About this file

Price Schedule / Schedule of Items - Ocmulgee/Oconee

View the file

Other files

File Type Posted
Award Notice.pdf PDF
SF-1449 form.pdf PDF
Boggs_Drawing_3.pdf PDF
Site showing attendee list.pdf PDF
combined revised Price Schedules.doc DOC document
spec_31_1000_revised.pdf PDF
sf_30_amendment_1.doc DOC document
Oconee_dwgs.pdf PDF
Ocmulgee_Oconee_Specs.pdf PDF
Boggs_Specs.pdf PDF
Boggs_Drawings.pdf PDF
SOW and clauses.pdf PDF
SCA Wage Determination - North GA.doc DOC document
IDIQ_Map.pdf PDF
SCA Wage Determination - Central GA.doc DOC document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARRA Project No. CIM-0803-07F, Developed Recreation Minor Facility Deferred Maintenance TASK ORDER 2: Ocmulgee Bluff Trailhead & Oconee River Recreation Area Chattahoochee-Oconee National Forest Oconee Ranger District Jasper & Greene Counties, Georgia

Schedule of Items

BASE Work

Totals from attached schedules A. Ocmulgee Bluff Trailhead

B. Oconee River Recreation Area

TOTAL BASE Work

Ocmulgee Bluff Trailhead, BASE

ITEM

NO.

DESCRIPTION
PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

OB01
Mobilization
LS
All
XXXXXX
$_________
OB02
Fee Tube Replacement
EA
1
$_________
$_________
OB03
Information Board Roof Replacement
LS
All
XXXXXX
$_________
OB04
Furnish & Install Trash Bin, 2-Unit
EA
2
$_________
$_________
OB05
Concrete Trash Bin Pad, 2-Unit
EA
2
$_________
$_________
OB06
Picnic Table Replacement
EA
1
$_________
$_________
OB07
Furnish & Install Gate Sign
EA
3
$_________
$_________
OB08
Replace Sign, Recycled Plastic, No Post
EA
1
$_________
$_________

TOTAL – Ocmulgee Bluff BASE

Oconee River Recreation Area, BASE

ITEM

NO.

DESCRIPTION
PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

OR01
Mobilization
LS
All
XXXXXX
$_________
OR02
Fee Tube Replacement
EA
1
$_________
$_________
OR03
Fire Ring Replacement
EA
5
$_________
$_________
OR04
Pedestal Grill Replacement
EA
9
$_________
$_________
OR05
Decommission Picnic Site (Remove & Discard Picnic Table and Pedestal Grill; Remove Gravel Walkway, Restore to Natural Grade & Seed)
EA
2
$_________
$_________
OR06
Lantern Post Replacement
EA
5
$_________
$_________
OR07
Picnic Table Replacement
EA
5
$_________
$_________
OR08
Tent Pad Border Replacement, (Remove Concrete Border, Replace with Timber Border)
EA
5
$_________
$_________
OR09
Crushed Aggregate Base, GAB, 1” Thick, For Spurs, Roller Compaction
TON
1.8
$_________
$_________
OR10
Crusher Fines Surfacing, Pea Gravel, 3” Thick, For Camping Areas/Tent Pads, Vibratory Plate Compaction
TON
10.8
$_________
$_________
OR11
Furnish and Hand Place Shot Rock along bank at Boat Launch
TON
40
$_________
$_________

TOTAL – Oconee River BASE