This is a Contractor Project Closeout form issued by the State of Arizona General Services Division for use in finalizing construction contracts and projects. The document serves as a standardized checklist for contractors, architects/engineers, and construction program specialists to ensure all required deliverables and documentation are submitted upon project completion.

Contractors are required to submit two binders with hard copies and two electronic copies on USB thumb drives containing comprehensive project documentation. Required contractor deliverables include Certificates of Substantial and Final Completion, final pay request documentation with unconditional lien releases from all subcontractors and material suppliers, surety consent forms, and evidence of project completion per specifications. Additional requirements encompass record construction documentation such as addenda, RFI logs, approved submittals, change orders, executed contracts, red line drawings in both full-size print and electronic format, and certificates of inspection from relevant authorities. Contractors must also provide maintenance and operations manuals, manufacturer's safety data sheets, a notarized letter certifying use of asbestos-free materials, and warranty documentation. Architects and engineers are responsible for incorporating contractor red line drawings into one hundred percent as-constructed record drawings and specifications, submitting these documents in CAD and PDF formats on flash drives and hard copy prints. All closeout binders and documents remain in General Services Division filing for the duration of the two-year warranty period, after which they are transferred to the State Archivist for storage according to retention procedures.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit M – Contractor Project Closeout State of Arizona

General Services Division

100 N 15th Avenue, Suite 103

Phoenix, AZ 85007 Contract/APP No.

Project Name: State Project No: Statutory Review No:

Design Professional: Contractor: State Project Manager:

Submit the items required for your contract and project specifications as well as special items called for in the specifications not covered by this list.

Two (2) binders with hard copies and two (2) electronic copies on USB thumb drive.

Contractor Responsibility *X if included or N/A in each box*

A. General Requirements:

1. Certificates of Substantial Completion – Exhibit K

2. Documents to accompany Final Pay Request:

a. Pay application - Exhibit H

b. Unconditional lien releases from:

- All Subcontractors and Material Suppliers (see list submitted with bid and all approved substitutions).

- All Vendors with Preliminary Notices Filed

c. Release of Lien from the Construction Contractor

d. Consent of Surety - Form from bonding company (if bonded)

e. Copy of Prime Consultant Letter certifying that project is completed according to Plans & Specifications

f. Certificate of Final Completion - Exhibit L

B. Guarantees/Warranties:

Minimum of 2 year warranty is required for labor and material unless greater is part of contract requirements.

1. Copies of Warranties/Guarantees from Contractor, Subcontractors and Manufacturers Product Warranties

C. Record Construction Documentation:

1. Addenda

2. RFI logs and all RFI’s (approved and withdrawn)

3. Approved (stamped) Submittals and a Submittal log

4. Approved Change Orders

5. Purchase Order

6. Executed contract or JOC job order with price proposal detail and supplementals

7. AUA’s - Authorized Use of Allowance

8. Governing Authority Certificates of Inspection/Special Inspections (i.e. Fire, Elevator, Boiler, Municipal, etc.)

9. Red line drawings / 1 full size print and electronic format on the flash drives

164272 Text Box Included

164272 Text Box N/A

D. Maintenance & Operations Manuals:

1. Subcontractors, major supplier list with company’s names, addresses and telephone numbers.

2. Notarized letter from general and subcontractors on use of asbestos free materials.

3. Maintenance/operation instructions and parts list.

4. List of extra materials supplied to owner (keys, video, training tapes, etc.)

5. Manufacturer’s Safety Data Sheets

6. Contractors warranty Notification Form

Architect / Engineer Responsibility

A. Complete Set of Construction Documents:

1. AE will take contractor "Red Line" drawings and incorporate into 100% as constructed record drawings and specifications:

a. Submit to Owner an E-copy CAD Backgrounds and PDF on 2-Flash Drives and 2 hard copy, full size constructed Record Drawings

2. Prime Consultant Letter certifying that project is completed according to Plans & Specifications (sign and seal)

INTERNAL PROCESS

Construction Program Specialist Responsibility

A. Executed design contract with terms and conditions _____ B. Purchase Order _____ C. Approved design change notice _____ D. Enter into Warranty Calendar in Google _____ E. Update Procore: Warranty Status/Dates _____

By signing this document the Contractor is agreeing that all the required documents have been provided and are enclosed in the Project Closeout binder and are saved on the required USB.

Contractor Sign Print Date

Revised 8/15/2019

Close out binders/documents will remain in GSD filing until after the warranty period of 2 years at which time it will be given to Archivist for movement to storage according to Retention Procedures.

Contract Amendment No:
Project Name:
State Project No:
Statutory Review No:
Design Professional:
Contractor:
Project Manager:
Text3:
Text4:
Check Box1: Off
Check Box6: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box7: Off
Check Box8: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box18: Off
Check Box19: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box37: Off
Check Box38: Off
Check Box39: Off
Check Box40: Off
Check Box41: Off
Check Box42: Off
Check Box43: Off
Check Box44: Off
Check Box45: Off
Check Box46: Off
Check Box47: Off
Check Box48: Off
Check Box49: Off
Check Box50: Off
Check Box51: Off
Check Box17: Off
Check Box20: Off

File details come from the government source that posted it. Updated .