Pike & San Isabel National Forests 31 January 2012

Roads Construction IDIQ

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 1 of 32

ATTACHMENT J.1

STANDARD SPECIFICATIONS

“Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03”, U.S. Customary Units, is applicable for this project, and is included by reference only.

The requirements contained in these Standard Specifications are hereby made a part of this solicitation and any resulting work. They are referenced herein as a general indication of the requirements governing the work. These specifications can be viewed at no cost on the FHWA website, which also gives ordering information:

http://www.wfl.fha.dot.gov/design/specs/fp03.htm.

SECTION TITLE

100 General Requirements All

150 Project Requirements All

200 Earthwork All

250 Slope Reinforcement and Retaining Walls 251 - 258

300 Aggregate Courses 301 - 308

600 Incidental Construction All except 636,637

700 Material All, as applicable.

And all specifications referenced by the above specifications.

SUPPLEMENTAL SPECIFICATIONS

The following list of Supplement Specifications modify the Standard Specifications, they are included herein (pages 3-22).

101 Terms, Format, and Definitions

102 Bid, Award, and Execution of Contract

103 Scope of Work

104 Control of Work

105 Control of Material

106 Acceptance of Work

107 Legal Relations and Responsibility to the Public

108 Prosecution and Progress

109 Measurement and Payment

151 Mobilization

153 Contractor Quality Control

152 Construction Survey and Staking

155 Schedules for Construction Contracts

156 Public Traffic http://www.wfl.fha.dot.gov/design/specs/fp03.htm

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 2 of 32

157 Soil Erosion Control

171 Weed and Disease Prevention

201 Clearing and Grubbing

202 Additional Clearing and Grubbing

203 Removal of Structures and Obstructions

204 Excavation and Embankment

209 Structure Excavation and Backfill

211 Roadway Obliteration

230 Roadside Brushing

301 Untreated Aggregate Courses

303 Road Reconditioning

602 Culverts and Drains

619 Fences, Gates, and Cattleguards

622 Rental Equipment

625 Turf Establishment

718 Traffic Signing and Marking Material

SPECIAL PROJECT SPECIFICATIONS

The following Special Project Specifications are stand-alone specifications. They are included in their entirety herein (pages 23-32).

802 Ditch Cleaning

805 Drainage Structures

808 Miscellaneous Structures

809 Developing Water Supply and Watering

850 Level 2 Road Maintenance

860 Level 3 Road Maintenance

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 3 of 32

SUPPLEMENTAL SPECIFICATIONS

101 - Terms, Format, and Definitions

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association

Mine Safety and Health Administration

National Institute of Standards and Technology

National Electrical Safety Code

West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Actual Quantity (AQ) - these estimated quantities are determined from actual measurements of completed work

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition

Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations http://www.nist.gov/

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 4 of 32

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96

Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the

Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36

CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 5 of 32

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 6 of 32

102 - Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work

Deletions

Delete Sections 104.01, 104.02, and 104.04.

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material

105.02 Material Sources.

105.02(a) Government-provided sources.

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work

106.07 Delete

Delete subsection 106.07.

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 7 of 32

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10 Environmental Protection.

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land. Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

Exact time and location of spill, including a description of the area involved.

Containment procedures.

Summary of any communications the Contractor had with news media, federal, state and local regulatory agencies and officials, or Forest Service officials.

Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available, provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with federal, state, and local laws and regulations.

108 - Prosecution and Progress

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 8 of 32

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

151 - Mobilization

Payment

151.03 Delete the 1

st sentence and replace with:

Payment will be made at the unit rates shown in the SCHEDULE OF ITEMS. Mobilization Pay

Items will be denoted by 151(xx)M, the “xx” corresponding to the specific piece of equipment under consideration.

151.03 Add the following sentence to the first paragraph:

Bonding shall apply to task orders exceeding $30,000.00 in contract amount, per individual task order, and shall be paid for under Pay Item 151(20). Mobilization for End-Result Pay Items will be covered via the 151(xx) Pay Items corresponding to the equipment required to accomplish the work. Any additional equipment needed for which a separate 151(xx) mobilization Pay Item is not shown on the Schedule of Items shall be considered incidental, and no separate payment will be made.

151.03 (b) and 151.03 (c): Change “original contract amount” to “original task order amount.”

153 - Contractor Quality Control

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 9 of 32

153.02 Contractor Quality Control Plan.

Submit written proposals for approval of alternate AASHTO or state approved test methods.

Alternate methods may be allowed based on documented equivalence to the specified method.

153.04 Records.

Delete the entire subsection and replace with the following:

Maintain complete testing and inspection records by pay item number and make them accessible to the Contracting Officer.

For each day of work, prepare a "Contract Daily Diary" (Form FS-6300-20) or an approved alternate form. Note the work items performed that day along with the Pay Items and quantities completed. Detail inspection results including deficiencies observed and corrective actions taken.

Include the following certification signed by the person with overall responsibility for the inspection system:

"It is hereby certified that the information contained in this record is accurate and that all work documented herein complies with the requirements of the contract. Any exceptions to this certification are documented as a part of this record."

Submit the Contract Daily Diary records and certifications within one working week of the work being performed. If the record is incomplete, in error, or otherwise misleading, a copy of the record will be returned with corrections noted. When chronic errors or omissions occur, correct the procedures by which the records are produced.

155 - Schedules for Construction Contracts

155 Delete.

Delete Section 155 in its entirety and replace with the following:

Description

155.01 This work consists of scheduling and monitoring all construction activities. See FAR

Clause 52.236-15 Schedules for Construction Contracts.

Measurement and Payment

155.09 Do not measure Schedules for Construction Contracts for payment.

156 - Public Traffic

Delete Section 156 in its entirety and replace with the following:

156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.

Material

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 10 of 32

156.02 Conform to the MUTCD and the following Sections and Subsections:

Construction sign panels 633

Retro-reflective sheeting 718.01

Temporary concrete barrier 618

Temporary plastic fence 710.11

Temporary traffic control devices 718.22

156.03 General.

Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic.

Maximum traffic delays will be specified per task order.

Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post construction signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.

If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.

156.04 Temporary Traffic Control.

Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:

(a) Furnish and install traffic control devices before the start of construction operations.

(b) All detours outside of clearing limits will be approved in writing by the Contracting

Officer as part of the traffic control plan.

(c) Install only those traffic control devices needed for each stage or phase.

(d) Relocate temporary traffic control devices as necessary.

(e) Remove devices that no longer apply to the existing conditions.

(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.

(g) Keep temporary traffic control devices clean.

(h) Remove all temporary traffic control devices upon contract completion or when approved.

(i) When required, use flaggers certified by the American Traffic Safety Services

Association, the National Safety Council, the International Municipal Signal

Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.

156.05 Temporary Closures.

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 11 of 32

Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown.

Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.

Prior to closing roads during construction, give written notice to the Contracting Officer at least

10 days in advance.

Table 156-1

Temporary Road Closures

Road

Number

From

Terminus

To

Terminus

Maximum

Consecutive

Days of

Closure

Minimum

Consecutive

Days Open

156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.

Measurement and Payment

156.07 Do not measure Public Traffic for payment. Compensation is made as an indirect payment.

157 - Soil Erosion Control

157.02 Materials

Provide bales, wattles, logs and rolls from a certified noxious weed free source.

157.03 General.

Delete the first two paragraphs and replace with the following:

Prepare, file and submit storm water permits as required by the state with jurisdiction, including payment of necessary fees. The storm water permits shall be for ___ outfalls.

Submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after construction in accordance with the plans and storm water permits. Do not modify the type, size, or location of any control or practice without approval. Submit the erosion control plan proposal at least 7 days before operations begin to the CO for approval.

Reflect in the Erosion Control Plan special concerns and measures necessary to protect resources and government improvements. Include:

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 12 of 32

(a) The construction activities and sequence of implementation relating to specific erosion control measures.

(b) The location and type of permanent controls to be implemented during construction.

(c) The location and type of temporary controls to be implemented during construction.

(d) For work in stream channels with running water, a detailed dewatering plan.

(e) For work in stream channels without flowing water, describe level of ground and vegetative disturbance and measures to reduce potential sediment delivery.

(f) Description of the monitoring plan.

Add the following to the third paragraph:

Upon completion of construction at the site, remove all temporary erosion control devices, dewatering materials and equipment from Government property.

157.08 Water Crossings.

At any channel crossing where there is running water, dewater by rerouting water flow around the site before and during excavation and embankment operations.

157.09 Diversions.

Delete the first sentence and replace with the following:

When shown on the plans, construct temporary channels, temporary culverts, or sandbags to divert water around disturbed areas and slopes. Earthen dams are prohibited.

171 – Weed and Disease Prevention

171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest

System lands.

Material

171.02 Conform to the following Subsection:

Water 725.01

Construction Requirements

171.03 General. Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest System lands.

Perform all work at a location designated on the plans or other locations approved in writing.

Provide the CO with an opportunity to monitor the washing and inspection.

171.04 Equipment. Use a high pressure washing system.

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 13 of 32

For work on National Forest System lands, use a washing system that traps all wash water and either stores it for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds in an approved manner. Do not mix soaps, detergents, or other chemicals with the wash water.

For work at a commercial washing facility, use an approved facility.

171.05 Washing. Wash the sides, tops, and undercarriages of all construction equipment.

Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.

171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment.

Rewash the construction equipment as necessary or as directed.

171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02.

201 - Clearing and Grubbing

201.01 Description

Replace with the following

This work consists of clearing and grubbing within clearing limits and other designated areas.

202 – Additional Clearing and Grubbing

202.01 Delete and replace with the following:

This work consists of clearing and grubbing within the clearing limits. It includes the removal of individual trees greater than 6” in diameter.

202.02 (d) Removal of individual trees or stumps.

Delete and replace with the following:

Removing individual trees or stumps within the clearing limits.

General

202.03 Delete the last sentence and replace with the following:

Dispose of clearing and grubbing debris according to subsection 201.06.

203 - Removal of Structures and Obstructions

203.01 Description.

Delete and replace with the following:

This work consists of disposing of construction slash and debris, salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions.

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 14 of 32

203.05(a) Remove from project.

Delete the section and replace with:

Dispose of material legally off government property.

203.05(e): Scattering. Scatter pieces of wood less than 3 inches in diameter and 3 feet in length within the clearing limits. Do not place construction slash in lakes, meadows, streams, or streambeds. Immediately remove construction slash that interferes with drainage structures.

204 – Excavation and Embankment

Roadway Excavation

204.06 Add the Following:

(d) Drainage Dips. Construct drainage dips as shown on the drawing. Use topping or other suitable material. Compact the material according to Subsection 204.11.

Compaction

204.11 Delete the first paragraph and replace it with the following:

For compaction according to method (a), (b), or (c), use AASHTO T 27 to determine the amount of material retained on a Number. 4 sieve. For compaction methods (d) or (e) no sieve test is required.

Add the following compaction methods:

(d) Layer Placement Method (Hauling and Spreading Equipment). Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.

(e) Layer Placement (Roller Compaction) Method. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases or, when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes.

Sloping, Shaping, and Finishing

204.13 Delete section (d) and add the following:

(d) Finishing. Finish the road surface to be smooth, uniform, and shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material. Finish roadbeds to the tolerance class D as shown in table 204-2. Ensure that the subgrade for both surfaced and unsurfaced roads is visibly moist during shaping and dressing.

Bring low sections, holes, cracks, or depressions to grade with suitable material. Maintain proper ditch drainage. Finish the roadbed for unsurfaced roads using one of the following methods:

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 15 of 32

(1) Method A. Ensure that the top 6 inches below the finished roadbed contains rocks no larger than 6 inches. Remove oversize material from the roadbed and replace it with suitable material

(2) Method B. Roll the roadbed to break down rocky material. Roll a minimum of five full-width passes, or until visual displacement ceases, with a vibratory grid roller or equivalent with a minimum mass of 10 tons.

(3) Method C. Tractor finish work by spreading the excavation for roads designated as

Construction Tolerance Class K, L, or M. Eliminate rock berms that may form during embankment construction with a tractor finish.

Table 204-1 Sampling and Testing Requirements.

Add the following note to the table:

When compaction methods (d) or (e) are used AASHTO M 145, T 99, T 180, and T 310 are not required for earth embankment test methods.

Add Table 204-2—Construction Tolerances:

Table 204- 2- Construction tolerances.

Tolerance Class (a)

A B C D E F G H I J K L M

Roadbed width (ft)

+0.

+0.

+1.

+1.

+1.

+1.

+1.

+1.

+2.

+2.

+2.

+2.

+2.

Subgrade elevation

(ft)

+0.

+0.

+0.

+0.

+0.

+1.

+1.

+1.

+2.

+3.

+2.

+3.

(c)

Centerline alignment

(ft)

+0.

+0.

+0.

+0.

+1.

+1.

`+1.

+1.

+2.

+3.

+3.

+5.

(c)

Slopes, excavation, and embankmen t (% slope (b)

+3 +5 +5 +5 +5 +5 +10 +10 +10 +10 +20 +20 +20

a. Maximum allowable deviation from construction stakes and drawings.

b. Maximum allowable deviation from staked slope measured from slope stakes or hinge points.

c. Unless otherwise shown the centerline alignment and subgrade elevation, as built, have no horizontal curves with a radius of less than 80 feet, and no vertical curves with a curve length of less than 80 feet when the algebraic difference in the grade change is less than 10 percent, or a curve length of less than 100 feet when the algebraic difference of the grade change is greater than or equal to 10 percent. The centerline grade is not to exceed 20 percent in 100 feet of length.

Disposal of Unsuitable or Excess Material

204.14 Delete the text of the first paragraph and substitute the following:

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 16 of 32

Dispose of unsuitable or excess material at designated sites or legally off of the project.

209 - Structure Excavation and Backfill

209.07 Dewatering

Delete the subsection and add the following:

Submit a Dewatering Plan 5 days prior to beginning excavation.

Construct diversion prior to performing any excavation. Construct diversions using water tight, non-eroding methods. Employ settling basins or other methods so that muddy water is not returned to stream. Install, operate, and remove diversions in a manner that minimizes erosion and sedimentation.

209.10 Backfill.

(a) General.

Add the following:

Replace any pipe that is distorted by more than 5 percent of nominal dimensions, or that is ruptured or broken.

Do not place or backfill pipe that meets any of the following conditions until the excavation and foundation have been approved in writing by the CO:

Embankment height greater than 5 feet at subgrade centerline.

Installation in a protected streamcourse.

Round pipe with a diameter of 48 inches or greater.

Pipe arches with a span of 50 inches or greater.

Any box culvert of structure other than pipe culverts.

(b) Pipe Culverts.

(1) Pipe culverts with compacted backfill.

Add the following:

On each side of the pipe, excavate an area at least as wide as the diameter of the pipe. Backfill without damaging or displacing the pipe. Complete backfilling of the trench with suitable material.

209.11 Compacting.

Delete the subsection and add the following:

Compact backfill using designated compaction method A, B, C, or D:

Method A. Ensure that backfill density exceeds the density of the surrounding embankment.

Method B. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact each layer 6 inch layer with a minimum of three complete passes or until visual displacement ceases using a mechanical tamper, (wacker-packer type or approved equal). For compaction under sections 252, 254, 255, 257, 258 and 262 compact with a vibratory steel wheeled roller with a mass of at least 8 tons.

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 17 of 32

Method C. Compact each layer of backfill with a minimum of two passes with mechanical tamper, (wacker-packer type, or approved equal).

Method D. Determine optimum moisture content and maximum density according to

AASHTO T 99 method C. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact material placed in all layers to at least 95 percent of the maximum density. Determine the in-place density and moisture content according to

AASHTO T 310 or other approved test procedures.

209.12 Acceptance.

Sampling and Testing Requirements

Add the following:

Compaction methods (A),(B), and (C) do not require AASHTO T-99 or T-310 test methods for foundation fill.

209.13 See Subsection 109.05

Delete the first sentence and replace with the following:

Do not measure structure excavation, bedding, and backfill for payment.

211 – Roadway Obliteration

211.01 Description

Delete this subsection and replace with the following:

This work consists of the reclamation of roadways by the removal of culverts; construction of waterbars and leadoff ditches; restoration of stream channels; and seeding, fertilizing, and mulching of all disturbed areas. This work may include necessary diverting of live streams, pumping, bailing, draining, sheeting, bracing, and miscellaneous items required for execution of the work. Additionally, survey stakes depicting work locations may need to be re-established using original survey notes and/or plans.

Roadway reclamation methods are designated as follows:

(a) Method 1. Fill ditches and restore the roadway to approximate original ground contour or shape to blend with the terrain. Before placing embankment, loosen the roadbed by ripping or scarifying to the depth of 12 inches. Pull all embankments and apply the material to contour or fill ditches; or haul it to designated areas. Construct waterbars as shown on the plans. Scatter any available slash on obliterated roadway. Keep excavated material within the original roadway limits unless otherwise shown on the plans.

(b) Method 2. Shape the roadway to drain water. Fill ditches, outslope the roadbed and loosen the roadbed by ripping or scarifying to the depth of 12 inches to provide a seedbed and promote establishment of vegetation. Scatter any available slash on obliterated roadway.

Construct waterbars as shown on the plans. Effectively close the road by method shown on plans.

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 18 of 32

(c) Method 3. Loosen the roadbed by scarifying to the depth of 12 inches. Construct waterbars as shown on the plans. Scatter any available slash on obliterated roadway.

Eliminate all ruts and low spots that could hold water. Effectively close the road by method shown on plans.

(d) Method 4. Grade the roadbed to eliminate all ruts and low spots that could hold water.

(e) Method 5. Treat the roadway as shown on the plans.

211.02 Construction Requirements

Delete this subsection and replace with the following:

Remove all culverts designated to be removed from National Forest lands and dispose of them in any legal manner. All removed culverts may be salvaged by the Contractor for personal use.

Excavate and finish to the lines shown on the plans. Seed, fertilize, and mulch all disturbed ground. Place Erosion Control Blankets and Straw Wattles as shown on the plans.

Dispose of bridges as shown on the plans.

230 - Roadside Brushing

230.01 Work. This work consists of removing all vegetative material including limbs, residual slash, live roadside brush, and small trees within the brushing limits designated on the plans.

Construction

230.02 Brushing. Cut all brush and small trees (6 inches diameter, or less, at the point of cut) inside the brushing limits and outside the roadbed no higher than 4 inches above ground level (6 inches for machine brushing). If rocks or other obstructions are encountered, cut no higher than

6 inches above the obstruction. Limb live trees with a diameter larger than 6 inches to provide a clear height of 18 feet above the road surface.

Cut all brush and trees located on the roadbed as nearly flush to the road surface as possible so stumps will not become a hazard to vehicle tires.

230.03 Windfalls. Limb windfalls lying within or across the brushing limits, cut off at the top of the existing cut slope or 5 feet from the shoulder on the fill slope. Dispose of windfall material as slash.

230.04 Road Junctions. Do not deposit brushing debris on the roadway of adjoining roads.

230.05 Slash Treatment. Scatter slash outside the brushing limits without damaging residual trees. Slash is defined as any material that has a length greater than 36 inches or a diameter greater than 2 inches at any point. Do not deposit material in streams, streambeds, culvert inlets or outlets, drainage ways, or cattle guards.

230.06 Acceptance. Roadside brushing will be evaluated under Subsection 106.02.

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 19 of 32

Measurement

230.07 Method. Measure the Section 230 items listed in the bid schedule according to

Subsection 109.02 and the following.

Linear measurements will be horizontal along the road centerline.

Quantities will be the number of miles (or stations) and fractions thereof along the road centerline.

230.08 The accepted quantities will be paid at the contract price per unit of measurement for the section 230 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this section. See Subsection 109.05.

301 – Untreated Aggregate Courses

Compacting

301.05 Delete the first and third paragraphs and add the following:

Compact the aggregate using the following method as specified:

(c) Determine the maximum density of the mixture according to AASHTO 180, method

D.

Compact each layer to at least 95 percent of maximum density. Determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedure.

(d) Hauling and Spreading Equipment. Adjust the moisture content to a level suitable for compaction. Operate spreading and hauling equipment over the full width of each layer of the aggregate.

(e) Roller Compaction. Adjust the moisture content to a level suitable for compaction.

Operate rollers over the full width of each layer until visual displacement ceases, but not fewer than three complete passes. Use rollers that meet the following requirements:

(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch of width of the compression roll or rolls.

(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum weight of 6 tons, specifically designed to compact the material on which it is used.

(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi.

Surface Tolerance

301.06 Add the following:

Thickness and Width requirements:

The maximum variation from the compacted specified thickness is ½ inch. The compacted thickness is not consistently above or below the specified thickness and the average thickness of

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 20 of 32

4 random measurements for any ½ mile of road segment is within + ¼ inch of the specified thickness.

The maximum variation from the specified width will not exceed +12 inches at any point. The compacted width is not consistently above the specified width and the average of any four random measurements along any ½ mile of road segment is within +4 inches of the specified width.

303 - Road Reconditioning

303.01 Description

Add the following paragraphs:

In-place rock crushing work consists of scarifying, windrowing, crushing, spreading, re-grading, and compacting road surface material to achieve a more uniform and serviceable travel way. The work performed herein and paid for under Pay Item 303(58) shall include furnishing all equipment, labor, materials, and transportation necessary for the completed project. Unless otherwise agreed to by the CO, no aspect of this work will be covered and paid for via other Pay Items.

Equipment used for in-place rock crushing shall be specifically manufactured and equipped for the task of crushing rock or concrete chunks up to 18” in maximum dimension. Equipment shall be capable of processing a minimum of 1,200 cubic yards per single-pass windrow/mile. Crusher shall be mobile during operation, and may be a self-contained unit or attached to a front-end loader or other wheeled or tracked equipment compatible with the unit and project performance requirements. FAHR road crusher Forester C-2000 model or equivalent is considered acceptable and representative of equipment required to perform this work.

Construction Requirements

303.08 Pulverizing.

Delete the entire paragraph and replace with the following:

Scarify road bed to a 6-inch depth and remove organic debris, rubbish, metallic debris, and other materials considered unsafe and/or unsuitable for crushing and incorporating into the completed road surface. Windrow scarified material into a linearly-uniform shape of a size and consistency suitable for the mobile crushing equipment deployed. As agreed upon by the CO, pull suitable materials from ditches for incorporating into windrowed input material.

Operate the mobile crushing equipment in a safe and effective manner necessary to pulverize and reduce the input material to a gradation not exceeding 1½ inches in maximum particle size.

Uniformly spread output material across the road surface and finish to within 0.05 feet of grade.

Mix, spread, compact, and finish the material according to Standard Specification 301, Section

301.

303.09 Acceptance.

Add the following:

In-place rock crushing and road reconditioning work will be evaluated by measurement and visual inspection for gradation, uniformity, compaction, and finished grade dimensions.

Measurement

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 21 of 32

303.10 Measurement

Add the following paragraphs:

Measure roadbed linear rock crushing by the square yard of completed road surface. Measure the square yard area on a horizontal plane.

Payment

303.11 Payment

Delete this section in its entirety and replace with the following:

The accepted quantities will be paid at the contract price per unit of measurement for the Section

303 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

602 - Culverts and Drains

602.03 General.

Ensure that the final installed alignment of all pipe allows no reverse grades, and does not permit horizontal and vertical alignments to vary from a straight line drawn from center of inlet to center of outlet by more than 2 percent of pipe center length or 1.0 feet, whichever is less.

619 – Fences, Gates, and Cattleguards

619.07(b) Concrete foundation.

Delete first sentence and replace with the following:

Construct cast-in-place concrete foundations according to Section 601 OR AS SHOWN ON

THE DRAWINGS.

622 – Rental Equipment

622.04 Measurement

Delete the following:

Measure time for moving equipment between project work sites.

Replace with:

Time will not be measured for equipment transportation. Such work will be compensated via the

Mobilization Pay Item(s) corresponding to the equipment in question.

625 – Turf Establishment

Construction Requirements

625.03 General

Delete this subsection and replace with the following:

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 22 of 32

Apply turf establishment to prepared ground between 5/1 and 6/15 and 9/1 and 10/31 on any disturbed area. Apply turf establishment to all cut and fill slopes, drain ditches, disposal sites, and all other disturbed areas unless otherwise directed by the CO. Seeded areas damaged by construction activities shall be reseeded within 10 days of the damage.

Seed as soon as possible after constructed to template lines unless otherwise specified in writing by the CO. Do not seed during windy weather or when the ground is excessively wet, frozen, snow covered.

Assure that all seed and mulch used in the work conforms to the weed free requirements of FP-

03 Section 713.

625.04 Preparing Seedbed.

Soil on areas to be seeded shall be left in a roughened condition favorable to the retention and germination of the seed.

625.05 Watering.

Delete entire subsection.

625.06 Fertilizing.

625.07 Seeding.

Delete entire subsection and replace with the following:

Seed shall be spread evenly at the rate of 18 lbs per acre. Seed mix shall be provided by the CO.

625.08 Mulching.

718 - Traffic Signing and Marking Material

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.

SPECIAL PROJECT SPECIFICATIONS

Special Project Specification 802 – Ditch Cleaning

DESCRIPTION

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 23 of 32

802.01 Ditch cleaning is the removal and disposal of all slough material and debris from drainage ditches, outlet ditches, and lead-off ditches to provide an unobstructed and free-draining waterway.

WORK REQUIREMENTS

802.02 All slough material or other debris which might obstruct water flow in the roadside ditch shall be removed. Slough material removed from the ditch, if suitable, may be blended into existing native road surface or shoulders or placed in designated berms during surface blading.

Material from ditch cleaning operations shall not be blended into or bladed across aggregate surface roads or bladed onto or across bituminous surface roads.

Excess material that cannot be blended into existing native road surfaces, shoulders, or berms shall be removed from the ditch and disposed of by sidecasting, unless otherwise SHOWN ON

THE DRAWINGS. Sidecasting into streams, lakes, or watercourses will not be permitted.

Roadway backslopes and berms shall not be undercut.

Limbs and wood chunks in excess of one (1) foot in length or three (3) inches in diameter shall be removed from ditches and placed outside the roadway.

MEASUREMENT

802.03 Ditch cleaning will be measured to the nearest one-tenth (0.1) mile of cumulative ditchline cleaned on each road.

PAYMENT

802.04 The accepted quantities will be paid for at the contract unit price for each pay item shown in the SCHEDULE OF ITEMS.

Payment will be made under:

Pay Item Pay Unit

802 (01) Ditch Cleaning .........................................................................L.F.

Special Project Specification 805 – Drainage Structures

805.01 This work shall consist of cleaning culverts, drainage dips, and related items such as catch basins, outlet ditches, lead-off ditches, trash racks, drop inlets, headwalls, aprons, and existing riprap.

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 24 of 32

805.02 Drainage structures and related items shall be cleared of all foreign material and all vegetative growth which interferes with the flow pattern. Grass shall be left in place provided drainage is not obstructed.

Culverts which have silted into a depth of 1/4 of their opening height or more shall have their inlet and outlets cleaned as well as (3) feet of the upper and lower ends of the inside cleaned out to expose the full diameter of the culvert.

Unless otherwise SHOWN ON THE DRAWINGS, catch basins shall be cleared of material to the bottom of the invert of the culvert and at least (18) inches horizontally towards the backslope or the width of the basin, whichever is greater.

The backslope shall be cleaned of loose material for a distance of (2) pipe diameters as measured from the bottom of the ditch up the backslope and for a width of (2) pipe diameters as measured horizontally on the backslope. Undercutting the backslope will not be permitted.

Inlet channel transition from the drainage ditch to the catch basin and outlet ditches shall be cleaned a distance of ten (10) feet. Material removed, if suitable, may be blended into existing native road surfaces or shoulders. On aggregate surface roads, care must be taken to assure the material is not mixed into the existing aggregate. Unsuitable material shall be disposed of by sidecasting unless otherwise SHOWN ON THE DRAWINGS.

Sidecasting into streams, lakes or watercourses will not be permitted.

Ditches shall be cleaned to conform to previous line, grade, and cross section. Cleaning is not required on ditches that provide drainage and are free of debris larger than (3) inches in diameter and (1) foot in length.

805.03 Drainage dip maintenance consists of cleaning existing dips on native surface and aggregate surfaced roads.

Drainage dips shall be shaped to a depth and width to provide drainage and in reasonable conformity to the original lines, grades, and cross sections unless otherwise SHOWN ON THE

DRAWINGS or designated on the ground. Handwork may be necessary to obtain a smooth surface and uniform cross section. Lead-off ditches shall be cleaned for a distance of ten (10) feet from the drainage dip.

805.04 Culvert cleaning measurement will be the number of units of each culvert type.

Cleaning of catch basins, outlet ditches, headwalls, riprap, and drop inlets shall be incidental to this Item.

Drainage dip cleaning measurement will be the number of dips completed and accepted.

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 25 of 32

Lead-off ditch cleaning shall be Incidental to this item.

Ditch cleaning greater than 10 feet from the drainage structure will be measured and paid in accordance with Section 802 Ditch Cleaning.

805.05 The accepted quantities will be paid for at the contract unit price for each pay item

Pay Item Pay Unit

805(01) Culvert cleaning 24” Dia. and under........................................EA.

805(02) Culvert cleaning 24” through 48” Dia. ....................................EA.

805(03) Culvert cleaning over 48” Dia. ................................................EA.

805(04) Drainage Dip cleaning .............................................................EA.

Special Project Specification 808 – Cattleguard Maintenance

808.01 This consists of maintaining miscellaneous structures such as cattleguards, gates, and other similar structures that have been previously installed to insure the safe and efficient operation of the road and structures.

MATERIALS

808.02 Any materials used in the maintenance of these structures shall be similar in type and quality to the existing material in the structure being maintained.

808.03 Loose rails shall be welded or bolted back in place. Ruptured welds and localized cracks shall be rewelded. The area beneath the cattleguard deck shall be cleaned of dirt and debris to a depth of two (2) feet below the tops of the grids or to the bottom of the foundation whichever is less. Where there are existing ditches, cleaning shall include removing material from the ditch to provide for drainage through the installation.

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 26 of 32

Materials removed shall be disposed of adjacent to the site outside the roadway and away from natural or man-made drainages unless otherwise SHOWN ON THE DRAWINGS.

If the cattleguard deck is required to be removed to facilitate repair and cleaning and there is no bypass, delay for traffic shall not exceed two (2) hours contingent on at least two (2) week days advance notice to the Government of the planned work.

Roadbed and surfacing materials disturbed by Contractor's operations shall be conserved separately, replaced, and compacted to conform to the adjacent roadbed material.

The Government may furnish replacement material for damaged or defective cattleguard components. Government furnished materials and locations are SHOWN ON THE

DRAWINGS.

808.05 Measurement will be the number of units for each item listed in the SCHEDULE

OF ITEMS completed and accepted.

808.06 The accepted quantities will be paid for at the contract unit price for each pay item

Pay Item Pay Unit

808(01) Maintaining Cattleguards...........................................................Each

Special Project Specification 809 -- Developing Water Supply and Watering

809.01 This work shall consist of furnishing, hauling, and applying water.

MATERIALS

809.02 Water sources are SHOWN ON THE DRAWING. If, the contractor elects to obtain water from other sources, the contractor shall be responsible for obtaining the right to use the water.

Attachment J.1 – Standard, Supplemental, and Special Project Specifications Page 27 of 32

809.03 Developing water supplies and access shall be as SHOWN ON THE DRAWINGS.

Mobile watering equipment shall have watertight tanks of known capacity. Equipment used for dust control and finishing operations of subgrade and surfaces shall provide uniform and controlled application of water without ponding or washing. Positive control of water from the driver's position is required at all times.

Calibrated tanks, distributors, or accurate water meters shall be required if SHOWN ON…