Specifications - Ocmulgee/Oconee

View the file

Other files

File Type Posted
Award Notice.pdf PDF
SF-1449 form.pdf PDF
Boggs_Drawing_3.pdf PDF
Site showing attendee list.pdf PDF
combined revised Price Schedules.doc DOC document
spec_31_1000_revised.pdf PDF
sf_30_amendment_1.doc DOC document
Oconee_dwgs.pdf PDF
Oconee_Price Schedule.doc DOC document
Boggs_Specs.pdf PDF
Boggs_Drawings.pdf PDF
SOW and clauses.pdf PDF
SCA Wage Determination - North GA.doc DOC document
IDIQ_Map.pdf PDF
SCA Wage Determination - Central GA.doc DOC document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 00 0101

PROJECT TITLE PAGE

SPECIFICATION MANUAL

FOR

OCMULGEE BLUFF TRALHEAD &

OCONEE RIVER RECREATION AREA REHABILITATION

PREPARED BY:

U.S. FOREST SERVICE

SOUTHERN REGION

CHATTAHOOCHEE-OCONEE NATIONAL FOREST

CIM-0803-07F / Rec_Mtce 00 0101 - 1 PROJECT TITLE PAGE

SECTION 00 0110

TABLE OF CONTENTS

SPECIFICATIONS

2.01 Division 01 -- General Requirements

A. 01 1000 - Summary

B. 01 4000 - Quality Requirements

C. 01 4216 - Definitions

D. 01 5000 - Temporary Facilities and Controls

E. 01 5500 - Vehicular Access and Parking

F. 01 5713 - Temporary Erosion and Sediment Control

G. 01 6000 - Product Requirements

H. 01 7000 - Execution and Closeout Requirements

2.02 Division 02 -- Existing Conditions

A. 02 4100 – Demolition

2.03 Division 07 – Thermal and Moisture Protection

A. 07 3113 – Asphalt Shingles

2.04 Division 12 -- Furnishings

A. 12 9300 - Site Furnishings

2.05 Division 34 -- Transportation

A. 34 3400 – Transportation

CIM-0803-07F / Rec_Mtce 00 0110 - 1 TABLE OF CONTENTS

SECTION 01 1000

SUMMARY

PART 1 GENERAL

1.01 PROJECT

A. Project Name: Ocmulgee Bluff Trailhead & Oconee River Recreation Area Rehabilitation.

B. Property Owner: U.S. Forest Service, Chattahoochee-Oconee National Forest.

C. Local Administrative Offices:

-- Oconee Ranger District, 1199 Madison Road, Eatonton, GA 31024, 706-485-3180

D. Project Location:

Ocmulgee Bluff Trailhead, Jasper County, GA

The Ocmulgee Bluff Trailhead serves the Ocmulgee Bluff Equestrian Riding Trails. It is located along Forest Service Road 1064, approximately 3 miles northwest of Gladesville, GA or 12 miles southwest of Monticello, GA. From Monticello, take State Route 83 south for approximately 10 miles. Turn right onto County Road 441, also known as Smith Mill Road.

After approximately 2 ½ miles, turn left onto Forest Service Road 1064. The Ocmulgee Bluff Trailhead is located near the termini of the Forest Service Road.

Oconee River Recreation Area, Greene County, GA

The Oconee River Recreation Area lies along the Oconee River and offers camping, picnicking and boat launching opportunities. It is located on Forest Service Road 1251. From Athens, take U.S. Highway 129 south to State Highway 15 south. After entering Greene County, continue for approximately 1 mile. Turn left onto Forest Service Road 1251. Follow signs to the recreation area.

E. The Project consists of rehabilitation and maintenance of recreation site amenities and facilities at the Ocmulgee Bluff Trailhead & Oconee River Recreation Area on the Chattahoochee- Oconee National Forest. Work includes the following items:

Ocmulgee Bluff, BASE WORK

1. Replace 1 Fee Tube, including removal of the existing, fabrication of the new fee tube according to Forest Service specifications and installation.

2. Replace the roof of an information board, including removal of the existing roof shingles and installation of a new asphalt composite shingle roof.

3. Furnish & install 1 trash bin (Double-Unit).

4. Construct a concrete trash bin pad.

5. Replace 1 picnic table, including removal & disposal of existing, furnishing of the new table and installation of the new table.

6. Furnish & Install 3 gate signs.

7. Replace 1 recreation site sign, to be made of recycled plastic and mount to existing base.

OPTION WORK

There are NO option bid items.

CIM-0803-07F / Rec_Mtce 01 1000 - 1 SUMMARY

Oconee River, BASE WORK

1. Replace 1 Fee Tube, including removal of the existing, fabrication of the new fee tube according to Forest Service specifications and installation.

2. Replace 5 Fire Rings, including removal of the existing, purchase of the new fire rings and installation.

3. Replace 9 Pedestal Grills, including removal of the existing, purchase of the new grills and installation.

4. Decommission 2 Picnic Sites, including discarding of the existing picnic tables and grills, removal of gravel at picnic sites and along connecting walkways, restoring the area to natural grade and seeding.

5. Replace 5 Lantern Posts, including removal & disposal of the existing, furnishing of the new lantern posts and installation.

6. Replace 5 Picnic Tables, including removal & disposal of the existing, furnishing of the new table and installation of the new table.

7. Replace tent pad borders at 5 campsites, including removal of the existing concrete tent pad borders and any work required for installation of timber tent pad borders.

8. Place 1.8 tons of GAB on the campsite spurs. Compact with a roller compactor.

9. Place 10.8 tons of pea gravel within the camping areas and tent pads. Compact with a vibratory plate compactor.

10. Furnish and place 40 tons of shot rock along the west bank of the Oconee River Boat Launch.

Will require hand placement.

OPTION WORK

There are NO option bid items.

1.02 WORK BY OWNER

A. The U.S. Forest Service or others will perform the following work:

1. Clearly communicate the location of site furnishings and amenities to the Contractor for installation when not outlined in the Drawings or Specifications. Contractor is responsible for confirming locations with the COR prior to installation.

1.03 OWNER OCCUPANCY

A. Cooperate with the U.S. Forest Service to minimize any potential conflict with local recreation area managers/contractors and the visiting public. Coordinate directly with the U.S. Forest Service in the execution of operations.

B. Schedule the Work to accommodate public occupancy of the recreation areas. If necessary, portions of the areas can be closed to the public to expedite progress or ensure a safe working environment. Any and all closures must be pre-approved by the U.S. Forest Service before implementation.

1.04 CONTRACTOR USE OF SITE

A. Construction Operations: Limited to areas noted on Drawings and Maps.

B. Arrange use of site to allow:

1. U.S. Forest Service occupancy.

2. Work by Others (Volunteers Hosts, Maintenance Contractors).

CIM-0803-07F / Rec_Mtce 01 1000 - 2 SUMMARY

CIM-0803-07F / Rec_Mtce 01 1000 - 3 SUMMARY

3. Work by U.S. Forest Service.

4. Use of site by the public.

C. Provide access to and from site as required by law.

1. Do not obstruct roadways without prior permission from the Forest Service.

D. Time Restrictions:

1. Limit conduct of especially noisy exterior/interior work to the hours of 0800-1800.

1.05 WORK SEQUENCE

A. Construct Work in stages during the construction period so as to meet the following requirements:

1. Priority 1: Limit the length of time in which ground disturbing activities occur so as to minimize unprotected surfaces and minimize potential for erosion.

2. Priority 2: Limit public inconvenience, as much as possible, while performing contract requirements. Should work begin during the peak summer season (Memorial Day through Labor Day) or during the peak fall season (October 1 - October 31), the Contractor may be required to coordinate construction schedule and operations with the Forest Service prior to commencement of work. Construction activities, unless with prior approval by the COR, will be prohibited to occur on weekends and holidays.

SECTION 01 4000

QUALITY CONTROL & QUANTITY MEASUREMENT

1.01 WORK

A. The contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.

1.02 MEASUREMENT

A. There will be no separate measurement for this section.

1.03 PAYMENT

A. Quality control and quantity measurement shall be incidental to other specified work.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 OVERVIEW

A. QUALITY CONTROL

1. The contractor shall provide and maintain a quality control system that will ensure that all services, supplies, and construction required under this contract conform to the contract requirements.

3.02 CONTROL OF INSTALLATION

A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.

B. Comply with manufacturers' instructions, including each step in sequence, unless otherwise specified in the Contract Documents.

C. Should manufacturers' instructions conflict with Contract Documents, request clarification from the COR before proceeding.

D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

E. Have Work performed by persons qualified to produce required and specified quality.

F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.

G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.

CIM-0803-07F / Rec_Mtce 01 4000 - 1 QUALITY CONTROL & QUANTITY MEASUREMENT

SECTION 01 4216

DEFINITIONS

1.01 SUMMARY

A. Other definitions are included in individual specification sections.

1.02 DEFINITIONS

A. Furnish: To supply, deliver, unload, and inspect for damage.

B. Install: To unpack, assemble, erect, apply, place, finish, cure, protect, clean, start up, and make ready for use.

C. Remove: To take away and dispose from government property.

D. Replace: To remove an existing item and substitute a like item in its approximate location.

E. Product: Material, machinery, components, equipment, fixtures, and systems forming the work result. Not materials or equipment used for preparation, fabrication, conveying, or erection and not incorporated into the work result. Products may be new, never before used, or re-used materials or equipment.

F. Provide: To furnish and install.

G. Supply: Same as Furnish.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

END OF SECTION

CIM-0803-07F / Rec_Mtce 01 4216 - 1 DEFINITIONS

SECTION 01 5000

TEMPORARY FACILITIES AND CONTROLS

1.01 TEMPORARY SANITARY FACILITIES

A. Provide and maintain required facilities and enclosures. Provide at time of project mobilization.

B. Use of existing facilities within the recreation areas is permitted.

1. Availability may be affected by winter shut down of the recreation areas.

C. Maintain daily in clean and sanitary condition.

D. At end of construction, return facilities to same or better condition as originally found.

1.02 TEMPORARY OVERNIGHT DWELLING

A. The Contractor, at no charge, may use designated campsites within certain campgrounds during the Contract period for workers to remain overnight on the job site. Sites shall be kept neat, clean and trash shall be picked up during use.

1.03 BARRIERS

A. Provide barriers to prevent unauthorized entry to construction areas, to prevent access to areas that could be hazardous to workers or the public, to allow for owner's use of site and to protect existing facilities and adjacent properties from damage from construction operations and demolition.

B. Provide barricades and covered walkways required by governing authorities for public rights-of-way and for public access to existing building.

C. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

END OF SECTION

CIM-0803-07F / Rec_Mtce 01 5000 - 1 TEMPORARY FACILITIES AND CONTROLS

SECTION 01 5500

VEHICULAR ACCESS AND PARKING

PART 3 EXECUTION

1.01 ACCESS ROADS

A. Use of existing established roads for construction traffic is permitted.

1.02 PARKING

A. Use of designated areas of existing parking facilities by construction personnel is permitted.

1. COR will designate areas which can be utilized for stockpiling and storage.

1.03 CONSTRUCTION PARKING CONTROL

A. Control vehicular parking to prevent interference with public traffic and parking, access by emergency vehicles, and Owner's operations.

B. Prevent parking on non-designated areas.

CIM-0803-07F / Rec_Mtce 01 5500 - 1 VEHICULAR ACCESS AND PARKING

SECTION 01 5713

TEMPORARY EROSION AND SEDIMENT CONTROL

1.01 SECTION INCLUDES

A. Prevention of erosion due to construction activities.

B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.

C. Restoration of areas eroded due to insufficient preventive measures.

1.02 PERFORMANCE REQUIREMENTS

Contractor shall control soil erosion and water pollution though the use of silt fences, hay bales or other approved erosion control methods, as directed by the COR and in accordance with the Georgia Erosion and Sedimentation Act, when one of the following occurs:

C. Storm Water Runoff: Control increased storm water runoff when construction activities have disturbed the vegetative surface cover of an area and, thereby, increased water runoff volume and velocity.

1. Typical Remediation = Seed and mulch area; Install silt fencing.

D. Erosion On Site: Minimize wind, water, and vehicular erosion of soil on project site due to construction activities for this project.

1. Typical Remediation = Seed and mulch; Install silt fencing (See below)

2. Control movement of sediment and soil from temporary stockpiles of soil.

3. Prevent development of ruts due to equipment and vehicular traffic.

4. If erosion occurs due to non-compliance with these requirements, restore eroded areas at no cost to U.S. Forest Service.

E. Erosion Off Site: Prevent erosion of soil and deposition of sediment on other properties caused by water leaving the project site due to construction activities for this project.

1. Typical Remediation = Install silt fencing (See below)

2. Prevent windblown soil from leaving the project site.

3. Prevent tracking of mud onto public roads outside site.

4. Prevent mud and sediment from flowing onto sidewalks and pavements.

5. If erosion occurs due to non-compliance with these requirements, restore eroded areas at no cost to U.S. Forest Service.

F. Sedimentation of Waterways On Site: Prevent sedimentation of waterways on the project site, including rivers, streams, lakes, ponds, open drainage ways, storm sewers, and sanitary sewers.

1. Typical Remediation = Install silt fencing (See below)

2. If sedimentation occurs, install or correct preventive measures immediately at no cost to

U.S. Forest Service; remove deposited sediments; comply with requirements of authorities having jurisdiction.

CIM-0803-07F / Rec_Mtce 01 5713 - 1 TEMPORARY EROSION AND SEDIMENT CONTROL

CIM-0803-07F / Rec_Mtce 01 5713 - 2 TEMPORARY EROSION AND SEDIMENT CONTROL

3. If sediment basins are used as temporary preventive measures, pump dry and remove deposited sediment after each storm.

G. Sedimentation of Waterways Off Site: Prevent sedimentation of waterways off the project site, including rivers, streams, lakes, ponds, open drainage ways, storm sewers, and sanitary sewers.

1. Typical Remediation = Install silt fencing (See below)

2. If sedimentation occurs, install or correct preventive measures immediately at no cost to

U.S. Forest Service; remove deposited sediments; comply with requirements of authorities having jurisdiction.

PART 2 PRODUCTS

2.01 MATERIALS

A. Mulch: Use one of the following:

1. Straw or hay.

2. Wood waste, chips, or bark.

B. Bales: Air dry, rectangular straw bales.

1. Cross Section: 14 by 18 inches (350 by 450 mm), minimum.

2. Bindings: Wire or string, around long dimension.

C. Bale Stakes: Minimum 3 feet (1 m) long:

1. Wood, 2 by 2 inches (50 by 50 mm) in cross section.

D. Silt Fence Fabric & Posts: Approved silt fence fabrics are listed in the Georgia Department of Transportation Qualified Products List #36 (QPL-36).

PART 3 EXECUTION

1.03 PREPARATION

A. Schedule work so that soil surfaces are left exposed for the minimum amount of time.

B. Timing: Put preventive measures in place as soon as possible after disturbance of surface cover and before precipitation occurs.

SECTION 01 6000

PRODUCT REQUIREMENTS

1.01 SUBMITTALS

A. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.

PART 2 PRODUCTS

2.01 EXISTING PRODUCTS

A. Do not use materials and equipment removed from existing premises unless specifically required or permitted by the Contract Documents.

B. Unforeseen historic items encountered remain the property of the U.S. Forest Service; notify U.S. Forest Service promptly upon discovery; protect, remove, handle, and store as directed by U.S. Forest Service.

C. Existing materials and equipment indicated to be removed, but not to be re-used, relocated, reinstalled, delivered to the U.S. Forest Service, or otherwise indicated as to remain the property of the U.S. Forest Service, become the property of the; remove from site.

D. Reused Products: Reused products include materials and equipment previously used in this or other construction, salvaged and refurbished as specified.

2.02 NEW PRODUCTS

A. Provide new products unless specifically required or permitted by the Contract Documents.

2.03 PRODUCT OPTIONS

A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description.

B. Products Specified by Naming One or More Manufacturers: Use a product of one of the manufacturers named and meeting specifications, no options or substitutions allowed.

C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions:

Submit a request for substitution for any manufacturer not named.

PART 3 EXECUTION

3.01 SUBSTITUTION PROCEDURES

A. Instructions to Bidders specify time restrictions for submitting requests for substitutions during the bidding period. Comply with requirements specified in this section.

B. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents.

C. A request for substitution constitutes a representation that the submitter:

1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product.

2. Will provide the same warranty for the substitution as for the specified product.

3. Will coordinate installation and make changes to other Work that may be required for the

Work to be complete with no additional cost to U.S. Forest Service.

4. Waives claims for additional costs or time extension that may subsequently become apparent.

D. Substitution Submittal Procedure:

CIM-0803-07F / Rec_Mtce 01 6000 - 1 PRODUCT REQUIREMENTS

CIM-0803-07F / Rec_Mtce 01 6000 - 2 PRODUCT REQUIREMENTS

1. Submit three copies of request for substitution for consideration. Limit each request to one proposed substitution.

2. Submit shop drawings, product data, and certified test results attesting to the proposed product equivalence. Burden of proof is on proposer.

3. The COR will notify in writing of decision to accept or reject request.

3.02 TRANSPORTATION AND HANDLING

A. Coordinate schedule of product delivery to designated prepared areas in order to minimize site storage time and potential damage to stored materials.

B. Transport and handle products in accordance with manufacturer's instructions.

C. Transport materials in covered trucks to prevent contamination of product and littering of surrounding areas.

D. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.

E. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage.

F. Contractor is responsible for disposal of packing materials, such as wood pallets, off of government property.

3.03 STORAGE AND PROTECTION

A. Designate receiving/storage areas for incoming products so that they are delivered according to installation schedule and placed convenient to work area in order to minimize waste due to excessive materials handling and misapplication.

B. Store and protect products in accordance with manufacturers' instructions.

C. Store with seals and labels intact and legible.

D. For exterior storage of fabricated products, place on sloped supports above ground.

E. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.

F. Prevent contact with material that may cause corrosion, discoloration, or staining.

G. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.

H. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.

SECTION 01 7000

EXECUTION AND CLOSEOUT REQUIREMENTS

1.01 PROJECT CONDITIONS

A. Noise Control: Provide methods, means, and facilities to minimize noise produced by construction operations.

1. Outdoors: Limit conduct of especially noisy exterior work to the hours of 8 am to 5 pm.

PART 2 PRODUCTS – NOT USED

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work.

Start of work means acceptance of existing conditions.

B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.

C. Examine and verify specific conditions described in individual specification sections.

D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or misfabrication.

3.02 PREPARATION

A. Clean substrate surfaces prior to applying next material or substance.

B. Seal cracks or openings of substrate prior to applying next material or substance.

C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.

3.03 GENERAL INSTALLATION REQUIREMENTS

A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement.

1. Refer to Drawings for alternative installation methods when specified by the Forest Service. Refer to the COR for clarification of discrepancies.

B. Make vertical elements plumb and horizontal elements level, unless otherwise indicated.

C. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical and horizontal lines, unless otherwise indicated.

D. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated.

E. Make neat transitions between different surfaces, maintaining texture and appearance.

3.04 CUTTING AND PATCHING

A. Whenever possible, execute the work by methods that avoid cutting or patching.

B. Perform whatever cutting and patching is necessary to:

1. Complete the work.

2. Fit products together to integrate with other work.

3. Provide openings for penetration of mechanical, electrical, and other services.

4. Match work that has been cut to adjacent work.

5. Repair areas adjacent to cuts to required condition.

6. Repair new work damaged by subsequent work.

CIM-0803-07F / Rec_Mtce 01 7000 - 1 EXECUTION AND CLOSEOUT REQUIREMENTS

CIM-0803-07F / Rec_Mtce 01 7000 - 2 EXECUTION AND CLOSEOUT REQUIREMENTS

7. Remove samples of installed work for testing when requested.

8. Remove and replace defective and non-conforming work.

C. Execute work by methods that avoid damage to other work and that will provide appropriate surfaces to receive patching and finishing. In existing work, minimize damage and restore to original condition.

D. Employ original installer to perform cutting for weather exposed and moisture resistant elements, and sight exposed surfaces.

E. Cut rigid materials using masonry saw or core drill. Pneumatic tools not allowed without prior approval.

F. Restore work with new products in accordance with requirements of Contract Documents.

G. Fit work air tight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.

H. At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal voids with fire rated material in accordance with Section 07 8400, to full thickness of the penetrated element.

I. Patching:

1. Finish patched surfaces to match finish that existed prior to patching. On continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit.

2. Match color, texture, and appearance.

3. Repair patched surfaces that are damaged, lifted, discolored, or showing other imperfections due to patching work. If defects are due to condition of substrate, repair substrate prior to repairing finish.

3.05 PROGRESS CLEANING

A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.

B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space.

C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.

D. Collect and remove waste materials, debris, and trash/rubbish from site periodically and dispose off-site; do not burn or bury.

3.06 PROTECTION OF INSTALLED WORK

A. Protect installed work from damage by construction operations.

B. Provide special protection where specified in individual specification sections.

C. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.

3.07 FINAL CLEANING

A. Use cleaning materials that are nonhazardous.

B. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the surface and material being cleaned.

C. Clean site; sweep paved areas, rake clean landscaped surfaces.

D. Remove waste, surplus materials, trash/rubbish, and construction facilities from the site; dispose of in legal manner; do not burn or bury.

SECTION 02 4100

DEMOLITION

PART 3 EXECUTION

1.01 SCOPE

A. Remove all items designated for removal or replacement off of Government property.

B. Remove other items indicated, for salvage, relocation, recycling, and any other means in accordance to the Contract Documents.

C. Fill excavations, open pits, and holes in ground areas generated as result of removals, using specified fill; compact fill as required so that required rough grade elevations do not subside within one year after completion.

D. All items designated for removal, except if noted, shall become the property of the Contractor.

1.02 GENERAL PROCEDURES AND PROJECT CONDITIONS

A. Comply with applicable codes and regulations for demolition operations and safety of adjacent structures and the public.

1. Conduct operations to minimize effects on and interference with adjacent structures and occupants.

2. Conduct operations to minimize obstruction of public and private entrances and exits; do not obstruct required exits at any time; protect persons using entrances and exits from removal operations.

B. Protect existing structures and other elements that are not to be removed.

1. Stop work immediately if adjacent structures appear to be in danger.

1.03 EXISTING UTILITIES

A. There are no existing utilities which service the Ocmulgee Bluff Trailhead.

1.04 SELECTIVE DEMOLITION FOR ALTERATIONS

A. Remove existing work as indicated and as required to accomplish new work.

1.05 DEBRIS AND WASTE REMOVAL

A. Remove debris, junk, and trash from site.

B. Leave site in clean condition, ready for subsequent work.

C. Clean up spillage and wind-blown debris from public and private lands.

CIM-0803-07F / Rec_Mtce 02 4100 - 1 DEMOLITION

SECTION 07 3113

ASPHALT SHINGLES

1.01 SECTION INCLUDES

A. Asphalt shingle roofing.

PART 2 PRODUCTS

2.01 SHINGLES

A. Asphalt Shingles: Asphalt-coated glass felt, mineral granule surfaced, complying with ASTM D 3462; Class A fire resistance.

1. Make: Timberline “Natural Shadow”

2. Style: Square.

3. Color: Shakewood.

2.02 ACCESSORIES

A. Nails: Standard round wire shingle type, of galvanized steel, 12 gage, 0.105 inch (2.67 mm) shank diameter, 3/8 inch (9.5 mm) head diameter, of sufficient length to penetrate through roof sheathing or 3/4 inch (19 mm) into roof sheathing or decking.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify existing conditions prior to beginning work.

B. Verify that deck is of sufficient thickness to accept fasteners.

C. Verify that roof penetrations and plumbing stacks are in place and flashed to deck surface.

D. Verify roof openings are correctly framed.

E. Verify deck surfaces are dry, free of ridges, warps, or voids.

3.02 PREPARATION

A. Seal roof deck joints wider than 1/16 inch (1.5 mm) with deck tape.

3.03 INSTALLATION - SHINGLES

A. Install shingles in accordance with manufacturer's instructions.

1. Fasten individual shingles using 4 nails per shingle, or as required by code, whichever is greater.

B. Place shingles in random coursing pattern.

C. Project first course of shingles ¼ inch – ½ inch beyond fascia boards.

D. Extend shingles ½ inch beyond face of gable edge fascia boards.

E. Complete installation to provide weather tight service.

CIM-0803-07F / Rec_Mtce 07 3113 - 1 ASPHALT SHINGLES

SECTION 12 9300

SITE FURNISHINGS

1.01 WORK

A. All items designated for installation or replacement must be furnished by the Contractor, including any materials, hardware and fasteners needed for installation and security. All items designated for removal, except those specified by the Government, shall become property of the contractor and shall be removed off government lands.

B. See part 2 for specific work requirements by product.

PART 2 PRODUCTS

a. Fee Tube

Contractor to remove existing fee tube and furnish and install (1) fee tube, constructed according to the specifications and drawings provided by the Forest Service. Contractor is responsible for the construction of the fee tube, as well as, its installation. Contractor shall provide all materials and hardware necessary to construct and install the fee tube and secure it on site, including a minimum 18” x 18” concrete footer. Location shall be equal to the existing fee tube or as specified by the COR. The fee tube shall meet all criteria as outlined in the Drawings and Specifications. Local manufacturers include:

A) Provider: Quality Maintenance & Fabrication, Inc.

202 South 2nd Avenue Chatsworth, GA 307058

706-422-9987 Product: Forest Service Fee Collection Tube

Description: See drawings

b. Picnic Table

Contractor to remove existing concrete picnic table and furnish and install a new picnic table in similar location per manufacturer’s instructions. Contractor shall provide all materials and hardware necessary to install tables per manufacturers’ instructions and as additionally required by the government to provide added security (i.e. concrete/rebar anchoring). Picnic tables shall be:

A) Manufacturer: Ultra Play 618-282-8200 www.ulraplay.com

Product: 6’ Rectangular Pedestal Picnic Table Product #: 337S-PT6

Description: 6’ Length, Pressure Treated Planks, In-Ground Mount

c. Trash Bin

Contractor to furnish and install 2 double-unit garbage bins side-by-side in a location as specified by the COR. Contractor shall provide all materials and hardware necessary to

CIM-0803-07F / Rec_Mtce 12 9300 SITE FURNISHINGS install bins per manufacturers’ instructions and as additionally required by the government to provide added security (i.e. concrete pad). Garbage bins shall be:

A) Provider: Bearsaver, Inc.

www.bearsaver.com

800-851-3887 Product: Hid-A-Bag Double

Product #: HB2-P Description: Hid-A-Bag Double Unit, 140 gall

d. Fire Rings

Contractor to remove existing fire rings and furnish and install new fire rings in similar location per manufacturer’s instructions and in accordance with Forest Service accessibility guidelines.

Contractor to remove existing fire rings from government property. Fasteners, accessories, hardware and mounts (i.e. concrete footers, anchors, spades) must be removed, as well. Note that existing fire rings vary in style, size and installation method.

Contractor shall provide all materials and hardware necessary to install fire rings.

Contractor to fill each fire ring with aggregate measuring 9” deep. This will provide an elevated fire surface to meet accessibility requirements. At final attachment, fire rings shall be level and secure. Fire rings shall be as follows:

A) Manufacturer: Pilot Rock P.O. Box 946 Cherokee, Iowa 51012 712-225-5115 www.pilotrock.com Product: Single Level Cooking Grate Product #: FS-30/18/PA

Description: Single Level Cooking Grate, Accessible, 30” Dia., 17 3/8” Height

e. Lantern Posts

Contractor to remove existing lantern posts and install new lantern posts in similar location per manufacturer’s instructions. Contractor shall provide all materials and hardware necessary to install lanterns. At final attachment, post shall be rigid and secure. Lanterns shall be as follows, or an equivalent:

1675 Locust Street Red Bud, IL 62278 618-282-8200 www.ultraplay.com

Product: Lantern Hanger, ADA Product #: 670H Description: Lantern Hanger, Powder Coated (Black), ADA

Equivalent lanterns must meet the following requirements:

1. Lantern must meet accessibility requirements as outlined in the Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG). The FSORAG is available at www.fs.fed.us/recreation/programs/accessibility.

2. Lantern must be constructed of at least 2” O.D. pipe.

3. Lantern must have a powder coat finish.

f. Pedestal Grills

Contractor to remove existing pedestal grills and install new pedestal grills in similar location per manufacturer’s instructions and in accordance with Forest Service accessibility guidelines (refer to Drawings). Contractor shall provide all materials and hardware necessary to install grills. Contractor shall install attachments, if specified. At final attachment, grills shall be rigid and secure. Pedestal grills shall be as follows:

1675 Locust Street Red Bud, IL 62278 618-282-8200 www.ultraplay.com Product: Rotating Grill Product #: 620H-3 Description: 280 sq inch w/ 3 1/2” Post, ADA Accessible

Equivalent grills must meet the following requirements:

1. Grills must meet accessibility requirements as outlined in the Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG). The FSORAG is available at www.fs.fed.us/recreation/programs/accessibility.

2. Grills must be at least 14” x 20”, with at least 280 sq in of cooking space.

3. Grill must be mounted on a 3 ½” O.D. pipe or greater.

4. Grill must be constructed of 3/16” steel or greater.

http://www.fs.fed.us/recreation/programs/accessibility http://www.fs.fed.us/recreation/programs/accessibility

SECTION 34 3400

TRANSPORTATION - Gravel

PART 2 EXECUTION

C. Gravel –

1) Campsite Spurs - Combination tailgate spread and manual spread GAB on campsite spurs. Exact locations will be marked by flagging and constitute approximately 380 sq ft of area. Stone must come from GA DOT certified quarry. The gravel will be evenly dispersed along the designated areas in the amounts or depths as required. Compact gravel with a vibratory roller capable of a minimum of 4,500 pounds of compaction force, until there is no visible displacement.

2) Tent Pads/Living Spaces- Manual spread pea gravel on tent pads/living spaces. Exact locations are defined by timber borders and constitute approximately 795 sq ft of area.

Stone must come from GA DOT certified quarry. The gravel will be evenly dispersed along the designated areas in the amounts or depths as required. Compact gravel in the living spaces, only, with a vibratory plate compactor or vibratory roller capable of a minimum of 4,500 pounds of compaction force, until there is no visible displacement.

3) Boat Launch Bank Stabilization – Place 40 tons of shot rock on and adjacent to eroded bank on the west side of the Oconee River Boat launch, as directed by the COR. Form a well-graded mass with a firm foundation. Place rock as to avoid displacing the underlying soil material. Do not place stone by methods that cause segregation or damage to the prepared surface. Place or rearrange individual rocks by mechanical or hand methods to obtain a dense uniform blanket with a reasonable smooth surface.

Hand methods are likely to be required for placement.

CIM-0803-07F / Rec_Mtce 34 3400-1 TRANSPORTATION

B_000101_BSD_OB.pdf
B_000110_BSD
B_011000_BSD_OB
B_0129300_Site_Furnishings_OB
B_014000_BSD_OB
B_014216_BSD_OB
B_015000_BSD
B_015500_BSD_OB
B_015713_BSD
01575_temp_erosion_control
SECTION 01575
B_016000_BSD_OB
B_017000_BSD_OB
B_024100_BSD_OB
073113_BSD
B_343400_BSD_OB