Attach J3 Sample Task Order FY12 IDIQ.pdf

PDF 3 MB Posted

Attached to
Pike & San Isabel NFs Road Construction IDIQ
Solicitation number
AG-82X9-S-12-0051
Issued by

About this file

Attach J3 Sample Task Order

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Aspen

Salida

Pueblo

Beulah

Bailey

Wetmore

Deckers

Penrose

La Veta

Hartsel

Cuchara

Alamosa

Aguilar

Trinidad

Monument

Keystone

Fairplay Leadville

Westcliffe

Walsenburg

South Fork

San Isabel

Canon City

Monte Vista

Lake George

Castle Rock

Buena Vista

Fort Garland

Woodland Park

Cripple Creek

Colorado City

Antero Junction

Colorado Springs

Mineral Hot Springs

§̈¦25

§̈¦70 §̈¦470

£¤96

£¤82

£¤12

£¤10

£¤159

£¤9

£¤50

£¤24

£¤94

£¤165

£¤115

£¤150 £¤17

£¤91

£¤142

£¤86

£¤15

£¤5

£¤45

£¤291

£¤285£¤370

£¤114

£¤69

£¤149

£¤368

£¤177£¤6

£¤136

£¤112

£¤75 £¤85

£¤300

£¤120

£¤239

£¤78

£¤233

£¤29

£¤231£¤67 £¤227

£¤16

£¤8 £¤121

£¤160

£¤371

£¤83£¤88 £¤30

£¤85

£¤371

£¤24

£¤285

£¤9

£¤82

£¤160

£¤177

£¤15

£¤165

£¤285

£¤83

£¤112

£¤85

£¤50

£¤12

£¤86

£¤285

£¤75

£¤24

£¤85

£¤114

£¤24

£¤112

£¤67

£¤83

£¤83

£¤160

£¤50

£¤85

£¤67

£¤368

£¤24

£¤69

£¤370

£¤83

£¤160

£¤9

£¤96

£¤285

£¤50

£¤17

£¤17

£¤69

£¤29

£¤285

£¤69

£¤160

£¤24

£¤91 £¤285

£¤368

£¤67

£¤24

£¤115

£¤6

£¤142

£¤285

£¤50

£¤160

0 25 5012.5 Miles

Pike & San Isabel National Forest CO Highways

Interstate Highways Collectors

PSICC Roads FS Roads ML3-5 FS Roads ML2 FS Roads ML1 PSICC Tra ils FR383 MP0.0 to 1.5 FR550 MP0.0 to 7.7 FR211 MP13.3 to 22.7 µ

PROJECT LOCATIONS

MAP 3

ATTACHMENT J.3 MOCK TASK ORDER FOR BIDDING

This is not a real task order. It is a visual representation of what a task order may look like. Page 5 uses a Unit

Cost of $1.00 on every pay item to visualize how pay items and costs will look in each task order.

MAP 2

Base of Operations:

Sheeprock

Windy Peak

Skull Rock

Baldy Peak

Banner Peak

Insmont Hill

Buffalo Peak

Bailey, Mount

Sugarloaf Peak

Green Mountain

Redskin Mountain

Mc Curdy Mountain

Cheesman Mountain

South Tarryall Peak

Little Scraggy Peak

Bailey

PRK-77

543.F

PRK-64

77.B

528.A

543.J

528.D

211.J

550.G

550.H

550.C1

528.B

211.O

550.C 550.E

550.D

543.H

528.F

543.G

528.G

543.H

550.A

528.C

554.A

554.B

BALDY

WIGWAM

MEADOWS

BUFFALO

BUFFALO

GASHOUSE

HAPPY TOP

SHEEP ROCK

BUCK GULCH

LAZY GULCH

GOOSE CREEK

SHINGLEMILL

695 DISPOSED

COLORADO 126

GILL - DISPOSED

BALDY - DISPOSED

TRAMWAY - DISPOSED

ROLLING CREEK/HOOPER

MOLLY GULCH - DISPOSED

0 2.5 51.25 Miles

Pike & San Isabel National Forest PSICC Recreation Sites

PSICC Recreation Sites CO Highways

Interstate Highways Collectors

PSICC Roads FS Roads ML3-5 FS Roads ML2 FS Roads ML1 PSICC Trails FR211 MP13.3 to 22.7 FR550 MP0.0 to 7.7 FR383 MP0.0 to 1.5 µ

ATTACHMENT J.3 MOCK TASK ORDER FOR BIDDING

(CONTRACT # XX-XXXX-X-XX-XXXX) BASE YEAR

TASKORDER ONE (Pikes Peak District Road Work)

FR211 MP13.3

Intersection w/ Goose Creek CG End Maintenance Work

FR211 MP24.7

Intersection w/ Cnty 126

FR211 MP22.7

Intersection w/ Cheeseman Res.

Start Maintenance Work

CNTY 126

GENERAL NOTES:

-Maintenance Level 2 miles = 0.0 -Maintenance Level 3 miles = 17.1 TOTAL MAINTENANCE = 17.1 Miles Maintain Roads As Follows:

FR211 - Matukat Rd.

BMP EMP Miles Termini Start Date

13.3 22.7 9.4 Goose Crk CG - Sept/Oct Cheeseman Res.

FR550 - Redskin Rd.

BMP EMP Miles Termini Start Date 0 7.7 7.7 Cnty 126 - FR549 Sept/Oct

FR550 MP7.7

Intersection w/ FR549 Stop Maintenance Work

CNTY 126

FR550 MP0.0

Intersection w/ Cnty 126 Start Maintenance Work

CNTY 126

Tracy Hill

MIDLAND

£¤67

0 0.25 0.50.125 Miles

Pike & San Isabel National Forest PSICC Recreation Sites

PSICC Recreation Sites CO Highways

Interstate Highways Collectors

PSICC Roads FS Roads ML3-5 FS Roads ML2 FS Roads ML1 PSICC Trails FR550 MP0.0 to 7.7 FR211 MP13.3 to 22.7 FR383 MP0.0 to 1.5 µ

ATTACHMENT J.3 MOCK TASK ORDER FOR BIDDING

(CONTRACT # XX-XXXX-X-XX-XXXX) BASE YEAR

TASKORDER ONE (Pikes Peak District Road Work)

FR383 MP0.0

Starts @ Hwy 67

FR383 MP 1.5

Mennonite Camp --Replace 21"X15"X40' Culvert --Install 15-30T of Class 6

GENERAL NOTES:

-See individual notes at points along FR383 below.

--All culverts will need a utility locate. The contractor is responsible for all utility locates.

FR383 MP0.4

--Replace 21"X15"X30' Culvert --Install 15-30T of Class 6 --End Fill from MP 0.1

FR383 MP0.1

--Install 21"X15"X50' Culvert Location w/ End Section --Install 1540-1570T of Class 6 in locations flagged by FS Engineer.

Hwy 67 Gravel Pit Approx. 0.5 miles from FR383

Road # Name ML BMP EMP Miles Termini Surface

Type Start Date Comments Annual (Routine) Maintenance

383 Upper Fourmile 3 0 0.4 0.4 SH 67 - MP0.4 Driveway Nat Sept/Oct/Nov

Place 1540T to 1570T of Class 6 where flagged by FS Engineer.

Compact in 8" lifts and Water when needed.

383 Upper Fourmile 3 0.1 0.1 0 MP 0.1 Nat Sept/Oct/Nov Install 50' of 21"X18" Culvert w/ End-Section.

383 Upper Fourmile 3 0.4 0.4 0 MP0.4 Driveway Nat Sept/Oct/Nov

Replace 30' of 21"X18" Culvert & Install 15 to 30 Tons of Class 6.

383 Upper Fourmile 3 1.5 1.5 0 Mennonite Camp Nat Sept/Oct/Nov

Replace 40' of 21"X18" Culvert & Install 15 to 30 Tons of Class 6.

Road # Name ML BMP EMP Miles Termini Surface

Type Start Date Comments Annual (Routine) Maintenance

211 Matukat Road 3 13.3 22.7 9.4 Goose Crk CG - Cheeseman Res. Nat Sept/Oct Travel Way Mtc Only.

550 Buffalo 3 0 7.7 7.7 Jeff Cnty 126 - FR549 Nat Sept/Oct Travel Way Mtc Only.

17.1 0.000

SOUTH PLATTE RANGER DISTRICT

ATTACHMENT J.3 MOCK TASK ORDER FOR BIDDING

PIKE & SAN ISABEL NATIONAL FOREST

PIKES PEAK RANGER DISTRICT

CONTRACT # XX-XXXX-X-XX-XXXX (BASE YEAR)

TASKORDER ONE (Pikes Peak District Road Work)

TOTAL ROAD MILES MAINTAINED=

Total Maintenance Level 2 Road Miles = Total Maintenance Level 3 Road Miles =

17.100

Pay Item 860(01)B includes FR211 & FR550.

Attachment J.3 Mock Task Order For Bidding

August 1, 2012 August 1, 2012 July 31, 2013 August 1, 2012 November 30, 2012

Pay Item Est. Quant. Pay Unit Unit Price Taskorder Cost Actual Quant. Actual Cost Taskorder Balance % Complete

151(01)M 85 Mile 1.00$ 85.00$ -$ 85.00$ 0% 151(02)M 45 Mile 1.00$ 45.00$ -$ 45.00$ 0% 151(03)M Mile 1.00$ -$ -$ -$ 0% 151(04)M Mile 1.00$ -$ -$ -$ 0% 151(05)M Mile 1.00$ -$ -$ -$ 0% 151(06)M Mile 1.00$ -$ -$ -$ 0% 151(07)M Mile 1.00$ -$ -$ -$ 0% 151(08)M Mile 1.00$ -$ -$ -$ 0% 151(09)M 45 Mile 1.00$ 45.00$ -$ 45.00$ 0% 151(10)M 45 Mile 1.00$ 45.00$ -$ 45.00$ 0% 151(11)M 45 Mile 1.00$ 45.00$ -$ 45.00$ 0% 151(12) 1 Percent 1.0% 20.05$ -$ 20.05$ 0% 157(02) L.F. 1.00$ -$ -$ -$ 0% 202(55) Each 1.00$ -$ -$ -$ 0% 202(55)A Each 1.00$ -$ -$ -$ 0% 203(01) 2 Each 1.00$ 2.00$ -$ 2.00$ 0% 204(01) C.Y. 1.00$ -$ -$ -$ 0% 204(02) C.Y.-Mile 1.00$ -$ -$ -$ 0% 204(20) Each 1.00$ -$ -$ -$ 0% 204(24) Ton-Mile 1.00$ -$ -$ -$ 0%

301(01)A Ton 1.00$ -$ -$ -$ 0%

301(01)B 1600 Ton 1.00$ 1,600.00$ -$ 1,600.00$ 0% 301(05) Ton 1.00$ -$ -$ -$ 0% 301(15) Ton 1.00$ -$ -$ -$ 0% 602(01)A L.F. 1.00$ -$ -$ -$ 0% 602(01)B L.F. 1.00$ -$ -$ -$ 0% 602(02)A 120 L.F. 1.00$ 120.00$ -$ 120.00$ 0% 602(02)B L.F. 1.00$ -$ -$ -$ 0% 602(06)A Each 1.00$ -$ -$ -$ 0% 602(06)B Each 1.00$ -$ -$ -$ 0% 602(07)A 1 Each 1.00$ 1.00$ -$ 1.00$ 0% 602(07)B Each 1.00$ -$ -$ -$ 0% 623(01) Hour 1.00$ -$ -$ -$ 0% 633(10) Each 1.00$ -$ -$ -$ 0% 633(90)A Each 1.00$ -$ -$ -$ 0% 633(90)B Each 1.00$ -$ -$ -$ 0% 850(01) Mile 1.00$ -$ -$ -$ 0% 860(01) Mile 1.00$ -$ -$ -$ 0% 860(01)B 17.1 Mile 1.00$ 17.10$ -$ 17.10$ 0%

2,025.15$ TOTAL -$ 2,025.15$ 0.00%

Attachment J.3 Mock Task Order for Bidding

TOTAL

Road Maintenance - Level 2 Roads Road Maintenance - Level 3-5 Roads Travelway Maintenance - Level 3-5 Roads

Removal & Disposal of Trees - Diameter 24' or Greater

Culvert, Install 28"x20" CMP, (max. burial depth 5' below road)

Signs, Install/Replace Single Post Sign - (GFP - Includes Post)

Culvert, End Section for 21"x15" CMP Culvert, End Section for 28"x20" CMP General Laborer Signs, Remove Sign - Disposal Off Government Property on schedule COR:

Signs, Install/Replace Double Post Sign - (GFP - Includes Post)

TASK ORDER ISSUED

Mobilization of Motor Grader from Base (Once per Job)

Mobilization of Dozer, Cat D6 or equiv. from Base (Once per Job) Mobilization of Excavator w/ Attach. from Base (Once per Job)

Mobilization of Compactor, 5-8 ton, from Base (Once per Job)

Bonding, Task Order $30,000 to $100,000 on scheduleTask order End Date: TOTAL TASK ORDER TIME USED= 0.00%Task order Start Date: Task Order is currently

2,025.15$

TASK ORDER FUNDS LEFT

ACTUAL QUANTITIES

DESCRIPTION OF TASK ORDER: The project is located on the Pikes Peak District in Teller Cnty & the South Platte District in Jefferson Cnty. The work includes Pay Item 860(01)B Travelway Maintenace - on FR211 & FR550. The work also includes 1 pipe removal, 100' of new 21"X15" pipe, & 1,600T of Class 6 on FR383.

Do not begin mobilization, or actual work until directed to do so by the Contracting Officer. Upon specific notification by the Contracting Officer mobilize grader to FR211 (60 mi.), then from FR211 to FR550 (10 mi.), then from Woodland Park to FR383 (15 mi.). Also mobilize backhoe, 15CY Dumptruck, Compactor, & Watertruck to FR383 (45 mi.) See the maps & spreadsheets for a detailed list of work. Reference the Contract's General Notes & Specifications to determine the work required for each Pay Item. The Specifications for this Contract include: 1.) FP-03 "Standard Specifications for Construction of Roads and Bridges of Federal Highways". 2.) Supplemental Specifications located within the Contract. 3.)Special Project Specifications located within the Contract.

Removal of Existing Culverts, Disposal Method "a"

Culvert, End Section for 24" CMP

Inspector:

Aggregate Base, "CDOT Class 6", Compaction Method "e"

Aggregate Base, "CDOT Class 6", Compaction Method "e", GOVERNMENT FURNISHED MATERIAL

Aggregate Base, Subbase Grading "A", Compaction Method "d"

Description

Mobilization of Backhoe/Loader from Base (Once per Job)

Haul

Mobilization of Skid Steer from Base (Once per Job)

Drainage Excavation, Type "Drainage Dip"

Mobilization of Dump Truck, 15 C.Y. from Base (Once per Job)

Mobilization of Dozer, Cat D3 or equiv. from Base (Once per Job)

Load, Haul, & Place Material, Finishing Method "A"

Removal & Disposal of Trees - Diameter Less than 24"

BASE OF OPERATIONS:

August 1, 2012Contract Start Date:

Contract Days:

BASE YEAR - TASK ORDER ONE Pikes Peak District Road Work

TODAY'S DATE:

TOTAL CONTRACT TIME USED= 0.00% Contract is currently

R - TASK ORDER ONE AWARD=2,025.15$

ATTACHMENT J.3 MOCK TASK ORDER FOR BIDDING (Contract # XX-XXXX-X-XX-XXXX)

TOTAL CONTRACT AWARD= 2,025.15$

NTP Date:

Contract End Date:

Culvert, End Section for 18" CMP

Silt Fence

Mobilization of Wheel Loader from Base (Once per Job) Mobilization of Dump Truck, 10 C.Y. from Base (Once per Job)

Mobilization of Water Tender, 1500 gal., from Base (Once per Job)

Culvert, Install 18" CMP, (max. burial depth 5' below road) Culvert, Install 24" CMP, (max. burial depth 5' below road) Culvert, Install 21"x15" CMP, (max. burial depth 5' below road)

Aggregate Base, Type "Pit Run", Compaction Method "d"

Roadway Excavation, Compaction Method "e", Finish Method "A"

File details come from the government source that posted it. Updated .