Attach J3 Sample Task Order FY12 IDIQ.pdf
PDF 3 MB Posted
- Attached to
- Pike & San Isabel NFs Road Construction IDIQ
- Solicitation number
- AG-82X9-S-12-0051
About this file
Attach J3 Sample Task Order
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Aspen
Salida
Pueblo
Beulah
Bailey
Wetmore
Deckers
Penrose
La Veta
Hartsel
Cuchara
Alamosa
Aguilar
Trinidad
Monument
Keystone
Fairplay Leadville
Westcliffe
Walsenburg
South Fork
San Isabel
Canon City
Monte Vista
Lake George
Castle Rock
Buena Vista
Fort Garland
Woodland Park
Cripple Creek
Colorado City
Antero Junction
Colorado Springs
Mineral Hot Springs
§̈¦25
§̈¦70 §̈¦470
£¤96
£¤82
£¤12
£¤10
£¤159
£¤9
£¤50
£¤24
£¤94
£¤165
£¤115
£¤150 £¤17
£¤91
£¤142
£¤86
£¤15
£¤5
£¤45
£¤291
£¤285£¤370
£¤114
£¤69
£¤149
£¤368
£¤177£¤6
£¤136
£¤112
£¤75 £¤85
£¤300
£¤120
£¤239
£¤78
£¤233
£¤29
£¤231£¤67 £¤227
£¤16
£¤8 £¤121
£¤160
£¤371
£¤83£¤88 £¤30
£¤85
£¤371
£¤24
£¤285
£¤9
£¤82
£¤160
£¤177
£¤15
£¤165
£¤285
£¤83
£¤112
£¤85
£¤50
£¤12
£¤86
£¤285
£¤75
£¤24
£¤85
£¤114
£¤24
£¤112
£¤67
£¤83
£¤83
£¤160
£¤50
£¤85
£¤67
£¤368
£¤24
£¤69
£¤370
£¤83
£¤160
£¤9
£¤96
£¤285
£¤50
£¤17
£¤17
£¤69
£¤29
£¤285
£¤69
£¤160
£¤24
£¤91 £¤285
£¤368
£¤67
£¤24
£¤115
£¤6
£¤142
£¤285
£¤50
£¤160
0 25 5012.5 Miles
Pike & San Isabel National Forest CO Highways
Interstate Highways Collectors
PSICC Roads FS Roads ML3-5 FS Roads ML2 FS Roads ML1 PSICC Tra ils FR383 MP0.0 to 1.5 FR550 MP0.0 to 7.7 FR211 MP13.3 to 22.7 µ
PROJECT LOCATIONS
MAP 3
ATTACHMENT J.3 MOCK TASK ORDER FOR BIDDING
This is not a real task order. It is a visual representation of what a task order may look like. Page 5 uses a Unit
Cost of $1.00 on every pay item to visualize how pay items and costs will look in each task order.
MAP 2
Base of Operations:
Sheeprock
Windy Peak
Skull Rock
Baldy Peak
Banner Peak
Insmont Hill
Buffalo Peak
Bailey, Mount
Sugarloaf Peak
Green Mountain
Redskin Mountain
Mc Curdy Mountain
Cheesman Mountain
South Tarryall Peak
Little Scraggy Peak
Bailey
PRK-77
543.F
PRK-64
77.B
528.A
543.J
528.D
211.J
550.G
550.H
550.C1
528.B
211.O
550.C 550.E
550.D
543.H
528.F
543.G
528.G
543.H
550.A
528.C
554.A
554.B
BALDY
WIGWAM
MEADOWS
BUFFALO
BUFFALO
GASHOUSE
HAPPY TOP
SHEEP ROCK
BUCK GULCH
LAZY GULCH
GOOSE CREEK
SHINGLEMILL
695 DISPOSED
COLORADO 126
GILL - DISPOSED
BALDY - DISPOSED
TRAMWAY - DISPOSED
ROLLING CREEK/HOOPER
MOLLY GULCH - DISPOSED
0 2.5 51.25 Miles
Pike & San Isabel National Forest PSICC Recreation Sites
PSICC Recreation Sites CO Highways
Interstate Highways Collectors
PSICC Roads FS Roads ML3-5 FS Roads ML2 FS Roads ML1 PSICC Trails FR211 MP13.3 to 22.7 FR550 MP0.0 to 7.7 FR383 MP0.0 to 1.5 µ
ATTACHMENT J.3 MOCK TASK ORDER FOR BIDDING
(CONTRACT # XX-XXXX-X-XX-XXXX) BASE YEAR
TASKORDER ONE (Pikes Peak District Road Work)
FR211 MP13.3
Intersection w/ Goose Creek CG End Maintenance Work
FR211 MP24.7
Intersection w/ Cnty 126
FR211 MP22.7
Intersection w/ Cheeseman Res.
Start Maintenance Work
CNTY 126
GENERAL NOTES:
-Maintenance Level 2 miles = 0.0 -Maintenance Level 3 miles = 17.1 TOTAL MAINTENANCE = 17.1 Miles Maintain Roads As Follows:
FR211 - Matukat Rd.
BMP EMP Miles Termini Start Date
13.3 22.7 9.4 Goose Crk CG - Sept/Oct Cheeseman Res.
FR550 - Redskin Rd.
BMP EMP Miles Termini Start Date 0 7.7 7.7 Cnty 126 - FR549 Sept/Oct
FR550 MP7.7
Intersection w/ FR549 Stop Maintenance Work
CNTY 126
FR550 MP0.0
Intersection w/ Cnty 126 Start Maintenance Work
CNTY 126
Tracy Hill
MIDLAND
£¤67
0 0.25 0.50.125 Miles
Pike & San Isabel National Forest PSICC Recreation Sites
PSICC Recreation Sites CO Highways
Interstate Highways Collectors
PSICC Roads FS Roads ML3-5 FS Roads ML2 FS Roads ML1 PSICC Trails FR550 MP0.0 to 7.7 FR211 MP13.3 to 22.7 FR383 MP0.0 to 1.5 µ
ATTACHMENT J.3 MOCK TASK ORDER FOR BIDDING
(CONTRACT # XX-XXXX-X-XX-XXXX) BASE YEAR
TASKORDER ONE (Pikes Peak District Road Work)
FR383 MP0.0
Starts @ Hwy 67
FR383 MP 1.5
Mennonite Camp --Replace 21"X15"X40' Culvert --Install 15-30T of Class 6
GENERAL NOTES:
-See individual notes at points along FR383 below.
--All culverts will need a utility locate. The contractor is responsible for all utility locates.
FR383 MP0.4
--Replace 21"X15"X30' Culvert --Install 15-30T of Class 6 --End Fill from MP 0.1
FR383 MP0.1
--Install 21"X15"X50' Culvert Location w/ End Section --Install 1540-1570T of Class 6 in locations flagged by FS Engineer.
Hwy 67 Gravel Pit Approx. 0.5 miles from FR383
Road # Name ML BMP EMP Miles Termini Surface
Type Start Date Comments Annual (Routine) Maintenance
383 Upper Fourmile 3 0 0.4 0.4 SH 67 - MP0.4 Driveway Nat Sept/Oct/Nov
Place 1540T to 1570T of Class 6 where flagged by FS Engineer.
Compact in 8" lifts and Water when needed.
383 Upper Fourmile 3 0.1 0.1 0 MP 0.1 Nat Sept/Oct/Nov Install 50' of 21"X18" Culvert w/ End-Section.
383 Upper Fourmile 3 0.4 0.4 0 MP0.4 Driveway Nat Sept/Oct/Nov
Replace 30' of 21"X18" Culvert & Install 15 to 30 Tons of Class 6.
383 Upper Fourmile 3 1.5 1.5 0 Mennonite Camp Nat Sept/Oct/Nov
Replace 40' of 21"X18" Culvert & Install 15 to 30 Tons of Class 6.
Road # Name ML BMP EMP Miles Termini Surface
Type Start Date Comments Annual (Routine) Maintenance
211 Matukat Road 3 13.3 22.7 9.4 Goose Crk CG - Cheeseman Res. Nat Sept/Oct Travel Way Mtc Only.
550 Buffalo 3 0 7.7 7.7 Jeff Cnty 126 - FR549 Nat Sept/Oct Travel Way Mtc Only.
17.1 0.000
SOUTH PLATTE RANGER DISTRICT
ATTACHMENT J.3 MOCK TASK ORDER FOR BIDDING
PIKE & SAN ISABEL NATIONAL FOREST
PIKES PEAK RANGER DISTRICT
CONTRACT # XX-XXXX-X-XX-XXXX (BASE YEAR)
TASKORDER ONE (Pikes Peak District Road Work)
TOTAL ROAD MILES MAINTAINED=
Total Maintenance Level 2 Road Miles = Total Maintenance Level 3 Road Miles =
17.100
Pay Item 860(01)B includes FR211 & FR550.
Attachment J.3 Mock Task Order For Bidding
August 1, 2012 August 1, 2012 July 31, 2013 August 1, 2012 November 30, 2012
Pay Item Est. Quant. Pay Unit Unit Price Taskorder Cost Actual Quant. Actual Cost Taskorder Balance % Complete
151(01)M 85 Mile 1.00$ 85.00$ -$ 85.00$ 0% 151(02)M 45 Mile 1.00$ 45.00$ -$ 45.00$ 0% 151(03)M Mile 1.00$ -$ -$ -$ 0% 151(04)M Mile 1.00$ -$ -$ -$ 0% 151(05)M Mile 1.00$ -$ -$ -$ 0% 151(06)M Mile 1.00$ -$ -$ -$ 0% 151(07)M Mile 1.00$ -$ -$ -$ 0% 151(08)M Mile 1.00$ -$ -$ -$ 0% 151(09)M 45 Mile 1.00$ 45.00$ -$ 45.00$ 0% 151(10)M 45 Mile 1.00$ 45.00$ -$ 45.00$ 0% 151(11)M 45 Mile 1.00$ 45.00$ -$ 45.00$ 0% 151(12) 1 Percent 1.0% 20.05$ -$ 20.05$ 0% 157(02) L.F. 1.00$ -$ -$ -$ 0% 202(55) Each 1.00$ -$ -$ -$ 0% 202(55)A Each 1.00$ -$ -$ -$ 0% 203(01) 2 Each 1.00$ 2.00$ -$ 2.00$ 0% 204(01) C.Y. 1.00$ -$ -$ -$ 0% 204(02) C.Y.-Mile 1.00$ -$ -$ -$ 0% 204(20) Each 1.00$ -$ -$ -$ 0% 204(24) Ton-Mile 1.00$ -$ -$ -$ 0%
301(01)A Ton 1.00$ -$ -$ -$ 0%
301(01)B 1600 Ton 1.00$ 1,600.00$ -$ 1,600.00$ 0% 301(05) Ton 1.00$ -$ -$ -$ 0% 301(15) Ton 1.00$ -$ -$ -$ 0% 602(01)A L.F. 1.00$ -$ -$ -$ 0% 602(01)B L.F. 1.00$ -$ -$ -$ 0% 602(02)A 120 L.F. 1.00$ 120.00$ -$ 120.00$ 0% 602(02)B L.F. 1.00$ -$ -$ -$ 0% 602(06)A Each 1.00$ -$ -$ -$ 0% 602(06)B Each 1.00$ -$ -$ -$ 0% 602(07)A 1 Each 1.00$ 1.00$ -$ 1.00$ 0% 602(07)B Each 1.00$ -$ -$ -$ 0% 623(01) Hour 1.00$ -$ -$ -$ 0% 633(10) Each 1.00$ -$ -$ -$ 0% 633(90)A Each 1.00$ -$ -$ -$ 0% 633(90)B Each 1.00$ -$ -$ -$ 0% 850(01) Mile 1.00$ -$ -$ -$ 0% 860(01) Mile 1.00$ -$ -$ -$ 0% 860(01)B 17.1 Mile 1.00$ 17.10$ -$ 17.10$ 0%
2,025.15$ TOTAL -$ 2,025.15$ 0.00%
Attachment J.3 Mock Task Order for Bidding
TOTAL
Road Maintenance - Level 2 Roads Road Maintenance - Level 3-5 Roads Travelway Maintenance - Level 3-5 Roads
Removal & Disposal of Trees - Diameter 24' or Greater
Culvert, Install 28"x20" CMP, (max. burial depth 5' below road)
Signs, Install/Replace Single Post Sign - (GFP - Includes Post)
Culvert, End Section for 21"x15" CMP Culvert, End Section for 28"x20" CMP General Laborer Signs, Remove Sign - Disposal Off Government Property on schedule COR:
Signs, Install/Replace Double Post Sign - (GFP - Includes Post)
TASK ORDER ISSUED
Mobilization of Motor Grader from Base (Once per Job)
Mobilization of Dozer, Cat D6 or equiv. from Base (Once per Job) Mobilization of Excavator w/ Attach. from Base (Once per Job)
Mobilization of Compactor, 5-8 ton, from Base (Once per Job)
Bonding, Task Order $30,000 to $100,000 on scheduleTask order End Date: TOTAL TASK ORDER TIME USED= 0.00%Task order Start Date: Task Order is currently
2,025.15$
TASK ORDER FUNDS LEFT
ACTUAL QUANTITIES
DESCRIPTION OF TASK ORDER: The project is located on the Pikes Peak District in Teller Cnty & the South Platte District in Jefferson Cnty. The work includes Pay Item 860(01)B Travelway Maintenace - on FR211 & FR550. The work also includes 1 pipe removal, 100' of new 21"X15" pipe, & 1,600T of Class 6 on FR383.
Do not begin mobilization, or actual work until directed to do so by the Contracting Officer. Upon specific notification by the Contracting Officer mobilize grader to FR211 (60 mi.), then from FR211 to FR550 (10 mi.), then from Woodland Park to FR383 (15 mi.). Also mobilize backhoe, 15CY Dumptruck, Compactor, & Watertruck to FR383 (45 mi.) See the maps & spreadsheets for a detailed list of work. Reference the Contract's General Notes & Specifications to determine the work required for each Pay Item. The Specifications for this Contract include: 1.) FP-03 "Standard Specifications for Construction of Roads and Bridges of Federal Highways". 2.) Supplemental Specifications located within the Contract. 3.)Special Project Specifications located within the Contract.
Removal of Existing Culverts, Disposal Method "a"
Culvert, End Section for 24" CMP
Inspector:
Aggregate Base, "CDOT Class 6", Compaction Method "e"
Aggregate Base, "CDOT Class 6", Compaction Method "e", GOVERNMENT FURNISHED MATERIAL
Aggregate Base, Subbase Grading "A", Compaction Method "d"
Description
Mobilization of Backhoe/Loader from Base (Once per Job)
Haul
Mobilization of Skid Steer from Base (Once per Job)
Drainage Excavation, Type "Drainage Dip"
Mobilization of Dump Truck, 15 C.Y. from Base (Once per Job)
Mobilization of Dozer, Cat D3 or equiv. from Base (Once per Job)
Load, Haul, & Place Material, Finishing Method "A"
Removal & Disposal of Trees - Diameter Less than 24"
BASE OF OPERATIONS:
August 1, 2012Contract Start Date:
Contract Days:
BASE YEAR - TASK ORDER ONE Pikes Peak District Road Work
TODAY'S DATE:
TOTAL CONTRACT TIME USED= 0.00% Contract is currently
R - TASK ORDER ONE AWARD=2,025.15$
ATTACHMENT J.3 MOCK TASK ORDER FOR BIDDING (Contract # XX-XXXX-X-XX-XXXX)
TOTAL CONTRACT AWARD= 2,025.15$
NTP Date:
Contract End Date:
Culvert, End Section for 18" CMP
Silt Fence
Mobilization of Wheel Loader from Base (Once per Job) Mobilization of Dump Truck, 10 C.Y. from Base (Once per Job)
Mobilization of Water Tender, 1500 gal., from Base (Once per Job)
Culvert, Install 18" CMP, (max. burial depth 5' below road) Culvert, Install 24" CMP, (max. burial depth 5' below road) Culvert, Install 21"x15" CMP, (max. burial depth 5' below road)
Aggregate Base, Type "Pit Run", Compaction Method "d"
Roadway Excavation, Compaction Method "e", Finish Method "A"
File details come from the government source that posted it. Updated .