SOL NO. AG-82X9-S-12-0051

Pike & San Isabel National Forests

Roads Construction IDIQ

SECTION B – Costs Schedule of Items……………………………………..…………………………………………………………5

SECTION C - Statement of Work

SECTION D - Packaging and Marking

SECTION E - Inspection and Acceptance

SECTION F - Deliveries or Performance

SECTION G - Contract Administration Data

SECTION H - Special Contract Requirements

SECTION I - Contract Clauses

SECTION J - List of Documents, Exhibits, and Other Attachments

SECTION K - Representations, Certifications, and Other Statements of Offerors

SECTION L - Instructions, Conditions, and Notices to Offerors or Respondents

SECTION M - Evaluation Factors for Award……………………………………………………………………………………….42

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

SCHEDULE I – BASE YEAR

The quantities of supplies and services specified in the Schedule are for estimating and evaluation purposes only and are not purchased by this contract. The quantities listed are an estimate of what typical quantities would be for pay items that may be included in a task order. See General Notes – Mobilization Pay Items

Item No. Description Estimated Quantity

Method of Meas. Unit Unit Price Total Price

151(01)M

Mobilization of motor grader, Cat 140, JD770D, or equivalent from base of operations (one time per job) 175 AQ Mile

151(02)M

Mobilization of backhoe/loader, Cat 416E , JD

310G, or equiv., 4-wheel drive, with extendable stick from base of operations (one time per job) 175 AQ Mile

151(03)M

Mobilization of dozer, Cat D-4, Case 550, or equiv., w/tilt blade from base of operations (one time per job) 175 AQ Mile

151(04)M

Mobilization of dozer, Cat D-6, Case 850, or

151(05)M

Mobilization of track-mounted excavator, Cat

315, Case 9030, or equiv., w/ thumb attachment from base of operation (one time per job) 175 AQ Mile

151(06)M

Mobilization of skid steer, Bobcat S220 or equivalent from base of operations. (one time per job) 175 AQ Mile

151(07)M

Mobilization of wheel loader, John Deere 544, Cat 950, or equiv. from base of operations. (one

151(08)M

Mobilization of dump truck, 10 CY end dump from base of operations (one time per job) 175 AQ Mile

151(09)M

Mobilization of dump truck, 15 CY dump truck

151(10)M

Mobilization of compactor, vibratory steel wheel, 5-8 ton from base of operations (one time per

151(11)M

Mobilization of water tender, 4,000 gallon pressurized; w/ operator. 8 hour minimum per job 175 AQ Mile

151(12)M

Mobilization of mini-excavator, Cat 303 5C or equiv. w/ thumb attachment from base. (one time

151(13)M

Mobilization of Road Reconditioning – In Place

Rock Crushing Crew from base of operations.

(one time per job)

Per Task

Order if applicable AQ Mile

151(20)

Bonding, Task Order $30,000 to $150,000. No

Individual Task Order will exceed $150,000

Per Task applicable % Each

152(01) Construction Survey and Staking

Per Task applicable AQ L.S.

157(02) Soil Erosion Control 300 AQ Foot

SCHEDULE I – BASE YEAR Cont.

Quantity

Method of Meas. Unit Unit Price Total Price

202(55)

Removal & disposal of trees – dia. less than 24", disposal method “e” 10 AQ Each

202(55)A

Removal & disposal of trees – dia. 24" or greater, disposal method “e” 10 AQ Each

203(01)

Removal of Existing Culverts, disposal method

"a" 20 AQ Each

204(01)

Roadway Excavation, compaction method "e", finishing method "A" 500 CQ C.Y.

204(02)

Load, Haul, and Place Material, compaction method “d”, finishing method "A" 1500 AQ C.Y.-Mile

204(20)A Drainage Excavation, Type Drainage Dip 10 AQ Each

204(20)B Drainage Excavation, Type Inlet/Outlet Ditch 10 AQ Each

204(24) Haul (excluding haul for 204(02)) 3000 AQ Ton-Mile

211(03)A Roadway Obliteration, Method 1

211(03)B Roadway Obliteration, Method 2 3 AQ Mile

211(03)C Roadway Obliteration, Method 3 5 AQ Mile

230(01) Roadside Brushing 5 AQ Mile

251(02) Placed Rip Rap, Class 4 30 AQ Ton

258(01)

Reinforced Concrete Retaining Wall – For Fills

Up To 9 Feet – Government Furnished Material

Per Task

Order if applicable AQ

Sq. Face

Foot

301(01)A

Aggregate base, Government Furnished Material, compaction method "d" 250 AQ Ton

301(01)B

Aggregate base, grading CDOT Class 6, compaction method "e" 500 AQ Ton

301(01)C

Aggregate base, grading CDOT Class 5, compaction method "d" 500 AQ Ton

301(01)D

Aggregate base, grading CDOT Class 4, 301(15)

Aggregate surface course, Type Pit Run, compaction method "d" 300 AQ Ton

303(58) Road Reconditioning – In Place Rock Crushing applicable AQ S.Y.

602(01)A

Installation of 18-inch diameter corrugated metal pipe, compaction method "A" 120 AQ LF

602(01)B

Installation of 24-inch diameter corrugated metal

602(01)C

Installation of 36-inch diameter corrugated metal pipe, compaction method "A" 100 AQ LF

602(02)A

Installation of 21" span, 15" rise corrugated metal pipe, compaction method "A" 120 AQ LF

602(02)B

Installation of 28" span, 20" rise corrugated metal pipe, compaction method "A" 120 AQ LF

602(06)A End section for 18" pipe culvert 5 AQ Each

602(06)B End section for 24" pipe culvert 5 AQ Each

602(07)A

End section for 21" span, 15" rise pipe arch culvert 5 AQ Each

SCHEDULE I – BASE YEAR Cont.

Quantity

Method of Meas. Unit Unit Price Total Price

602(07)B

End section for 28" span, 20" rise pipe arch culvert 5 AQ Each

619(02)

Transport and Install Government Furnished 12’

Heavy Duty Gate 2 AQ Each

622(01)

Motor Grader, Cat 140, JD770D, or equivalent;

with operator 50 AQ Man Hour

622(02)

Backhoe/Loader, Cat 416E, JD 310G, or equivalent, 4-wheel drive, w/ extendable stick;

with operator 50 AQ Man Hour

622(03)

Crawler Dozer, Cat D-4, Case 550, or equivalent, w/ tilt blade; with operator 50 AQ Man Hour

622(05)

Track Mounted Excavator, Cat 315, Case 9030, or equiv., w/ thumb attachment; with operator 50 AQ Hour

622(07)

Wheel Loader, John Deere 544, Cat 950, or equivalent, with operator 50 AQ Hour

623(01) General Labor 60 AQ Hour

625(01) Seeding, Dry Method 5 CQ Acre

633(10)

Remove Sign (includes disposal of sign off

Government property) 5 AQ Each

633(90)A

Install or Replace Single Post Sign - Government

Furnished (includes post) 5 AQ Each

633(90)B

Install or Replace Double Post Sign -

Government Furnished (includes post) 5 AQ Each

802(01) Ditch Cleaning 15840 AQ LF

805(01) Culvert Cleaning 24" or under 10 AQ Each

805(02) Culvert Cleaning 36" to 48" 10 AQ Each

805(03) Culvert Cleaning over 48" 10 AQ Each

805(04) Drainage Dip Cleaning 15 AQ Each

808(01) Cattleguard Cleaning 5 AQ Each

809(01) Water Supply applicable AQ LS

850(01)A Road Maintenance - Level 2 Roads 25 AQ Mile

850(01)B Travelway Maintenance - Level 2 Roads 20 AQ Mile

860(01)A Road Maintenance - Level 3-5 Roads 25 AQ Mile

860(01)B Travelway Maintenance - Level 3-5 Roads 20 AQ Mile

SCHEDULE II – OPTION YEAR ONE

The quantities of supplies and services specified in the Schedule are for estimating and evaluation purposes only and are not purchased by this contract. The quantities listed are an estimate of what typical quantities would be for pay items that may be

Quantity

Method of Meas. Unit Unit Price Total Price

151(01)M

Mobilization of motor grader, Cat 140, JD770D, 315, Case 9030, or equiv., w/ thumb attachment from base of operation (one time per job) 175 AQ Mile

Rock Crushing Crew from base of operations.

(one time per job)

Per Task

Individual Task Order will exceed $150,000

Per Task

SCHEDULE II – OPTION YEAR ONE Cont.

Quantity

Method of Meas. Unit Unit Price Total Price

202(55)

Removal & disposal of trees – dia. 24" or greater, disposal method “e” 10 AQ Each

203(01) Removal of Existing Culverts, disposal method "a" 20 AQ Each

204(01)

Roadway Excavation, compaction method "e", finishing method "A" 500 CQ C.Y.

204(02)

Reinforced Concrete Retaining Wall – For Fills Up

To 9 Feet – Government Furnished Material

Per Task

Order if applicable AQ

Installation of 21" span, 15" rise corrugated metal

Installation of 28" span, 20" rise corrugated metal

602(07)A End section for 21" span, 15" rise pipe arch culvert 5 AQ Each

602(07)B End section for 28" span, 20" rise pipe arch culvert 5 AQ Each

SCHEDULE II – OPTION YEAR ONE Cont.

Quantity

Method of Meas. Unit Unit Price Total Price

619(02) with operator 50 AQ Hour w/ tilt blade; with operator 50 AQ Hour

SCHEDULE III – OPTION YEAR TWO

The quantities of supplies and services specified in the Schedule are for estimating and evaluation purposes only and are not purchased by this contract. The quantities listed are an estimate of what typical quantities would be for pay items that may be

Quantity

Method of Meas. Unit Unit Price Total Price

151(01)M

Mobilization of motor grader, Cat 140, JD770D, 315, Case 9030, or equiv., w/ thumb attachment from base of operation (one time per job) 175 AQ Mile

Rock Crushing Crew from base of operations.

(one time per job)

Per Task

Individual Task Order will exceed $150,000

Per Task

SCHEDULE III – OPTION YEAR TWO Cont.

Quantity

Method of Meas. Unit Unit Price Total Price

202(55)

Removal & disposal of trees – dia. 24" or greater, disposal method “e” 10 AQ Each

203(01) Removal of Existing Culverts, disposal method "a" 20 AQ Each

204(01)

Roadway Excavation, compaction method "e", finishing method "A" 500 CQ C.Y.

204(02)

Reinforced Concrete Retaining Wall – For Fills Up

To 9 Feet – Government Furnished Material

Per Task Order if applicable AQ

Installation of 21" span, 15" rise corrugated metal

Installation of 28" span, 20" rise corrugated metal

602(07)A End section for 21" span, 15" rise pipe arch culvert 5 AQ Each

602(07)B End section for 28" span, 20" rise pipe arch culvert 5 AQ Each

SCHEDULE III – OPTION YEAR TWO Cont.

Quantity

Method of Meas. Unit Unit Price Total Price

619(02) w/ tilt blade; with operator 50 AQ Hour

Schedule General Notes:

1) The base of operations location shall be used for mobilization distance determination purposes. Base of Operations should be the location where the equipment is staged but may be any business office location. Some task orders may be based on shorter distances, if the affected equipment is closer to the project site than the base of operations (e.g., mobilization from one project site to another).

2) Mobilization shall be for one time per job. Mobilization will not be paid for the return trip to the base of operations, or for re-mobilization to the same project (e.g., equipment taken back to the base of operations for the weekend, poor project planning), unless agreed to in advance by the Contracting Officer.

3) Mobilization covers movement of personnel, equipment, supplies, and incidentals to or from the project area.

Requirements and provisions shall follow Section 151 in the FP-03 specifications. Payment will be made at the accepted rates shown on the bid schedule for each corresponding piece of equipment, as applicable. Separate mobilization pay items for each type of major equipment anticipated under the contract are shown in the Schedule of Items.

4) Mobilization of equipment for which a separate mobilization pay item is not shown on the Schedule of Items shall be considered incidental to the work pay item requiring that equipment. Pickup trucks, chase vehicles, etc., shall be considered incidental to the pay items shown in the Bid Schedule, and no separate payment will be made for their use. If the Contracting Officer agrees that the equipment needed is a major part of the work it may be negotiated and added to the Schedule of Items. In certain conditions some equipment may be considered incidental to another pay item. An example is when a dump truck is hauling a backhoe to do culvert & aggregate work. In this case the dump truck is incidental to the backhoe and only mobilization of the backhoe shall be paid.

5) Mobilization Item 151(13)M shall include any equipment and transportation necessary to perform Pay Item 303(58) according to specification. Equipment needed to perform the work may consist of motor grader, backhoe, dozer, track mounted excavator w/ hammer attachment, skid steer, wheel loader, water truck, and mobile rock crushing unit. Additional equipment may or may not be needed and unit costs shall be determined by Task Order if applicable based on project design.

6) Pay Item 151(12) Bonding is a percentage unit price and shall be used for any Task Order between $30,000 and

$150,000. The Pay Item is calculated by adding all mobilization pay item costs with all work pay items costs and then multiplying it by the percentage unit price.

7) Pay Item 152(01) Construction Survey and Staking shall be performed according to FP-03 Specification 152. Unit costs shall be determined by Task Order if applicable based on project design.

8) Pay Item 157(02) Soil Erosion Control structures shall be installed according to FP-03 Section 157 and the drawing detail.

9) Pay Items 202(55) and 202(55)A assume trees removed shall be limbed, with an on-site lop-and-scatter disposal method. Merchantable material shall be hauled and placed in a F.S.-designated stockpile site within five miles of the tree location, unless otherwise arranged by and paid for by the Contracting Officer. Work under these Pay Items does not include grubbing of stumps, which shall be covered separately, as needed.

10) Pay Item 204(01) involves excavation, placement, and compaction of common/ripable earthen materials for minor roadway and/or trail construction. Cut and fill quantities shall balance out. Bid prices should assume a haul distance not to exceed 1 mile one-way from the work location. Distances exceeding this amount shall be negotiated and covered separately, as needed.

11) Construct Pay Item 204(20)A & B according to FP-03 Section 204 and the drawing detail in the contract.

Schedule General Notes Continued.

12) Pay Item 204(24) Haul shall include ton/mile costs for hauling of excavation, aggregate, pit run, rip rap, borrow material, etc. To cover project hauling not covered in other specifications.

13) Pay Item 211(03)A Roadway Obliteration, Method 1 shall be performed according to Supplemental Specification 211.

The intent of this pay item is to re-contour to match original/existing round contour. Unit costs shall be determined by

Task Order if applicable based on project design.

14) Pay Item 211(03)B Roadway Obliteration, Method 2 shall be performed according to Supplemental Specification 211.

The intent of this pay item is to reshape/outslope existing road bed to drain.

15) Pay Item 211(03)C Roadway Obliteration, Method 3 shall be performed according to Supplemental Specification 211.

The intent of this pay item is to scarify ground to a 12” depth one pass and out.

16) Pay Item 230(01) Roadside Brushing shall be performed according to Supplemental Specification 230 and the drawing detail in the contract.

17) Pay Item 251(02) Placed Riprap, Class “4” shall be installed according to FP-03 Section 251. Pay Item shall include furnishing, hauling, and placing the specified material. Bid prices should assume a haul distance not to exceed 40 miles one-way from the nearest acceptable commercial source to the project site. Distances exceeding this amount shall be negotiated and covered separately, as needed.

18) Pay Item 258(01) includes installation, including minor block transportation, excavation, and backfill of pre-cast

Government-Furnished modular concrete retaining wall blocks according to FP-03 Section 258, manufacturer’s instructions located in Attachment J.2 Drawings on sheets 15 to 32, and Contracting Officer direction, design, and layout. Unit bid rate should be based on locally available backfill material. Unit costs shall be determined by Task

Order if applicable based on project design.

19) Pay Items 301(01)B, 301(01)C, 301(01)D, & 301(15) shall include furnishing, hauling, and placing the specified material. Bid prices should assume a haul distance not to exceed 40 miles one-way from the nearest acceptable commercial source to the project site. Distances exceeding this amount shall be negotiated and covered separately, as needed. Measure according to Subsection 109.03.

20) Pay Item 301(01)A, involves placement only. Any materials shall be Government-Furnished.

21) Pay Item 303(58) Road Reconditioning – In Place Rock Crushing shall be performed according to Supplemental

Specification 303. Unit costs shall be determined by Task Order if applicable based on project design.

22) Pay Items 602(01) and 602(02) assume excavation achievable with a backhoe or trackhoe. Solid material requiring the use of hydraulic hammers or blasting shall be covered separately. Imported backfill material will also be covered separately under an applicable pay item as determined by the Contracting Officer. Bid prices should assume a maximum burial depth of 5 feet below existing road surface. Depths exceeding this amount shall be negotiated and covered separately, as needed.

23) Pay Item 619(02) shall include transporting and installing Government-Furnished gate. Each task order shall detail the specific location of the gate to be installed. Bid prices should assume a haul distance not to exceed 40 miles one-way from the gate location to the project site. Install gate according to FP-03 Section 619 and the drawing detail in the contract. All gate installations require concrete as shown in the drawing detail. Concrete for anchoring locking open, locking closed, and hinge posts shall be Sakrete 5000 Plus High Strength Concrete Mix or equal as approved by the

Contracting Officer.

Schedule General Notes Continued.

24) Traffic control for all Pay Items shall be considered incidental, with the exception of work requiring flaggers which shall be covered under Pay Item 623(01) – General labor.

25) Pay Item 623(01) General Labor is intended to cover hand labor and operation of small mechanical equipment not otherwise covered by specific equipment operator requirements (e.g. chainsaws, “whacker-packers’).

26) Pay Item 625(01) Seeding, Dry Method shall be performed according to Supplemental Specification 625.

27) Pay Item 633(10), 633(90)A, and 633(90)B shall be performed according to the Manual on Uniform Traffic Control

Devices (2009 Edition) and the Forest Service Sign Installation Guide, Publication No. 1071 2812P. The Sign

Installation Guide can be downloaded from http://www.fs.fed.us/t-d/pubs/.

28) Pay Item 808(01) Cattle guard Cleaning requires cleaning the area beneath the cattle guard deck, generally accomplished by removing the deck. The costs for additional maintenance needed such as welding or replacing parts shall be negotiated and covered separately, as needed.

29) Pay Item 809(01) Developing Water Supply and Watering unit costs shall be determined by Task Order if applicable based on project design.

30) Pay Item 850(01)A covers road maintenance items and includes all aspects of maintenance required by Special

Project Specification 850. Pay Item 850(01)B is a travelway maintenance item and shall be performed in accordance with subsection 850.06; it is for roadway surface maintenance and minor drainage maintenance.

31) Pay Item 860(01)A covers road maintenance items and includes all aspects of maintenance required by Special

Project Specification 860. Pay Item 860(01)B is a travelway maintenance item and shall be performed in accordance with subsection 860.06; it is for roadway surface maintenance only, and does not include other related work, such as drainage maintenance or vegetative clearing.

32) The Contractor is required to call Digger’s Hotline to obtain a utility line locate before any ground disturbance on any task order. The Forest Service will try to provide as much information about any utilities known but it is the

Contractor’s responsibility to locate all utility lines.

33) The Contractor is required to complete a Contract Daily Diary for each day of work. Each Daily Diary must be submitted to the Contracting Officer within one working week of the work being performed. See Supplemental

Specification 153 for requirements.

34) The Contractor is required to submit a Construction Schedule for each Task Order awarded. See Supplemental

Specification 155 for requirements.

35) Pay Items not listed in the Schedule of Items that are similar in scope but very slightly because of the detail of work may be modified to the contract on an individual Task Order basis. Unit costs shall be determined by Task Order if applicable based on project design.

36) Pay Item 204(02) bid prices should assume a haul distance not to exceed 5 miles one-way from the work location.

Distances exceeding this amount shall be negotiated and covered separately, as needed

37) Hour (HR): All hours worked under a pay item as "on-shift" in performance of actual work necessary for the performance of pay item. Hours do not include "off-shift" time allowed for transportation to the worksite or breaks.

The minimum computation time allowance is increments of 15 minutes. Rates will be in accordance with the applicable pay item in the schedule.

http://www.fs.fed.us/t-d/pubs/

SECTION C--DESCRIPTION/SPECIFICATIONS

C.1 Scope of Contract Pike & San Isabel NF’s Road Construction IDIQ Contract located within the Pike & San Isabel National Forests. By design, an Indefinite Delivery, Indefinite Quantity (IDIQ) contract allows the Government to respond to various emergencies and light construction needs rapidly, without committing to a specific quantity or type of work. When a project is initiated, a Task Order will be offered to the awarded Contractor that outlines the project needs, equipment needs, dates, and specific project location. The resulting Task Orders will be competed among the awardees and evaluated based on a best value to the Government determination. Section C.2 Description of Work below outlines, in a general sense, the various types of work that may be offered as a Task Order under this IDIQ Contract.

C.2 Description of Work

The project includes, but is not limited to, the following work: road construction and re-construction, emergency road construction due to major emergencies such as landslides, blizzards, flooding, fire, etc; road and/or parking area construction, reconstruction, reconditioning, maintenance, decommissioning; trail construction, reconstruction, reconditioning, maintenance, and decommissioning; vegetative clearing, grubbing, and brushing; culvert installation and repair; road/stream interaction projects; aquatic organism passage projects, erosion control, sign installation and repair;

cattleguard installation and repair; gate installation and repair including minor concrete forming and finishing;

recreational site construction, reconstruction, reconditioning, and maintenance; material haul; haul and placement of imported borrow or aggregate, and other related road work as described in the Statement of Work under each individual

Task Order issued under this contract. Contractor shall provide all necessary heavy equipment, manpower, transportation and operating supplies and other incidentals to accomplish this work

C.3 Location of Project

The project area is described herein and shown on the attached maps (See Section J, List of Attachments). The work is located within the Pike & San Isabel National Forests.

C.4 Performance of the Work

All work shall be conducted in a safe and expedient manner and in conformance with the specifications referenced in

Section J attachment J.1 and the Task Order. When applicable, traffic control shall be in accordance with standards set forth in the most current edition of the Manual on Uniform Traffic Control Devices (MUTCD). See General Notes in

Section B for discussion of compensation for traffic control work. All work shall be conducted by personnel fully qualified to perform such tasks assigned and shall be supervised by an onsite designated Contractor’s Representative.

C.5 Equipment All equipment shall be in good repair, and capable of accomplishing assigned tasks in a safe and environmentally acceptable manner. Where applicable, all equipment shall be fitted with approved spark arrestors. All repairs to equipment under this contract shall be made and paid for by the Contractor.

The equipment listed in the Schedule of Items constitutes the minimum mandatory equipment to be furnished and operated under this contract. Failure to furnish rates for this equipment will render the offer non-responsive. Larger equipment maybe used except in such cases that oversized equipment would result in unacceptable ground disturbance or be counterproductive. Equipment substitutions must be requested in writing and must be approved by the Contracting

Officer prior to use.

Equipment may be owned, rented, or subcontracted.

All equipment shall be cleaned of earthen and vegetative materials that may contain weed seed prior to delivery onto

National Forest Lands. If using equipment on multiple Task Orders at one time or if there are long mobilization distances between sites on the same Task Order, the Contracting Officer may require cleaning of equipment between the project sites. See Supplemental Specification 171 - Weed and Disease Prevention.

C.6 Equipment and Materials Storage & Staging Upon concurrence from the Contracting Officer, certain areas on the National Forests may be used on a case-by-case basis for storage of equipment and/or materials during active construction and/or maintenance periods. The Contractor shall be responsible for protection of items stored on Government property, and shall ensure adequate safety measures are maintained at such sites.

C.7 Routine Road Maintenance- Gravel and Native Surfaced Roads

When the task order calls for routine blading (road grading) of forest roads, equipment operators with no previous national forest road maintenance experience shall view a short (18-minute) video on proper road maintenance techniques prior to beginning work. The operator shall work in a manner that closely follows the techniques shown in the video.

C.8 References in the Statement of Work/Specifications

Any reference in this solicitation to Engineer, Forest Engineer, Project Engineer, Forest Service, COR, shall be replaced with Contracting Officer.

C.9 Standard Specifications

“Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03”, U.S. Customary

Units, is applicable for this project, and is included by reference only. The requirements contained in these Standard

Specifications are hereby made a part of this solicitation and any resulting work. These specifications can be viewed at no cost on the FHWA website, which also gives ordering information: http://www.wfl.fha.dot.gov/design/specs/fp03.htm.

Section J of this contract contains Supplemental and Special Project Specifications that supplement and/or modify the

Standard Specifications. The Standard, Supplemental, and Special Project Specifications shall all be used in conjunction with each other to properly determine the correct specification for each Pay Item in the Schedule of Items.

C.10 Government Furnished Property

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the

"Government Property" FAR clause contained elsewhere in the contract.

Unless otherwise agreed upon, any Government-Furnished Property incorporated into the work shall be furnished and delivered to or near the project site(s) by the Government.

Government will make available 18 minute video as described in Section C.7 Routine Road Maintenance – Gravel and

Native Surfaced Roads for the contractor to review and return to the Government.

Government will provide official National Forest Maps and specific vicinity maps for each task order issued.

TASK ORDERS: The CO,or designated Contracting Officer Representative (COR) shall submit an executed task order to the

Contractor. All work will be ordered by Firm-Fixed price TASK ORDERS (TO) at the prices listed on the Schedule of Items through the Base Period and each Option Year exercised. The price may change only by a written modification to the task order signed by the

Contracting Officer and the Contractor. The Contractor shall schedule work to minimize impact on road use when possible.

AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract. This includes Standard Specifications and Supplemental specifications applicable to this project.

http://www.wfl.fha.dot.gov/design/specs/fp03.htm

SECTION D - Packaging and Marking {For this Solicitation, there are NO clauses in this Section}

SECTION E - Inspection and Acceptance

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

52.246-1 Contractor Inspection Requirements (APR 1984)

52.246-12 Inspection of Construction. (APR 1996)

SECTION F - Deliveries or Performance

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

52.242-14 Suspension of Work (APR 1984)

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than date stated in the individual Task Order. The time stated for completion shall include final cleanup of the premises.

452.211-75 Effective Period of the Contract. (FEB 1988)

The effective period of this contract is from 365 days from award date. There will be two (2) one year optional years that may be exercised at the discretion of the Government

452.236-75 Maximum Workweek - Construction Schedule. (NOV 1996) Within five (5) calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following in writing for approval:

(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposes to carry out the work.

The maximum workweek that will be approved is Monday through Friday, not to exceed forty (40) hours, unless change is agreed to in writing by the Contracting Officer.

http://www.arnet.gov/far/

SECTION G - Contract Administration Data

AGAR 452.215-73 Post Award Conference (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and held within fifteen (15) days after the date of contract award. The conference will be held at a location to be determined, that will be identified upon contract award.

G.1 INVOICES & PAYMENTS

INVOICES SHALL BE SUBMITTED TO:

Toinette P. Aranda, Administrative Contracting Officer (ACO)

Phone: 719-553-1431 Fax: 719-553-1435

E-Mail: tparanda@fs.fed.us

USDA Forest Service

2840 Kachina Drive

Pueblo, Colorado 81008

IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT.

PAYMENT WILL BE MADE BY:

USDA Rural Development

Centralized Servicing Center

4300 Goodfellow Blvd (FC-233)

Bldg 105E

St. Louis, MO 63120-1703

Phone: 314-457-4525

G.2 FOREST SERVICE REPRESENTATIVES:

Ginger R. Domingos will serve as the Contracting Officer on this contract. She will have full warrant authority over all contract issues. She can be reached at 970 385-1245or gingerdomingos@fs.fed.us.

Toinette P. Aranda will serve as the Administrative Contracting Officer (ACO) on this project. She will serve as your primary point of contact throughout this contract. A letter of delegation of her authority will be provided at contract award. Her contact information is included above. She can be reached at

719-553-1431 or tparanda@fs.fed.us .

A Contracting Officer Representative (COR) will be appointed for this contract upon award. His/her delegated authority and responsibilities will be defined on a delegation letter issued after contract award.

This delegation will also contain his contact information.

mailto:gingerdomingos@fs.fed.us mailto:tparanda@fs.fed.us

SECTION H - Special Contract Requirements

4G52.222-704 PERSONAL PROTECTIVE EQUIPMENT (FEB 2007)

The contractor shall train workers in the safe operation and use of equipment that the worker may use before the worker begins using such equipment.

Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities must be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered which may cause injury or impairment in the function of any part of the body. Defective or damaged personal protective equipment must not be used.

The contractor shall provide chain saw chaps to each employee who operates a chain saw, at no cost to the employee. These chaps must be approved by an Underwriters Laboratory or meet Forest Service specification 6170-47. The chaps must cover the full length of the thigh and must extend to the top of the boot on each leg.

The contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support. Employees operating chain saws shall wear foot protection that is constructed with cut-resistant material which will protect the employee against contact with a running chain saw.

In any area where the worker is exposed to the potential for flying or falling objects, the contractor shall provide a hard hat, at no cost to the employee, and the contractor shall assure that the employee wears the hard hat. The hard hat must meet the minimum requirements of American National Standards Institute (ANSI) standard Z89.1-1997.

The contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects.

This eye protection must meet the minimum requirements of ANSI standard Z87.1-2003.

The contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise for example, chain saw operation.

Emergency Response (AGAR 452.236-77) (Nov 1996)

(a) Contractor’s Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR Clause 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the

Contractor’s agents or employees.

(b) Contractor’s Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the

Government of any fires signed on or in the vicinity of the work site.

(c) Contractor’s Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the

Contractor shall allow the Forest Service to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). An equitable adjustment for the temporary use of employees and equipment will be made under the Changes Clause, FAR 52.243-4.

ADDENDUM to AGAR 452.236-77(c)

Paragraph (c) above add Changes clause, FAR 52.243-5, Changes and changed conditions.

AGAR 452.237-74 Key Personnel (FEB 1998)

(a) The Contractor shall assign to this contract the following key personnel: CONTRACTOR REPRESENTATIVE, FOREMAN/WOMAN, and INSPECTOR.

(b) During the performance of this contract, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

H. 1. FIRE CONTROL

H.1.1. Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest

Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The

Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.

H.1.2. Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the

Contractor or his employees, the Contractor when requested by the Contracting Officer shall place his employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.

H.1.3. Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.

H.1.4. An equitable adjustment in contract time may be made for this period.

H.1.5. Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to his operation under the contract.

H.1.5.1. Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under H.2.5.2. and H.2.5.4. below shall count toward fulfillment of the above requirement. Where additional tools, beyond those required below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.

H.1.5.2. Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:

a. One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.

b. One - shovel, round point #0 lady or equal.

c. One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.

d. One - water container (at least 1-gallon capacity), not required with stationary equipment.

H.1.5.3. Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chainsaws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.

H.1.5.4. Powersaws. For each powersaw used in connection with this contract, the following will be provided:

a. One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.

b. One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.

H.1.5.4.1. Any fueling or refueling of a powersaw or auger shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw or auger shall be moved at least 10 feet from place of fueling before starting.

H.1.5.5. Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.

H.1.5.6. Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.

H.1.5.7. Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.

H.1.5.8. Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.

H.1.5.9. Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch. All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.

H.1.5.10. Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.

H.1.5.11. Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as

Hoot Owl restrictions, necessary during periods of critical fire weather conditions.

H.1.5.11.1. When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:

a. All high fire risk operations could be terminated at 1300 local time.

b. All burning could be stopped, including debris burning fires.

c. Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the

Government will provide the patrolman.

H.1.5.12. Pump and Trailer. Not required.

H.1.5.13. Burning. Before starting any open burning, the Contractor shall comply with the following:

a. Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.

b. Obtain a burning permit from the District Ranger.

c. Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.

d. Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.

e. Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.

f. Under certain atmospheric conditions, smoke accumulations may become excessive and, in these cases, the

Regional Forester may, at his discretion, prohibit all open burning for definite periods within specific areas of the National Forest.

H. 2 FIRE PREVENTION AND CONTROL

See Section J Attachments

SECTION I - Contract Clauses

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/ or www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.202-1 Definitions. (JUL 2004)

52.203-3 Gratuities. (APR 1984)

52.203-5 Covenant Against Contingent Fees. (APR 1984)

52.203-6 Restrictions on Subcontractor Sales to the Government. (SEP 2006)

52.203-7 Anti-Kickback Procedures. (OCT 2010)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (JAN 1997)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (JAN 1997)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010)

52.204-4 Printed or Copied Double-Sided on Recycled Paper. (AUG 2000)

52.204-7 Central Contractor Registration (FEB 2012)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (FEB 2012)

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or

Proposed for Debarment. (DEC 2010)

52.211-18 Variation in Estimated Quantity. (APR 1984)

52.215-2 Audit and Records - Negotiation. (OCT 2010)

52.215-8 Order of Precedence -- Uniform Contract Format (OCT 1997)

52.219-6 Notice of Total Small Business Set-Aside (NOV 2011)

52.219-8 Utilization of Small Business Concerns. (JAN 2011)

52.219-14 Limitations on Subcontracting. (NOV 2011)

52.219-28 Post-Award Small Business Program Rerepresentation (APR 2009)

52.222-3 Convict Labor. (JUN 2003)

52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (JUL 2005)

52.222-6 Davis-Bacon Act. (JUL 2005)

52.222-7 Withholding of Funds. (FEB 1988)

52.222-8 Payrolls and Basic Records. (JUN 2010)

52.222-9 Apprentices and Trainees. (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)

52.222-11 Subcontracts (Labor Standards). (JUL 2005)

52.222-12 Contract Termination - Debarment. (FEB 1988)

52.222-13 Compliance with Davis-Bacon and Related Act Regulations. (FEB 1988)

52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

52.222-15 Certification of Eligibility. (FEB 1988)

52.222-21 Prohibition of Segregated Facilities. (FEB 1999)

52.222-26 Equal Opportunity. (MAR 2007)

52.222-27 Affirmative Action Compliance Requirements for Construction. (FEB 1999)

52.222-32 Davis-Bacon Act--Price Adjustment (Actual Method). (DEC 2001)

52.222-35 Equal Opportunity for Veterans. (SEP 2010)

52.222-36 Affirmative Action for Workers with Disabilities. (OCT 2010)

52.222-37 Employment Reports on Veterans. (SEP 2010)

52.222-50 Combating Trafficking in Persons. (FEB 2009)

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (DEC 2007)

52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011)

52.223-6 Drug-Free Workplace. (MAY 2001)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011)

52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)

52.227-1 Authorization and Consent (DEC 2007) http://www.usda.gov/procurement/policy/agar.html

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997)

52.228-5 Insurance -- Work on a Government Installation (JAN 1997)

52.228-11 Pledges of Assets. (JAN 2012)

52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995)

52.228-14 Irrevocable Letter of Credit (DEC 1999)

52.228-15 Performance and Payment Bonds – Construction (OCT 2010)

52.229-3 Federal, State, and Local Taxes. (APR 2003)

52.232-5 Payments under Fixed-Price Construction Contracts. (SEP 2002)

52.232-17 Interest (OCT 2010)

52.232-18 Availability of Funds. (APR 1984)

52.232-23 Assignment of Claims. (JAN 1986)

52.232-27 Prompt Payment For Construction Contracts. (OCT 2008)

52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration. (OCT 2003)

52.233-1 Disputes. (JUL 2002)

52.233-3 Protest after Award. (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)

52.236-2 Differing Site Conditions. (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)

52.236-5 Material and Workmanship. (APR 1984)

52.236-6 Superintendence by the Contractor. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-8 Other Contracts. (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures,…