004-MarionForksTrailSpecs.pdf

PDF 509 KB Posted

Attached to
Marion Forks Day Use Improvements Federal contract opportunity
Solicitation number
AG-04R4-S-14-0004
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

FPO3 Trail Specs

View the file

Other files for this federal contract opportunity

Other files attached to Marion Forks Day Use Improvements, newest first.
File Type Posted
Amendment1.pdf PDF
AG04R4S140004-CompleteSolicitation.pdf PDF
003-MarionForksCSI.pdf PDF
001-MarionForksFP03SpecList.pdf PDF
007-FireProtection-All3.pdf PDF
006-WageDetermination-OR1.pdf PDF
AG04R4S140004-ReturnPackage.pdf PDF
005-MarionForksProjectDrawings.pdf PDF
002-MarionForksFP03Supp.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRAIL SPECIFICATIONS

FOR

MARION FORKS ENHANCEMENTS

Applicable Sections of Standard Specifications for Construction and Maintenance of Trails (July, 2005) apply to this project with special project specifications as noted

901 Abbreviations, Acronyms, and Terms 902 Definitions 903 Intent of Contract 904 Maintenance for Traffic 905 Control of Material 906 Measurement and Payment 907 Quality Assurance and Quality Measurements 908 Staking, Flagging, and Cleanup 911 Clearing and Grubbing 912 Excavation and Embankment 941 Aggregate Surfacing and Base Course 942 Hot Bituminous Plant Mix Trail Surfacing

Trail Special Project Specifications

911 Clearing and Grubbing 942 Hot Bituminous Plant Mix Trail Surfacing

Marion Forks Day use Area Willamette National Forest Detroit Ranger District Request for Proposals

AG-04R4-S-14-0004

Section 911 – Clearing and Grubbing

Section 911 – Clearing and Grubbing

Construction

911.03 Material to be Cleared.

Delete this section and add the following;

Remove and dispose of all trees, logs, limbs, branches, brush, herbaceous plants, and other vegetation within the clearing limits.

Cut all limbs and branches that extend in the clearing limits. Cut limbs flush with the tree trunks or stems or cut at the ground surface as SHOWN ON THE DRAWINGS.

Fall and limb designated trees.

911.04 Damaged Trees.

Delete the following from the second sentence;

“as SHOWN ON THE DRAWINGS.”

And substitute with the following;

“as directed by the Contracting Officer”

911.05 Removal of Stumps.

Add the following;

Fill and compact all stump holes. Use embankment material to fill stump holes from the project site or imported from a commercial source as needed.

911.05 Removal of Stumps.

Add the following;

Fill and compact all stump holes. Use embankment material to fill stump holes from the project site or imported from a commercial source as needed.

911.06 Disposal of Clearing slash, Logs, Stumps, Brush, and Roots.

Delete this section and add the following;

Limb all felled trees to 4” diameter top, including designated trees outside the clearing limits.

Haul all trees, logs, limbs, stumps, brush, clearing slash, and roots to Minto pit and place as directed by Contracting Offer.

Willamette National Forest

Section 942 – Hot Bituminous Plant Mix Trail Surfacing

Payment

942.10 Basis.

Add the following pay item;

Make payment under:

PAY ITEM PAY UNIT

942(06) Hot asphalt concrete dike………………………………………………. L.F.

Willamette National Forest

Applicable Sections of Standard Specifications for Construction and Maintenance of Trails (July, 2005) apply to this project with special project specifications as noted
Trail Special Project Specifications
Section 911 – Clearing and Grubbing
Section 911 – Clearing and Grubbing
911.04 Damaged Trees.
911.05 Removal of Stumps.
911.05 Removal of Stumps.
911.06 Disposal of Clearing slash, Logs, Stumps, Brush, and Roots.
Section 942 – Hot Bituminous Plant Mix Trail Surfacing
Payment
PAY ITEM PAY UNIT