Amend_002_-_AG-0261-S-13-0012.pdf

PDF 148 KB Posted

Attached to
Mahogany Grove Group Campground Reconstruction Project Federal contract opportunity
Solicitation number
AG-0261-S-13-0012
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO. /3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0002 04/12/2013

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

SW IDAHO-NEVADA ACQUISTION CENTER

1249 S VINNELL WAY STE 200

BOISE, ID 83709-1663

CONTRACTING OFFICER - USDA ,USFS, SWINAC

c/o SPRING MTNS. NATIONAL REC. AREA

4701 N. TORREY PINES DRIVE

LAS VEGAS, NV 89130

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-0261-S-13-0016

9B. DATED (SEE ITEM 11)

03/18/2013

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Project Title: Mahogany Grove Group Campground Reconstruction Project

Purpose of Amendment: To answer final questions posed by vendors, and make corrections to the specifications.

Receipt of Offers: The date, time, and receipt of proposals remains unchanged. The place for receipt of offers remains the same.

Acknowledgment: See Block 11 above regarding how to acknowledge this amendment. The acknowledgement must be received at the place designated for receipt of offers (see Block 19 of the Solicitation, Offer, and Award, Standard Form 1442).

cept as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Margaret S. Schafer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

04/05/2013

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0002 AG-0261-S-13-0012 – Mahogany Grove Group Campground Reconstruction Project Page 2 of 3.

1. Replace Section C in its entirety. Replacement pages are attached (Attachment 1 – 2 pages).

2. The following list of specification changes are herein provided:

Replacement pages are attached (Attachment 2 – 26 Pages).

PAGE NUMBER SECTION CHANGES

000001‐1 1.1 Delete seeding from scope of contract 000001‐2 1.3(A)(8) Add provision for migratory birds

000001‐3

1.7 1.8 1.10

Add Section 1.7 Government Furnished Property Change start date Add Section 09114 – Exterior Powder Coatings

013300‐4 1.10 Delete Section 329206 – Seeding 013300‐5 Table 013300‐1 Add submittals for Exterior Powder Coatings 013300‐6 Table 013300‐1 Delete submittal for seeding 024102‐1 1.1(B) Delete seeding reference 024102‐2 3.4 Delete seeding reference 099114‐1 to 099114‐4 All Add Specifications for Exterior Powder Coatings

129410‐1 1.3 Change 20 PAOT Group Site requirement to include only

133460‐1 to 133460‐4 All Remove excavation and backfill for CXT toilet 323116‐1 to 323116‐2 All Change gate finish from paint to powder coating

329206‐1 to 329206‐5 All Delete Seeding Specification 312000‐11 3.13(H)(1) Remove seeding reference

3. Question and Answers:

1. Question: On plan sheet D17, is the Crushed Bedding Material, in the Tent

Pads, 4" thick as indicated in the "Aluminum Edging Details" (left side of sheet) or 6" thick as indicated in the "Tent Pad Installation" (top, right portion of sheet)?

Answer: The crushed bedding material is 4” compacted.

2. Question: Will the project drawing CAD files be made available (free of charge) to the winning offeror to generate construction staking data, etc?

Answer: Yes. We will make the AutoCAD files available to the successful offeror. We will also provide survey control sheets to the successful offeror, as noted in Specification 010250.

3. Question: We contacted Ameristar Fence and they stated that they do not make the fence that is shown on the plans and specifications?

Answer: The Ameristar Montage II fence is called for in the specifications and is acceptable. The drawing shown on Sheet D14 differs slightly from the Montage II standard drawing. We will accept the Montage II as equal.

4. Question: In regards to RFP AG-0261-S-13-0012 Mahogany Grove Group Campground Reconstruction Project, will the Forest Service accept past experience projects from a HUBzone Contractors teaming partner in order to meet the requirements?

Answer: Providing this information may help your proposal. However, please also provide recent contracts performed by the primary contractor.

5. Question: Per Specification Section 129410 paragraph 1.3.A.1, 20 PAOT Group Site requires two pedestal grills; however, according to the site plan on Drawing D1 only one pedestal grill is represented at 20 PAOT Group Site. Can you please confirm the total number of pedestal grills required for the 20 PAOT Group Site?

Answer: The specifications will be corrected to require only one pedestal grill for the 20 PAOT Group Site.

6. Question: July 21st is the soonest we can run equipment and Dec. 31st is the projects last day. November has 25 days with the temperature below 32 degrees and an average 5" of snow which would affect the concrete and AC placement. I think this means without weather delays; we must have the project completed within 3.5 months or add to our bid a significant amount until it is warm enough to place concrete and AC paving which are some of the last items of work. I am concerned about the timeframe.

Answer: The USFS realizes that it is asking for an accelerated schedule. We have made provisions in our NEPA documents to allow construction during extended hours of operation (work on weekends, evenings, and holidays, etc.). We feel that the additional costs of a compressed work schedule are outweighed by the potential savings in remobilization costs and the benefit of having the campground open a season earlier.

7. Question: In the solicitation documents it states that the contractor is to submit:

(a) Furnish financial statements for the last two years, including an interim statement for the current year, unless previously provided to the office issuing the RFP, in which case a statement as to when and where this information was provided may be furnished instead.

Is the evidence of a bid bond and then when awarded, a performance and payment bond, sufficient evidence that firms have the financial stability to perform the contract?

Answer: No. Providing financial statements is still required.