Amendment 3 to AG-52KY-S-10-0002.pdf

PDF 152 KB Posted

Attached to
Phase 2A Construction of Honey Creek Part C - Watershed Protection and Flood Prevention Project
Solicitation number
AG-52KY-10-S-0002
Issued by

View the file

Other files

File Type Posted
amendment 5.pdf PDF
Route Survey for Honey Creek Part C Thompson Ditch.pdf PDF
Amendment 4 to Solicitation AG-52KY-10-S-0002.pdf PDF
Amendment 2 to Solicitation.pdf PDF
Amendment 1 to AG-52KY-10-S-0002.pdf PDF
Attachment J1.pdf PDF
Attachment J4.pdf PDF
FBO solicitation package.pdf PDF
Attachment J2 plans.pdf PDF
Attachment J3.pdf PDF
Attachment J6.pdf PDF
Attachment J5.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-52KY-S-10-0002

x x

0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

NRCS-IN-1252KY

INDIANAPOLIS IN 46278

6013 LAKESIDE BOULEVARD

USDA-NRCS-INDIANA STATE OFFICE

NRCS-IN-1252KY

INDIANAPOLIS IN 46278

6013 LAKESIDE BOULEVARD

USDA-NRCS-INDIANA STATE OFFICE

05/13/2010000003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/26/2010

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to amend the solicitation package and answer questions submitted. See attached pages 2-3.

Period of Performance: 06/01/2010 to 12/31/2010

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JUDITH A. WEBER

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Honey Creek Watershed Protection and Flood Prevention Project Part C – Phase 2A

Solicitation # AG‐52KY‐10‐S‐0002 Amendment # 3

1. Construction Specification 8 – Mobilization and Demobilization Item 4.a.(2) shall be revised to read as follows:

a. Mobilization shall include costs associated with insurance, bonding and permitting requirements imposed by the Vigo County Engineering Department that may be associated with county roads. Payment will not be made under this item for repair to county roads.

b. See page 3 of 3 of this amendment for further guidance received from the Vigo County Engineering Department on May 12, 2010.

Vigo County Engineering Department

121 Oak Street, Terre Haute, Indiana 47807 Telephone: (812) 462-3419 Fax: (812) 234-2409

Jerry Netherlain ~ County Engineer Neil Costello ~ Assistant Engineer

Unusual Haul on County Roads $ 100.00 Temporary Driveways 2 @ 30.00 60.00 Road Bond $25,000.00

INDOT guidelines for traffic control

7th Street truck route from Thompson Ditch – 7th Street north to Davis Avenue west to U.S. 41 south to Springhill Rd and west to St Rd 63.

Halt Drive truck route – Halt Drive to U.S. 41 south to Springhill Rd and west to SR 63.

File details come from the government source that posted it. Updated .