About this file

J-1 Description of Work

View the file

Other files

File Type Posted
amendment 5.pdf PDF
Route Survey for Honey Creek Part C Thompson Ditch.pdf PDF
Amendment 4 to Solicitation AG-52KY-10-S-0002.pdf PDF
Amendment 3 to AG-52KY-S-10-0002.pdf PDF
Amendment 2 to Solicitation.pdf PDF
Amendment 1 to AG-52KY-10-S-0002.pdf PDF
Attachment J4.pdf PDF
FBO solicitation package.pdf PDF
Attachment J2 plans.pdf PDF
Attachment J3.pdf PDF
Attachment J6.pdf PDF
Attachment J5.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J-1

Description of Work

Honey Creek Part C – Phase 2A (Extending from 7th Street to US41) of the Honey Creek Watershed Protection and Flood Prevention Project

LOCATED IN HONEY CREEK TOWNSHIP, EXTENDING FROM 7TH

STREET TO US 41 ALONG THOMPSON DITCH ON THE SOUTH SIDE

OF TERRE HAUTE, IN VIGO COUNTY, INDIANA.

The work will consist of construction activities on both the north and south sides of Thompson Ditch between Seventh Street and US41 and will include the construction of approximately 5,000 lineal feet of compacted earth dike with fill heights up to seven (7) feet. The major items of work include approximately 45,740 CY of common excavation, 36,890 CY of compacted earthfill, removal of or furnish and installation of fourteen (14) drainage structures ranging in size from 12 inches to 48 inches including corrugated polyethelene smooth interior dual wall pipe, drain basins, flared end sections, aluminum flap gates and concrete headwalls, placement of 166 tons of revetment riprap and seeding of approximately 17 acres. A borrow source is provided. The contractor is responsible for disposal of unsuitable earthen material, sod, all cleared material including stumps, and other excavated materials including woody debris, asphalt, pipes, concrete, and other foreign materials, etc. The larger non-utility structures to be removed by the contractor include a pole barn and a garage. The construction contract also includes performance of contractor quality control, furnishing a field office and construction survey for layout, control and measurement of the work.

File details come from the government source that posted it. Updated .