This is an Allowance Use Authorization Request (AUA) form issued by the State of Arizona General Services Division for use in state and local construction contracts. The form is designed to document and authorize the use of allowances as defined in Section 11.4 of the Uniform Terms and Conditions. The AUA process requires the contractor to provide adequate notice and comprehensive supporting documentation for each authorization request, including detailed breakdowns of labor, materials, equipment, subcontract proposals, and reimbursable expenses. The form includes fields for project identification, contractor information, design professional and state project manager signatures, and itemized cost categories organized by labor, materials, equipment, and subcontract expenses with subtotal columns for each category.
The AUA must be executed by all authorized parties—including the State Procurement Officer, State Project Manager, Design Professional, State Lead Building Inspector, and Contractor—before becoming effective. Upon execution, the contractor is authorized to proceed immediately with the approved items. The form structure accommodates multiple allowance line items with corresponding quantities and units, allowing for organized tracking of costs across various construction phases or work elements. No specific pricing, funding amounts, or contract duration are prescribed in this exhibit; rather, it serves as the administrative mechanism for managing allowances throughout the contract performance period in accordance with the terms and conditions referenced in the primary contract agreement.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions:
1. Adequate notice by Contractor shall be provided to request authorization to use allowances. Contractor shall provide all supporting documentation for each AUA including, but not limited to, detailed breakout(s) of labor, Materials, equipment, subcontract proposals and reimbursable expenses.
2. Allowances shall be in accordance with Section 11.4 of the Uniform Terms and Conditions and, if applicable, modifications to Allowance(s) in the Special Terms and Conditions.
Quantity: Unit: Labor: Material: Equipment: Subcontract: SUBTOTAL
ALL OTHER REQUIREMENTS, SPECIFICATIONS, TERMS AND CONDITIONS REMAIN UNCHANGED
TOTALS
State Lead Building Inspector Name:
Authorized Signature and Date:Authorized Signature and Date:Authorized Signature and Date:
Address: Address: Agency and Address:
Contractor (Company Name):State Procurement Officer Name:
Design Professional: Contractor: State Project Manager:
Allowance Description:
Description: (attach proposal if needed)
Project Name and Description: Agency Project No.: Statutory Review No.:
State of Arizona General Services Division
1110 W Washington Street, Suite 155
Phoenix, AZ 85007
EXHIBIT S
ALLOWANCE USE AUTHORIZATION REQUEST (AUA)
CONTRACT/APP NO.:
DATE: AUA ORDER No.:
When signed by all parties, this AUA becomes effective immediately and the Contractor shall proceed with the above item(s) identified and approved.