amendment No. 2.pdf PDF
Attendee Sign-In Sheet.pdf PDF
Acton Notes and Q As_503.pdf PDF
Attendee Business Cards.pdf PDF
281300.pdf PDF
Acton Amendment No. 1.pdf PDF
Acton - Plumbing Drawings.pdf PDF
Acton - Landscape Drawings.pdf PDF
Acton - Architectural Drawings.pdf PDF
Acton Geotechnical1.pdf PDF
Acton Fire Station 100 Specs.pdf PDF
1-21-10 Acton Fire Station 100 Drawings.pdf PDF
Acton - Electrical Drawings.pdf PDF
Acton District office-0318.docx DOCX document
Acton - Mechanical Drawings.pdf PDF
Acton - Civil Drawings.pdf PDF
Acton - Drawing Cover T1.pdf PDF
Acton - Structural Drawings.pdf PDF
Acton Final Specification Binder.pdf PDF
Acton - Bridge Drawings.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Continuation (page 2) – SF 30 Solicitation # AG-91S8-S-10-0014

1) Inclusion of Specification 28 13 00 ACCESS CONTROL for a Security Access System in the Acton Office & Warehouse base bid; CCTV system is NOT included in the solicitation. (3 page spec. attached).

2) For Optional fire Station, reference is made on the plans to a structure labeled “Option A”; this structure should be included in the bid for the Fire Station.

3) As a reminder, Section C of the Solicitation page 6 reads as follows (no change):

References in the Drawings (for the Office and Warehouse)to: Add Alt. 1A & 1B Ground Water Source Heat Pump; Add Alt. #2 Turf Block Permeable Pavers; and Add Alt. #4 Carport shall be disregarded. These items shall not be included in the offer submitted.

File details come from the government source that posted it. Updated .