004-MarionForksTrailSpecs.pdf
PDF 509 KB Posted
- Attached to
- Marion Forks Day Use Improvements Federal contract opportunity
- Solicitation number
- AG-04R4-S-14-0004
About this file
FPO3 Trail Specs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment1.pdf | ||
| AG04R4S140004-CompleteSolicitation.pdf | ||
| 003-MarionForksCSI.pdf | ||
| 001-MarionForksFP03SpecList.pdf | ||
| 007-FireProtection-All3.pdf | ||
| 006-WageDetermination-OR1.pdf | ||
| AG04R4S140004-ReturnPackage.pdf | ||
| 005-MarionForksProjectDrawings.pdf | ||
| 002-MarionForksFP03Supp.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRAIL SPECIFICATIONS
FOR
MARION FORKS ENHANCEMENTS
Applicable Sections of Standard Specifications for Construction and Maintenance of Trails (July, 2005) apply to this project with special project specifications as noted
901 Abbreviations, Acronyms, and Terms 902 Definitions 903 Intent of Contract 904 Maintenance for Traffic 905 Control of Material 906 Measurement and Payment 907 Quality Assurance and Quality Measurements 908 Staking, Flagging, and Cleanup 911 Clearing and Grubbing 912 Excavation and Embankment 941 Aggregate Surfacing and Base Course 942 Hot Bituminous Plant Mix Trail Surfacing
Trail Special Project Specifications
911 Clearing and Grubbing 942 Hot Bituminous Plant Mix Trail Surfacing
Marion Forks Day use Area Willamette National Forest Detroit Ranger District Request for Proposals
AG-04R4-S-14-0004
Section 911 – Clearing and Grubbing
Section 911 – Clearing and Grubbing
Construction
911.03 Material to be Cleared.
Delete this section and add the following;
Remove and dispose of all trees, logs, limbs, branches, brush, herbaceous plants, and other vegetation within the clearing limits.
Cut all limbs and branches that extend in the clearing limits. Cut limbs flush with the tree trunks or stems or cut at the ground surface as SHOWN ON THE DRAWINGS.
Fall and limb designated trees.
911.04 Damaged Trees.
Delete the following from the second sentence;
“as SHOWN ON THE DRAWINGS.”
And substitute with the following;
“as directed by the Contracting Officer”
911.05 Removal of Stumps.
Add the following;
Fill and compact all stump holes. Use embankment material to fill stump holes from the project site or imported from a commercial source as needed.
911.05 Removal of Stumps.
Add the following;
Fill and compact all stump holes. Use embankment material to fill stump holes from the project site or imported from a commercial source as needed.
911.06 Disposal of Clearing slash, Logs, Stumps, Brush, and Roots.
Delete this section and add the following;
Limb all felled trees to 4” diameter top, including designated trees outside the clearing limits.
Haul all trees, logs, limbs, stumps, brush, clearing slash, and roots to Minto pit and place as directed by Contracting Offer.
Willamette National Forest
Section 942 – Hot Bituminous Plant Mix Trail Surfacing
Payment
942.10 Basis.
Add the following pay item;
Make payment under:
PAY ITEM PAY UNIT
942(06) Hot asphalt concrete dike………………………………………………. L.F.
Willamette National Forest
| Applicable Sections of Standard Specifications for Construction and Maintenance of Trails (July, 2005) apply to this project with special project specifications as noted |
| Trail Special Project Specifications |
| Section 911 – Clearing and Grubbing |
| Section 911 – Clearing and Grubbing |
| 911.04 Damaged Trees. |
| 911.05 Removal of Stumps. |
| 911.05 Removal of Stumps. |
| 911.06 Disposal of Clearing slash, Logs, Stumps, Brush, and Roots. |
| Section 942 – Hot Bituminous Plant Mix Trail Surfacing |
| Payment |
| PAY ITEM PAY UNIT |
File details come from the government source that posted it. Updated .