Specifications - Boggs Creek

View the file

Other files

File Type Posted
Award Notice.pdf PDF
SF-1449 form.pdf PDF
Boggs_Drawing_3.pdf PDF
Site showing attendee list.pdf PDF
combined revised Price Schedules.doc DOC document
spec_31_1000_revised.pdf PDF
sf_30_amendment_1.doc DOC document
Oconee_dwgs.pdf PDF
Oconee_Price Schedule.doc DOC document
Ocmulgee_Oconee_Specs.pdf PDF
Boggs_Drawings.pdf PDF
SOW and clauses.pdf PDF
SCA Wage Determination - North GA.doc DOC document
IDIQ_Map.pdf PDF
SCA Wage Determination - Central GA.doc DOC document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIM-0803-07F / Rec_Mtce 00 0101 - 1 PROJECT TITLE PAGE

SECTION 00 0101

PROJECT TITLE PAGE

SPECIFICATION MANUAL

FOR

BOGGS CREEK RECREATION AREA REHABILITATION

PREPARED BY:

U.S. FOREST SERVICE

SOUTHERN REGION

CHATTAHOOCHEE-OCONEE NATIONAL FOREST

SECTION 00 0110

TABLE OF CONTENTS

SPECIFICATIONS

2.01 Division 01 -- General Requirements

A. 01 1000 - Summary

B. 01 4000 - Quality Requirements

C. 01 4216 - Definitions

D. 01 5000 - Temporary Facilities and Controls

E. 01 5500 - Vehicular Access and Parking

F. 01 5713 - Temporary Erosion and Sediment Control

G. 01 6000 - Product Requirements

H. 01 7000 - Execution and Closeout Requirements

2.02 Division 02 -- Existing Conditions

A. 02 4100 - Demolition

2.03 Division 12 -- Furnishings

A. 12 9300 - Site Furnishings

2.04 Division 31 -- Earthwork

A. 31 1000 - Site Clearing

2.05 Division 32 -- Exterior Improvements

A. 32 3200 – Exterior Improvements

2.06 Division 34 -- Transportation

A. 34 3400 – Transportation

2.07 Division 40 -- Worklog

A. 40 4000 – Worklog

CIM-0803-07F / Rec_Mtce 00 0110 - 1 TABLE OF CONTENTS

SECTION 01 1000

SUMMARY

PART 1 GENERAL

1.01 PROJECT

A. Project Name: Boggs Creek Recreation Area Rehabilitation.

B. Property Owner: U.S. Forest Service, Chattahoochee-Oconee National Forest.

C. Local Administrative Offices:

-- Blue Ridge Ranger District, 2042 Hwy 515 W., Blairsville, GA 30512, 706-745-6928

D. Project Location: Boggs Creek Recreation Area, Lumpkin County, GA

Boggs Creek is located along Forest Service Road 443, approximately 2 miles north of the junction of U.S. Highway 129 and U.S. Highway 19. From Cleveland, take U.S. Highway 129 north for approximately 11 miles. Turn right onto Forest Service Road 443. Boggs Creek Recreation Area is located along a 2-mile portion of Forest Service Road 443 and 443a and adjacent to Boggs Creek, a stocked tributary to the Chestatee River.

E. The Project consists of rehabilitation of recreation site amenities and facilities at the Boggs Creek Recreation Area on the Chattahoochee-Oconee National Forest. Work includes the following items:

BASE WORK

1. Haul and spread gravel in parking areas, campsite spurs and camping areas/tent pads;

a. Gravel, #4, Approx. 507 Tons

b. Gravel, GAB, Approx. 113 Tons

c. Gravel, Pea Gravel, Approx. 357 Tons

2. Removal of existing campsite furnishings;

a. 5 Lantern posts

3. Replacement of campsite furnishings;

a. 1 Fee Tube

b. 7 Site Unit Markers

c. 8 Fire Rings

4. Purchase and installation of new campsite furnishings;

a. 35 Picnic Tables

5. Parking barrier removal and installation;

6. Boulder purchase and placement.

OPTION A

1. Road Maintenance

a. Road reconditioning, 2.5 miles

b. Clean and reshape ditches, .25 mile

c. Haul and spread gravel, #4, Approx. 2100 Tons

d. Roadside mowing and brushing, 2.5 miles

CIM-0803-07F / Rec_Mtce 01 1000 - 1 SUMMARY

OPTION B

1. Replacement of campsite furnishings;

a. 26 Fire Rings

OPTION C

1. Replacement of campsite furnishings;

a. 40 Signs, including posts/bases

OPTION D

1. Tree Removal, 52 trees

OPTION E

2. Host site reconditioning;

e. Food Storage Locker Installation

f. Storage Building Replacement

1.02 WORK BY OWNER

A. The U.S. Forest Service or others will perform the following work:

1. Trees for removal will be clearly marked with flagging by the Forest Service. The

Contractor shall seek approval for removal of trees other than those marked.

2. Location of site furnishings will be clearly marked on the ground by the Forest Service, if not depicted on the drawings. Furnishings will be marked by either wood stakes or wire flags. In most instances, site furnishings will simply be replaced in the same location as the existing. Contractor is responsible for confirming locations with the COR prior to installation.

1.03 OWNER OCCUPANCY

A. Cooperate with the U.S. Forest Service to minimize any potential conflict with local recreation area managers/concessionaires and the visiting public. Coordinate directly with the U.S. Forest Service in the execution of operations.

B. Schedule the Work to accommodate public occupancy of the recreation areas. If necessary, portions of the areas can be closed to the public to expedite progress or ensure a safe working environment. Any and all closures must be pre-approved by the U.S. Forest Service before implementation.

1.04 CONTRACTOR USE OF SITE

A. Construction Operations: Limited to areas noted on Drawings and Maps.

B. Arrange use of site to allow:

1. U.S. Forest Service occupancy.

2. Work by Others (Volunteers Hosts, Concessionaires).

3. Work by U.S. Forest Service.

4. Use of site by the public.

C. Provide access to and from site as required by law.

1. Do not obstruct roadways without prior permission from the Forest Service.

D. Time Restrictions:

1. Limit conduct of especially noisy exterior/interior work to the hours of 0800-1800.

CIM-0803-07F / Rec_Mtce 01 1000 - 2 SUMMARY

CIM-0803-07F / Rec_Mtce 01 1000 - 3 SUMMARY

1.05 WORK SEQUENCE

A. Construct Work in stages during the construction period so as to meet the following requirements:

1. Priority 1: Limit the length of time in which ground disturbing activities occur so as to minimize unprotected surfaces and minimize potential for erosion.

2. Priority 2: Limit public inconvenience, as much as possible, while performing contract requirements. Should work begin during the peak summer season (Memorial Day through Labor Day) or during the peak fall season (October 1 - October 31), the Contractor may be required to coordinate construction schedule and operations with the Forest Service prior to commencement of work. Construction activities, unless with prior approval by the COR, will be prohibited to occur on weekends and holidays.

SECTION 12 9300

SITE FURNISHINGS

1.01 WORK

A. All items designated for installation or replacement must be furnished by the Contractor, including any materials, hardware and fasteners needed for installation and security. All items designated for removal, except those specified by the Government, shall become property of the contractor and shall be removed off government lands.

B. See part 2 for specific work requirements by product.

PART 2 PRODUCTS

a. Picnic Tables

Contractor to remove existing picnic tables and furnish and install new picnic tables in similar location per manufacturer’s instructions. Contractor shall provide all materials and hardware necessary to install tables per manufacturers’ instructions and as additionally required by the government to provide added security (i.e. concrete/rebar anchoring).

Picnic tables shall be:

A) Manufacturer: Jamestown Advanced Products Corporation 2855 Girts Road Jamestown, NY 14701 716-483-3406 www.jamestownadvanced.com

Product: Universal Access Picnic Table Product #: 12610-11

Description: 8’ Frame w/ treated #1 Pine; 2” Schedule 40 pipe, Galvanized

b. Fire Rings

Contractor to remove existing fire rings and furnish and install new fire rings in similar location per manufacturer’s instructions and in accordance with Forest Service accessibility guidelines.

Contractor to remove existing fire rings from government property. Fasteners, accessories, hardware and mounts (i.e. concrete footers, anchors, spades) must be removed, as well. Note that existing fire rings vary in style, size and installation method.

Contractor shall provide all materials and hardware necessary to install fire rings.

Contractor to fill each fire ring with aggregate measuring 9” deep. This will provide an elevated fire surface to meet accessibility requirements. At final attachment, fire rings shall be level and secure. Fire rings shall be as follows:

A) Manufacturer: Pilot Rock P.O. Box 946 Cherokee, Iowa 51012 712-225-5115 www.pilotrock.com Product: Single Level Cooking Grate

CIM-0803-07F / Rec_Mtce 12 9300 SITE FURNISHINGS

Product #: FS-30/18/PA Description: Single Level Cooking Grate, Accessible, 30” Dia., 17 3/8” Height

c. Lantern Posts

Contractor to remove existing lantern posts from government property. Hardware and mounts (i.e. concrete footer) must be removed. Existing lantern posts vary nominally in style, size and installation method. Reference Campsite Furnishings Drawing for typical lantern posts found within project areas.

d. Campsite Markers

Contractor to remove existing campsite markers and furnish and install new campsite markers in similar location as specified in the Drawings and Specifications. Contractor shall provide all materials and hardware necessary to remove and install campsite markers. New campsite markers shall be one of the following types, as specified per area:

1. Carsonite Post & Sticker

Carsonite posts and stickers shall be as follows, or equivalent:

A) Manufacturer: Carsonite Composites

19845 U.S. Highway 76 Newberry, South Carolina 29108 1-800-648-7916 www.carsonite.com

Product: Recreational RoadMarker Product #: CRM30 _ NW

Description: 3.75” x 60” RoadMarker

Product: Numbers

Product #: Contact Carsonite Composites for Product No.

Description: 4” Number Decals, #s As Needed for Individual Areas

Equivalent products shall meet the following requirements:

1. The marker upon proper installation shall resist displacement from wind and vehicle impact forces.

2. The marker shall be constructed of a durable, UV resistant, flexible and continuous material.

3. The marker width shall be at least 2.6 inches to in order to accommodate a 2.5” decal.

4. The marker length shall be at least 60” with a minimum visible height of 42” and a minimum embedment depth of 18.”

5. Decals shall be reflective white on a brown background and UV resistant with numbers at least 3” high.

e. Fee Tube http://www.carsonite.com/

Contractor to furnish and install (1) fee tube, constructed according to the specifications and drawings provided by the Forest Service. Contractor is responsible for the construction of the fee tube, as well as, its installation. Contractor shall provide all materials and hardware necessary to construct and install the fee tube and secure it on site, including a concrete pad. Location shall be equal to the existing fee tube or as specified by the COR. The fee tube shall meet all criteria as outlined in the Drawings and Specifications. Local manufacturers include:

A) Provider: Quality Maintenance & Fabrication, Inc.

202 South 2nd Avenue Chatsworth, GA 307058

706-422-9987 Product: Forest Service Fee Collection Tube

Description: See drawings

f. Food Lockers

Contractor to furnish and install (1) food locker at the campground host site using one of two installation methods: 1) pole-type installation or 2) surface mount installation.

Contractor shall provide all materials and hardware necessary to install food lockers.

Contractor to install per manufacturer’s instructions. At final attachment, food locker shall be rigid and secure. Food lockers shall be A or B, as specified per area:

A) Manufacturer: BearSaver 1390 S. Milliken Avenue Ontario, CA 91761 909-605-1697 www.bearsaver.com

Product: 24 Cubic Foot Food Storage Locker Product #: FS24-RCE

Description: 24 Cubic Foot Food Storage Locker, Pitched Roof

g. Storage Building

Contractor to furnish and install (1) prefabricated storage building at the campground host site per the manufacturer’s instructions. Contractor shall provide all materials and hardware necessary to install storage building and secure it on site. Location shall be equal to the existing storage building. The storage building shall be as follows, or equivalent:

A) Provider: The Home Depot www.homedepot.com

Product: Big Max Jr. Shed by Rubbermaid Product #: 371301SANWN

Description: Resin Storage Building, 7’ x 3.5’ x 7.9’

Equivalent products must meet the following requirements:

1. Have a storage capacity of at least 190 cu ft.

2. Be resistant to fading, chipping, cracking or breaking.

3. Be resistant to moisture.

4. Be lockable.

5. Have a floor included.

http://www.homedepot.com/

SECTION 01 4000

QUALITY CONTROL & QUANTITY MEASUREMENT

1.01 WORK

A. The contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.

1.02 MEASUREMENT

A. There will be no separate measurement for this section.

1.03 PAYMENT

A. Quality control and quantity measurement shall be incidental to other specified work.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 OVERVIEW

A. QUALITY CONTROL

1. The contractor shall provide and maintain a quality control system that will ensure that all services, supplies, and construction required under this contract conform to the contract requirements. The contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all supplies, services, and construction conform to the contract requirements.

B. QUANTITY MEASUREMENT

1. The contractor shall also perform, or cause to be performed, all measurement of quantities of materials incorporated into the work or work processes that are to be measured under the provisions of the contract.

3.02 CERTIFICATIONS & MEASUREMENTS

A. Offsite Produced Materials. The contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. Incidental purchases needed to remedy minor shortages of material shall be certified by the contractor.

B. Quantity Measurements. The contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Designed Quantity (DQ). The contractor shall compute the quantities for periodic progress payments to be verified and approved by the CO and COR. The Engineer will compute the quantities for the final payment based on measurements taken by the contractor. All contractor measurements are subject to verification. The contractor shall submit all field notes, calculation sheets, and other data used to determine quantities. The contractor shall certify in writing as to the accuracy of the measurements and computations submitted.

1. The following information must be contained:

a. Project No.

b. Contract No.

c. Quantity or Certification

d. Measured By

e. Bid Item No.

f. Date

g. Location

h. Measurement

CIM-0803-07F / Rec_Mtce 01 4000 - 1 QUALITY CONTROL & QUANTITY MEASUREMENT

CIM-0803-07F / Rec_Mtce 01 4000 - 2 QUALITY CONTROL & QUANTITY MEASUREMENT

i. Initials of Measurer

3.03 CONTROL OF INSTALLATION

A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.

B. Comply with manufacturers' instructions, including each step in sequence, unless otherwise specified in the Contract Documents.

C. Should manufacturers' instructions conflict with Contract Documents, request clarification from the COR before proceeding.

D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

E. Have Work performed by persons qualified to produce required and specified quality.

F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.

G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.

SECTION 01 4216

DEFINITIONS

1.01 SUMMARY

A. Other definitions are included in individual specification sections.

1.02 DEFINITIONS

A. Furnish: To supply, deliver, unload, and inspect for damage.

B. Install: To unpack, assemble, erect, apply, place, finish, cure, protect, clean, start up, and make ready for use.

C. Remove: To take away and dispose from government property.

D. Replace: To remove an existing item and provide a like item in its approximate location.

E. Product: Material, machinery, components, equipment, fixtures, and systems forming the work result. Not materials or equipment used for preparation, fabrication, conveying, or erection and not incorporated into the work result. Products may be new, never before used, or re-used materials or equipment.

F. Provide: To furnish and install.

G. Supply: Same as Furnish.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

END OF SECTION

CIM-0803-07F / Rec_Mtce 01 4216 - 1 DEFINITIONS

SECTION 01 5000

TEMPORARY FACILITIES AND CONTROLS

1.01 TEMPORARY SANITARY FACILITIES

A. Provide and maintain required facilities and enclosures. Provide at time of project mobilization.

B. Use of existing facilities within the recreation areas is permitted.

1. Availability may be affected by winter shut down of the recreation areas.

C. Maintain daily in clean and sanitary condition.

D. At end of construction, return facilities to same or better condition as originally found.

1.02 TEMPORARY OVERNIGHT DWELLING

A. The Contractor, at no charge, may use designated campsites within certain campgrounds during the Contract period for workers to remain overnight on the job site. Sites shall be kept neat, clean and trash shall be picked up during use.

1.03 BARRIERS

A. Provide barriers to prevent unauthorized entry to construction areas, to prevent access to areas that could be hazardous to workers or the public, to allow for owner's use of site and to protect existing facilities and adjacent properties from damage from construction operations and demolition.

B. Provide barricades and covered walkways required by governing authorities for public rights-of-way and for public access to existing building.

C. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

END OF SECTION

CIM-0803-07F / Rec_Mtce 01 5000 - 1 TEMPORARY FACILITIES AND CONTROLS

SECTION 01 5500

VEHICULAR ACCESS AND PARKING

PART 3 EXECUTION

1.01 ACCESS ROADS

A. Use of existing on-site streets for construction traffic is permitted.

1.02 PARKING

A. Use of designated areas of existing parking facilities by construction personnel is permitted.

1. COR will designate areas which can be utilized for stockpiling and storage.

1.03 CONSTRUCTION PARKING CONTROL

A. Control vehicular parking to prevent interference with public traffic and parking, access by emergency vehicles, and Owner's operations.

B. Prevent parking on non-designated areas.

CIM-0803-07F / Rec_Mtce 01 5500 - 1 VEHICULAR ACCESS AND PARKING

SECTION 01 5713

TEMPORARY EROSION AND SEDIMENT CONTROL

1.01 SECTION INCLUDES

A. Prevention of erosion due to construction activities.

B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.

C. Restoration of areas eroded due to insufficient preventive measures.

1.02 PERFORMANCE REQUIREMENTS

Contractor shall control soil erosion and water pollution though the use of silt fences, hay bales or other approved erosion control methods, as directed by the COR and in accordance with the Georgia Erosion and Sedimentation Act, when one of the following occurs:

C. Storm Water Runoff: Control increased storm water runoff when construction activities have disturbed the vegetative surface cover of an area and, thereby, increased water runoff volume and velocity.

1. Typical Remediation = Seed and mulch area; Install silt fencing.

D. Erosion On Site: Minimize wind, water, and vehicular erosion of soil on project site due to construction activities for this project.

1. Typical Remediation = Seed and mulch; Install silt fencing (See below)

2. Control movement of sediment and soil from temporary stockpiles of soil.

3. Prevent development of ruts due to equipment and vehicular traffic.

4. If erosion occurs due to non-compliance with these requirements, restore eroded areas at no cost to U.S. Forest Service.

E. Erosion Off Site: Prevent erosion of soil and deposition of sediment on other properties caused by water leaving the project site due to construction activities for this project.

1. Typical Remediation = Install silt fencing (See below)

2. Prevent windblown soil from leaving the project site.

3. Prevent tracking of mud onto public roads outside site.

4. Prevent mud and sediment from flowing onto sidewalks and pavements.

5. If erosion occurs due to non-compliance with these requirements, restore eroded areas at no cost to U.S. Forest Service.

F. Sedimentation of Waterways On Site: Prevent sedimentation of waterways on the project site, including rivers, streams, lakes, ponds, open drainage ways, storm sewers, and sanitary sewers.

1. Typical Remediation = Install silt fencing (See below)

2. If sedimentation occurs, install or correct preventive measures immediately at no cost to

U.S. Forest Service; remove deposited sediments; comply with requirements of authorities having jurisdiction.

CIM-0803-07F / Rec_Mtce 01 5713 - 1 TEMPORARY EROSION AND SEDIMENT CONTROL

CIM-0803-07F / Rec_Mtce 01 5713 - 2 TEMPORARY EROSION AND SEDIMENT CONTROL

3. If sediment basins are used as temporary preventive measures, pump dry and remove deposited sediment after each storm.

G. Sedimentation of Waterways Off Site: Prevent sedimentation of waterways off the project site, including rivers, streams, lakes, ponds, open drainage ways, storm sewers, and sanitary sewers.

1. Typical Remediation = Install silt fencing (See below)

2. If sedimentation occurs, install or correct preventive measures immediately at no cost to

U.S. Forest Service; remove deposited sediments; comply with requirements of authorities having jurisdiction.

PART 2 PRODUCTS

2.01 MATERIALS

A. Mulch: Use one of the following:

1. Straw or hay.

2. Wood waste, chips, or bark.

B. Bales: Air dry, rectangular straw bales.

1. Cross Section: 14 by 18 inches (350 by 450 mm), minimum.

2. Bindings: Wire or string, around long dimension.

C. Bale Stakes: Minimum 3 feet (1 m) long:

1. Wood, 2 by 2 inches (50 by 50 mm) in cross section.

D. Silt Fence Fabric & Posts: Approved silt fence fabrics are listed in the Georgia Department of Transportation Qualified Products List #36 (QPL-36).

PART 3 EXECUTION

1.03 PREPARATION

A. Schedule work so that soil surfaces are left exposed for the minimum amount of time.

B. Timing: Put preventive measures in place as soon as possible after disturbance of surface cover and before precipitation occurs.

SECTION 01 6000

PRODUCT REQUIREMENTS

1.01 SUBMITTALS

A. Proposed Products List: Submit list of major products proposed for use, with name of manufacturer, trade name, and model number of each product.

1. Submit within 15 days after date of Notice to Proceed.

2. For products specified only by reference standards, list applicable reference standards.

B. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.

C. Shop Drawing Submittals: Prepared specifically for this Project; indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.

D. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.

1. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns.

PART 2 PRODUCTS

2.01 EXISTING PRODUCTS

A. Do not use materials and equipment removed from existing premises unless specifically required or permitted by the Contract Documents.

B. Unforeseen historic items encountered remain the property of the U.S. Forest Service; notify U.S. Forest Service promptly upon discovery; protect, remove, handle, and store as directed by U.S. Forest Service.

C. Existing materials and equipment indicated to be removed, but not to be re-used, relocated, reinstalled, delivered to the U.S. Forest Service, or otherwise indicated as to remain the property of the U.S. Forest Service, become the property of the; remove from site.

D. Reused Products: Reused products include materials and equipment previously used in this or other construction, salvaged and refurbished as specified.

2.02 NEW PRODUCTS

A. Provide new products unless specifically required or permitted by the Contract Documents.

2.03 PRODUCT OPTIONS

A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description.

B. Products Specified by Naming One or More Manufacturers: Use a product of one of the manufacturers named and meeting specifications, no options or substitutions allowed.

C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions:

Submit a request for substitution for any manufacturer not named.

PART 3 EXECUTION

3.01 SUBSTITUTION PROCEDURES

A. Instructions to Bidders specify time restrictions for submitting requests for substitutions during the bidding period. Comply with requirements specified in this section.

CIM-0803-07F / Rec_Mtce 01 6000 - 1 PRODUCT REQUIREMENTS

CIM-0803-07F / Rec_Mtce 01 6000 - 2 PRODUCT REQUIREMENTS

B. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents.

C. A request for substitution constitutes a representation that the submitter:

1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product.

2. Will provide the same warranty for the substitution as for the specified product.

3. Will coordinate installation and make changes to other Work that may be required for the

Work to be complete with no additional cost to U.S. Forest Service.

4. Waives claims for additional costs or time extension that may subsequently become apparent.

D. Substitution Submittal Procedure:

1. Submit three copies of request for substitution for consideration. Limit each request to one proposed substitution.

2. Submit shop drawings, product data, and certified test results attesting to the proposed product equivalence. Burden of proof is on proposer.

3. The COR will notify in writing of decision to accept or reject request.

3.02 TRANSPORTATION AND HANDLING

A. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.

B. Transport and handle products in accordance with manufacturer's instructions.

C. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas.

D. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.

E. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage.

F. Contractor is responsible for disposal of packing materials, such as wood pallets, off of government property.

3.03 STORAGE AND PROTECTION

A. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication.

B. Store and protect products in accordance with manufacturers' instructions.

C. Store with seals and labels intact and legible.

D. For exterior storage of fabricated products, place on sloped supports above ground.

E. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.

F. Prevent contact with material that may cause corrosion, discoloration, or staining.

G. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.

H. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.

SECTION 01 7000

EXECUTION AND CLOSEOUT REQUIREMENTS

1.01 PROJECT CONDITIONS

A. Noise Control: Provide methods, means, and facilities to minimize noise produced by construction operations.

1. Outdoors: Limit conduct of especially noisy exterior work to the hours of 8 am to 5 pm.

PART 2 PRODUCTS – NOT USED

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work.

Start of work means acceptance of existing conditions.

B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.

C. Examine and verify specific conditions described in individual specification sections.

D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or misfabrication.

3.02 PREPARATION

A. Clean substrate surfaces prior to applying next material or substance.

B. Seal cracks or openings of substrate prior to applying next material or substance.

C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.

3.03 GENERAL INSTALLATION REQUIREMENTS

A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement.

1. Refer to Drawings for alternative installation methods when specified by the Forest Service. Refer to the COR for clarification of discrepancies.

B. Make vertical elements plumb and horizontal elements level, unless otherwise indicated.

C. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical and horizontal lines, unless otherwise indicated.

D. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated.

E. Make neat transitions between different surfaces, maintaining texture and appearance.

3.04 CUTTING AND PATCHING

A. Whenever possible, execute the work by methods that avoid cutting or patching.

B. Perform whatever cutting and patching is necessary to:

1. Complete the work.

2. Fit products together to integrate with other work.

3. Provide openings for penetration of mechanical, electrical, and other services.

4. Match work that has been cut to adjacent work.

5. Repair areas adjacent to cuts to required condition.

6. Repair new work damaged by subsequent work.

CIM-0803-07F / Rec_Mtce 01 7000 - 1 EXECUTION AND CLOSEOUT REQUIREMENTS

7. Remove samples of installed work for testing when requested.

8. Remove and replace defective and non-conforming work.

C. Execute work by methods that avoid damage to other work and that will provide appropriate surfaces to receive patching and finishing. In existing work, minimize damage and restore to original condition.

D. Employ original installer to perform cutting for weather exposed and moisture resistant elements, and sight exposed surfaces.

E. Cut rigid materials using masonry saw or core drill. Pneumatic tools not allowed without prior approval.

F. Restore work with new products in accordance with requirements of Contract Documents.

G. Fit work air tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.

H. At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal voids with fire rated material in accordance with Section 07 8400, to full thickness of the penetrated element.

I. Patching:

1. Finish patched surfaces to match finish that existed prior to patching. On continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit.

2. Match color, texture, and appearance.

3. Repair patched surfaces that are damaged, lifted, discolored, or showing other imperfections due to patching work. If defects are due to condition of substrate, repair substrate prior to repairing finish.

3.05 PROGRESS CLEANING

A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.

B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space.

C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.

D. Collect and remove waste materials, debris, and trash/rubbish from site periodically and dispose off-site; do not burn or bury.

3.06 PROTECTION OF INSTALLED WORK

A. Protect installed work from damage by construction operations.

B. Provide special protection where specified in individual specification sections.

C. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.

3.07 FINAL CLEANING

A. Use cleaning materials that are nonhazardous.

B. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the surface and material being cleaned.

C. Clean site; sweep paved areas, rake clean landscaped surfaces.

D. Remove waste, surplus materials, trash/rubbish, and construction facilities from the site; dispose of in legal manner; do not burn or bury.

CIM-0803-07F / Rec_Mtce 01 7000 - 2 EXECUTION AND CLOSEOUT REQUIREMENTS

CIM-0803-07F / Rec_Mtce 01 7000 - 3 EXECUTION AND CLOSEOUT REQUIREMENTS

3.08 CLOSEOUT PROCEDURES

A. Make submittals that are required by governing or other authorities.

1. Provide copies to the COR.

B. Notify the COR when work is considered ready for Substantial Completion.

SECTION 02 4100

DEMOLITION

PART 3 EXECUTION

1.01 SCOPE

A. Remove all items designated for removal or replacement off of Government property.

B. Remove other items indicated, for salvage, relocation, recycling,, and any other means in accordance to the Contract Documents.

C. Fill excavations, open pits, and holes in ground areas generated as result of removals, using specified fill; compact fill as required so that required rough grade elevations do not subside within one year after completion.

D. All items designated for removal, except if noted, shall become the property of the Contractor.

1.02 GENERAL PROCEDURES AND PROJECT CONDITIONS

A. Comply with applicable codes and regulations for demolition operations and safety of adjacent structures and the public.

1. Conduct operations to minimize effects on and interference with adjacent structures and occupants.

2. Conduct operations to minimize obstruction of public and private entrances and exits; do not obstruct required exits at any time; protect persons using entrances and exits from removal operations.

B. Protect existing structures and other elements that are not to be removed.

1. Stop work immediately if adjacent structures appear to be in danger.

1.03 EXISTING UTILITIES

A. There are no existing utilities which service the Boggs Creek Recreation Area.

1.04 SELECTIVE DEMOLITION FOR ALTERATIONS

A. Remove existing work as indicated and as required to accomplish new work.

1.05 DEBRIS AND WASTE REMOVAL

A. Remove debris, junk, and trash from site.

B. Leave site in clean condition, ready for subsequent work.

C. Clean up spillage and wind-blown debris from public and private lands.

CIM-0803-07F / Rec_Mtce 02 4100 - 1 DEMOLITION

SECTION 31 1000

SITE CLEARING

1.01 SECTION INCLUDES

A. Removal of Individual Marked Trees.

PART 2 PRODUCTS

2.01 MATERIALS

PART 3 EXECUTION

3.01 TREE REMOVAL & DISPOSAL REQUIREMENTS

A. Scope: Contractor to remove and dispose of individual trees, as marked by the Forest Service.

Individual trees shall be marked with pink flagging. All debris, marked trees, stumps, roots and other protruding vegetative material shall be cleared, grubbed, removed or disposed of in accordance to the specifications.

B. Vegetation Removed: Do not bury, landfill, or leave on site, except as indicated.

1. All trees over 6" in diameter must be limbed and bucked to a length no greater than 3 feet and stacked adjacent to campsites or roadways, in a location as approved by the COR.

2. Slash (tops, limbs and trees under 6" diameter) must be chipped by the Contractor to be used for mulching on site. Chips on Government property must be spread. The average depth of the chips cannot exceed 3 inches above ground surface.

3. Trees: Remove stumps and roots to depth of 18 inches (450 mm) for those trees within five feet of a use area (i.e. campsite, picnic site). Grubbed stumps shall be disposed of by the Contractor off site. Other stumps may remain.

a. Controlled felling shall be used to ensure the direction of fall so as to prevent damage to property, structures, other vegetation or traffic.

b. If branches of remaining trees or shrubs are damaged during construction, the

Contractor shall trim the damaged limb as near flush with the truck/stem as practicable.

3.03 DEBRIS

A. Remove debris, junk, and trash from site.

B. Leave site in clean condition, ready for subsequent work.

C. Clean up spillage and wind-blown debris from public and private lands.

CIM-0803-07F / Rec_Mtce 31 1000 - 1 SITE CLEARING

SECTION 32 3200

EXTERIOR IMPROVEMENTS

1.01 WORK

A. All items designated for installation or replacement must be furnished by the Contractor, including any materials, hardware and fasteners needed for installation and security. All items designated for removal, except those specified by the Government, shall become property of the contractor and shall be removed off government lands.

B. See part 2 for specific work requirements by item.

PART 2 PRODUCTS

1.01 Parking Barrier

Contractor to remove existing barriers and furnish and install new barriers in similar location per the Drawings. Existing barriers may include 4” x 4” in-ground posts or timber/post guardrail. Removal of existing barriers is subsidiary to the overall scope of work. Contractor shall provide all materials and hardware necessary to install barriers.

1. Total approximate length of all barriers equals 90 feet. Contractor to assume 10’ length per section.

1. WOOD MATERIALS

A. Wood fabricated from old growth timber is not permitted.

B. Lumber Grading Rules: RIS (GR).

C. Lumber: As specified in Drawings.

2. ACCESSORIES

A. Bolts, Nuts, Washers, Lags, and Screws, Untreated and Preservative-Treated Wood: Medium carbon steel; galvanized coating per ASTM A 153/A 153M; size and type to suit application.

3. FABRICATION

A. Fabricate components in accordance with AITC 108, with joints neatly fitted, welded, and ground smooth.

4. ERECTION

A. Set structural members level and plumb, in correct position.

B. Make provisions for erection loads, and for sufficient temporary bracing to maintain structure safe, plumb, and in true alignment until completion of erection and installation of permanent bracing.

1.02 Rock Boulder

Contractor to remove existing barriers and furnish and install 40 boulders of varying sizes in earthen ground for replacement. Boulders shall be no smaller than 3’ x 3’ x 3’ and

CIM-0803-07F / Rec_Mtce 32 3200 EXTERIOR IMPROVEMENTS

CIM-0803-07F / Rec_Mtce 32 3200 EXTERIOR IMPROVEMENTS tan/brown in color. All boulders must be embedded at least 1/3 of its depth upon placement. Contractor is responsible for filling excavations, open pits and holes in ground areas generated as a result of installation, using excavated dirt. Compact fill as required so that adjacent area does not subside within one year after completion.

1.03 Signs

Contractor to replace existing signs and furnish and install 40 signs, including mounts.

This item shall consist of installing signs, including posts and bases, complete according to the details indicated on the drawings. The exact locations of sign installations shall be as located as approximately SHOWN ON THE MAPS and as exactly staked by the Contracting Officer Representative in the field.

1. WOOD MATERIALS

(a) WOOD SIGN POSTS - 4" x 4" posts shall be Pressure Treated Southern Pine.

2. ACCESSORIES

(a) VANDAL-PROOF BOLTS AND HARDWARE - All bolts and hardware shall be galvanized or cadmium plated steel. Bolts shall be 5/16" carriage bolts. Nuts installed with wood posts shall be NTPAFN fluted nuts. Nuts installed with tubular steel posts shall be vandal proof tufnuts. An installation tool for installing special nuts shall be provided to the Government. Vandal-proof hardware shall be as supplied by Walker Safety and Sign Co., Idaho Falls, Idaho, phone (208) 529-2733, or an approved equal.

3. ERECTION

(a) POST SETTING - Post holes not larger than 18-inch diameter shall be excavated to a depth as shown on the drawings. Backfill shall be hand tamped around the wood posts so as to make the post solid and plumb. Any loose posts shall be removed and re-installed.

(b) SIGN MOUNTING - Signs shall be mounted as shown on the drawings. Bolt holes shall be neatly drilled in the signs so as to prevent splintering and drilling through letters or delaminate sheathing. Sign face sheathing or coverings shall not be broken.

SECTION 34 3400

TRANSPORTATION

1.02 PAYMENT

A. Reconditioning the roadbed measurement and roadside mowing/brushing shall be made to the nearest tenth (0.1) of a mile using an odometer calibrated over a measured mile. A mile, or portion thereof, is measured as the linear distance of the work item, regardless of the number of passes required to complete the task.

B. For ditches, measurement shall be made for each side of the road. Lead-off ditches shall be measured from the road ditch line to the end of the ditch and converted into miles. The total length of lead-off ditches cleaned and reshaped shall be measured prior to conversion and rounding off to the nearest tenth of a mile.

1.03 Public Safety and Traffic Control

A. The Contractor shall exercise caution and care while pursuing the work to prevent unnecessary conflict with, or potential hazards to road users.

B. The Contractor shall post warning signs with flags on each end of the section of road being worked. Signs shall be of the size, quantity, and colors as required in the current edition of the "Manual on Uniform Traffic Control Devices". These signs shall be moved as needed to properly delineate and identify the section of road being maintained. At no time shall these signs be more than one mile from operating equipment and shall be in place only when road equipment or men are actually performing operations. All slow moving equipment shall have a reflectorized "slow moving" vehicle emblem properly attached.

C. All work shall be so scheduled so that at the end of a working period, the road is passable for the type of traffic normally using the road. If, for any reason traffic hazards are left in or adjacent to the road after normal work periods, they shall be properly signed as hazards and visibly illuminated at night.

PART 2 EXECUTION

2.01 PREPARATION

A. Reconditioning the roadbed –

Blading and shaping operations shall scarify the roadbed as required to remove, ruts, potholes, corrugations, and berms. The roadbed shall be scarified no more than 6 inches. All suitable dislodged aggregate shall be smoothly redistributed over the entire traveled way to produce proper cross slope or crown (l/4" to l/2" per foot) as shown in the Drawings.

All suitable aggregate which has been worked onto road shoulder by traffic or maintenance activities shall be reclaimed onto the traveled way. Grass or leaf litter disturbed within the traveled way shall be smoothly spread within the traveled way or along the shoulder after

CIM-0803-07F/Rec_Mtce 34 3400 - 1 TRANSPORTATION movement sufficient to sift out surface aggregate.

Assure proper surface drainage following this operation. No undercutting of road surface at shoulder line nor material berms will be allowed unless designated by the COR.

Loose rocks protruding three (3) inches or more above graded surface shall be removed from the traveled way. It is permissible to waste these rocks over the road shoulder edge away from drainage ditches.

All traveled way widths (aggregate surface) shall be perpetuated as existing. Dips and swales within the traveled way designed to control surface drainage shall be maintained.

Compact using the following method:

(a) Compaction A. Operate equipment over the full width.

B. Clean and reshape ditches –

All ditches shall be maintained in their original location to the shape and grade required to insure drainage of the roadway. Drainage structures and road appurtenances shall not be damaged during this operation. Handwork required to properly connect ditch flow lines to drainage structure inlets is considered a part of this activity.

Road Ditches. All suitable material (having the same character as the road surface) excavated through this activity shall be reclaimed and used within the traveled way. Unsuitable material shall be spread along road shoulders or fill slopes to assure road surface drainage and preventing unsuitable material being pulled onto aggregate surfaces.

Tail and Lead-Off Ditches. Ditches shall be opened to provide drainage away from the roadway. No material excavated from these structures shall be reclaimed onto the roadbed.

C. Gravel –

1) Roads- Tailgate spread #4 gravel on roads where indicated by the COR, including Forest Service Road 443, 443A and 443B. Exact locations will be marked by flagging and constitute approximately 2.5 miles in length. Stone must come from GA DOT certified quarry. The gravel will be evenly dispersed along the designated areas in the amounts or depths as required.

2) Campsite Spurs/Parking Areas- Combination tailgate spread and manual spread #4 gravel and GAB on campsite spurs and day use parking areas along Forest Service Road 443, 443A and 443B. Exact locations will be marked by flagging and constitute approximately 1,400 sq ft of area. Stone must come from GA DOT certified quarry.

The gravel will be evenly dispersed along the designated areas in the amounts or depths as required. Compact gravel with a vibratory plate compactor or vibratory roller capable of a minimum of 4,500 pounds of compaction force, until there is no visible displacement.

CIM-0803-07F/Rec_Mtce 34 3400 - 2 TRANSPORTATION

3) Tent Pads/Living Spaces- Manual spread pea gravel on tent pads/living spaces. Exact locations are defined by timber borders and constitute approximately 900 sq ft of area.

Stone must come from GA DOT certified quarry. The gravel will be evenly dispersed along the designated areas in the amounts or depths as required. Compact gravel in the living spaces, only, with a vibratory plate compactor or vibratory roller capable of a minimum of 4,500 pounds of compaction force, until there is no visible displacement.

D. Roadside Mowing and Brushing –

Growth shall be cut as close to the ground surface as practical, normally not to exceed 6 inches high. Mow roadbed, cut-banks and fill-slopes to the full reach of the boom including the overhanging canopies. Mowing will include clearing around signs and appurtenances without damaging them.

All equipment proposed to be used for performance of the work shall be of the size, type, and in such condition to properly pursue the requirements of this contract.

Mower shall be either flat head or rotary cutter capable of cutting trees up to 4 inches diameter.

Rotary cutter shall be 5 feet diameter with two sets of blades (minimum).

Mower boom shall have a reach of 17 feet and be able to mow at any angle within the 270 degree rotation of the cutting head. Boom swing and articulation shall be hydraulically operated.

The Contractor’s proposed equipment shall be made available to the Contracting Officer for inspection prior to award of the contract. If at any time during the course of this contract any equipment is deemed unsatisfactory, the Contracting Officer may order removal and may require a satisfactory replacement at Contractor’s expense.

Any movement or transportation of equipment to or from the work areas required to pursue the work, repair or replace, or for the Contractor’s convenience shall be at the Contractor’s expense.

CIM-0803-07F / Rec_Mtce 09 9000 - 3 PAINTING AND COATING akoopman Rectangle akoopman Typewritten Text

34 3400 - 2 TRANSPORTATION

Location of work (Refer to Map)

Work items by location

Campsite #1

1. Replace site unit marker (missing)

2. Gravel spur/tent pad

3. Replace fire ring (option)

4. Remove 3 hazard trees

5. Install picnic table

Campsite #2

1. Remove 1 lantern post (located at back of tent pad)

2. Gravel spur/tent pad

3. Replace fire ring (option)

4. Install picnic table

Campsite #3

1. Gravel spur/tent pad

2. Install missing fire ring (base)

3. Remove 3 hazard trees

4. Install picnic table

Campsite #4

1. Remove 1 hazard tree

2. Replace fire ring (option)

3. Gravel spur/tent pad

4. Install picnic table

Campsite #5

1. Install 2 sections of parking barrier

2. Gravel spur/tent pad

3. Remove 1 lantern post (2 total) on right side of pad

4. Remove 3 hazard trees

5. Replace fire ring (base)

6. Replace unit marker

7. Install picnic table

Campsite #6

1. Gravel spur/tent pad

2. Replace fire ring (base)

3. Remove 4 hazard trees

4. Install picnic table

Campsite #7- Walk-In

1. Install site unit marker (missing)

2. Place boulders, 5

3. Replace fire ring (base)

4. Install picnic table

Campsite #8

1. Gravel tent pad/spur

2. Replace fire ring (option)

3. Remove 2 hazard trees

4. Install picnic table

Campsite #9

1. Remove 1 hazard tree

2. Replace fire ring (option)

3. Gravel spur/tent pad

4. Install picnic table

Campsite #10

1. Gravel tent pad & spur

2. Replace fire ring (option)

3. Remove 1 hazard tree

4. Replace site unit marker (broken/out of ground

5. Install picnic table

PART 1 GENERAL

1.01 WORK ITEMS BY LOCATION

SECTION 40 4000

WORKLOG

CIM-0803-07F / Rec_Mtce 40 4000 WORKLOG

Work items by location

Campsite #11

1. Gravel pull-through spur/tent pad

2. Replace fire ring (option)

3. Remove 1 hazard tree

4. Install picnic table

Campsite #12

1. Gravel tent pad/spur

2. Replace fire ring (option)

3. Install picnic table

Campsite #13

1. Gravel tent pad/spur

2. Replace fire ring (option)

3. Replace site unit marker

4. Install picnic table

Campsite #14

1. Gravel tent pad/spur

2. Replace fire ring (option)

3. Install picnic table

Campsite #15

1. Gravel tent pad/spur

2. Replace fire ring (option)

3. Install picnic table

Campsite #16

1. Gravel tent pad/spur

2. Replace fire ring (option)

3. Install picnic table

Campsite #17

1. Gravel tent pad/spur

2. Replace fire ring (option)

3. Remove 2 hazard trees

4. Install picnic table

Campsite #18 (Campground Host Site)

1. Remove 6 hazard trees

2. Replace storage building

3. Install food locker

4. Replace fire ring (base)

5. Gravel tent pad & spur

6. Install picnic table

Campsite #19

1. Gravel tent pad/spur

2. Replace fire ring (option)

3. Remove 1 hazard tree

4. Install picnic table

Campsite #20

1. Gravel tent pad/spur

2.