Attach J5 General Decision CO12.pdf

PDF 64 KB Posted

Attached to
Pike & San Isabel NFs Road Construction IDIQ
Solicitation number
AG-82X9-S-12-0051
Issued by

About this file

Attach J5 General Decision CO12

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J.5 Page 1 of 6

Page 1 of 5 Page 1 of 5

General Decision Number: CO120012 04/20/2012 CO12

Superseded General Decision Number: CO20100012

State: Colorado

Construction Type: Heavy

Counties: Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo and Weld Counties in Colorado.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date

0 01/06/2012

1 01/13/2012

2 01/27/2012

3 04/20/2012

ASBE0028-001 07/01/2010

Rates Fringes

Asbestos Workers/Insulator

(Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)....................$ 30.23 11.53

BRCO0007-004 01/01/2011

ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS AND

JEFFERSON COUNTIES

BRICKLAYER.......................$ 22.13 9.89

BRCO0007-006 06/01/2011

EL PASO AND PUEBLO COUNTIES

BRICKLAYER.......................$ 21.97 9.88

ELEC0012-004 09/01/2011

PUEBLO COUNTY

ELECTRICIAN

Attachment J.5 Page 2 of 6

Electrical work where the cost is $150,000 or less....$ 24.25 11.83

Electrical work where the cost is over $150,000.......$ 26.75 11.90

ELEC0068-001 06/01/2011

ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS,

JEFFERSON, LARIMER, AND WELD COUNTIES

ELECTRICIAN......................$ 31.60 12.52

ELEC0111-001 09/01/2010

Line Construction:

Cable Splicer...............$ 28.65 13.75%+4.75

Equipment Operator-

Underground.................$ 25.06 12.75%+4.75

Groundman...................$ 20.48 17.75%+4.75

Line Equipment Operator.....$ 25.74 17.75%+4.75

Lineman and Welder..........$ 35.81 20.75%+4.75

ELEC0113-002 06/01/2011

EL PASO COUNTY

ELECTRICIAN......................$ 28.55 14.46

ELEC0969-002 06/01/2010

MESA COUNTY

ELECTRICIAN......................$ 20.75 5.66

ENGI0009-001 05/01/2011

Power equipment operators:

Blade: Finish...............$ 23.97 9.22

Blade: Rough................$ 23.67 9.22

Bulldozer...................$ 23.67 9.22

Cranes: 50 tons and under..$ 23.82 9.22

Cranes: 51 to 90 tons......$ 23.97 9.22

Cranes: 91 to 140 tons.....$ 24.12 9.22

Cranes: 141 tons and over...$ 24.88 9.22

Forklift....................$ 23.32 9.22

Mechanic....................$ 25.97 9.22

Attachment J.5 Page 3 of 6

Oiler.......................$ 22.97 9.22

Scraper: Single bowl under 40 cubic yards........$ 23.82 9.22

Scraper: Single bowl, including pups 40 cubic yards and over and tandem bowls.......................$ 23.97 9.22

Trackhoe....................$ 23.82 9.22

IRON0024-003 07/01/2011

Ironworkers:.....................$ 23.80 18.07

Structural

LABO0086-001 05/01/2009

Laborers:

Pipelayer...................$ 18.68 6.78

PLUM0003-005 01/01/2012

JEFFERSON, LARIMER AND WELD COUNTIES

PLUMBER..........................$ 32.68 11.44

PLUM0058-002 07/01/2011

EL PASO COUNTY

Plumbers and Pipefitters.........$ 32.05 12.85

PLUM0058-008 07/01/2011

PUEBLO COUNTY

Plumbers and Pipefitters.........$ 32.05 12.85

PLUM0145-002 07/01/2011

MESA COUNTY

Plumbers and Pipefitters.........$ 35.17 11.05

Attachment J.5 Page 4 of 6

PLUM0208-004 01/01/2012

JEFFERSON, LARIMER AND WELD COUNTIES

PIPEFITTER.......................$ 32.60 11.52

SHEE0009-002 01/01/2011

Sheet metal worker...............$ 31.66 10.98

SUCO2001-006 12/20/2001

BOILERMAKER......................$ 17.60

Carpenters:

Form Building and Setting...$ 16.97 2.74

All Other Work..............$ 15.14 3.37

Cement Mason/Concrete Finisher...$ 17.31 2.85

IRONWORKER, REINFORCING..........$ 18.83 3.90

Laborers:

Common......................$ 11.22 2.92

Flagger.....................$ 8.91 3.80

Landscape...................$ 12.56 3.21

Painters:

Brush, Roller & Spray.......$ 15.81 3.26

Power equipment operators:

Backhoe.....................$ 16.36 2.48

Front End Loader............$ 17.24 3.23

Skid Loader.................$ 15.37 4.41

* TEAM0455-002 07/01/2011

Truck drivers:

Pickup......................$ 18.41 3.87

Tandem/Semi and Water.......$ 19.04 3.87

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Attachment J.5 Page 5 of 6

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than

"SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011.

The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

Attachment J.5 Page 6 of 6

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .